Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 final focus prototype ( emphasizing French involvement )
LHC Status and Start-Up
Julie Coupard, LHC Performance Workshop, 25 th September 2014
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron
Latest results from the upgraded PITZ facility
ACS at ANKA – Status 2007 Igor Kriznar, Klemen Zagar ACS Workshop 2007.
Scenario for commissioning of the powering system
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK 28-29 May, 2007.
ATF2 Commissioning Strategy & CERN participation in ATF2 Ralph Assmann, Hans Braun, Helmut Burkhardt, Angeles Faus-Golfe, Maxim Korostelev, Andrea Latina,
LHC Machine Protection