1 1.Motivations 2.Parameters, Architecture, Schedule, Organisation 3.Requirements for the ion source.
Linac4 Status
Beam loss and its mitigation in the J-PARC RCS Space charge 2013 April 16-19, 2013 @ CERN
Linac4 Status 1 M. Vretenar sLHC public event 23.06.2010.
Status of Linac4 Ion Source Review , 14 November 2013
Linac4 Summary (including schedule and performance)
Linac4 Construction Status and Plans
Linac4