1 PIP – Linac Modulator Specification Data Trevor Butler, F.G. Garcia, H. Pfeffer, D. Wolff December 13, 2011 Introduction This document is not written to be a complete…

PIP PIP FY14 PMG W. Pellico 7/8/14 7/8/2014 PIP PMG 1 PIP Activities RIL & Linac 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement Accelerator Physics…

PowerPoint Presentation LE Linac Modulator Update Trevor Butler April 3rd, 2013 Data from: Dan Wolff, Howie Pfeffer, & Jim Biggs (EE Support) Mark Kemp & Tony Beukers…

1 The Linac Modulator 1 Introduction 2 Block Diagram 3 Charging PFN Capacitors 4 Dumping the PFN 5 Monitoring PFN Voltage 6 The Summing Box 7 Pulsing 8 Forming the Pulse…

Microsoft PowerPoint - 130425 - Modulator HVPS Upgrade_Progress.pptxScope of modulator 24-8 upgrade • Installs a low power, high voltage inverter power supply (HVPS)

PIP Linac Laser Notcher Overview & Plans PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser…

PIP Linac Laser Notcher Overview & Plans PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser…

Slide 1 Linac 6575 Modulator PFN Charging Power Supply Upgrade Minh Nguyen December 5, 2012 Present L1S (21-1) modulator Several modifications have been made since May 2011…

Linac PIP Utilities jobs for 2014 shutdown PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14 PIP Linac Utilities Power Distribution L1 substation LCW…

Slide 1 Linac Marx Modulator Update Trevor Butler 7/22/2015 Slide 2 Linac Marx Modulator Update Present Status 28 Cell Assembled (100%) – Problem w/ clamp ckt 28 Cell Testing–…

Linac Marx Modulator Update Linac Marx Modulator Update Trevor Butler 5/20/2015 Overall Status Update Ordered parts for both 28 & 54 cell system Waiting on capacitors…

Linac PIP Modulator Update Linac Marx Modulator Update Trevor Butler 10/29/2014 Overall Status 25 Cell Modulator Many parts to make 25 cell modulator have arrived except;…

Slide 1PIP Status Report Linac Startup plans 12/05/2012 Slide 2 Linac Shutdown Activities 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans2 Slide 3 Linac Tunnel Activities…

PIP Linac Laser Notcher Overview & Plans PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser…

Slide 1 Linac Marx Modulator Update Trevor Butler & Howie Pfeffer 2/25/2015 Slide 2 Overall Status Update Finished up Marx 9 Cell Design Started to build 25 cell Marx…

Linac Laser Notcher Projectin the Proton Improvement Plan (PIP) David Johnson, Todd Johnson, John Sobolewski, Fred Mach, Kevin Duel, Andrea Saewert February 11, 2014 Accelerator…

Linac Laser Notcher Projectin the Proton Improvement Plan (PIP) David Johnson, Todd Johnson, John Sobolewski, Fred Mach, Kevin Duel, Andrea Saewert February 11, 2013 Accelerator…

Linac Laser Notcher Projectin the Proton Improvement Plan (PIP) David Johnson, Todd Johnson, John Sobolewski, Fred Mach, Kevin Duel, Andrea Saewert February 11, 2014 Accelerator…

Status of Linac Lattice Study Overview Motivation On-line application Measurement H J Kim Fermi National Accelerator Laboratory January 11 2012 H J Kim Fermilab Linac Lattice…

Slide 1PIP FY15 PMG W. Pellico PIP PMG March 5 th 2015 Slide 2 PIP FY15 Year to Date Outline –FY15 activities PIP quarterly milestones Linac Booster Project Controls –FY15…