Waterway LanePreliminary Engineering Study
Public Input Meeting August 17, 2021
• Elected Officials• City of New Braunfels Staff• Garry Ford, PE, City Engineer• Charlie Blue, Assistant Capital Project Manager
• Consultant Engineer: HMT • Bill Ball, PE • Ryan Stangel, PE
Introductions
• Improve mobility and safety
• Reduce congestion
• Accommodate pedestrian and bicycle traffic
• Maintain reasonable access to existing properties
Project Objectives
Project Location
Project History
• Originally identified in 2008 Capital Improvements Plan
• Project intent is to connect two sections of Waterway Lane creating a connection between Gruene Road and Common Street.
• Data Collection (survey, utilities, geotechnical investigation)• Drainage Analysis• Identify and Evaluate Constraints • Conceptual Design • Public Input• Schematic Design (roadway and ROW details)• Cost Estimates (ROW, engineering, construction)
Preliminary Engineering Study
• Construct two lane roadway
• Left-turn lane at intersections with Gruene Rd. and Common St. • Left-turn lane on Gruene Rd. onto Waterway Lane• 5’ bike lane on each side of roadway
• 6’ sidewalk on each side of roadway• Traffic signal at the intersection of Waterway Lane and
Common Street
Proposed Project
Existing Area
Proposed Typical Section – at intersections
Proposed Typical Section – between intersections
Proposed Schematic
•Alleviate traffic in the area•Local drainage patterns•Gruene Rd. intersection•Preserving existing trees and landscaping• Improve quality of non-vehicular transportation
Project Considerations
• Future developments on Common St. • Future roadway geometry of Common St.
Other Considerations
• No funding for final design or Construction
• May be funded through 2023 Bond
• Final design/construction funded through 2023 Bond
• Construction Cost Estimate: $2.4M
Timeline• Survey and right-of-way• Drainage and utility review
• Conceptual Design• Geometry Options
• Schematic design• 30% Plans• Cost estimate• Public Input
QUESTIONS?