Page 1 J-M Lagniel & L Roupsard HIAT 09 Venezia, Italy 8-12 June 2009 Building design for high beam-power facilities The example of SPIRAL 2 Jean-Michel.
LEAD ION TESTS IN LEAR PPC - 19 Septembre 1997 M. CHANEL.
Beam Profile Monitor Instrumentation in the Fermilab M-Test Beam Gianni Tassotto, Wanda Newby, Rick Pierce, Linda Purcell-Taylor, Daniel Schoo, Greg Selberg,
Rol - April 5, 2012 GWU Colloquium 1 The long-range goal of this project is to sell intrinsically safe and versatile nuclear reactors to address world.
Beam Delivery Simulation Development & BDS / MDI Applications L. Nevay, S. Boogert, H. Garcia-Morales, S. Gibson, J. Snuverink, L. Deacon Royal Holloway,
MA CS workshop 3-2-06Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.