Lina4 Source commissioning: Vacuum Aspects Linac4 Ion Source commissioning: Vacuum Aspects C.Pasquino, N.Thaus, J.Hansen, P.Chiggiato Linac4 Ion Source Review - 14th November…

Linac4 H‐ Ion Sources • Linac4  ion source front‐end • H‐ sources: Simulation, Test, Operation • Cesiated 2MHz RF‐driven plasma H‐ source test stand results…

Lina4 Source commissioning: Vacuum Aspects Linac4 Ion Source commissioning: Vacuum Aspects C.Pasquino, N.Thaus, J.Hansen, P.Chiggiato Linac4 Ion Source Review - 14th November…

7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber New LINAC4…

PRELIMINARY PROPOSALS FOR LINAC’14 Status of Linac4 Ion Source Review, 14 November 2013 M. Vretenar, CERN A cheering crowd celebrating the first beam accelerated by the…

PowerPoint Presentation Linac4 ion source review Beam optics simulations and measurements Øystein Midttun European Organization for Nuclear Research University of Oslo 14.11.2013…

Overview of linacs 1 Linac4 Ion Source – Safety Aspects HT, Gas, Cs, Electrical, Fire 1 A. Funken – J. Lettry On behalf of the Ion Source team L4 Ion Source Review 14.11.2013…

CERN’s Linac4 ion sources Status RFQchopper lineDTLCCDTLPIMS 160 MeV 104 MeV 50 MeV 3 MeV 86 m H- source 2016 2015 2014 2013 M. Vretenar et.al., Progress in the Construction…

Slide 1 RF fields simulations Alexej Grudiev, BE-RF 14/11/2013 Linac4 Ion Source Review, CERN Slide 2 Outline RF field simulations setup Plasma model as a conductor Surface…

Linac4 Status M. Vretenar, 30.10.2008 AB 22.11.07 PS2 - SPS PS PSB Future SPL Transfer line to Linac2 Linac4 Linac4 on the CERN site Linac4 will be built at the place of…

LINAC4 Meeting Status of the future CERN H- RF ion source Th. Meinschad / AB-ABP-HSL Contents Introduction (volume source /H- production / optimisation ) Collaboration –…

Overview of linacs Linac4 Status 1 Project Meeting 22.06.2010 1 Schedule 2 - The schedule defined at Chamonix (connection of Linac4 to PSB during the long shut-down 2014/15)…

Slide 1 Linac4 FBCT’s 18/10-2011 1 L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria 1 BCT’s…

Overview of linacs Linac4 Status 1 M. Vretenar sLHC public event 23.06.2010 1 Looking from this point and with a bit of imagination you can already see the LHC… Linac4…

Overview of linacs 1 Linac4 Update Project Meeting 14 March 2013 1 1. Updated Schedule 2. EVM (light) rebaselining 3. Linac4 at Open Days 1 Building and Tunnel CV and EL…

PowerPoint Presentation alessandra lombardi â 20 Nov 2013 â GSI commissioning and measurements LINAC4 RFQ The time allocated for this talk is longer than the time it took…

Overview of linacs Linac4 Status 1 M. Vretenar 16.07.2010 1 Looking from this point and with a bit of imagination you can already see the LHC… Linac4 - Description 2 Linac4…

Overview of linacs Linac4 Status 1 M. Vretenar for the Linac4 team BI Review 18.10.2011 1 Looking from this point and with a bit of imagination you can already see the LHC⦅

Overview of linacs Linac4 Topics 1 M. Vretenar for the CERN MAC 22.08.2011 Summary of H- source review Options for connection to the PS Booster 1 Looking from this point…

Linac4 H- source Linac4 H- source 1 Sept. 2nd 2013: 1st H- beam in linac4 Flexible front end suited for unprecedented IS-diversity : Direct extraction of H- from the RF-H2…