Search results for H.Weerts Argonne National Lab For DHCAL group

Explore all categories to find your favorite topic

Argonne HEP detector R&D H.Weerts Argonne National Lab For DHCAL group DOE site visit Sept 23-24, 2009 IWLC2010, Geneva, CH 18 – 22 October 2010 Study of RPC-based…

Slide 1SID RAL meeting; 14-16 April 2008 H.Weerts DHCAL status, progress & future Based on RPC efforts in CALICE mostly by US groups H.Weerts for DHCAL group Argonne…

Slide 1 ALCPG2011 Summary H.Weerts Argonne National Laboratory ALCPG2011, March 2011 H.Weerts ‹#› Summary attempt of your work. It will be incomplete and biased. Apologies…

DHCAL Status Lei Xia – Mar 18, 2007 – CALICE Meeting – ANL 3 System Physical Implementation VME Interface Data Collectors Timing Module Ext. Trig In Data…

Fermilab ILC Detector R&DSiD in France, 11 Feb 2008 H.Weerts Short term and mid term goals for SiD Create a LOI ( or whatever it will be called) and submit to Research

W-DHCAL Analysis Overview W-DHCAL Analysis Overview José Repond Argonne National Laboratory Data Quality I Dead ASICs/FEBs/RPCs Check noise runs Make table of dead regions…

DHCAL Construction Status Lei Xia Argonne National Laboratory ALCPG2009, Albuquerque 1 m3 – Physics Prototype Description 40 layers each ~ 1 x 1 m2 Each layer with 3 RPCs,…

Slide 1H.Weerts H.Weerts Jae-’s class Sept 20, 2006 H.Weerts It is much more fun that way Jae-’s class Sept 20, 2006 H.Weerts Intro Observe anular distribution

Construction and Testing of the CALICE Digital Hadron Calorimeter DHCAL - Resolution (S)DHCAL Meeting January 15, 2014 Lyon, France Burak Bilki, José Repond and Lei Xia…

Slide 1ILC US detector R&D H.Weerts, Argonne Nat. Lab. Status & progress in the US Organizational status Slide 2 KEK, July 18, 2007; Status of US R&D H.Weerts…

Slide 1 H.Weerts March 10, 2006LCWS06--Bangalore 1 WWS Detector R&D H.Weerts Argonne National Lab Report from the WWS R&D panel For the WWS R&D panel: J-C. Brient,…

Slide 1BILCW07, Beijing, February 4 – 7, 2007 Research done as part of program of CALICE collaboration with main efforts from: Argonne National Lab At MTBF in Spring

RPC-DHCAL Progress Report José Repond Argonne National Laboratory SiD Workshop, FNAL, April 9 – 11, 2007 Staged approach I R&D on RPCs Concept of electronic readout…

Slide 1DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013 Slide 2 2 Activities of the Next…

Status of the DHCAL Project José Repond Argonne National Laboratory Status of the DHCAL Project SiD Collaboration Week January 12 – 14, 2015 SLAC 2 Outline The DHCAL project…

PowerPoint Presentation Analysis of DHCAL Data José Repond Argonne National Laboratory CALICE Collaboration Meeting September 17 – 19, 2012 Cambridge, UK DHCAL Data Summary…

Slide 1 Analysis of DHCAL Muon Events José Repond Argonne National Laboratory ALCPG 2011 Meeting, University of Oregon, Eugene, OR General DHCAL Analysis Strategy Noise…

Slide 1 H. Weerts SLAC SLUO meeting; Sept 18, 2008 SiD-- a compact detector for ILC H.Weerts for SiD detector concept Argonne National Lab Slide 2 H. Weerts SLAC SLUO meeting;…