The ALPHA-X Project Mark Wiggins Technical Manager The Cockcroft Institute.
CERN-CARE Workshop HHH2004, 8 November 2004 Technological Challenges for the LHC Upgrade W. Scandale CERN Accelerator Technology Department Thanks to the.
L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities P. Forck et al.,
Introductory comments on: “ How will the low level rf systems required for bunch compression, cavity tuning, machine protection, etc. be designed so as.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC 07.08.2012,
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
9/22/04J. Welch, LCLS Commissioning Worskhop, SLAC LCLS Commissioning Schedule and Startup Plan LCLS Commissioning Schedule and Startup Plan.
Presented by Bruno Spataro on behalf of the SALAF team. US High Gradient Research Collaboration Workshop 2011, February 9-10, 2011 SLAC National Accelerator.
GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS
ML / RTML WG Summary N.Solyak, K.Kubo, A.Latina AWLC 2014 – Fermilab – May 16, 2014.