MULTAN DEVELOPMENT AUTHORITY CONTRACTOR: CONSULTANT: CH. ABDULLATIF & CO. ABM ENGINEERS: SOUTHERN BYEPASS PHASE II MULTAN Sieve Analysis of Embankment & Sub Grade Material Grain Size Analysis AASHTO-T-27 PROJECT: Sampling Date Kind of Material Testing Date LOCATION Field Sample No. Lab. Sample No. Original Sourse Analyst. Weight of Original Sample Gms Weight of Oven Dry Gms 1042.9 Weight of Washed Oven Dry Gms Sieve Size Wt. Retained Cum. Wt.Retained Cum. Retained Cum. Passing Specification Rema mm (alt.) Grms Grms % % % 75 3'' 63 2 1/2" 50.0 2 " 37.5 1 1/2'' 25.0 1 " 19.0 3/4 " 12.5 1/2 " 9.5 3/8 " 4.75 No. 4 0.0 0.0 0.0 100.0 2.36 No. 8 2.00 No. 10 10.4 10.4 1.0 99.0 1.18 No. 16 0.60 No. 30 0.425 No. 40 66.7 77.2 7.4 92.6 0.3 No. 50 0.18 No. 80 0.15 No. 100 0.075 No. 200 135.6 212.8 20.4 79.6 Oven Dry wt. -4 # Sieve ( Gms) Sieve Size No.10 No.40 No.200 Passing % Calculations Cumulative Percent Retained = Cumulative mass Retained / Dry Mass Before Wash Percent Passing = 100 - Cumulative Percent Retained CONTRACTOR: CONSULTANT: CONSULT LAB TECHNICIAN MATERIAL INSPECTOR MATERIAL ENGINEE

Transcript of A.L BH#1 D3

Page 1: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITY

CONTRACTOR: CONSULTANT:

CH. ABDULLATIF & CO. ABM ENGINEERS:

SOUTHERN BYEPASS PHASE II MULTAN

Sieve Analysis of Embankment & Sub Grade Material

Grain Size Analysis AASHTO-T-27

PROJECT: Sampling Date

Kind of Material Testing Date

LOCATIONField Sample No.

Lab. Sample No.

Original Sourse Analyst.

Weight of Original Sample GmsWeight of Oven Dry Gms 1042.9Weight of Washed Oven Dry Gms

Sieve Size Wt. Retained Cum. Wt.Retained Cum. Retained Cum. Passing SpecificationRemarks

mm (alt.) Grms Grms % % %

75 3''

63 2 1/2"

50.0 2 "

37.5 1 1/2''

25.0 1 "

19.0 3/4 "

12.5 1/2 "

9.5 3/8 "

4.75 No. 4 0.0 0.0 0.0 100.0

2.36 No. 8

2.00 No. 10 10.4 10.4 1.0 99.0

1.18 No. 16

0.60 No. 30

0.425 No. 40 66.7 77.2 7.4 92.6

0.3 No. 50

0.18 No. 80

0.15 No. 100

0.075 No. 200 135.6 212.8 20.4 79.6

Oven Dry wt. -4 # Sieve ( Gms)

Sieve Size No.10 No.40 No.200

Passing %

CalculationsCumulative Percent Retained = Cumulative mass Retained / Dry Mass Before Wash

Percent Passing = 100 - Cumulative Percent Retained

CONTRACTOR: CONSULTANT: CONSULTANT:

LAB TECHNICIAN MATERIAL INSPECTOR MATERIAL ENGINEER

Date (التاريخ)

Page 2: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:

CH.ABDUL LATIF & CO. ABM ENGINEERS

SOUTHERN BYE PASS PHASE II MULTAN

Soils Classification /Atterburg LimitsMRD Test Method 208 -209 - 210 (Adaptation of AASHTO T 89 - 90 - 80)

Project Sampling Date

Kind of Material Testing Date

Location Lab. Sample No.

Quantity Represented Material Used:

Sieve AnalysisSieve Size Individual Wt. Retained Cumulative Wt. Retained

3/4 in (19 mm) 0 0 0 100No.4 (4.75 mm) 0 0 0 100No.10 (2.00 mm) 0.9 0.9 0 99.9No. 40 (0.425 mm) 5.7 6.6 1 99.3No.200 (0.075 mm) 179.8 186.4 20 80.3

PanWashTotal 186.4

Original Wt. Gram Dry Wt. Gram Wash Dry Wt. Gram946.3

Atterburg Limits (Liquid Limit & Plastic Limit )Type of Test LIQUID LIMIT TEST

PLASTIC LIMIT TESTNumber of Blows 40 32 25 18

Trial No. 1 32 24 18 1 2 3Container Number A-1 A-2 A-3 A-4 A-5 A-6 A-7Wt. of Container g 17.70 27.70 18.50 19.50 22.20 20.20 24.00Wt. Wet Soil + Container g 45.54 53.43 46.15 44.63 34.96 33.66 35.93Wt. Dry Soil + Container g 40.85 48.72 40.70 39.36 32.85 31.45 33.99Wt. of Water g 4.69 4.71 5.45 5.27 2.11 2.21 1.94Wt. of Dry Soil g 23.15 21.02 22.20 19.86 10.65 11.25 9.99

Water Content % 20.26 22.41 24.56 26.54 19.85 19.65 19.40

Avg. 23.44 19.63

Liquid Limit (L.L) LL = 24.40 Plastic Limit (P.L) P.L = 19.63

Plasticity Index (P.I) P.I = L.L - P.L 4.77 Classification Group A-4

CONTRACTOR CONSULTANT CONSULTANT

LAB TECHNICIAN MATERIALS INSPECTOR MATERIAL ENGINEER

Cumulative Percent Retained

Percent Passing

10 100

17.00

18.00

19.00

20.00

21.00

22.00

23.00

24.00

25.00

26.00

27.00

28.00

29.00

30.00

No. of Blows

Wate

r C

on

ten

t %

20 30 40 50 60 70 80 9025

Page 3: A.L BH#1 D3
Page 4: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:

NAZIR & COMPANY ABM CONSULTANT

FATIMA JINNAH TOWN PHASE 1 VEHARI ROAD MULTAN

California Bearing RatioMRD Test Method 213 (Adaptation of ASTM D 1883 - AASHOT 193)

Page 1 Of 2

Road Name FATIMA JINNAH TOWN Field Sample No.Description: SUB GRADE MATERIAL Date Of Sampling

2/1/2010Location

B-BLOCK Date TestedSUB GRADE MATERIAL Quant. Rep.

Materials Analyst:Surcharge Weight Used(kg) 4.54 Rate of penetration mm/Minute 1.27

Density DeterminationTest No. 1 2 3 Test No. 1 2 3Can No. A5 A9 B4 2128.0 2109.0 2124.0

A Mass. Wet Soil + Can. g 647.6 727.8 621.4 Mass. Sample + Mold . g 10997 11191 11496B Mass Dry Soil + Can. g 581.9 655.2 558 Mass Mold . g 7090 6950 6940C 65.7 72.6 63.4 Mass Sample . g 3907 4241 4556D Mass Can. g 48 70.1 47.1 1.836 2.011 2.145E 533.9 585.1 510.9 Percent Moisture % 12.30 12.4 12.40F 12.30 12.40 12.40 1.635 1.789 1.908

Test No. 1 2 3Blows Per Lift 10 30 65Penetration

Molded Tested Molded Tested Molded TestedTotal Unit Corrected

CBRTotal Unit Corrected

CBRTotal Unit Corrected

CBRmm

Load Load Load Load Load Load Load Load Load

Kg % Kg % Kg %

0 0 0 0 0

0.5 0.64 0.7 1.2 1.8 3.0 2.7 4.6

1 1.27 1.3 2.2 3.0 5.1 4.3 7.3

1.5 1.90 1.7 2.9 4.2 7.1 5.6 9.5

2 2.54 70.35 2.2 3.7 5.3 5.1 8.7 12.3 6.8 11.4 16.23 3.81 2.9 4.9 6.3 10.7 8.4 14.2

4 5.08 105.53 3.3 5.6 5.3 7.5 12.7 12.1 9.9 16.8 15.96 7.62 3.9 6.6 9.1 15.4 12.0 20.3

Swell ReadingDate Moldend

Test No. 1 2 3

Mold No. 1 2 3

Final Height . mm 0.42 0.34 0.21

Initial Height . mm 0.000 0.000 0.000

Difference . mm 0.42 0.34 0.21

Sample Length . mm 116.43 116.43 116.43

Percent Swell % 0.36 0.29 0.18

MAX DRY DENSITY 1.899

OPTIMUM MOISTURE CONTENT 12.4 %

Blows Per Lift No. 10 30 65

1.635 1.789 1.908

Soaked C.B.R. % 5.3 12.1 15.9

95 % of Max. Dry Density 1.804

C.B.R At 95% of Max Dry Density 12.8 %

Contractor: Consultant:

Lab Technician Material Inspector Material Engineer

Molding Moisture Content (ASTM D 2216)

Mold Volume cm3

Mass Of Water. A-B g

Unit Wet Mass. g/cm3

Mass Dry Soil . B-D gMoisture Content C/E X 100 % Unit Dry Mass. g/cm3

Sta

nda

rd L

oad

(Str

esse

s) K

g / C

m2

Per Min. Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2

PROCTOR MODIFIED

g/cm3

Dry Density g/cm3.

g/cm3 0 1.27 2.54 3.81 5.08 6.35 7.62 8.89

0

5

10

15

20

25

Penetration mm

Un

it L

oa

d (

Str

ess

) k

g /

cm

2

Page 5: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:NAZIR & COMPANY ABM CONSULTANTS:

FATIMA JINNAH TOWN PHASE 1 VEHARI ROAD MULTAN

California Bearing RatioMRD Test Method 213 (Adaptation of ASTM D 1883 - AASHOT 193)

Page 2 Of 2Description: SUB GRADE MATERIAL LOCATION: B-BLOCK

PROCTOR MODIFIEDMAX DRY DENSITY 1.915

OPTIMUM MOISTURE CONTENT 11.9 %

BLOWS PER LAYER No. 10 30 65

1.635 1.877 1.980

SOAKED C.B.R. % 5 12 16

95 % of Max. Dry Density 1.819C.B.R At 93.0% of Max Dry Density 11.2 %

C.B.R At 95% of Max Dry Density 12.8 %

CONTRACTOR: CONSULTANT:

Lab Technician Material Inspector Material Engineer

g/cm³

DRY DENSITY AS MOLDED g/cm3

g/cm3

1.600 1.650 1.700 1.750 1.800 1.850 1.900 1.950 2.0000

2

4

6

8

10

12

14

16

18

Dry Density g/cc

Soa

ked

CB

R %

Page 6: A.L BH#1 D3

IMPROVEMENT&WIDENING OF NATIONAL HIGHWAY N-5 BAHAWAL POUR CHOWK (929+000) TO

CONTRACTOR: CONSULTANT:

CH:ABDUL LATIF &CO ABM ENGINEERS

SOUTHREN BYPASS PHASE II VEHARI ROAD TO BAHAWALPUR CHOWK MULTAN

Moisture-Density Relationship of SoilsMRDTM 212 (ASTM D 698 - 1557 - AASHO T 99 - T 180)

Project Sampling Date

Description Of Sample Testing DateLOCATION: Field Sample No.

LAYER: Lab. Sample No.

Analyst.

A Mold No. Formula 1 2 3 4 5 6B Wt. Compacted Wet soil + Mold (gm) 8382 8755 9072 9237 9110

C Wt. Mold (gm) 4724 4724 4724 4724 4724

D 2118 2118 2118 2118 2118

E Wt. Compacted Wet soil (gm) B - C 3658 4031 4348 4513 4386

F E / D 1.727 1.903 2.053 2.131 2.071

G Container No. A-1 A-2 A-3 A-4 A-4H Wt. of Container 36.0 35.5 34.0 34.5 36.2I Wt. Wet Soil + Container (gm) 336.9 302.3 313.2 302.5 308.1J Wt. Dry Soil + Container (gm) 322.6 285.3 290.6 275.5 274.9K Wt of Water (gm) I - J 14.3 17.0 22.6 27.0 33.2L Wt. of Dry Soil (gm) J - H 286.6 249.8 256.6 241 238.7M Water Content % ( K / L )*100 5.0 6.8 8.8 11.2 13.9N Dry Density (g/cc) F / ( 1+ ( M/100 ) ) 1.645 1.782 1.887 1.916 1.818

11.31.917

Remraks :

CONTRACTOR: CONSULTANT:

LAB TECHNICIAN MATERIALS INSPECTOR MATERIAL ENGINEER

Volume of Mold (Cm3)

Wet Density (gm/Cm3)

OPIMUM MOISTURE CONTENT %

MAXIMUM DRY DENSITY gm/Cm3

4 5 6 7 8 9 10 11 12 13 14 15

1.508

1.568

1.628

1.689

1.749

1.809

1.870

1.930

1.990Moisture-Density Relationship

Moisture Content %

Dry

Den

sity

gm

/cm

3

Page 7: A.L BH#1 D3
Page 8: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:

CH:ABDUL LATIF &CO ABM CONSULTANT

SOUTHERN BYEPASS PHASE II MULTANCalifornia Bearing Ratio

MRD Test Method 213 (Adaptation of ASTM D 1883 - AASHOT 193)Page 1 Of 2

Road Name Field Sample No.Description: Date Of Sampling

LocationDate TestedQuant. Rep.

Materials Analyst:

Density DeterminationTest No. 1 2 3 Test No. 1 2 3Can No. A5 A9 B4 2124.0 2128.0 2109.0

A Mass. Wet Soil + Can. g 740.2 638.0 686.3 Mass. Sample + Mold . g 10969 11310 11344B Mass Dry Soil + Can. g 680.4 586.9 631.1 Mass Mold . g 6510 7090 6950C 59.8 51.1 55.2 Mass Sample . g 4459 4220 4394D Mass Can. g 70.1 65 68 2.099 1.983 2.084E 610.3 521.9 563.1 Percent Moisture % 9.80 9.8 9.80F 9.80 9.80 9.80 1.912 1.806 1.898

Test No. 1 2 3Blows Per Lift 10 30 65Penetration

Molded Tested Molded Tested Molded TestedTotal Unit Corrected

CBRTotal Unit Corrected

CBRTotal Unit Corrected

CBRmm

Load Load Load Load Load Load Load Load Load

Kg % Kg % Kg %

0 0 0 0 0

0.5 0.64 1.0 1.7 1.4 2.4 2.4 4.1

1 1.27 1.3 2.2 3.0 5.0 3.9 6.6

1.5 1.90 1.7 2.8 4.2 7.1 5.3 9.0

2 2.54 70.35 2.1 3.6 5.2 5.0 8.4 12.0 6.6 11.2 15.93 3.81 2.8 4.7 6.3 10.7 8.0 13.5

4 5.08 105.53 3.2 5.3 5.1 7.3 12.4 11.7 9.7 16.4 15.56 7.62 3.8 6.5 8.9 15.0 11.7 19.8

Swell ReadingDate Moldend

Test No. 1 2 3

Mold No. 1 2 3

Final Height . mm 0.45 0.36 0.28

Initial Height . mm 0.000 0.000 0.000

Difference . mm 0.45 0.36 0.28

Sample Length . mm 116.43 116.43 116.43

Percent Swell % 0.39 0.31 0.24

MAX DRY DENSITY 1.909

OPTIMUM MOISTURE CONTENT 9.8 %

Blows Per Lift No. 10 30 65

1.912 1.806 1.898

Soaked C.B.R. % 5.1 11.7 15.5

95 % of Max. Dry Density 1.814

C.B.R At 95% of Max Dry Density 12.2 %

Contractor: Consultant:

Lab Technician Material Inspector Material Engineer

Molding Moisture Content (ASTM D 2216)

Mold Volume cm3

Mass Of Water. A-B g

Unit Wet Mass. g/cm3

Mass Dry Soil . B-D gMoisture Content C/E X 100 % Unit Dry Mass. g/cm3

Sta

nda

rd L

oad

(Str

esse

s) K

g / C

m2

Per Min. Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2

PROCTOR MODIFIED

g/cm3

Dry Density g/cm3.

g/cm3 0 1.27 2.54 3.81 5.08 6.35 7.62 8.89

0

5

10

15

20

25

Penetration mm

Un

it L

oa

d (

Str

ess

) k

g /

cm

2

Page 9: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:CH. CONSTRUCTON COMPANY ABM CONSULTANTS:

SOUTHERN BYEPASS MULTAN

California Bearing RatioMRD Test Method 213 (Adaptation of ASTM D 1883 - AASHOT 193)

Page 2 Of 2Description: Embankment 4th Layer LOCATION: 3+175 TO 3+500 Full Width

PROCTOR MODIFIEDMAX DRY DENSITY 1.909

OPTIMUM MOISTURE CONTENT 9.8 %

BLOWS PER LAYER No. 10 30 65

1.912 1.806 1.898

SOAKED C.B.R. % 5.1 11.7 15.5

95 % of Max. Dry Density 1.814C.B.R At 93.0% of Max Dry Density 9.6 %

C.B.R At 95% of Max Dry Density 12.2 %

CONTRACTOR: CONSULTANT:

Lab Technician Material Inspector Material Engineer

g/cm³

DRY DENSITY AS MOLDED g/cm3

g/cm3

1.650 1.700 1.750 1.800 1.850 1.900 1.9500.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Dry Density g/cc

Soa

ked

CB

R %

Page 10: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITY

CONTRACTOR: CONSULTANT:

CHOUDHARY CONSTRUCTION CO. ABM ENGINEERS

SOUTHERN BYEPASS PHASE 1 MULTAN

Moisture-Density Relationship of SoilsMRDTM 212 (ASTM D 698 - 1557 - AASHO T 99 - T 180)

Project Sothern ByePass Multan Sampling Date

Description Of Sample Embankment 4th Layer Testing DateLOCATION: 3+175 to 3+500 Full Width Field Sample No.

LAYER: 4th Layer Lab. Sample No.

Analyst.

A Mold No. Formula 1 2 3 4 5 6B Wt. Compacted Wet soil + Mold (gm) 9144 9438 9695 9851 9798

C Wt. Mold (gm) 5376 5376 5376 5376 5376

D 2135 2135 2135 2135 2135

E Wt. Compacted Wet soil (gm) B - C 3768 4062 4319 4475 4422

F E / D 1.765 1.903 2.023 2.096 2.071

G Container No. A-1 A-2 A-3 A-4 A-4H Wt. of Container 36.2 34.5 35.0 35.0 35.4I Wt. Wet Soil + Container (gm) 314.4 372.2 446.3 362.3 394.5J Wt. Dry Soil + Container (gm) 304.5 353.1 416.2 333.1 357.2K Wt of Water (gm) I - J 9.9 19.1 30.1 29.2 37.3L Wt. of Dry Soil (gm) J - H 268.3 318.6 381.2 298.1 321.8M Water Content % ( K / L )*100 3.7 6.0 7.9 9.8 11.6N Dry Density (g/cc) F / ( 1+ ( M/100 ) ) 1.702 1.795 1.875 1.909 1.856

OPTIMUM MOISTURE CONTENT % 9.81.909

Remraks :

CONTRACTOR: CONSULTANT:

LAB TECHNICIAN MATERIALS INSPECTOR MATERIAL ENGINEER

Volume of Mold (Cm3)

Wet Density (gm/Cm3)

MAXIMUM DRY DENSITY gm/Cm3

3 4 5 6 7 8 9 10 11 12 13

1.550

1.600

1.650

1.700

1.750

1.800

1.850

1.900

1.950Moisture-Density Relationship

Moisture Content %

Dry

Den

sity

gm

/cm

3

Page 11: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:

CH. CONSTRUCTION COMPANY ABM ENGINEERS

SOUTHERN BYE PASS MULTAN

Soils Classification /Atterburg LimitsMRD Test Method 208 -209 - 210 (Adaptation of AASHTO T 89 - 90 - 80)

Project SOUTHERN BYE PASS MULTAN Sampling Date

Kind of Material Embankment 4th Layer Testing Date

Location 3+175 to 3+500 Full Width Lab. Sample No.

Quantity Represented Material Used: Embankment

Sieve AnalysisSieve Size Individual Wt. Retained Cumulative Wt. Retained

3/4 in (19 mm) 0 0 0 100No.4 (4.75 mm) 0 0 0 100No.10 (2.00 mm) 0.9 0.9 0 99.9No. 40 (0.425 mm) 5.7 6.6 1 99.3No.200 (0.075 mm) 179.8 186.4 20 80.3

PanWashTotal 186.4

Original Wt. Gram Dry Wt. Gram Wash Dry Wt. Gram946.3

Atterburg Limits (Liquid Limit & Plastic Limit )Type of Test LIQUID LIMIT TEST

PLASTIC LIMIT TESTNumber of Blows 40 32 24 16

Trial No. 1 2 3 4 1 2 3Container Number A-1 A-2 A-3 A-4 A-5 A-6 A-7Wt. of Container g 22.40 17.90 27.70 19.50 22.20 16.80 17.00Wt. Wet Soil + Container g 50.53 42.80 64.32 47.91 35.73 28.83 30.87Wt. Dry Soil + Container g 45.59 38.06 56.91 41.79 33.46 26.80 28.48Wt. of Water g 4.94 4.74 7.41 6.12 2.27 2.03 2.39Wt. of Dry Soil g 23.19 20.16 29.21 22.29 11.26 10.00 11.48

Water Content % 21.29 23.51 25.36 27.45 20.16 20.25 20.81

Avg. 24.80 20.41

Liquid Limit (L.L) LL = 24.20 Plastic Limit (P.L) P.L = 20.41

Plasticity Index (P.I) P.I = L.L - P.L 3.79 Classification Group A-4

CONTRACTOR CONSULTANT CONSULTANT

LAB TECHNICIAN MATERIALS INSPECTOR MATERIAL ENGINEER

Cumulative Percent Retained

Percent Passing

10 100

19.00

20.00

21.00

22.00

23.00

24.00

25.00

26.00

27.00

28.00

29.00

30.00

No. of Blows

Wate

r C

on

ten

t %

20 30 40 50 60 70 80 9025

Page 12: A.L BH#1 D3
Page 13: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITY

CONTRACTOR: CONSULTANT:

CH.CONSTRUCTION COMPANY ABM ENGINEERS:

SOUTHERN BYEPASS MULTAN

Sieve Analysis of Embankment Material

Grain Size Analysis AASHTO-T-27

PROJECT: Southern ByePass Sampling Date

Kind of Material Testing Date

LOCATION3+175 TO 3+500 Full Width Field Sample No.

Embankmant Lab. Sample No.

Original Sourse Analyst.

Weight of Original Sample GmsWeight of Oven Dry Gms 971.6Weight of Washed Oven Dry Gms

Sieve Size Wt. Retained Cum. Wt.Retained Cum. Retained Cum. Passing SpecificationRemarks

mm (alt.) Grms Grms % % %

75 3'' 0 0 34.4 65.6

63 2 1/2" 0 0 48 52.0

50.0 2 " 0 0 60 40.4

37.5 1 1/2'' 0 0 0.0 100.0

25.0 1 " 131 131 13.5 86.5

19.0 3/4 " 0 0 0.0 100.0

12.5 1/2 " 0 0 99.7 0.3

9.5 3/8 " 76 36 3.7 96.3

4.75 No. 4 0.0 0.0 0.0 100.0

2.36 No. 8

2.00 No. 10 7.8 7.8 0.8 99.2

1.18 No. 16

0.60 No. 30

0.425 No. 40 -3.9 3.9 0.4 99.6

0.3 No. 50

0.18 No. 80

0.15 No. 100

0.075 No. 200 177.8 181.7 18.7 81.3

Oven Dry wt. -4 # Sieve ( Gms)

Sieve Size No.10 No.40 No.200

Passing %

CalculationsCumulative Percent Retained = Cumulative mass Retained / Dry Mass Before Wash

Percent Passing = 100 - Cumulative Percent Retained

CONTRACTOR: CONSULTANT: CONSULTANT:

LAB TECHNICIAN MATERIAL INSPECTOR MATERIAL ENGINEER

EMBANKMENT 4TH LAYER

Date (التاريخ)

Page 14: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:

CH.CONSTRUCTION COMPANY ABM CONSULTANT

SOUTHERN BYEPASS PHASE 1 MULTANCalifornia Bearing Ratio

MRD Test Method 213 (Adaptation of ASTM D 1883 - AASHOT 193)Page 1 Of 2

Road Name SOUTHERN BYEPASS MULTAN Field Sample No.Description: SUB GRADE MATERIAL Date Of Sampling

Location1+550 to 2+600 L/S Date Tested

Sub Grade 1st Layer Quant. Rep.Materials Analyst:Surcharge Weight Used(kg) 4.54 Rate of penetration mm/Minute 1.27

Density DeterminationTest No. 1 2 3 Test No. 1 2 3Can No. A5 A9 B4 2128.0 2109.0 2124.0

A Mass. Wet Soil + Can. g 624.3 638.2 683.1 Mass. Sample + Mold . g 11155 11198 11457B Mass Dry Soil + Can. g 571.0 584 626.4 Mass Mold . g 7090 6950 6940C 53.3 54.2 56.7 Mass Sample . g 4065 4248 4517D Mass Can. g 48 47.1 65 1.910 2.014 2.127E 523.0 536.9 561.4 Percent Moisture % 10.20 10.1 10.10F 10.20 10.10 10.10 1.734 1.829 1.932

Test No. 1 2 3Blows Per Lift 10 30 65Penetration

Molded Tested Molded Tested Molded TestedTotal Unit Corrected

CBRTotal Unit Corrected

CBRTotal Unit Corrected

CBRmm

Load Load Load Load Load Load Load Load Load

Kg % Kg % Kg %

0 0 0 0 0

0.5 0.64 1.0 1.8 2.0 3.4 2.8 4.7

1 1.27 1.6 2.7 3.5 5.9 4.5 7.6

1.5 1.90 2.0 3.4 4.5 7.6 6.0 10.2

2 2.54 70.35 2.4 4.0 5.7 5.6 9.4 13.4 7.4 12.5 17.83 3.81 3.1 5.2 7.1 12.0 9.8 16.6

4 5.08 105.53 3.7 6.3 6.0 8.7 14.7 14.0 11.6 19.6 18.66 7.62 4.7 7.9 10.9 18.5 14.5 24.6

Swell ReadingDate Moldend

Test No. 1 2 3

Mold No. 1 2 3

Final Height . mm 0.00 0.00 0.00

Initial Height . mm 0.000 0.000 0.000

Difference . mm 0.00 0.00 0

Sample Length . mm 116.43 116.43 116.43

Percent Swell % 0.00 0.00 0.00

MAX DRY DENSITY 1.931

OPTIMUM MOISTURE CONTENT 10.1 %

Blows Per Lift No. 10 30 65

1.734 1.829 1.932

Soaked C.B.R. % 6.0 14.0 18.6

95 % of Max. Dry Density 1.834

C.B.R At 95% of Max Dry Density 14.2 %

Contractor: Consultant:

Lab Technician Material Inspector Material Engineer

Molding Moisture Content (ASTM D 2216)

Mold Volume cm3

Mass Of Water. A-B g

Unit Wet Mass. g/cm3

Mass Dry Soil . B-D gMoisture Content C/E X 100 % Unit Dry Mass. g/cm3

Sta

nda

rd L

oad

(Str

esse

s) K

g / C

m2

Per Min. Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2

PROCTOR MODIFIED

g/cm3

Dry Density g/cm3.

g/cm3 0 1.27 2.54 3.81 5.08 6.35 7.62 8.89

0

5

10

15

20

25

Penetration mm

Un

it L

oa

d (

Str

ess

) k

g /

cm

2

Page 15: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:CH. CONSTRUCTON COMPANY ABM CONSULTANTS:

SOUTHERN BYEPASS MULTAN

California Bearing RatioMRD Test Method 213 (Adaptation of ASTM D 1883 - AASHOT 193)

Page 2 Of 2Description: Sub Grade 1st Layer LOCATION: 1+550 TO 2+600 L/S

PROCTOR MODIFIEDMAX DRY DENSITY 1.931

OPTIMUM MOISTURE CONTENT 10.1 %

BLOWS PER LAYER No. 10 30 65

1.734 1.829 1.932

SOAKED C.B.R. % 6.0 14.0 18.6

95 % of Max. Dry Density 1.834C.B.R At 93.0% of Max Dry Density 11.6 %

C.B.R At 95% of Max Dry Density 14.2 %

CONTRACTOR: CONSULTANT:

Lab Technician Material Inspector Material Engineer

g/cm³

DRY DENSITY AS MOLDED g/cm3

g/cm3

1.650 1.700 1.750 1.800 1.850 1.900 1.9500.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

Dry Density g/cc

Soa

ked

CB

R %

Page 16: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITY

CONTRACTOR: CONSULTANT:

CHOUDHARY CONSTRUCTION CO. ABM ENGINEERS

SOUTHERN BYEPASS PHASE 1 MULTAN

Moisture-Density Relationship of SoilsMRDTM 212 (ASTM D 698 - 1557 - AASHO T 99 - T 180)

Project Sothern ByePass Multan Sampling Date

Description Of Sample SUB GRADE MATERIAL Testing DateLOCATION: 1+550 to 2+600 L/S Field Sample No.

LAYER: Sub Grade 1st Layer Lab. Sample No.

Analyst.

A Mold No. Formula 1 2 3 4 5 6B Wt. Compacted Wet soil + Mold (gm) 9149 9463 9722 9915 9834

C Wt. Mold (gm) 5376 5376 5376 5376 5376

D 2135 2135 2135 2135 2135

E Wt. Compacted Wet soil (gm) B - C 3773 4087 4346 4539 4458

F E / D 1.767 1.914 2.036 2.126 2.088

G Container No. A-1 A-2 A-3 A-4 A-4H Wt. of Container 35.4 35.0 35.0 36.2 41.1I Wt. Wet Soil + Container (gm) 366.3 381.9 412.1 378.1 397.1J Wt. Dry Soil + Container (gm) 353.9 361.3 384.2 346.7 360.1K Wt of Water (gm) I - J 12.4 20.6 27.9 31.4 37.0L Wt. of Dry Soil (gm) J - H 318.5 326.3 349.2 310.5 319M Water Content % ( K / L )*100 3.9 6.3 8.0 10.1 11.6N Dry Density (g/cc) F / ( 1+ ( M/100 ) ) 1.701 1.801 1.885 1.931 1.871

OPTIMUM MOISTURE CONTENT % 10.11.931

Remraks :

CONTRACTOR: CONSULTANT:

LAB TECHNICIAN MATERIALS INSPECTOR MATERIAL ENGINEER

Volume of Mold (Cm3)

Wet Density (gm/Cm3)

MAXIMUM DRY DENSITY gm/Cm3

3 4 5 6 7 8 9 10 11 12 13

1.550

1.600

1.650

1.700

1.750

1.800

1.850

1.900

1.950

2.000Moisture-Density Relationship

Moisture Content %

Dry

Den

sity

gm

/cm

3

Page 17: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:

NAZIR & COMPANY ABM ENGINEERS

FATIMA JINNAH TOWN PHASE 1 VEHARI ROAD MULTAN

Soils Classification /Atterburg LimitsMRD Test Method 208 -209 - 210 (Adaptation of AASHTO T 89 - 90 - 80)

Project FATIMA JINNAH TOWN PHASE 1 Sampling Date1/1/2010

Kind of Material SUB GRADE MATERIAL Testing Date

Location B-BLOCK Lab. Sample No.

Quantity Represented Material Used: SUB GRADE

Sieve AnalysisSieve Size Individual Wt. Retained Cumulative Wt. Retained

3/4 in (19 mm) 0 0 0 100No.4 (4.75 mm) 0 0 0 100No.10 (2.00 mm) 0.9 0.9 0 99.9No. 40 (0.425 mm) 5.7 6.6 1 99.3No.200 (0.075 mm) 179.8 186.4 20 80.3

PanWashTotal 186.4

Original Wt. Gram Dry Wt. Gram Wash Dry Wt. Gram946.3

Atterburg Limits (Liquid Limit & Plastic Limit )Type of Test LIQUID LIMIT TEST

PLASTIC LIMIT TESTNumber of Blows 41 33 25 17

Trial No. 1 2 3 4 1 2 3Container Number A-1 A-2 A-3 A-4 A-5 A-6 A-7Wt. of Container g 27.70 17.00 16.80 20.20 19.50 22.40 17.90Wt. Wet Soil + Container g 59.74 52.19 56.28 53.06 33.12 34.48 31.78Wt. Dry Soil + Container g 53.89 45.34 48.06 45.84 30.76 32.40 29.38Wt. of Water g 5.85 6.85 8.22 7.22 2.36 2.08 2.40Wt. of Dry Soil g 26.19 28.34 31.26 25.64 11.26 10.00 11.48

Water Content % 22.35 24.16 26.29 28.16 20.95 20.81 20.93

Avg. 24.80 20.90

Liquid Limit (L.L) LL = 26.00 Plastic Limit (P.L) P.L = 20.90

Plasticity Index (P.I) P.I = L.L - P.L 5.10 Classification Group A-4

CONTRACTOR CONSULTANT CONSULTANT

LAB TECHNICIAN MATERIALS INSPECTOR MATERIAL ENGINEER

Cumulative Percent Retained

Percent Passing

10 100

19.00

20.00

21.00

22.00

23.00

24.00

25.00

26.00

27.00

28.00

29.00

30.00

No. of Blows

Wate

r C

on

ten

t %

20 30 40 50 60 70 80 9025

Page 18: A.L BH#1 D3
Page 19: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITY

CONTRACTOR: CONSULTANT:

NAZIR & COMPANY ABM ENGINEERS:

FATIMA JINNAH TOWN PHASE 1 VEHARI ROAD MULTAN

Sieve Analysis of Sub Grade Material

Grain Size Analysis AASHTO-T-27

PROJECT: FATIMA JINNAH TOWN Sampling Date

Kind of Material SUB GRADE MAERIAL Testing Date 01/01/2010

LOCATIONB-BLOCK Field Sample No.

SUB GRADE MATERIAL Lab. Sample No.

Original Sourse Analyst.

Weight of Original Sample GmsWeight of Oven Dry Gms 1193.6Weight of Washed Oven Dry Gms

Sieve Size Wt. Retained Cum. Wt.Retained Cum. Retained Cum. Passing SpecificationRemarks

mm (alt.) Grms Grms % % %

75 3'' 0 0 34.4 65.6

63 2 1/2" 0 0 48 52.0

50.0 2 " 0 0 60 40.4

37.5 1 1/2'' 0 0 0.0 100.0

25.0 1 " 161 161 13.5 86.5

19.0 3/4 " 0 0 0.0 100.0

12.5 1/2 " 0 0 99.7 0.3

9.5 3/8 " 0 0.0 100.0

4.75 No. 4 7.2 0.0 0.0 100.0

2.36 No. 8

2.00 No. 10 9.5 9.5 0.8 99.2

1.18 No. 16

0.60 No. 30

0.425 No. 40 81.2 90.7 7.6 92.4

0.3 No. 50

0.18 No. 80

0.15 No. 100

0.075 No. 200 37.0 127.7 10.7 89.3

Oven Dry wt. -4 # Sieve ( Gms)

Sieve Size No.10 No.40 No.200

Passing %

CalculationsCumulative Percent Retained = Cumulative mass Retained / Dry Mass Before Wash

Percent Passing = 100 - Cumulative Percent Retained

CONTRACTOR: CONSULTANT: CONSULTANT:

LAB TECHNICIAN MATERIAL INSPECTOR MATERIAL ENGINEER

Date (التاريخ)

Page 20: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITY

CONTRACTOR: CONSULTANT:

CHOUDHARY CONSTRUCTION CO. ABM ENGINEERS

SOUTHERN BYEPASS PHASE 1 MULTAN

Moisture-Density Relationship of SoilsMRDTM 212 (ASTM D 698 - 1557 - AASHO T 99 - T 180)

Project Sothern ByePass Multan Sampling Date

Description Of Sample SUB BASE MATERIAL Testing DateLOCATION: 1+550 to 2+600 L/S Field Sample No.

LAYER: Sub Grade 1st Layer Lab. Sample No.

Analyst.

A Mold No. Formula 1 2 3 4 5 6B Wt. Compacted Wet soil + Mold (gm) 9149 9463 9722 9915 9834

C Wt. Mold (gm) 5376 5376 5376 5376 5376

D 2135 2135 2135 2135 2135

E Wt. Compacted Wet soil (gm) B - C 3773 4087 4346 4539 4458

F E / D 1.767 1.914 2.036 2.126 2.088

G Container No. A-1 A-2 A-3 A-4 A-4H Wt. of Container 35.4 35.0 35.0 36.2 41.1I Wt. Wet Soil + Container (gm) 366.3 381.9 412.1 378.1 397.1J Wt. Dry Soil + Container (gm) 353.9 361.3 384.2 346.7 360.1K Wt of Water (gm) I - J 12.4 20.6 27.9 31.4 37.0L Wt. of Dry Soil (gm) J - H 318.5 326.3 349.2 310.5 319M Water Content % ( K / L )*100 3.9 6.3 8.0 10.1 11.6N Dry Density (g/cc) F / ( 1+ ( M/100 ) ) 1.701 1.801 1.885 1.931 1.871

OPTIMUM MOISTURE CONTENT % 10.11.931

Remraks :

CONTRACTOR: CONSULTANT:

LAB TECHNICIAN MATERIALS INSPECTOR MATERIAL ENGINEER

Volume of Mold (Cm3)

Wet Density (gm/Cm3)

MAXIMUM DRY DENSITY gm/Cm3

3 4 5 6 7 8 9 10 11 12 13

1.550

1.600

1.650

1.700

1.750

1.800

1.850

1.900

1.950

2.000Moisture-Density Relationship

Moisture Content %

Dry

Den

sity

gm

/cm

3

Page 21: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITY

CONTRACTOR: CONSULTANT:

CH.ABDUL LATIF & CO. ABM ENGINEERS

SOUTHERN BYEPASS PART:II MULTAN

Moisture-Density Relationship of SoilsMRDTM 212 (ASTM D 698 - 1557 - AASHO T 99 - T 180)

Project Sampling Date

Description Of Sample Testing Date

Field Sample No.Lab. Sample No.

Analyst.

A Mold No. Formula 1 2 3 4 5 6B Wt. Compacted Wet soil + Mold (gm) 9190 9502 9702 9904 9729

C Wt. Mold (gm) 4836 4836 4836 4836 4836

D 2118 2118 2118 2118 2118

E Wt. Compacted Wet soil (gm) B - C 4354 4666 4866 5068 4893

F E / D 2.056 2.203 2.298 2.393 2.310

G Container No. A-1 A-2 A-3 A-4 A-1H Wt. of Container 48.0 65.0 47.1 62.4 70.1I Wt. Wet Soil + Container (gm) 573.9 613.4 639.6 643.1 619.5J Wt. Dry Soil + Container (gm) 558.6 591.3 610.3 607.7 580.7K Wt of Water (gm) I - J 15.3 22.1 29.3 35.4 38.8L Wt. of Dry Soil (gm) J - H 510.6 526.3 563.2 545.3 510.6M Water Content % ( K / L )*100 3.0 4.2 5.2 6.5 7.6N Dry Density (g/cc) F / ( 1+ ( M/100 ) ) 1.996 2.114 2.184 2.247 2.147

OPTIMUM MOISTURE CONTENT % 6.62.248

Remraks :

CONTRACTOR: CONSULTANT:

LAB TECNICIAN MATERIALS INSPECTOR MATERIAL ENGINEER

Volume of Mold (Cm3)

Wet Density (gm/Cm3)

MAXIMUM DRY DENSITY gm/Cm3

2 3 4 5 6 7 8

1.850

1.900

1.950

2.000

2.050

2.100

2.150

2.200

2.250

2.300Moisture-Density Relationship

Moisture Content %

Dry

Den

sity

gm

/cm

3

Page 22: A.L BH#1 D3

MULTAN DEVELOPMENT AUTHORITYCONTRACTOR: CONSULTANT:

CH.CONSTRUCTION COMPANY ABM CONSULTANT

SOUTHERN BYEPASS PHASE 1 MULTANCalifornia Bearing Ratio

MRD Test Method 213 (Adaptation of ASTM D 1883 - AASHOT 193)Page 1 Of 2

Road Name SOUTHERN BYEPASS MULTAN Field Sample No.Description: SUB BASE MATERIAL Date Of Sampling

Location0+175 to 1+250 L/S Date Tested

Sub Base 1st Layer Quant. Rep.Materials Analyst:Surcharge Weight Used(kg) 4.54 Rate of penetration mm/Minute 1.27

Density DeterminationTest No. 1 2 3 Test No. 1 2 3Can No. A5 A9 B4 2109.0 2124.0 2128.0

A Mass. Wet Soil + Can. g 674.5 594.5 608.1 Mass. Sample + Mold . g 11466 11690 12162B Mass Dry Soil + Can. g 639.6 563.6 576.8 Mass Mold . g 6950 6940 7090C 34.9 30.9 31.3 Mass Sample . g 4516 4750 5072D Mass Can. g 76 65 64 2.141 2.236 2.383E 563.6 498.6 512.8 Percent Moisture % 6.20 6.2 6.10F 6.20 6.20 6.10 2.016 2.106 2.246

Test No. 1 2 3Blows Per Lift 10 30 65Penetration

Molded Tested Molded Tested Molded TestedTotal Unit Corrected

CBRTotal Unit Corrected

CBRTotal Unit Corrected

CBRmm

Load Load Load Load Load Load Load Load Load

Kg % Kg % Kg %

0 0 0 0 0

0.5 0.64 4.4 3.1 11.0 7.7 14.2 9.9

1 1.27 7.3 5.1 17.9 12.5 23.1 16.1

1.5 1.90 10.0 6960.0 24.3 16.9 31.2 21.7

2 2.54 70.35 12.3 8594.7 12217.0 28.6 19.9 28.3 37.8 26.3 37.43 3.81 15.6 10.9 35.6 24.8 47.2 32.9

4 5.08 105.53 18.2 12.6 12.0 42.1 29.3 27.8 55.6 38.7 36.76 7.62 22.0 15.3 51.0 35.5 67.3 46.8

Swell ReadingDate Moldend

Test No. 1 2 3

Mold No. 1 2 3

Final Height . mm 0.4 0.32 0.21

Initial Height . mm 0.000 0.000 0.000

Difference . mm 0.40 0.32 0.21

Sample Length . mm 116.43 116.43 116.43

Percent Swell % 0.34 0.27 0.18

MAX DRY DENSITY 2.233

OPTIMUM MOISTURE CONTENT 6.0 %

Blows Per Lift No. 10 30 65

2.016 2.106 2.246

Soaked C.B.R. % 12.0 27.8 36.7

98 % of Max. Dry Density 2.188

C.B.R At 98% of Max Dry Density #REF! %

Contractor: Consultant:

Lab Technician Material Inspector Material Engineer

Molding Moisture Content (ASTM D 2216)

Mold Volume cm3

Mass Of Water. A-B g

Unit Wet Mass. g/cm3

Mass Dry Soil . B-D gMoisture Content C/E X 100 % Unit Dry Mass. g/cm3

Sta

nda

rd L

oad

(Str

esse

s) K

g / C

m2

Per Min. Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2 Kg / Cm2

PROCTOR MODIFIED

g/cm3

Dry Density g/cm3.

g/cm3 0 1.27 2.54 3.81 5.08 6.35 7.62 8.89

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Penetration mm

Un

it L

oa

d (

Str

ess

) k

g /

cm

2

Page 23: A.L BH#1 D3

AN ASSOCIATES GEOTECHNICAL &SOIL TESTING

ATTERBURG'S LIMITSBH # 1

LOCATION: Plot #61,ST# Jinnah Blved,Sector#A,PH#II DHA Islamabad. Sample Depth : 03 ft

Sampling Date: 05/10/2011

946.3 Testing Date : 08/10/2011

Atterburg Limits (Liquid Limit & Plastic Limit )Type of Test LIQUID LIMIT TEST

PLASTIC LIMIT TESTNumber of Blows 35 26 17

Trial No. 1 2 3 1 2 3

Container Number 4 5 6 A4 A2 A3

Wt. of Container g 9.00 13.70 12.50 5.00 5.50 6.00

Wt. Wet Soil + Container g 16.23 23.60 20.85 12.50 17.20 15.80

Wt. Dry Soil + Container g 14.62 21.25 18.74 11.07 14.88 13.99

Wt. of Water g 1.61 2.35 2.11 1.43 2.32 1.81

Wt. of Dry Soil g 5.62 7.55 6.24 6.07 9.38 7.99

Water Content % 28.65 31.13 33.81 23.56 24.73 22.65

Avg. 31.20 23.65

Liquid Limit (L.L) LL = 31.20 Plastic Limit (P.L) P.L = 23.65Plasticity Index (P.I) P.I = L.L - P.L 7.55 Classification Group CL-ML

TESTED BY:--------------------------- CHECKED BY:---------------------------

LABORATORY

PROJECT: Sub-soil Investigation of Plot of Capt. Arshad M.Nasir.

10 100

26.00

27.00

28.00

29.00

30.00

31.00

32.00

33.00

34.00

35.00

31.13

No. of Blows

Wa

ter

Co

nte

nt

%

20 30 40 50 60 70 80 9025