Lab #6 Report due TODAY Individual Data Processing and Individual Write Up Lab #6 Report is due TODAY by midnight Answer Multiple Choice Questions ONLINE.
Experience with RCS Injection and Extraction Systems Pranab SAHA for the RCS of J-PARC August 27, 2008 42nd ICFA Advanced Beam Dynamics Workshop on High-Intensity,
1 BROOKHAVEN SCIENCE ASSOCIATES Considerations for Nonlinear Beam Dynamics in NSLS-II lattice design Weiming Guo 05/26/08 Acknowledgement: J. Bengtsson.
The EURISOL Multi-MW Target Unit: Radiological protection and radiation safety issues
Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences and Education
Y. Romanets 1, R. Luis 1,J. Bermudez 3, J.C. David 5, D. Ene 5, I. F. Goncalves 1, Y. Kadi 2, C. Kharoua 2, F. Negoita 4, R. Rocca 2, L. Tecchio 3, P.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
Space Charge Electric-Field Calculations for Coherent Tune Shift Estimations using the Electron-cloud Modelling Algorithm ECLOUD Jim Crittenden Cornell.
Shear and Development Length