T Bradshaw On behalf of the SCU group 1 Status of the Superconducting Undulator Development in the UK Superconducting Undulator Workshop, Rutherford Appleton.
LINAC 4 Emittance Meter. Linac 4 Emittance Meter 1er design for commissioning of the source Slit Sem-grid Measurement plate (F.C.) Emittance meter Upgrade.
Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
March 22, 2011Mike Hildreth – ALCPG 2011, Beam Instrumentation Energy Spectrometer R&D; Plans for End Station A Test Beams Mike Hildreth University of.
BPS Monitors Inductive Pick-Up: experience on CTF3 BPS Monitors Inductive Pick-Up: experience on CTF3 J.J. García Garrigós IFIC, GAP (Group of Accelerator.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
1 Multi-Optical Transition Radiation System for ATF2 A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White,
Jim Stewart Tagger Magnet Design Review July 2009.
CLIC-PACMAN: BPM-to-Quadrupole Alignment based on EM Field Measurements Manfred Wendt CERN BE-BI-QP.
1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June 2009 8 th TB/SGC Meeting.