WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Status Report, ENTM 02/11/2010 BEAM INTERCEPTING DEVICES FOR LINAC 4.
Possible irradiation needs from CERN and requirements (a partial and selected view) M. Calviani (EN/STI)
Engineering Department ENEN Screwed solutions for the new tertiary collimator jaw assembly Federico Carra (CERN EN/MME) Geneva, 4 th September 2014 4th.
PS/SPS Days O. Aberle/ R. Losito for the ATB Group 18 th January 2006
PS Booster Energy Upgrade K. Hanke for the PSB Upgrade WG CERN MAC 26-28 April 2010
beam intercepting devices for LINAC 4
HI gh RAD iation to MAT erials Facility as Test Bed for Phase-II Collimators