2011-10-05 LHC 8:30 meetingEBH 11 Wednesday 4 October 2011.
LINAC 4 Emittance Meter. Linac 4 Emittance Meter 1er design for commissioning of the source Slit Sem-grid Measurement plate (F.C.) Emittance meter Upgrade.
LHC: Status und Ausblick Rüdiger Schmidt - CERN KET November 2003 Bad Honnef On behalf of the CERN staff and the outside collaborators Aussergewöhnliche.
Design and Test of a Prototype Cavity for a Stern-Gerlach Polarimeter Peter Cameron - BNL.
March 22, 2011Mike Hildreth – ALCPG 2011, Beam Instrumentation Energy Spectrometer R&D; Plans for End Station A Test Beams Mike Hildreth University of.
. FUTURE of MICROELECTRONIC TECHNOLOGIES FROM SINGLE TRANSISTORS to INTEGRATED IMAGERS NEWS from INTERNATIONAL ELECTRON DEVICES MEETING Washington, 2-5.
ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD.
, a rad-tol FPGA-based WorldFIP agent E. Gousiou, P.Alvarez, E.van der Bij, G.Penacoba, J. Serrano | CERN TWEPP 2011 nan FIP.
Beam Instrumentation for HPM -with a strong focus on ESS Andreas Jansson Paris, France, 2011-07-01.
Welcome! Mauro Pivi SLAC, ESTB Workshop March 2011, SLAC.
ISS-detectors BENE06 Frascati Alain Blondel ISS-detectors “Evaluate the options for the neutrino detection systems with a view to defining a baseline set.
President Hbar Technologies, LLC [email protected] Bob as a Mentor at Cornell (and later at Fermilab) Gerald P. Jackson 7/7/20091Symposium in Memory.