M I N N E S O TA M U LT I - P U R P O S E S TA D I U M
CONSTRUCTION UPDATE
Dear Neighbor,
The Minnesota Sports Facilities Authority (MSFA) in partnership with the Minnesota Vikings is building a new Multi-Purpose Stadium on the site of the Metrodome. Mortenson/Thor is overseeing construction and is providing neighborhood construction updates on a regular basis.
The plan for the stadium site is to close 5th street and make 6th street a wider, two way street. This letter is to inform you that 5th Street will close beginning Monday, March 30, 2015. Notification signs are posted at 5th and 11th streets to alert commuters. The detour route is 11th Avenue to 7th Street to Park Avenue (see attached map), until 6th Street has been constructed into a two way road later this year. Please be prepared to make alternate travel plans.
We will continue to update the neighborhood on the construction of the Minnesota Multi-Purpose Stadium. If you have any questions, please do not hesitate to contact me directly.
Regards,
Lynn R. LittlejohnDirector of Community AffairsMortenson/[email protected]
MARCH 16, 2015
M I N N E S O TA M U LT I - P U R P O S E S TA D I U M
CONSTRUCTION UPDATE
DATE BY CKDNO DRAWN BY
DESIGNED BY
CHECKED BY
DATE:
PRINT NAME:
REVISION I HEREBY CERTIFY THAT THIS PLAN SHEET WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
SHEETTITLE
XXXXXXX
DAN E. BOWAR
LIC. NO:XX XXX 2014 45018
6TH STREET PUBLIC INFRASTRUCTURE IMPROVEMENTS
Minneapolis
OF
NO
T FO
R C
ON
STR
UC
TIO
N
C. TA
S. PARK
D. BOWAR
4 OCT 14 SP DEBCCD-144 CITY SUBMITTAL
24 NOV 14 SP DEB1 BID DOCS DETOUR PLAN
SCALE IN FEET
2000
TC1
TC6
NOTES:1 PLACE SIGN 7 DAYS IN ADVANCE OF START OF
PROJECT AND OR CLOSURES
DETOUR ROUTE
ROAD CLOSED
ALL TRAFFIC CONTROL DEVICES AND SIGNING SHALL CONFORMTO AND BE PLACED OR CONSTRUCTED IN ACCORDANCE WITH THE"MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES"(MN MUTCD) INCLUDING THE FIELD MANUAL FOR TEMPORARYTRAFFIC CONTROL ZONE LAYOUTS, DATED JANUARY, 2014.
POSTEDSPEED LIMIT
PRIOR TOWORK
STARTING
SPACING OFADVANCEWARNING
SIGNS(A)
TAPERLENGTH
(L)
SPACING OFCHANNELIZING
DEVICES(G)
BUFFERSPACE
(B)
(mph) FEET FEET FEET FEET
0 - 30 250 200 25 200
35 - 40 325 325 25 305
45 - 50 600 600 50 425
55 750 700 50 500
60 - 65 1000 800 50 650
Top Related