Growth of Solar Power Projects in MP
S R MohantyAdditional Chief Secretary,
Government of MP
State of Madhya Pradesh in India
2
Located at the Heart of India.
Second largest State in India
Tropic of Cancer passes through the state
Logistically Well Connected
Jawaharlal Nehru National Solar Mission
3
Launched on 11th January 2011 with a resolution to Deploy 20,000 MW of Grid Connected Solar Projects by 2022
Phase I completed successfully.
Batch I 249.55 MW
Batch II 350.00 MW
Total Pan India PV Capacity :
2631.9 MW
Pan India Capacity Added During 2013-14 :
947.47 MW
PV Solar Capacity Addition 2013-14
4
Sr. No.
State/UTTotal Commissioned Cap till 31.04.14
Total Commissioned Cap till 31.04.13
DifferencePosition During 2014
1 Andhra Pradesh 131.84 23.15 108.69 4
2 Chhattisgarh 7.1 4 3.1
3 Gujrat 916.4 857.9 58.5 6
4 Haryana 10.3 7.8 2.5
5 Karnataka 31 14 17
6 Madhya Pradesh 347.16 37.31 309.85 1
7 Maharashtra 249.25 100 149.25 3
8 Orissa 30.5 13 17.5
9 Punjab 16.845 9.325 7.52
10 Rajasthan 730.1 551.15 178.95 2
11 Tamil Nadu 98.36 17.05 81.31 5
12 Others 63.05 49.75 13.3
Total 2631.905 1684.435 947.47
Madhya PradeshAdvantages for Solar
Projects
Madhya Pradesh & Solar Energy
6
More than 300 days of clear sun.
Solar radiation between 5.6 - 6.2 kWh/sq. m/day
Limited Dust and Moisture
Solar Power in MP
• Transmission Capacity of More than 13000 MW and Expanding
Stable Transmission Network
• Over 10,000 Hectare identified for solar energy projects
Availability of abundant land
Madhya PradeshRE Policy
DevelopmentStrategy
Requisite Support System
9
• Clear Policy Direction
• Simple Documentation
• Transparency in Approach
• Quick and Committed Response
• Committed Implementation
Policy Development
10
• Formulation Process Kept Open
• Draft shared with all stake holders
• Consultation with Financial
Institutions, Consultants etc
Policy Development
11
• Simple land allocation procedures.
• No environment impact assessment required
• No land or project related inspection.
Policy Development
12
• No permission for construction from local bodies
• Simple Process & Minimal documentation
• Transparent project clearance & monitoring
Policy BenefitsNotified on July 2012
Benefits under Policies
14
• Ease in selection of land
– Freedom to identify suitable land
– Bankable document for government land
– Government land for 25 years
Benefits under Policies
15
• No electricity duty for 10 years
• No electricity cess for 10 years
• Wheeling charges reduced to 2%
Benefits under Policies
16
• Third party sale permitted
• Sale outside the state permitted
• No VAT and no entry tax
• Benefits of industry status also provided
Benefits under Policies
17
• Stamp duty exemption on pvt. land purchase
• 100% banking
• Reduction in contract demand for captive use
• 100% CDM Benefit
Response to Policy Framework
Page 19
Response to Polices(Phase I Oct 2012, Phase II May 2013 and Phase III May 2014)
56
96
50
23
77
99
Phase 1 Phase 2 Phase 3
Response in Numbers
Solar Wind
8801461
588685
3527
5753
Phase 1 Phase 2 Phase 3
Response in MW
Solar Wind
20
Solar Projects in the state
(From 2 MW to 2 GW)
Projects Under Execution
21
MW Numbers
Solar 1449 118
Page 22
Capacity Installed March 2012 2.0 MW
Capacity Commissioned By Apr 2014 354 MW
Progress in Solar Power
Solar Capacity Addition
23
2
220354
375
1250
1700
2000
Apr 2012 Sep 2013 Mar 2014 Jun 2014 May 2015 Dec 2015 March 2016
MP: Take-off Stage
24
Maximum Capacity Addition Pan-India
During 2013-14
REC Projects in MP
• First REC project of India registered in MP
• Projects registered: 52
25
Highest number of projects registered in the country
26
JNNSM Phase IIBatch I
Developers Selected from M.P.
27
Name of Developer MW
SEI Sitara Pvt. Ltd. 30
SEI L'Volta Pvt. Ltd. 20
Focal Energy Solar India Pvt. Ltd. 40
IL&FS Energy Development Company Limited 40
Hero Solar Energy Pvt. Ltd. 30
Finnsurya Energy Pvt. Ltd. 30
Waree Energy Pvt Ltd 50
Total 250
M.P. in JNNSM
28
• Total Projects 250 MW
(1/3 rd of Total Allocation)
• Weighted Average VGF from MP :
Lower by 2-5% in both the DCR and open category from the Pan India average
29
Key Developers in M.P.
Key Developers: Commissioned Projects
30
Name of Developer MW
Welspun Solar Madhya Pradesh Pvt Ltd 130
Alpha Infra Pvt Ltd 20
Friends Salt Works & Allied Industries 10
KRBL Limitd 9.31
M & B Switch Gears Limited 7
Deepak Industries Limited 5
Bhadresh Trading Corporation Ltd 5
Shri Balaji Enterprises 2
Eastman International 2
Adora Energy Pvt Ltd 2
Key Developers: Ongoing Projects
31
Name of Developer MW
NTPC Ltd 50
Deligentia Energy & Infrastructure Pvt Ltd 25
Dmulasia Solar Energy Pvt Ltd 100
Radox Consultants Services Pvt Ltd 100
Waaree Energies Pvt Ltd Mumbai 99
Welspun Renewable Energy Ltd Mumbai 55
Emami Power Ltd Kolkata 30
Avantee Power Pvt Ltd Indore 25
Jyotikiran Energy Pvt Ltd Noida 51
Steple Energy Pvt Ltd Bhopal 35
Key Developers: Ongoing Projects
32
Name of Developer MW
Sai Prakash Power India Ltd 100
Satec Solar Energy Pvt Ltd 10
ADS Project and System Pvt Ltd 10
THDC India Lts Tehri Garhwal 20
Forever Solar Project Pvt Ltd 24
M & B Switch Gears Ltd 121.85
Banco Infrastructure Pvt Ltd 11
Ujjas Energy Ltd 23
NJS Renewable Energy Pvt Ltd 20
Madhya Pradesh Construction Company 4
Recent Initiatives
Recent Initiatives for Investment Facilitation
• Solar Park and Farms
• Resource Assessment
• Infrastructure upgradation
• Process simplification
Solar Park
35
• Identified locations
- Neemuch
- Mandsaur
- Sheopur kalan
- Rewa
- Rajgarh
Solar Park
SOLAR PARK POLICY NOTIFIED
THE SOLAR PARKS WILL BE DEVELOPED ON PPP MODE
THE SOLAR PARKS WILL BE OF MIN CAPACITY OF 100 MW
ADDITIONAL BENEFITS TO THAT OF SOLAR POLICY
36
Solar Farms
• State to set up four solar farms of 15MW each
• Farms to include all infrastructure
• Farms to be ready with EPC pre fixed
• Farms for small investors to plug and play.
37
Resource Assessment
38
Investment Facilitation
Infrastructure upgradation
Process Simplification
Resource Assessment
20 stations for solar radiation measurement
Infrastructure Up gradation
39
Transmission infrastructure Upgradation
INR 2100 CrorePlan
ready
Cater to
4000 MW
Under PPP
Mode
Funded by NCEF
Process Simplification
40
Process Simplification
Dynamic Project
Tracking System
Documents Standardization
MW Scale ProjectsCommissioned
Project Sites in MP
42
43
First 1 MW Plant Commissioned in March 2012
First REC Plant in the Country
44
3 MW Plant Commissioned in December ’12
12 MW Plant Commissioned on 31st March
45
25 MW Plant Commissioned June ‘13
15 MW Plant Commissioned June ‘13
46
20 MW Plant Commissioned in September 2013
47
25 MW Plant at Khilchipur , distt Rajgarh (Biaora) developed by Acme Tele; commissioned in Jan 2014
Largest Solar Project in the Country
Largest Solar Project in India
49
Largest Solar Project in India
Total Capacity: 130 MW (151 MW DC)
Dedicated to Nation : 26th February, 2014
50
Largest Solar Project in India
Village Diken
Distt. Neemuch
Spread over 900 Acres
51
• Completed 8 months ahead of schedule
• Developer: M/S Welspun Renewable MP
52
Largest Solar Project in India Dedication to the Nation
53
World’s Largest Solar Project (Proposed)
World’s Largest Solar Project
55
Image credits: The World Bank
• Capacity: 700-900 MW
• Identified site: Rewa
• Project Development:
Govt of MP & SECI with
support from The World
bank
World’s Largest Solar Project
56
Image credits: The World Bank
• Land area: 1168.224 Ha
And By March 2016…
99.98%
0.02%
Apr-12
Conventional Power Solar Power
Solar Share in State Energy Pool
58
Projected Solar installed capacity: 2000 MW
88.24%
11.76%
Mar-16
Conventional Power Solar Power
95.91%
4.09%Apr-12
Conventional Power Renewable Power
Total Renewable Energy Share
59
Projected NRE installed capacity: 3800 MW
79.79%
20.21%
Mar-16
Conventional Power Renewable Power