WATERVIEW CONNECTION PROJECT
WATERVIEW CONNECTION TEAM
SH16 Constructability
Aly Gleeson – Design Manager
CONSTRUCTABILITY FUNDAMENTALS
o Maintain existing number of traffic lanes during peak hour traffic
o Maintain pedestrian and cycle movement through the project area
o Bus shoulder movement to be maintained where possible
o Actively manage all works to meet daily & seasonal traffic conditions
o Maintain services such as Power, Water, Telecom etc…
o Minimise noise during works
o Safety
KEY CONSTRUCTION ELEMENTS
1. Stormwater Treatment -Wetland
2. Te Atatu Interchange
3. Whau Bridge Widening
4. Patiki Cycle Bridge
5. Causeway Construction
6. Causeway Bridge Widening
12
3
465
STORMWATER TREATMENT - WETLAND
TE ATATU INTERCHANGE
Site Compound
TE ATATU BRIDGES
WHAU BRIDGE
Te Atatu Interchange
City
CAUSEWAY CONSTRUCTION
GROUND IMPROVEMENTS – STAGE 1
GROUND IMPROVEMENTS – STAGE 2
Stage 3
POSSIBLE GROUND IMPROVEMENTS
GROUND IMPROVEMENTS – STAGE 3
Stage 4
CAUSEWAY CONSTRUCTION – PHASE 1
CAUSEWAY CONSTRUCTION – PHASE 2
CAUSEWAY CONSTRUCTION – PHASE 3
CAUSEWAY CONSTRUCTION – PHASE 4
CAUSEWAY CONSTRUCTION – PHASE 5
CAUSEWAY CONSTRUCTION – PHASE 6
QUESTIONS