Supplier Conference 2013 (Combined)

119
Lear Supplier Conference

Transcript of Supplier Conference 2013 (Combined)

Page 1: Supplier Conference 2013 (Combined)

Lear Supplier Conference

Page 2: Supplier Conference 2013 (Combined)

Welcome

CEO Video

Lear Corporation—Strengths

Business Overview and Growth

Product Leadership—Technology

Operational Excellence

Supplier Expectations

Supplier Diversity

Supplier of the Year

Agenda

2

Page 3: Supplier Conference 2013 (Combined)

3

Page 4: Supplier Conference 2013 (Combined)

This is Lear

Page 5: Supplier Conference 2013 (Combined)

5

Our Vision & Core Values

Page 6: Supplier Conference 2013 (Combined)

6

The Lear Difference

• Superior Sales Growth . . . Through Innovation

• Customer and Geographic Diversity

• Continuous Improvement Focus

• Financial Discipline

Page 7: Supplier Conference 2013 (Combined)

7

Lear Profile

• Leading Tier 1 global automotive supplier

– 2012 sales of $14.6 billion – rank #189 in the Fortune 500

– Three-year sales backlog of $1.8 billion

• Strong global market positions and low-cost footprint in:

– Seating

– Electrical Distribution Systems

• Diversified sales and customer base serving all of the world’s

major automakers

• Strong balance sheet with $1.4 billion in cash and no debt

maturities until 2018

• Leader in product quality, customer service and innovation

Three-year sales backlog as of January 11, 2012.

Page 8: Supplier Conference 2013 (Combined)

8

Global Capabilities with Low-Cost Footprint

Low-Cost Engineering Centers

India, Philippines

Low-Cost Operations

22 Countries

More Than 80% of Component Facilities and More Than 90% of

Related Employment Located in Low-Cost Countries

Page 9: Supplier Conference 2013 (Combined)

• Strong Market Position -- One of two

independent seat suppliers with global scale

and complete component capabilities;

2012 sales of $11.0 billion

• Key Capabilities -- Complete automotive seat

systems, seat covers (including cut & sew,

fabric and leather), mechanisms & structures

and foam

• Quality Leader -- Lear is the highest quality

independent major seat manufacturer for 11

of the last 12 years according to the J.D.

Power and Associates Seat Quality and

Satisfaction StudySM

• Benchmark Technology -- Lear’s EvolutionTM

Seat has seven first-to-market innovations

Global Leader in Automotive Seating

ECO Foam

ECO Padding

EVO Mini Recliner

ECO/EVO Structures

Expanded Polypropylene Frame

ProTec® PLuS Whiplash Protection

Dynamic Environmental Comfort Seating (DECS)™

9

Seat*

* Provides up to a 30% weight reduction, environmental benefits and cost savings

RECLINERS STRUCTURES SEAT TRIM

Page 10: Supplier Conference 2013 (Combined)

HIGH-POWER WIRE HARNESS

SOLID STATE

SMART JUNCTION BOX™

TRADITIONAL WIRE HARNESS

• Strong Market Position -- One of four suppliers with

global capability in both traditional and high-power

electrical power management systems;

2012 sales of $3.6 billion

• Key Capabilities -- Traditional electrical distribution

systems, emerging high-power systems and related

components including connectors, smart junction

boxes and battery chargers

• Quality Leader -- Outstanding program management

capabilities support thousands of design changes

per year with world class quality

• Benchmark Technology -- Lear’s Solid State Smart

Junction Box™ won an industry-leading PACE

award sponsored by Automotive News

• Sales growth opportunity with improving margins

– Additional consumer demand for features and

functionality

– Greater electrification and signal management

of alternative powertrain design

10

Strong Global Position in Automotive

Electrical Power Management Systems

HIGH-POWER CONNECTORS HIGH-POWER BATTERY CHARGER

Page 12: Supplier Conference 2013 (Combined)

12

Strategic Direction Remains Consistent

• Profitably grow and diversify sales globally

• Continue to expand component capability in emerging and

low-cost markets

• Pursue niche acquisitions to strengthen both core

businesses; no transformational acquisitions needed or

planned

• Maintain strong balance sheet with investment grade

credit metrics

• Consistently return excess cash to shareholders

Page 13: Supplier Conference 2013 (Combined)

13

Investment in Component Capacity in Emerging Markets

and Low-Cost Countries

Mexico • Mechanisms & Structures

• Seat Trim

• Wire Harnesses

Brazil • Mechanisms & Structures

• Seat Foam

• Seat Trim

• Wire Harnesses

India • Mechanisms & Structures

• Seat Foam

• Wire Harnesses

Thailand • Seat Foam

• Seat Trim

• Wire Harnesses

China • Mechanisms & Structures

• Seat Foam

• Seat Trim

• Connectors

• Electronics

• Wire Harnesses

Morocco • Electronics

• Wire Harnesses Moldova • Seat Trim

Tunisia • Wire Harnesses

Approximately $300 Million Invested to Increase Emerging

Market and Low-Cost Component Capacity in 2010-2012

Seating Facilities

Electrical Facilities

13

Page 14: Supplier Conference 2013 (Combined)

• Produces automotive fabric for seats, headliners and other

interior applications

• Strengthens Lear’s global seat cover capabilities

• Extends Lear’s regional fabric manufacturing capability presently

located in China

• Adds design and technical capability to facilitate future growth

• Strong management team with textile and manufacturing

expertise

• Further diversifies Lear’s customer base

• Majority of restructuring is complete

• Includes small, non-automotive specialty fabric business

14

Guilford Mills – Strategic Benefits

Page 15: Supplier Conference 2013 (Combined)

• One of the strongest balance sheets in the industry

• Strong credit metrics in-line with investment grade peers

• Covenants and capital structure provide flexibility to invest in our business and execute our strategic objectives going forward

• Modest pension and OPEB liability – Substantially all U.S. plans are frozen or at

closed locations with no future benefit accruals

• Balanced and flexible shareholder distribution policy – Modest annual dividend – Flexible share repurchase program

Strong Capital Structure and Liquidity

Cash and Debt Balances

15

As of December 31, 2012 (in millions)

(1)

$1,402

$626

$533

Cash Total Debt Pension/OPEB

(1) Cash includes cash and cash equivalents

Page 16: Supplier Conference 2013 (Combined)

16

Longer-Term Outlook

• Global growth in automotive demand and further consolidation of supply base

• Increasing customer trend toward global platforms

• Critical success factors: global capabilities, a low-cost footprint and superior quality

• Leading technologies and innovation are key differentiating factors

• Lear well positioned to be successful as the industry recovery continues

Seating – Global capability and scale

– Increasing sales diversification

– Low-cost engineering and manufacturing footprint

– Selective vertical integration in key components

– Among leaders in technology and innovation

– Recognized industry leader in quality

Electrical Power Management Systems

– Significant growth opportunity

– Global presence and capability

– Competitive low-cost footprint

– Investing in key technologies (e.g., high-power and hybrid electrical

systems and components, Solid State Smart Junction BoxesTM and

terminals & connectors)

Page 17: Supplier Conference 2013 (Combined)

17

Page 18: Supplier Conference 2013 (Combined)

Market Overview

Page 19: Supplier Conference 2013 (Combined)

• Market Trends

• Market Growth Forecast

• Lear Growth & Market Position

• New Business Backlog & Key Wins

19

Agenda

Page 20: Supplier Conference 2013 (Combined)

• Global vehicle platform proliferation

• Increased direct sourcing of components

• Significant customer expectations regarding pricing,

productivity and cost reduction

• OEMs increasingly shifting costs (warranty, tooling,

engineering, etc.) to suppliers

• Increased fuel economy and emissions standards driving

focus on weight reduction

• Growth in electrical/electronics content on the car

• Aggressive timing in new platform launches

Key Market Trends Affecting Lear

20

Page 21: Supplier Conference 2013 (Combined)

• Global industry production forecasted to grow at 4.0% CAGR

– BRIC markets growing at 8.0%

– China the major driver at 9% to 18.5M vehicles

• Largest six China OEMs (SAIC, DFM, FAW, Changan, BAIC,

GAC) forecasted to grow by more than N.A. and EU markets

combined

• The B and C segments remain, by far, the largest segments

globally and are growing the fastest

• All major OEMs forecasted to grow with VW, Toyota, and GM

remaining clear global leaders

– Ford, Fiat/Chrysler, and BMW have higher growth among larger

OEM’s

Industry Production Outlook Summary

21

Page 22: Supplier Conference 2013 (Combined)

Full Year 2013 Vehicle Production

2012 2013 YOY

Actual Outlook Change

China 17.0 18.5 up 9%

Europe 16.8 16.2 down 4%

North America 15.4 15.6 up 1%

India 3.7 4.1 up 9%

Brazil 3.2 3.3 up 5%

Russia 2.1 2.0 down 2%

Global 79.7 80.7 up 1%

Vehicle production estimates based on IHS Automotive production forecast and Company estimates.

Units (in millions)

22

Page 23: Supplier Conference 2013 (Combined)

Industry Volumes

NA, Europe and BRIC Market Production

15.8 15.8 15.3 15.0

12.68.6

11.913.1

15.3 15.6 16.1 16.9 17.5 17.7

18.7 18.7 19.1 20.218.8

15.6 17.5 18.0 16.6 16.2 17.0 17.7 18.5 19.4

8.2 9.3 11.213.2

14.1

17.4

23.2 24.3 26.128.0

31.234.1 36.8

38.8

60.2 62.8

65.3

68.9 65.8

57.7

72.6 74.8

79.7 80.7

85.6

90.7

95.0

98.5

'04 '05 '06 '07 '08 '09 '10 '11 '12 '13 '14 '15 '16 '17

North America Europe

BRIC Global

Source: Wards, IHS and Company estimates as of November 2012

8% 2012 to 2017 CAGR

3% 2012 to 2017 CAGR

3% 2012 to 2017 CAGR

units in millions

23

4% 2012 to 2017 CAGR

Page 24: Supplier Conference 2013 (Combined)

2009 2010 2011 2012 2013

24

Lear’s Growth

Lear 12.4% CAGR

Global Production 8.9% CAGR

Lear is Growing Faster Than Market

Co

mp

ou

nd

ed G

row

th

Page 25: Supplier Conference 2013 (Combined)

Growing in Emerging Markets

$0.5

$0.9

$1.1

$1.4 $1.5

2008 2009 2010 2011 2012

Lear in BRIC Countries

(Consolidated sales in billions)

Brazil, Russia and India

China

$1.2

$1.5

$2.0

$2.4

25

$2.7

2008 2009 2010 2011 2012

Lear in China

$1.3

$0.8

$1.7

$2.1

Non-Consolidated

Consolidated

(Sales in billions)

$2.4

$1.5

$1.4

$1.1

$0.9

$0.5

Lear CAGR of 23% vs. Industry CAGR of 17% in BRIC Markets

Page 26: Supplier Conference 2013 (Combined)

Full Year 2012

Sales Diversification by Region and by Customer

By Customer By Region

2012 Consolidated Sales

Sales Well Balanced by Region and by Customer

26

GM

Ford

BMW

VW/Audi

Fiat/Chrysler

Renault/

Nissan

DaimlerPSA GroupJaguar/Land

RoverHyundaiOther Asian

Mazda

Volvo

Porsche

All Other

Europe

35%

Rest of World

9% Asia

17%

North America

39%

Page 27: Supplier Conference 2013 (Combined)

All Segments Growing – B and C are

the Largest and Growing Fastest

Source: IHS Automotive 9/15/2012

C-Segment, 38.6%

B-Segment, 35.3%

D-Segment, 11.1%

A-Segment, 8.0%

Full Frame, 3.8%

E-Segment, 3.2%

Industry Production Outlook

Demand Growth By Segment

Source of Light Vehicle

Demand Growth 2012 - 2017

2012 2017 CAGR Change

A-Segment 9,031 10,524 3.1% 1,493

B-Segment 18,310 24,932 6.4% 6,622

C-Segment 22,471 29,728 5.8% 7,256

D-Segment 14,362 16,452 2.8% 2,090

E-Segment 5,273 5,882 2.2% 608

Full Frame 9,769 10,474 1.4% 705

Global 79,216 97,991 4.3% 18,775

27

(units in thousands)

Page 28: Supplier Conference 2013 (Combined)

Lear Share by Segment

Sales Diversification by Vehicle Segment

2012 2007

A-Segment

B-Segment

C-Segment

D-Segment

E-Segment

Compact Full-Frame

Full-Size Full-Frame

* Excludes sales in non-consolidated Joint Ventures

28

Lear Growth in B & C Segments – Aligning with Market

Page 29: Supplier Conference 2013 (Combined)

2013 to 2015 Consolidated Sales Backlog

2013 to 2015 Sales Backlog

Composition of Sales Backlog

• By Product:

– Seating -- 55%

– EPMS -- 45%

• By Region:

– Europe -- $750M

– North America -- $600M

– Asia -- $400M

– South America -- $50M

29

(in millions)

$1,000

$400 $450

$150

$800

$450 $200

$150

2013-2015 2013 2014 2015

Seating EPMS

≈$650

≈$850

≈$1,800

≈$300

Page 30: Supplier Conference 2013 (Combined)

$1.8B Net New Business ‘13 thru ‘15

Europe: 42%

BMW •Seating JIT Assembly •Trim Assembly

Daimler •Lighting Modules •Amplifiers JLR •Seating JIT Assembly •Amplifiers •Gateway Module

PSA •Seating Harness

GM •Track Assemblies

Nissan •Seating JIT Assembly •Electrical Distribution AvtoVAZ •Seating JIT Assembly

Skoda •Head Restraints

Daimler •Seating JIT Assembly

Asia: 22%

Hyundai/Kia • Seating JIT Assembly

Nissan • Seating JIT Assembly • Electrical DIstribution

DPCA • Engine Wire • Electrical Distribution

Dongfeng • Seating JIT Assembly

VW/Audi • Seating JIT Assembly

GM • Track Assemblies • Fabric

Ford • Seating JIT Assembly

BHNC • Electrical Distribution

CA-Mazda • Electrical Distribution

Suzuki • Seating JIT Assembly

Americas: 36%

Nissan • Seating JIT Assembly • Electrical Distribution Chrysler/Fiat • Seating JIT Assembly

GM • Seating JIT Assembly • Track Assemblies • Electrical Distribution • Fabric

VW • Seating JIT Assembly Ford • Seating JIT Assembly • Electrical Distribution Toyota • Headliner

Page 31: Supplier Conference 2013 (Combined)

• Superior Sales Growth with Financial Discipline

• Customer, Geographic, and Platform Diversity

• Continued Market Share Growth in all Key Markets

• Well Represented in Key Global Platforms

• $1.8B Net New Business Through 2015

31

The Lear Difference

Page 32: Supplier Conference 2013 (Combined)

32

Page 33: Supplier Conference 2013 (Combined)

Product Leadership—

Technology

Page 34: Supplier Conference 2013 (Combined)

Lear Seating

Product Engineering

Page 35: Supplier Conference 2013 (Combined)
Page 36: Supplier Conference 2013 (Combined)

• One of the most complex and highly engineered vehicle

systems

• Integral element of the vehicle safety system

• Complex and highly engineered mechanisms

• Intimate vehicle owner experience

• Multiple degrees and aspect of functionality

• Expertise in multiple materials

• Evaluated on objective and subjective criteria

• Major focus of OEM’s for mass and cost reduction

• Requires the integration of many sub-systems

Seats Are Highly Engineered Products

36

The Scope and Complexity of Seat Engineering

Requires the Support and Expertise of the Lear

Supplier Partners

Page 37: Supplier Conference 2013 (Combined)

37

Supporting Customers Globally with 40% of

Engineering Resources in Low Cost Countries

Rui’an, China

Germany Gustavsberg

Reitberg

Schwaig

Boblingen

Wolfsburg

Coventry, England

Paris-Velizy, France

Grugliasco, Italy

Tychy, Poland

Presov, Slovakia

Shanghai, China

Pune, India

Yokohama, Japan Seoul, South Korea

Bangkok, Thailand

Cebu, Phillippines

Southfield, USA

Sao Paulo, Brazil

North America Headcount: ~300

Europe Headcount: ~750

Asia Headcount: ~500

South America Headcount: ~50

Pilzen, Czech Rep.

Global Engineering Headcount: 1,600

Global Technology Centers

Page 38: Supplier Conference 2013 (Combined)

• Currently developing approximately 200 vehicle programs

with 40 customers

• Global team of 1,600 engineers across 20 global technical

centers

• Developing seat systems as well as vertically integrated

sub-systems

• Industry recognized technology

– History of First-to-Market Technologies

– Lear Crafted Comfort Connect 2013 PACE Award

Finalist

• Lear is the World Leader in Luxury and Performance

Automotive Seating

Global Engineering Scope

38

Global Engineering Scope

Page 39: Supplier Conference 2013 (Combined)

Southfield: Full Service Technology & Validation Center

North America Technology Center - Southfield,

Michigan

• 59 vehicle programs across 7 customers

• World class validation center

• Homeroom for mechanisms, fabric, &

leather

• Recent launches:

Ford Fusion & Lincoln MKZ

Cadillac XTS

Chevy Sonic

Fiat 500 Abarth

• Upcoming launches:

Chevy Silverado & GMC Sierra

Chevy Corvette

BMW X5

Chevy Impala

Page 40: Supplier Conference 2013 (Combined)

Munich : Full Service Technology & Validation Center

European Technology Center – Munich, Germany

• 62 vehicle programs across 16 customers

• World class validation center

• Homeroom for mechanisms, frames, headrest &

armrest

• Recent launches:

JLR F Type, XF sports brake

Audi A3 RDW Limo

BMW F18, F32, F34,F36

Ferrari F12

• Upcoming launches:

BMW F15/F16

Daimler BR205

Audi TT3

PSA B3/B4, E3

Page 41: Supplier Conference 2013 (Combined)

Full Service Technology & Development Centers

Asia Technology Centers – China, India, Korea,

Japan, ASEAN

• 75 vehicle programs across 32 customers

• World class validation center

• Recent launches:

Ford - B515, C520

GM - SGM E18, CN100, T300

DPCA - B73

Proton - P3

Nissan - X11M

• Upcoming launches:

GM - SGM E15, J300, Z2xx, PM7

Ford - B515

Qoros - CF11/14

Mazda - J53

Diamler - BYD

VW -Polo

MM - U206

Page 42: Supplier Conference 2013 (Combined)

Lear Seats – On Every Vehicle Segment From

Compact to Full-size Sports Utility

42

Page 43: Supplier Conference 2013 (Combined)

Seating Core Product Portfolio

STRUCTURES

• ECO Front Seat Structure

• Modular Rear Seat Structures (MRS)

• LS3 Sport Seat Structure

• Laser Welding

MECHANISMS

• Single & Dual Sided Std & Mini Recliner

• EVO Manual & Power Tracks/Adjusters

• EVO Track modular components

• ProTecTM Active Head Restraint

• EZ Entry

• Floor Latch

FOAM / COMPONENTS

• Molded Seat Foam

• SoyFoamTM

• DECSTM Advanced Seat Comfort

• Adjustable Comfort Head Restraint

• Modular Armrest

•LearBond

SURFACE MATERIALS

• Cut/Sew

• CraftedClipTM

• Lamination

• Guilford Performance Textiles

• AventinoTM Leather

• Nappa Leather

43

Page 44: Supplier Conference 2013 (Combined)

• Work collaboratively with Lear using your product and process

expertise

• Global platforms – same part everywhere

• Help us manage the sometimes delicate customer / Tier 1 / Tier 2

relationship

• Partner with Lear on product and process technology

• Help us achieve mass and cost reductions

How Can the Lear Supply Partners Help?

44

Breadth and Complexity of Seat Engineering

Requires a Reliance Upon Supplier Expertise

Page 45: Supplier Conference 2013 (Combined)

Lear Electrical Power

Management Systems

Product Engineering

Page 46: Supplier Conference 2013 (Combined)
Page 47: Supplier Conference 2013 (Combined)

High Power Distribution Distributes high power throughout the vehicle

Front Electronic Module - Industry 1st

•State of the Art in Automotive Industry

• Very high level of HW integration

• High grade of safety and security (Fusi)

• Significant cost and weight reduction

S3JB - Industry 1st

• Eliminates fuses and relays

• Self resetting Smart Fuse technology

• Allows wire gauge optimization

• Up to 70% weight & 80% size reduction

Power Distribution - Industry Leading

• Low / High voltage wire harnesses

• Power distribution boxes

• Excellence in change management

• Wire gage reduction 0.13mm2 wire – Copper Clad Steel / Silver Alloy

• Trends

• Increased functionality, Functional integration, Minimize current

consumption, Weight and size reduction, Wire gauge reduction

Complete Architecture Systems: Power Distribution/BCM/ Solid State Smart Junction Box

Page 48: Supplier Conference 2013 (Combined)

High Power Distribution Distributes high power throughout the vehicle

Amplifiers

• 1st to Market infotainment platform based on Ethernet architecture.

• 3 D Surround Sound

Active Engine Mount Controller - 1st to Market

• Compensates for vibrations during cylinder deactivation

• Reuse of amplifiers, networking & signal processing technology

LED Lighting Control Modules

• Exterior signal and lighting controls

• Lower power consumption

• 1st to Market Matrix Beam Control

• Spotlight function to highlight people or objects

• Glare free high beam

• Trends

• Higher data transfer rates, increased fuel economy, Minimize Power Consumption, Increased safety, Enhanced vehicle styling

Audio/Lighting

Page 49: Supplier Conference 2013 (Combined)

Pace Award for Lear S3JB

Page 50: Supplier Conference 2013 (Combined)

High Power Distribution

Charging Systems - 1st to Market & Technology Leader

•EVSE

• Level 1 & 2 charging solutions (Both SAE & IEC)

• Lear Universal Design

• Simplified manufacturing, Economies of scale

•Developing 3 phase IEC version & DC fast Charging Connector

• Battery Chargers

• 1st to market Smart Charger

• 1st to market Rectifier Module

• Industry Leading Efficiency 96%

• Industry smallest charger (4 L for 3.7 Kw)

• Industry lightest charger (4.8 Kg for 3.7 Kw)

• Operating voltage 85– 265VAC (Global compatible)

• Developing wireless charging test systems /technology

• Fast chargers: 7Kw, 22 Kw

• Trends

• Faster Charging, Smart Charging, Customer Convenience

Charging System

Page 51: Supplier Conference 2013 (Combined)

High Power Distribution Distributes high power throughout the vehicle

Energy Management Converts power for multiple uses, from vehicle propulsion to accessories

Power Distribution System - Technology Leader

• Industry Highest Power to size ratio terminals

• Industry Highest contact operating temperature terminals

due to steel metal spring innovation

• Industry First conductive plastic connection system

• Industry First fused connection system

•Trends

• Conductive Plastic Enclosures, Aluminum Wires,

Aluminum Terminals, Pluggable contactors for serviceability,

Non Bolted Electrical Power Connection, Solid State Relays

for Drivers, Higher Power Transfer per unit of Contact Area,

Higher Operating Temperature Interconnect

Power Distribution System

Page 52: Supplier Conference 2013 (Combined)

High Power Distribution Distributes high power throughout the vehicle

Energy Management – Power Conversion

• Industry leading size and efficiency

• Industry 1st application of Heat Pipes for cooling film

capacitors to reduce overall size and cost.

• Industry 1st impedance matched parallel switches to reduce

cost, size & weight.

• Integration trends with chargers and other hybrid functions

• Trends

• Higher Operating Temperature, Conductive Plastic

Enclosures, Functional Integration, Wide Band Gap

Semiconductor Materials

Energy Management System

Page 53: Supplier Conference 2013 (Combined)

• Expertise at the architecture level

• Capabilities to optimize both components and systems

• Product and technology roadmap fully aligned with OEMs & industry trends

• EPMS growing faster than the industry growth

• At Lear, Innovation is a key focus moving forward

From our preferred suppliers, Lear needs strong collaboration – suppliers need to:

– Bring forward new technologies, new components, new materials, new processes that

enable us to achieve:

• Cost/weight/size/complexity reductions

• Quality improvements

– Actively work with Lear engineering to review proposed component designs and pro-

actively offer alternatives that reduce cost/complexity

– Match component roadmaps to Lear product roadmaps. Quarterly reviews with

preferred suppliers to match the technology roadmap.

Conclusion

Page 54: Supplier Conference 2013 (Combined)

54

Page 55: Supplier Conference 2013 (Combined)

Continuous Improvement

Page 56: Supplier Conference 2013 (Combined)

Message From The President and CEO

56

Consistent message – “Operational Excellence” and “Continuous Improvement” is the cornerstone of Lear’s Culture

Page 57: Supplier Conference 2013 (Combined)

Global Operations and Priorities:

Relentless pursuit to eliminate “Waste” through out our

business and our supply chain using the Lear Continuous

Improvement culture

Strong focus on results thru process improvements in;

People, Safety, Quality, Delivery, and Costs

Build Quality into our product, and processes, both inside

Lear and at our Supplier base

Strengthen the Organization with new Talent and

Capabilities : External Hires with strong CI background

Page 58: Supplier Conference 2013 (Combined)

Continuous Improvement

58

Six Sigma

Projects

Focus on reduction

in variation

Processes

LEAN

Focus on Elimination

of Waste

Relentless pursuit to eliminate “waste” throughout our business and a strong Focus on People,

Quality, Delivery, and Costs

Page 59: Supplier Conference 2013 (Combined)

Contractor

Labor (Overtime)

Operations Impact (Freight,..)

Optimized Cost Current Costs

Capacity

Waste

Inventory Management

Operations Excellence Waterfall

Preventable Failures Operations

Preventable Failure Maintenance

Cost Optimization

59

Laser focus on ALL costs in the value chain

Page 60: Supplier Conference 2013 (Combined)

World Class training system: “I would say Lear has one of the best Continuous Improvement Websites from any company I have seen” Kaizen Institute 2012

Standardized Teaching

Page 61: Supplier Conference 2013 (Combined)

Global

Region

Plant

Process

Daily Weekly Monthly Quarterly

Review

Review

Review

Review Review

Review

Review

KPI Focus Action

Continuous Focus on Lear’s five pillars of Safety, People, Quality, Cost Productivity and Delivery

throughout the organization.

Page 62: Supplier Conference 2013 (Combined)

62

Monthly Plant Reviews

Page 63: Supplier Conference 2013 (Combined)

Best in Class Comparisons

Every Metric is reviewed and Bench marked against BIC and Minimum acceptable standards

Page 64: Supplier Conference 2013 (Combined)

• LPS is a Lear Proprietary software system written by Lear

as a global solution to manufacturing execution.

• LPS runs, monitors, records and controls all the

production processes on our shop floor.

• LPS has been successfully running for 6 years.

• LPS is a flexible system designed to meet the demands of

any build process and layout and meet all TS16949

requirements.

• LPS is designed to interact with existing PLC’s, DC tools

test equipment and all production processes.

Lear’s technical “know how” has developed an Industry leading shop floor tool to deliver the highest

quality, lowest cost to its customers.

Lear Production System

Page 65: Supplier Conference 2013 (Combined)

Standardized processes to ensure repeatable and predictable operations

Typical LPS Screen

Page 66: Supplier Conference 2013 (Combined)

Lear Visual Factory Standards

WIP INVENTORY

RM INVENTORY TOOLS AND FIXTURES

AISLE, PATHWAY

GREEN Demarcation

Line

BLUE Demarcation

Line

BLACK Demarcation

Line BLACK / YELLOW Demarcation

Line

FG FOR QUALITY VERIFICATION

ORANGE Demarcation Line

FOR DIAGNOSTICS

YELLOW Demarcation

Line

Standardized Visual and Color formats for all 167 Lear Facilities

worldwide.

Page 67: Supplier Conference 2013 (Combined)

Map the Current State

The Process

Analyze the Current State and Design the Future State

Tues. & Fri.

PC & L

MRP MSS

# times/day

Steel Supplier

Steel

Pin # pcs

# days

or shifts

I I I

I Stamping

Downtime

Changeover Time=4 hr

2 Shifts

TAKT =

2 Presses

Cycle Time =

Change Over

Welding

Layout

Scrap/Rework

Downtime = 20%

Uptime

# Operators

Cycle Time =

Weekly Build Schedule Daily Ship

Schedule

Finished Goods

Overtime =

# Shifts =

Assembly

DT, Scrap Rework

WIP =

Cycle Time =

TAKT =

Changeover Time =

Layout

= 10%

Scrap

? days ? days ? days ? days ? days ? days ? days

Inventory Time Processing Time

TPc /t = ?

TAKT =

WIP =

WIP = WIP =

X pcs /month

Std. Pack Qty.

# shifts

Customer

Finished Goods Assembly

Layout

Welding

6 x / Day

PC & L

Daily

Level Box

DA1

DA2

DA3

C/O Time =

CT =

TAKT Time

3 Shifts

DT =

Scrap =

Stamping

0 Overtime

2 Shifts

Max Size

# Material Handlers

C/O Time =

CT =

TAKT Time

3 Shifts

DT =

Scrap / Rework =

C/O Time =

CT =

TAKT Time

3 Shifts

DT =

Scrap / Rework=

Small Lot # Operators

Customer

X pcs / month

Std Pack Qty

# Shifts

WIP =

WIP = WIP =

Steel Supplier

Inv .Time

Proc .Time TPc /t = ?

? days ? days ? days ? days

? days ? days ? days

67

Future State

Current State

Ideal State ?

Value Stream Everything We Do

1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH

Establish TAKT & Flow in Tank Ass'y

Stamping Changeover Reduction

Reduce Stamping Buffer

Move Ass'y to Plant 10

Establish TAKT & Flow in Sender Ass'y

Pull To Sender Ass'y

Training

2011 2012 Activity

Page 68: Supplier Conference 2013 (Combined)

0

20

40

60

80

100

Waste Walk VSM Waste Walk VSM

Opportunity Opportunity Total Opportunity Total Opportunity

31

12

81

28 30

8 20

10

Team 1

Team 2

Team 3

Kaizen Workshops

Page 69: Supplier Conference 2013 (Combined)

Q1/12 Q2/12 Q3/12 Q4/12

Elimination of waste led to an increase of sales of $2,413/m²/Mo

Transformation of San Luis Potosi

Page 70: Supplier Conference 2013 (Combined)

Communication area

Transformation of San Luis Potosi

Page 71: Supplier Conference 2013 (Combined)

Reduction in turnover from 6% a month to 0.9%

Plant attitude after changes

Page 72: Supplier Conference 2013 (Combined)

CATEGORY METRIC BASE LINE

(2011)

2012 FY DELTA

Space released (sq ft) 0 m² 442 m² 442 m²

Sales / employee

(308 employees)

Sales by month

/ employee ('000) $ 14.8 $17.4 $ 2.6

Total OI Impact

Scrap ('000) $ 375.0 $ 84.0 $291.0

Premium freight out ('000) $ 180 $ 24 $ (156 )

HC Direct ('000) From308 - 274 (-34) $ 408 $ 408

$6.2 M

Before and After Results

Page 73: Supplier Conference 2013 (Combined)

Plant Profile:

Initiated operations 1987,

Largest sewing plant in Mexican Trim Operations located in North of Mexico:

• Building size 39,284 m² with 32,200 m² of manufacturing space

• Lamination, cutting, sewing processes and assembly of small components

• 3,800 hourly employees (2 shifts)

• 102 Salary employees

• High complexity :

o 2251 Component part numbers

o 11 Programs

o 18 Customers

Transformation of La Cuesta

Page 74: Supplier Conference 2013 (Combined)

Roll goods from warehouse to cutting room

Purchased parts from warehouse to sewing cells

Cut kits from cutting room to lay bay warehouse

Cut kits from lay bay warehouse to sewing cells

Finished goods from sewing cells to shipping area

154 m 240 m 105 m 248 m 191 m

PROCESS ENDS

PROCESS START

Material transportation = 935 m

Transformation of La Cuesta

Page 75: Supplier Conference 2013 (Combined)

GERBERS

Lay bay

Purchased

Parts

Rolls

Leather

Available

8 K sqft Availables

Cutting Bruno 2

Lay bay

Rolls

P. Parts

Cutting Bruno 1

12K sqft Availables

Piel

Over Cast

Leather

Overcast

Lay bay

Rolls Purch. Parts

Lamination Warehouse

Pro

toty

pes

Ing. Equipment

Laminadoras

Rollos Laminadora

Receiving 3

Receiving 2 Receiving 1

UQA

Die Room

Rampas 5

Tool crib.

Restrooms

Ramps

Sew

ing

Sew

ing

Sew

ing

Sew

ing

Sew

ing

Sew

ing

Ramp Ramp

BU3 BU2 BU1

7 K sqft Available

BU4

Material transportation = 160 m

Autonomous Business Units led to increased efficiency and ownership of the business

Layout rearrangement of La Cuesta

Page 76: Supplier Conference 2013 (Combined)

34,500 m² and no racking!! 2.3 DOH to 0.5 DOH

Transformation of La Cuesta –

Current Shop Floor

Page 77: Supplier Conference 2013 (Combined)

CATEGORY METRIC BASE LINE

(2011)

2012 FY DELTA

SPACE &

DISTANCE

Material travel

distance (ft) 935 m 160 m (775) m

Space released (sq ft) 0 m² 378 m² 378 m²

Sales / employee

(668 employees)

Sales by month

/ employee ('000) $ 7.7 $ 9.0 $ 1.3

Scrap ('000) $ 540.0 $ 311.9 $ (228.1)

OI Impact

Material Variance ('000) $ 604.0 $ 262.2 $ (341.8)

External Sorts ('000) $ 335.0 $ 63.2 $ (271.8)

Premium freight out ('000) $ 428.0 $ 84.6 $ (343.4)

HC Direct ('000) From 654 to 582 (-72) $ 267.0 $ (267.0)

HC Indirect ('000) From 122 to 84 (-38) $ 105.0 $ (105.0)

Total OI Impact $ 1.84 M

O I

Impact

Space &

Distance

Before and After Results

Page 78: Supplier Conference 2013 (Combined)

10. Future Potential

Area Rollout

3. Workshop Objective

9. Workshop Results

1. Team

2. Team Photograph

7. Improvements Achieved 5. Current Situation

4. Lean Training Material

6. Current Photograph 8. After Photograph

• Reduce the scrap in 50% MC E50 station bulge shape.

• Lean Concepts • 7 waste •TPM.

• Scrap average 4 pcs/day • Damaged tooling • Reworks • Overtime • Loss of production time • Excessive corrective maintenance time • Moral loss

The pressure is being monitored and fitting directly from the hydraulic unit: Cyl #30 = 60 bar; Cyl #10 = 58 bar; Cyl #20 = 35 bar; Cyl #40 = 60 bar Installed a fixture to hold the tubing FSC motion link Improved the lubrication system Modified PFMEA, CP and SWI

DEFECTS HOLDING

• All equipment with high down time & producing consistent scarp & rework • Focus support function resources towards satisfying customer and production requirements.

• Reduced corrective maintenance by more than 50% • Eliminated scrap and rework • Reduced overtime work • Improved employees moral (to work on this equipment)

Annual Savings: $30,000

Sergio Zaragoza – Leader David Degollado – Worker Gabriel Avila – Maintenance Supervisor

78

Celebrating Successes – Common

Storyboards utilized at all Lear Plants

Page 79: Supplier Conference 2013 (Combined)

10. Future Potential

Area Rollout

3. Workshop Objective

9. Workshop Results

1. Team

2. Team Photograph

7. Improvements Achieved

4. Lean Training Material

6. Current Photograph

8. After Photograph

79

Roberto Romero Omar Yzabal Carlos Navarro

• Reduce weekly frequency • Maximum optimization per Container and trailer. • Freight Cost Saving

• VSM • Total Packaging Optimization Software (TOPS: Max Load)

• Analyze Freight optimization for all routes and major commodities.

• Weekly frequency reduced from 9 trucks to 5 trucks. • Reduced overall material handling time at plant due to higher pack density •PHASE 1 Savings: $356,998.00 •PHASE 2 Savings: $207,000.00 Annual Savings: $563,998.00

• Low packaging efficiency. • Std pack of 20 and 78 boxes per truck with 1560 pieces per truck • 9 trucks per week. • Parts origin New Albany , IN and destination is Hermosillo, MX

• Greater pack efficiency. Phase 1: October 2012 • 104 boxes per truck • Std pack of 20 Phase 2: Jan 2013 • 104 boxes per truck • Std pack of 28 • 2912 pieces per truck

•New Albany, IN to Hermosillo, MX via Nogales, AZ Total Dist: 2039 mi

Commodity: Plastics CD4 program to Ford Motor Company

5. Current Situation

Celebrating Successes – Common

Storyboards utilized at all Lear Plants

Page 80: Supplier Conference 2013 (Combined)

50% Improvement in TGW since 1999

9% Uptick in TGW due to new vehicle platforms added, not degradation in quality performance, no performance data for 2011

2012 Major Contributors

‒ Fiat 500

‒ Buick Verano

‒ Volkswagen Beetle Hatchback

‒ Chevrolet Sonic

Lear leads the industry in seat quality;

– Best Large Conventional Seat Quality– Chrysler 300

– Best Midsize Sporty Seat Quality-Ford Mustang Coupe

– Best Midsize Premium Sporty Seat Quality-Porsche 911 Coupe

– Best Midsize Premium Utility Seat Quality-Land Rover LR4

– Best Compact Premium Sporty Seat Quality-Mercedes-Benz E-Class Convertible

Source: 2012 J.D. Power Seat Quality Study

Lear’s 2012 J.D. Power Results Things Gone Wrong (TGW)

per 100 vehicles

Leadership in Quality

Highest Quality for a Major Seat Manufacturer For 11 of Last 12 Years

Page 81: Supplier Conference 2013 (Combined)

What Can You Expect From Us?

• Partnership orientation: All of us need to be competitive

• Continue reduction on lead time and inventory. DOH will be

key driver going forward

• Relentless emphasis on Continuous Improvement

• Fact based decision making

• Focus on Safety, People, Quality, Delivery and Cost

• We must meet our customers’ expectations

Page 82: Supplier Conference 2013 (Combined)

It Starts with you the Leadership

Go See

• “Senior Management must spend time on the front lines”

• Ask Why

• “Use the “Why?” technique daily”

• Show Respect

• “Respect your people.” Fujio Cho, Former Chairman of Toyota Motor Corp.

82

Page 83: Supplier Conference 2013 (Combined)

83

Page 84: Supplier Conference 2013 (Combined)

Supplier Expectations

Page 85: Supplier Conference 2013 (Combined)

Purchasing Strategy

• Drive competitive advantage for Lear

through the supply base with best in class

costs, superior quality and flexible supply

• Establish collaborative relationships with

our supply partners to work in an

environment of continuous improvement

so that we grow and prosper together.

Page 86: Supplier Conference 2013 (Combined)

Where We Need To Go . . .

Current State

Over 2400 Production

Suppliers

Current Supplier PPM = 45

At Risk Suppliers = 39

Material Cost Reduction 2.5%

Future State

Fewer Than 700 Suppliers

Less Than 25 Supplier PPM

Less Than 2% of Supply Base

Average Cost Reduction 4%

Partner with Suppliers that offer Technology and Process Capability with a Best in Class Cost Structure

Page 87: Supplier Conference 2013 (Combined)

How do we get there?

• Eliminate Waste – Take Costs Out – “Should Cost” Models – ID Gaps and Drive Actions to Close

– Collaborative Continuous Improvement – SCTO Projects

– Early Design Involvement – Design for Cost – Build in Quality

• Complexity Reduction – Fewer Part Numbers – Part Re-use

– Standard Materials – Don’t over spec

• Real Supplier Development – Focus on improving Process Capability - CpK

– Implement Lean Principles

• Supplier Rationalization – Grow the Preferred Suppliers – Exit poor performers and small spend suppliers – Focus limited Lear resources on fewer suppliers

Page 88: Supplier Conference 2013 (Combined)

How to Become a Preferred Supplier to Lear?

• Share Current Financial Data to Demonstrate

Health of Company

• Maintain SRS Score of 90% or Greater

• Commitment to Annual Productivity Targets

• Commitment to Annual SCTO Idea Targets

• Demonstrated BIC Cost Structure

• Use Cost Models with Data Transparency

• New Technology & Innovation Offered to Lear First

• Agreement to Terms & Conditions

• Lear is Viewed as a Top Strategic Customer

Page 89: Supplier Conference 2013 (Combined)

Why Become a Lear Preferred Supplier?

• Top Choice for New Business Awards and

Resourcing Projects

• Early Involvement in Product Development

• Share Product Plans and Technology

Roadmaps

• On-going Senior Leadership Communication

• Recognized as Preferred Supplier and

Eligible for Supplier of the Year Award

• Grow Your Business Profitably

Page 90: Supplier Conference 2013 (Combined)

2011 2012

PP

M

68% Better

Preferred Supplier Growth & Performance

2009 2010 2011 2012

% S

pe

nd

Preferred All Other

69% Better

Page 91: Supplier Conference 2013 (Combined)

A Few Words on:

Supplier Cost Technical Optimization (SCTO)

• Process used on current production parts

• Seek to reduce the cost of a part without impact to

performance

• Eliminate features that add no true value but incur cost

• Improvement in quality and/or eliminate waste in the value

stream

Recovers “Avoidable” costs throughout the product life

Page 92: Supplier Conference 2013 (Combined)

SCTO Examples

• Change materials or specifications of materials

• Change dimensions or tolerances

• Reduce unnecessary test requirements

• Logistics or packaging improvements

• Manufacturing process improvements or elimination

• Improvements that reduce warranty costs

• Changes that improve manufacturing costs at Lear

• Inventory management improvements

• Alternate component and/or construction

Page 93: Supplier Conference 2013 (Combined)

Lear Supplier Expectations - SCTO

• SCTO is a formal requirement for production suppliers to

Lear

• Suppliers must submit SCTO ideas on current

production parts each calendar year

• Annual target for SCTO ideas is given as a percentage

of sales to Lear

• Ideas must be technically and economically feasible – as

mutually determined by Lear and the supplier to count

towards the supplier’s SCTO ideas target

Page 94: Supplier Conference 2013 (Combined)

94

Lear Quality Expectations

ZERO DEFECT Performance:

Part Quality and Delivery

Development Activities Completed On Time

Flawless Launch Performance

Service / Responsiveness / Open Communication

Same as Our Customer’s Expectations

Page 95: Supplier Conference 2013 (Combined)

Supplier Rating System

• Scorecards rate all suppliers and supplier

locations on Quality, Delivery, Warranty,

Customer Satisfaction and Competitiveness

• Scorecards are reviewed prior to all

sourcing decisions

• Suppliers expected to review scorecards on

a monthly basis

• All discrepancies must be disputed

immediately

Page 96: Supplier Conference 2013 (Combined)

96

Supply Viz - Supplier Self Service Access

• Coming soon - Supplier Self Service Access - Lear Supply Viz

• Vision:

– Web based supplier self service tool that provides Lear’s supply base a way to communicate updates on supplier profile data and a means of uploading required business documents both quickly and efficiently.

– Supplier Self Service maintenance requirements

• Corporate / Ownership Information

• Contact Information

• Quality, Environmental Certifications

• Financial Information

• Commodity Information

– Implementation

• July 2013

Page 97: Supplier Conference 2013 (Combined)

97

Suppliers Are Key to Lear Success

• Our future depends largely on you – 68% of what we sell comes from our suppliers

• Current performance is not “World Class” – Lear combined Supplier PPM: 45

– Over 1.9 million purchased parts rejected in 2012

– Over 25 thousand supplier complaints (QN’s) in 2012

• Warranty costs shifting to Tier 1’s like Lear

Page 98: Supplier Conference 2013 (Combined)

What does Lear need from you?

• A Change in Behavior

– Cooperative & Knowledge Sharing

– Open and honest communications at all levels

• Cost Transparency

– Participate in cost model development

• Relentless Pursuit of Continuous Improvement

– Implement Lean Principles

– Reduce complexity and non-value activities

– Propose innovative solutions to reduce costs

• Consider Lear your Customer of Choice – Put your best resource on Lear business

– Grow profitably with us

Page 99: Supplier Conference 2013 (Combined)

99

Page 100: Supplier Conference 2013 (Combined)

Supplier Diversity

100

Page 101: Supplier Conference 2013 (Combined)

Minorities Represent 36.3% of U.S. Population

Growing to 54% by 2050

Start with the Facts …

2010 Census Data

0%

10%

20%

30%

40%

50%

60%

1900 1960 1980 1990 2000 2010 2050

12% 15%

20%

24%

31%

36%

54%

Minority Population as a % of US Population (1900 - 2050)

Note: Data Source for both charts – Demographics of the United States - Wikipedia

Race Number of People % of Population

Caucasian 196,817,552 63.7%

Hispanic 50,477,594

African American 37,685,848

Asian 14,465,124

Two or more races 5,966,481

American Indian or Alaska Native 2,247,098

Some other race 604,265

Native Hawaiian 481,576

Total Population 2010 308,745,538 100%

Memo: Women 156,842,733 50.8%

36.3%

101

Page 102: Supplier Conference 2013 (Combined)

2011 2012 Goal

$514

$639

$1,000

Goal: Billion Dollar Roundtable

(in millions)

Lear Diversity Spending Trends

102

Page 103: Supplier Conference 2013 (Combined)

103

Lear Expectations From Suppliers

Diversity Included in Future Sourcing Considerations

1. Achieve 5% Diverse

Spend with Your Supply

Base

2. Report Diverse

Spending Results

Page 104: Supplier Conference 2013 (Combined)

104

Page 105: Supplier Conference 2013 (Combined)

Lear Supplier of the Year

Page 106: Supplier Conference 2013 (Combined)

BAE Industries, Inc.

Excelling Together

Page 107: Supplier Conference 2013 (Combined)

Coficab Tunisie

Excelling Together

Page 108: Supplier Conference 2013 (Combined)

Coroplast Fritz Müller

GmbH & Co. KG

Excelling Together

Page 109: Supplier Conference 2013 (Combined)

Grand Rapids Controls LLC

Excelling Together

Page 110: Supplier Conference 2013 (Combined)

KOA Speer Electronics Inc.

Excelling Together

Page 111: Supplier Conference 2013 (Combined)

Magno International, LP

Excelling Together

Page 112: Supplier Conference 2013 (Combined)

MSX International Inc.

Excelling Together

Page 113: Supplier Conference 2013 (Combined)

Murata Manufacturing Co.

Ltd.

Excelling Together

Page 114: Supplier Conference 2013 (Combined)

Netlink Software Group

America Inc.

Excelling Together

Page 115: Supplier Conference 2013 (Combined)

Nifco Inc.

Excelling Together

Page 116: Supplier Conference 2013 (Combined)

Ningbo Jifeng Auto

Parts Co.

Excelling Together

Page 117: Supplier Conference 2013 (Combined)

Panalpina, Inc.

Excelling Together

Page 118: Supplier Conference 2013 (Combined)

W.E.T. Automotive

Systems AG

Excelling Together

Page 119: Supplier Conference 2013 (Combined)

119