Download - Umts utran call flow cs and ps

Transcript
Page 1: Umts utran call flow cs and ps

UMTS Call Flow Scenarios

An Overview of Circuit and

Packet Call Flow

Scenarios V1.2

Page 2: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 2 (164)

INTRODUCTION & ACKNOWLEDGEMENTS

› Introduction.› Acknowledgements:

– Kuldeep Kaushik, authors of the original

presentation ‘FirstCallFlow’ (formed basis of this slide pack).

My sincere thanks to all who gives there valuable support and reviews to make this document better.

Page 3: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 3 (164)

ADVISORY

› The aim is to provide a broad understanding of the Call Flow Scenarios needed for Call Setup / Teardown

› The scenarios outlined are not definitive, some parts of the individual procedures have been cut back or omitted for simplicity.

› Scenarios are outlined for both R99 Circuit and Packet calls, from Network Initialisation through to call set-up and tear-down.

Page 4: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 4 (164)

SUMMARY OF PRESENTATION

UEUE Node B

Node B RNCRNC CNCN

Node B Initialisation and System Information Broadcast Procedure

UE Initiated CS Call Setup Procedure

UE Camp on and Location Update Procedure

UE Initiated CS Call Tear Down Procedure

UE Initiated PS Call Setup Procedure

UE Initiated PS Call Tear Down Procedure

Part 1

Part 2

Part 3

Part 4

Part 5

Part 6

Page 5: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 5 (164)

OBLIGATORY STUFF – UTRAN INTERFACES

MSC SGSN

S-RNC

Node B

UE

Iu-psIu-cs

Uu

Iu-b

Cell

No Handover – single RL

Page 6: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 6 (164)

OBLIGATORY STUFF – UTRAN INTERFACES

MSC SGSN

S-RNC

Node B

UE

Iu-psIu-cs

Cell

Uu

Iu-b

Intra-NodeB Softer Handover

Page 7: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 7 (164)

OBLIGATORY STUFF – UTRAN INTERFACES

MSC SGSN

S-RNC

Node B Node B

UE

Iu-psIu-cs

Uu

Iu-b

Intra-RNC Soft Handover

Iu-b

Cell

Page 8: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 8 (164)

OBLIGATORY STUFF – UTRAN INTERFACES

MSC SGSN

S-RNC D-RNC

Node BNode B

UE

Iu-psIu-cs

Iu-r

Iu-b

Uu

Iu-b

Cell

Inter-RNC Soft Handover

Page 9: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 9 (164)

3GMSC3GMSCRNCRNCNode BNode B

AA

MM

SM

MAC

Phy-up

PHY

codec

RRC

RLC

MM

CM

MAC

Phy-up

PHY

RRC

MTP

AAL5

SSCF

Iu UPQ2150.1

ATM

E1

AAL2

SSCOP

MTP3B

AAL5

SSCF

SCCP

SM

MM

RANAP

Iu UPSTC.1

ALCAP

STM-1

AAL2

SSCOP

MTP3B

AAL5

SSCF-NNI

SCCP

MM

CM

ATM

E1

FP

AAL2

STC.2

SSCOP

NBAP

AAL5

SSCF-UNI

PHY

ALCAP

Uu Iub Iucs

SSCOP

NBAP

AAL5

SSCOP

ALCAP

AAL5

SSCF SSCF FP

AAL2 AAL2

RLC

MAC

Phy-up

RRC

ATM

E1

NBAP

AAL5

SSCOP

MTP3-b

SSCF-NNI

SCCP

RANAP

ATM

STM-1

ALCAP

STC.2

SSCF-UNI

SSCOP

Iu UP

MAC

Phy-up

FP

AAL5

codec RRC

RLC

AAL2

ALCAP

STC.1

ATM

codec

RLC

Control Plane User Plane Transport Plane Common Control Plane User Plane Transport Plane Common

OBLIGATORY STUFF – UE / CS CN PROTOCOL STACK

Page 10: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 10 (164)

Q2150.1

SGSNSGSN

RNCRNC

Node BNode B

Control Plane User Plane Transport Plane Common Control Plane User Plane Transport Plane Common

MM

SM

MAC

Phy-up

PHY

codec

RRC

RLC

PMM

SM

MAC

Phy-up

PHY

RRC

IP

PDCP

RLC

SSCOP

NBAP

AAL5

SSCOP

ALCAP

AAL5

SSCF SSCF FP

AAL2 AAL2 AAL5 AAL5

SSCF

RLC

MAC

Phy-up SCCP

FP

RRC

ATM

E1

NBAP

AAL5 AAL2

SSCOP

MTP3-b

SSCF-N

SCCP

RANAP

RRC

ATM

STM-1

GTP-U

UDP

PDCP

ALCAP

STC.2

SSCF-UNI

SSCOP

IP

RLC

MAC

Phy-up

FP

AAL5

ATM

E1

FP

AAL2

SSCOP

ALCAP

AAL5

SSCOP

NBAP

AAL5

SSCF SSCF

PHY

ATM

E1/ STM-1

AAL2 AAL5

NBAP

PHY

ALCAP

SSCOP

STC.2

SSCF-UNIFP

SSCOP

MTP3B

AAL5

SSCF

Q2150.1

Q2150.1

Iu UP

ATM

E1

AAL2

SSCOP

MTP3B

AAL5

SSCF

SCCP

SM

MM

RANAP

SSCOP

MTP3-b

SSCF-N

SCCP

PMM

SM

ATM

STM-1

AAL5

IP

GTP-U GTP-C

UDP

L1

L2

SSCOP

MTP3B

AAL5

SSCF

Q2150.1

Q2150.1

IP

GTP-C

L1

GTP-U

UDP

L2

IP

GGSNGGSN

Uu Iub Iups Gn

OBLIGATORY STUFF – UE / PS CN PROTOCOL STACK

Page 11: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 11 (164)

BASIC CALL SETUP PURPOSE

› To provision a dedicated traffic channel and a dedicated control channel over every interface applicable for the call from the core network to the UE

› To Synchronise the transmissions across the network› To provide security to the end user

Page 12: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 12 (164)

UTRAN CONNECTIONS – ABSTRACTION

If synchronisation status, dedicated traffic anddedicated control channels only are shown on aUTRAN Block Diagram…..

MS

C

RN

C NB

UE

UTRAN Status

Dedicated Control Channels

Synchronisation Status

Dedicated Traffic Channels

These are the parts of UTRAN that need to be configured at call setup. A call cannot proceed without all of these connections and synchronisation

Page 13: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 13 (164)

UTRAN CONNECTIONS – KEY TO BLOCK DIAGRAM

Using RED to denote configured andWHITE to denote not configured….

MS

C

RN

C

NB

UE

UTRAN Status

MS

C

RN

C

NB

UE

UTRAN Status

Example 1:No dedicated traffic or control,Air interface synchronised.i.e. UE in Idle Mode

Example 2:Dedicated control between RNC and UE,No dedicated traffic,Synchronisation between RNC and UE,i.e. RRC Connection exists over dedicated channels

Page 14: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 14 (164)

WARNING - PLEASE READ

› This Presentation Contains Ladder Diagrams. . . . › Lots of them !!!!!

View Presentation

Request View Presentation Ack Ladder Diagram

Indication Enter sleep Mode Request

Sleep mode complete

Ladder Diagram - Normal Procedure Ladder Diagram - Normal Procedure

BodyBody

BrainBrain

› You have been warned . . . .

Page 15: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 15 (164)

CALL FLOW SCENARIOS

For ease of understanding the Call Flow Scenarios will be split into 6 parts.

1. Node B Initialisation - Appendix A

2. Cell “Camp-on” / Location Update - Appendix B

3. Circuit Switched Call set-up

4. Circuit Switched Call tear-down

5. Packet Switched Call set-up

6. Packet Switched Call tear-down

Page 16: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 16 (164)

PART 1

Node B Initialisation and Cell “Camp on” for First Call

Refer to Appendix A

Page 17: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 17 (164)

PART 2

UE “Camp On” & Location Update

Refer to Appendix B

Page 18: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 18 (164)

PARTS 3 - 4

Circuit Switched Calls

Parts 3 & 4

Call Setup and Tear Down Scenarios

Page 19: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 19 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure Overview

In this Procedure the UE is attached to the Network in Idle mode. The call setup is Mobile Originated (mo).The following steps need to be executed in order for a mo call to complete;

1. RRC Connection Setup 2. Service Request 3. Security Procedures (Identity / Authentication / Security mode)

8. Call Setup Request 9. Radio Link and RAB Configuration 10. Call Connection

Page 20: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 20 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessage (1): Connection Request Message (1): Connection Request

Type:RRC

Channels:CCCH / RACH

Main IE’s:1. Initial UE ID

Establishment CauseInitial UE capability

Type:RRC

Channels:CCCH / RACH

Main IE’s:1. Initial UE ID

Establishment CauseInitial UE capability

UEUE Node B

Node B RNCRNC MSCMSC

RRC Connection Request

(RACH)[1]

MS

C

RN

C

NB

UE

UTRAN Status

Page 21: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 21 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (2): Radio Link Set-up Request / Response Messages (2): Radio Link Set-up Request / Response

UEUE Node B

Node B RNCRNC MSCMSCType:

NBAP

Main IE’s:1. Cell ID, TFS / TFCS

Frequency, UL Scrambling CodeDL Channelisation CodePower Control Info

2. Transport Layer Address Sig. Link terminationDL Channelisation CodeDCH Binding ID

Type:NBAP

Main IE’s:1. Cell ID, TFS / TFCS

Frequency, UL Scrambling CodeDL Channelisation CodePower Control Info

2. Transport Layer Address Sig. Link terminationDL Channelisation CodeDCH Binding ID

NBAP RL setup Req.

NBAP RL setup Resp.

RRC Connection Request

(RACH)[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 22: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 22 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (3): Establish Request (ERQ) / Confirm (ECF) Messages (3): Establish Request (ERQ) / Confirm (ECF)

UEUE Node B

Node B RNCRNC MSCMSCType:

ALCAP

Main IE’s: Destination address, DSAI,

ALC, CEID, OSAI, SUGR, SSISU

Type:ALCAP

Main IE’s: Destination address, DSAI,

ALC, CEID, OSAI, SUGR, SSISU

NBAP RL setup Req.

NBAP RL setup Resp.

ALCAP ERQ

ALCAP ECF

RRC Connection Request

(RACH)

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 23: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 23 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (4): DCH-FP DL / UL Synchronisation Messages (4): DCH-FP DL / UL Synchronisation

UEUE Node B

Node B RNCRNC MSCMSCType:

DCH-FP

Main IE’s:

Type:DCH-FP

Main IE’s:

ALCAP ERQ

ALCAP ECF

RRC Connection Request

(RACH)

FP DL Synchronisation

FP UL Synchronisation

NBAP RL setup Req.

NBAP RL setup Resp.

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 24: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 24 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (5): Connection Set-up / Complete Messages (5): Connection Set-up / Complete

UEUE Node B

Node B RNCRNC MSCMSCType:

RRC

Channels:1. FACH

2. DCCH

Main IE’s:1. Initial UE ID, RNTI,

CapUpReq, TFS, TFCS, frequ, DL Scram + Chann codes, Power control info.

2. UE Capability, Ciphering, Integrity info

Type:RRC

Channels:1. FACH

2. DCCH

Main IE’s:1. Initial UE ID, RNTI,

CapUpReq, TFS, TFCS, frequ, DL Scram + Chann codes, Power control info.

2. UE Capability, Ciphering, Integrity info

RRC Connection Request

(RACH)

FP DL Synchronisation

FP UL Synchronisation

RRC Conn. Setup

(FACH)RRC Conn. Setup Comp

(DCCH)

ALCAP ERQ

ALCAP ECF

NBAP RL setup Req.

NBAP RL setup Resp.

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 25: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 25 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (6): Initial Direct Transfer + Initial UE messageMessages (6): Initial Direct Transfer + Initial UE message

UEUE Node B

Node B RNCRNC MSCMSCType:

1. RRC

2. RANAP

Channel:DCCH

Main IE’s:

Type:1. RRC

2. RANAP

Channel:DCCH

Main IE’s:

RANAP Initial UE

(CM Service Req.)(SCCP Con Req.)

RRC Initial D T

(CM Service Request.)

RRC Connection Setup

[1] [2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 26: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 26 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (7): Connection Confirm + CM Service Accept Messages (7): Connection Confirm + CM Service Accept

UEUE Node B

Node B RNCRNC MSCMSCType:

1. SCCP / RANAP DT

2. RRC DL DT

3. RANAP DT

4. RRC DL DT (not req)

Channel:DCCH

Main IE’s:

Type:1. SCCP / RANAP DT

2. RRC DL DT

3. RANAP DT

4. RRC DL DT (not req)

Channel:DCCH

Main IE’s:

RANAP Initial UE

(CM Service Req.)(SCCP Con Req.)

RRC Initial DT

(CM Service Request)

RRC Connection Setup

RRC DL DT (OPT)(CM Service Acc)

RANAP DT(CM Service Acc)

SCCP Conn Conf[1]

[2][3]

MS

C

RN

C

NB

UE

UTRAN Status

Page 27: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 27 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (8): Authentication + Security Mode Commands Messages (8): Authentication + Security Mode Commands

Type:1. RANAP

2. RRC

3. RRC

4. RANAP

Channel:DCCH

Main IE’s:

Type:1. RANAP

2. RRC

3. RRC

4. RANAP

Channel:DCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

RANAP Initial UE

(CM Service Req.)(SCCP Con Req.)

RRC Initial DT

RRC Connection Setup

(CM Service Request)

Authentication

RRCSecurity Mode Command

RANAPSecurity Mode

Command

RRCSecurity Mode Complete

RANAPSecurity Mode

Complete

[1]

[4]

[2]

[3]

SCCP Conn Conf

RRC DL DT (OPT)(CM Service Acc)

RANAP DT(CM Service Acc)

MS

C

RN

C

NB

UE

UTRAN Status

Page 28: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 28 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewIdentity, Authentication and Security Mode Commands Identity, Authentication and Security Mode Commands

Description

The procedures detailed on the right may be used together or separately (note: Security mode requires that authentication has already been done at least one time).

Their presence is dependant on which associated procedure is being carried out and on Operator requirements.

For First Call there will be No Identity request, but there will be authentication and there will be Security mode, the latter being MSC - RNC only .

Description

The procedures detailed on the right may be used together or separately (note: Security mode requires that authentication has already been done at least one time).

Their presence is dependant on which associated procedure is being carried out and on Operator requirements.

For First Call there will be No Identity request, but there will be authentication and there will be Security mode, the latter being MSC - RNC only .

UEUE Node B

Node B RNCRNC MSCMSC

Identity Request Procedure

Identity Request Procedure

Authentication

Authentication

Security Mode

Security Mode

Page 29: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 29 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewIdentity Request Procedure: NAS: Identity RequestIdentity Request Procedure: NAS: Identity Request

Type: NAS (PMM)

Purpose: Identity Request: Used by the CN to request the UE identity. Can be of type;

[IMSI, IMEI, IEMISV, TMSI]

Identity Response: UE reply to the Identity request can be of type;

[IMSI, IMEI, IEMISV, TMSI]

Main IE’s:

Req: Identity Request Type

Res: Mobile Identity

Type: NAS (PMM)

Purpose: Identity Request: Used by the CN to request the UE identity. Can be of type;

[IMSI, IMEI, IEMISV, TMSI]

Identity Response: UE reply to the Identity request can be of type;

[IMSI, IMEI, IEMISV, TMSI]

Main IE’s:

Req: Identity Request Type

Res: Mobile Identity

UEUE Node B

Node B RNCRNC MSCMSC

Identity Request Procedure

Identity Request Procedure

Authentication

Authentication

Security Mode

Security Mode

RRC DL DT(Identity Request)

RANAP DT(Identity Request)

RRC UL D T

(Identity Response.)RANAP DT

(Identity Request)

Page 30: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 30 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewIdentity, Authentication and Security Mode Commands Identity, Authentication and Security Mode Commands

Type: NAS (PMM)

Purpose: UE AuthenticationNetwork AuthenticationIntegrity Key exchangeCiphering Key Exchange

Main IE’s:Req: CK Sequence Number RAND AUTN

Res: CK Sequence Number RES

Type: NAS (PMM)

Purpose: UE AuthenticationNetwork AuthenticationIntegrity Key exchangeCiphering Key Exchange

Main IE’s:Req: CK Sequence Number RAND AUTN

Res: CK Sequence Number RES

UEUE Node B

Node B RNCRNC MSCMSC

Identity Request Procedure

Identity Request Procedure

Authentication

Authentication

Security Mode

Security Mode

RRC DL DT(Identity Request)

RANAP DT(Identity Request)

RRC UL D T

(Identity Response.)RANAP DT

(Identity Request)

RRC DL DT(Authentication Request)

RANAP DT(Authentication Request)

RRC UL D T

(Authentication Response)RANAP DT

(Authentication Response)

Page 31: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 31 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewIdentity, Authentication and Security Mode Commands Identity, Authentication and Security Mode Commands

Type: RANAP DTRRC DTPurpose: Selection of Integrity and Ciphering Algorithms (by RNC)

Control Of Integrity and Ciphering Operation.

Main IE’s:SM Command: 1. Algorithm List, IK2. Integrity Check Info Integrity prot. mode info Domain ID

SM Complete: 1.UL Integrity protection info2. Chosen Integrity Algorithm

Type: RANAP DTRRC DTPurpose: Selection of Integrity and Ciphering Algorithms (by RNC)

Control Of Integrity and Ciphering Operation.

Main IE’s:SM Command: 1. Algorithm List, IK2. Integrity Check Info Integrity prot. mode info Domain ID

SM Complete: 1.UL Integrity protection info2. Chosen Integrity Algorithm

UEUE Node B

Node B RNCRNC MSCMSC

Identity Request Procedure

Identity Request Procedure

Authentication

Authentication

Security Mode

Security Mode

RRCSecurity Mode Command

RANAPSecurity Mode

Command

RRC

Security Mode Complete RANAP Security Mode Complete

RRC DL DT(Identity Request)

RANAP DT(Identity Request)

RRC Initial D T

(Identity Response.)RANAP DT

(Identity Request)

RRC DL DT(Authentication Request)

RANAP DT(Authentication Request)

RRC UL D T

(Authentication Response)RANAP DT

(Authentication Response)

Page 32: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 32 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (9): Common ID Messages (9): Common ID

Type:1. RANAP

Main IE’s:1. Permanent NAS ID

Type:1. RANAP

Main IE’s:1. Permanent NAS ID

UEUE Node B

Node B RNCRNC MSCMSC

RANAP Initial UE

(CM Service Req.)(SCCP Con Req.)

RRC Initial DT

RRC Connection Setup

(CM Service Request)

Authentication

RRCSecurity Mode Command

RANAPSecurity Mode

Command

RRCSecurity Mode Complete

RANAPSecurity Mode

Complete

RANAPCommon ID

[1]

SCCP Conn Conf

RANAP DT(CM Service Acc)RRC DL DT (OPT)

(CM Service Acc)

MS

C

RN

C

NB

UE

UTRAN Status

Page 33: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 33 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (10): Call Setup + Call ProceedingMessages (10): Call Setup + Call Proceeding

Type:1. RRC UL DT

2. RANAP DT

3. RANAP DT

4. RRC DL DT

Main IE’s:1. Calling/Called Party

Numbers, Calling/Called party sub-address, bearer capability

Type:1. RRC UL DT

2. RANAP DT

3. RANAP DT

4. RRC DL DT

Main IE’s:1. Calling/Called Party

Numbers, Calling/Called party sub-address, bearer capability

UEUE Node B

Node B RNCRNC MSCMSC

RRC Connection Setup

Service Request / Authentication / Security

RRC UL DT(Call Setup) RANAP DT

(Call Setup)

RRC DL DT(Call Proceeding)

RANAP DT(Call Proceeding)

[2]

[3]

[1]

[4]

MS

C

RN

C

NB

UE

UTRAN Status

Page 34: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 34 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (11): RAB Assignment Request + Iucs ALCAP SetupMessages (11): RAB Assignment Request + Iucs ALCAP Setup

Type:1. RANAP

2. ALCAP

3. ALCAP

Main IE’s:1. RAB Param, NAS Bind Info,

User Plane Mode, Transport Add, IU Transport Association

2. CEID, Destination address, DSAID, OSAID

3. CEID, Destination address, DSAID, OSAID

Type:1. RANAP

2. ALCAP

3. ALCAP

Main IE’s:1. RAB Param, NAS Bind Info,

User Plane Mode, Transport Add, IU Transport Association

2. CEID, Destination address, DSAID, OSAID

3. CEID, Destination address, DSAID, OSAID

UEUE Node B

Node B RNCRNC MSCMSC

RRC Connection Setup

Service Request / Authentication / Security

RRC DL DT(Call Proceeding)

RRC UL DT(Call Setup) RANAP DT

(Call Setup)

RANAP DT(Call Proceeding)

RANAPRAB Assignment Req.

ALCAPERQ

ALCAPECF

[1]

[2]

[3]

MS

C

RN

C

NB

UE

UTRAN Status

Page 35: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 35 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (12): RL Reconfigure Prepare / ReadyMessages (12): RL Reconfigure Prepare / Ready

Type:1. NBAP

2. NBAP

Main IE’s:1. TFS ; TFCS; power control

info, Transaction ID

2. Transaction ID, DL Chan code, Transport Layer addr.

Type:1. NBAP

2. NBAP

Main IE’s:1. TFS ; TFCS; power control

info, Transaction ID

2. Transaction ID, DL Chan code, Transport Layer addr.

UEUE Node B

Node B RNCRNC MSCMSC

RRC Connection Setup

Service Request / Authentication / Security

RRC DL DT(Call Proceeding)

RRC UL DT(Call Setup) RANAP DT

(Call Setup)

RANAP DT(Call Proceeding)

RANAPRAB Assignment Req.

NBAPRL Reconfigure

PrepareNBAP

RL Reconfigure Ready

ALCAPERQ

ALCAPECF[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 36: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 36 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (13): RAB - Iub Establish Request / ConfirmMessages (13): RAB - Iub Establish Request / Confirm

Type:1. ALCAP

2. ALCAP

Main IE’s:1. CEID, Destination address,

DSAID, OSAID

2. CEID, Destination address, DSAID, OSAID

Type:1. ALCAP

2. ALCAP

Main IE’s:1. CEID, Destination address,

DSAID, OSAID

2. CEID, Destination address, DSAID, OSAID

UEUE Node B

Node B RNCRNC MSCMSC

Continued from NBAP RL Reconfigure Procedure

ALCAPERQ

ALCAPECF

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 37: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 37 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (14): RAB - Iucs Establish Request / ConfirmMessages (14): RAB - Iucs Establish Request / Confirm

Type:1. ALCAP

2. ALCAP

Main IE’s:1. CEID, Destination address,

DSAID, OSAID

2. CEID, Destination address, DSAID, OSAID

Type:1. ALCAP

2. ALCAP

Main IE’s:1. CEID, Destination address,

DSAID, OSAID

2. CEID, Destination address, DSAID, OSAID

UEUE Node B

Node B RNCRNC MSCMSC

Continued from NBAP RL Reconfigure Procedure

ALCAPERQ

ALCAPECF

NBAPRL Reconfigure Commit [1]

MS

C

RN

C

NB

UE

UTRAN Status

Page 38: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 38 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (15): RAB - Radio Bearer Setup / CompleteMessages (15): RAB - Radio Bearer Setup / Complete

Type:1. RRC

2. RRC

ChannelDCCH

Main IE’s:

Type:1. RRC

2. RRC

ChannelDCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

RRC Radio Bearer Setup(DCCH)

RRC RB Setup Comp(DCCH)

ALCAPERQ

ALCAPECF

NBAPRL Reconfigure Commit

Continued from NBAP RL Reconfigure Procedure

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 39: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 39 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (16): RAB Assignment ResponseMessages (16): RAB Assignment Response

Type:1. RANAP

2. IUUP

Main IE’s:

Type:1. RANAP

2. IUUP

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

RRC Radio Bearer Setup(DCCH)

RRC RB Setup Comp(DCCH)

RANAPRAB Assignment Resp

ALCAPERQ

ALCAPECF

NBAPRL Reconfigure Commit

Continued from NBAP RL Reconfigure Procedure

[1]

MS

C

RN

C

NB

UE

UTRAN Status

IUUPInitialisation

[2]

Page 40: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 40 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (17): Call ConnectMessages (17): Call Connect

Type:1. RANAP DT

2. RRC DT

ChannelDCCH

Main IE’s:

Type:1. RANAP DT

2. RRC DT

ChannelDCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

RRC Connection Setup

Service Request / Authentication / Security

Call Setup Request and RAB Assignment

RRC DL DT(Alerting)

RANAP DT(Alerting)

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 41: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 41 (164)

PART 3 - UE INITIATED CALL SET-UP (CS)

Procedure OverviewMessages (18): Connect / Connect AcknowledgeMessages (18): Connect / Connect Acknowledge

Type:1. RANAP DT

2. RRC DL DT

3. RRC UL DT

4. RANAP DT

ChannelDCCH / DCH

Main IE’s:

Type:1. RANAP DT

2. RRC DL DT

3. RRC UL DT

4. RANAP DT

ChannelDCCH / DCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

RRC Connection Setup

Service Request / Authentication / Security

Call Setup Request and RAB Assignment

RRC DL DT(Alerting)

RANAP DT(Alerting)

RRC DL DT(CC: Connect)

RANAP DT(CC: Connect)

RRC UL DT(CC: Connect Ack)

RANAP DT (CC: Connect Ack)

Call ConnectedCall Connected

[1]

[4]

[2]

[3]

MS

C

RN

C

NB

UE

UTRAN Status

Page 42: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 42 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure Overview.In this Procedure the UE is attached to the Network in Call Processing mode. The call tear-down is Mobile Originated (mo).The following steps need to be executed in order for the mobile to tear-down the call;

1. Initiate Call Release 2. Initiate Iu Release Procedure 3. Release Iu Connection to MSC for UE 4. Release RRC Connection to UE 5. Delete Radio Link Resources in UTRAN 6. Release RAB on Iub for UE

Page 43: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 43 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure OverviewMessages (1): CC: Disconnect Messages (1): CC: Disconnect

Type:1. RRC UL DT

2. RANAP DT

Channels:DCCH

Main IE’s:

Type:1. RRC UL DT

2. RANAP DT

Channels:DCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

Call ConnectedCall Connected

RRC UL DT(CC: Disconnect) RANAP DT

(CC: Disconnect)[1] [2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 44: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 44 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure OverviewMessages (2): CC: Release + Release Complete Messages (2): CC: Release + Release Complete

Type:1. RANAP DT

2. RRC DL DT

3. RRC UL DT

4. RANAP DT

Channels:DCCH / DCH

Main IE’s:

Type:1. RANAP DT

2. RRC DL DT

3. RRC UL DT

4. RANAP DT

Channels:DCCH / DCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

Call ConnectedCall Connected

RRC UL DT(CC: Disconnect) RANAP DT

(CC: Disconnect)

RRC DL DT(CC: Release)

RANAP DT(CC: Release)

RRC UL DT(CC: Release Complete) RANAP DT

(CC: Release Complete )

[1]

[4]

[2]

[3]

MS

C

RN

C

NB

UE

UTRAN Status

Page 45: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 45 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure OverviewMessage (3): Iu Release Command Message (3): Iu Release Command

Type:1. RANAP

2. RANAP

Main IE’s:1. Cause=Normal Release

Type:1. RANAP

2. RANAP

Main IE’s:1. Cause=Normal Release

UEUE Node B

Node B RNCRNC MSCMSC

Call ConnectedCall Connected

RANAPIu Release Command

CC: Call Release

RANAPIu Release Complete

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 46: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 46 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure OverviewMessages (4): RAB - Release Request / Confirm (Iucs) Messages (4): RAB - Release Request / Confirm (Iucs)

Type:1. ALCAP

2. ALCAP

Main IE’s:1. DSAID, Cause= 31, normal

unspecified

Type:1. ALCAP

2. ALCAP

Main IE’s:1. DSAID, Cause= 31, normal

unspecified

UEUE Node B

Node B RNCRNC MSCMSC

Call ConnectedCall Connected

RANAPIu Release Command

CC: Call Release

ALCAPRelease Request

ALCAPRelease Confirm

RANAPIu Release Complete

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 47: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 47 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure OverviewMessages (5): RRC - Connection Release / Complete Messages (5): RRC - Connection Release / Complete

Type:1. RRC

2. RRC

Main IE’s:

Type:1. RRC

2. RRC

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

Call ConnectedCall Connected

CC: Call Release

RANAPIu Release Command

ALCAPRelease Request

ALCAPRelease Confirm

RRC Connection Release

RRCCon. Release Complete

RANAPIu Release Complete

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 48: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 48 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure OverviewMessages (6): RL Deletion Request / Response Messages (6): RL Deletion Request / Response

Type:1. NBAP

2. NBAP

Main IE’s:

Type:1. NBAP

2. NBAP

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

Call ConnectedCall Connected

CC: Call Release

RANAPIu Release Command

ALCAPRelease Request

ALCAPRelease Confirm

RRC Connection Release

RRCCon. Release Complete

NBAPRL Deletion Request

NBAPRL Deletion Response

RANAPIu Release Complete

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 49: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 49 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure OverviewMessages (7): RAB - Release Request / Confirm (Iub) Messages (7): RAB - Release Request / Confirm (Iub)

Type:1. ALCAP

2. ALCAP

Main IE’s:

1. DSAID, Cause= 31, normal unspecified

Type:1. ALCAP

2. ALCAP

Main IE’s:

1. DSAID, Cause= 31, normal unspecified

UEUE Node B

Node B RNCRNC MSCMSC

Call ConnectedCall Connected

CC: Call Release

ALCAPRelease Request

ALCAPRelease Confirm

RANAPIu Release Command

ALCAPRelease Request

ALCAPRelease Confirm

NBAPRL Deletion Request

NBAPRL Deletion Response

RRC Connection Release

RRCCon. Release Complete

RANAPIu Release Complete

[1]

[2]

MS

C

RN

C

NB

UE

UTRAN Status

Page 50: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 50 (164)

PART 4 - UE INITIATED CALL TEAR-DOWN (CS)

Procedure OverviewMessages (7): CS Call Tear Down Complete Messages (7): CS Call Tear Down Complete

UEUE Node B

Node B RNCRNC MSCMSC

Call ConnectedCall Connected

CC: Call Release

CC: Call ReleaseCS Call Tear Down Complete

CS Call Tear Down Complete

RRC, RL and Iu Release

Page 51: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 51 (164)

PARTS 5 & 6

Packet Switched Data Sessions

Parts 5 & 6

Call Setup and Tear Down Scenarios

Page 52: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 52 (164)

PART 5 - UE INITIATED CALL SET UP (PS)

Procedure Overview.At the start of this Procedure the UE is RRC Idle, PMM Detached and SM Inactive. The call setup is Mobile Originated (mo).The following steps need to be executed in order for a mo call to complete;

1. Establish an RRC connection to the UTRAN 2. Establish an Iu connection to the CN 3. Make an Attach Request 4. Carry out Security Procedures 5. Complete the Attach 6. Request PDP context activation 7. Set-up RAB’s for the connection 8. Create GTP connections and activate PDP Context at the GGSN 9. Data Transfer

Page 53: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 53 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDN

UE State: RRC Idle PMM Detached SM Inactive

Connections: Signalling :- None User :- None

UE State: RRC Idle PMM Detached SM Inactive

Connections: Signalling :- None User :- None

Check Point OneUE Detached – No PDP Contexts

Page 54: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 54 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewRRC Connection Set-Up: RRC: RRC Connection Request RRC Connection Set-Up: RRC: RRC Connection Request

Description:This message is sent from by

the UE in order to establish an RRC connection. Once RRC connected the UE can use the signalling connection to carry out the necessary mobility procedures for Call set-up.

Main IE’s:1. Initial UE ID

Establishment CauseInitial UE capability

Description:This message is sent from by

the UE in order to establish an RRC connection. Once RRC connected the UE can use the signalling connection to carry out the necessary mobility procedures for Call set-up.

Main IE’s:1. Initial UE ID

Establishment CauseInitial UE capability

UEUE Node BNode B RNCRNC SGSNSGSN

RRC Connection Request

(RACH)[1]

Page 55: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 55 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewRRC Connection Set-Up: NBAP: Radio Link Set-up Request / Response RRC Connection Set-Up: NBAP: Radio Link Set-up Request / Response

Description:On reception of the RRC

Connection Request the RNC initiates its set-up by requesting the Node B to configure a Radio Link. The Node B sets-up the Requested Link (DCCH) and returns a set-up response indicating the Link configuration and the Binding ID.

Main IE’s:1. Cell ID, TFS / TFCS

Frequency, UL Scrambling CodeDL Channelisation CodePower Control Info

2. Transport Layer Address Sig. Link terminationDL Channelisation CodeDCH Binding ID

Description:On reception of the RRC

Connection Request the RNC initiates its set-up by requesting the Node B to configure a Radio Link. The Node B sets-up the Requested Link (DCCH) and returns a set-up response indicating the Link configuration and the Binding ID.

Main IE’s:1. Cell ID, TFS / TFCS

Frequency, UL Scrambling CodeDL Channelisation CodePower Control Info

2. Transport Layer Address Sig. Link terminationDL Channelisation CodeDCH Binding ID

RL setup Request

RL setup Response

RRC Connection Request

(RACH)[1]

[2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 56: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 56 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewRRC Connection Set-Up: ALCAP: Establish Request / ConfirmRRC Connection Set-Up: ALCAP: Establish Request / Confirm

Description:Once the Radio Link has been

configured in the Node B, the RNC sets-up an AAL2 bearer to carry it. This is done using the services of ALCAP. The RNC sends a Establish Request to the Node B, providing details of the bearer configuration and the Link identifiers. It also includes the Binding ID for the Radio Link that the Node B created.The Node B responds with a Establish confirm indicating the Originating and terminating references

Main IE’s:1. Destination address, DSAI, ALC, CEID, OSAI, SUGR, SSISU

2. DSAID, OSAID

Description:Once the Radio Link has been

configured in the Node B, the RNC sets-up an AAL2 bearer to carry it. This is done using the services of ALCAP. The RNC sends a Establish Request to the Node B, providing details of the bearer configuration and the Link identifiers. It also includes the Binding ID for the Radio Link that the Node B created.The Node B responds with a Establish confirm indicating the Originating and terminating references

Main IE’s:1. Destination address, DSAI, ALC, CEID, OSAI, SUGR, SSISU

2. DSAID, OSAID

RL setup Request

RL setup Response

ALCAP ERQ

ALCAP ECF

RRC Connection Request

(RACH)

[1]

[2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 57: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 57 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewRRC Connection Set-Up: FP: DL / UL Synchronisation RRC Connection Set-Up: FP: DL / UL Synchronisation

Description:Before use the new DCCH

needs to be synchronised. This procedure allows the RNC to calculate and adjust for timing delays in the DL direction. The Framing Protocol DL Synchronisation message is sent to the Node B indicating the target frame number.

The Node B measures the time of arrival of the indicated frame (wrt ToAWE) and returns this value in an UL synchronisation message.

Main IE’s:1. CFN

2. CFN, ToA

Description:Before use the new DCCH

needs to be synchronised. This procedure allows the RNC to calculate and adjust for timing delays in the DL direction. The Framing Protocol DL Synchronisation message is sent to the Node B indicating the target frame number.

The Node B measures the time of arrival of the indicated frame (wrt ToAWE) and returns this value in an UL synchronisation message.

Main IE’s:1. CFN

2. CFN, ToA

RL setup Request

RL setup Response

ALCAP ERQ

ALCAP ECF

RRC Connection Request

(RACH)

FP DL Synchronisation

FP UL Synchronisation

[1]

[2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 58: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 58 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewRRC Connection Set-Up: RRC: Connection Set-up / Complete RRC Connection Set-Up: RRC: Connection Set-up / Complete

Description:Once the UTRAN resources are

configured the RNC can instruct the UE to set-up the RRC connection and move from RACH / FACH to DCCH. This is done via a RRC Connection Set-up message sent on the FACH.

The UE responds with a set-up complete on the new DCCH.

Main IE’s:1. Initial UE ID, RNTI,

CapUpReq, TFS, TFCS, frequ, DL Scram + Chann codes, Power control info.

2. UE Capability, Ciphering, Integrity info

Description:Once the UTRAN resources are

configured the RNC can instruct the UE to set-up the RRC connection and move from RACH / FACH to DCCH. This is done via a RRC Connection Set-up message sent on the FACH.

The UE responds with a set-up complete on the new DCCH.

Main IE’s:1. Initial UE ID, RNTI,

CapUpReq, TFS, TFCS, frequ, DL Scram + Chann codes, Power control info.

2. UE Capability, Ciphering, Integrity info

RL setup Request

RL setup Response

ALCAP ERQ

ALCAP ECF

RRC Connection Request

(RACH)

FP DL Synchronisation

FP UL Synchronisation

RRC Conn. Setup

(FACH)RRC Conn. Setup Comp

(DCCH)

[1]

[2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 59: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 59 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDN

UE State: RRC Connected PMM Detached SM Inactive

Connections: Signalling :- RRC User :- None

UE State: RRC Connected PMM Detached SM Inactive

Connections: Signalling :- RRC User :- None

Check Point TwoUE Detached – No PDP Contexts – RRC Connected

RRC Connection (DCCH)

Page 60: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 60 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPMM Attach : RRC: Initial Direct Transfer + RANAP: Initial UE messagePMM Attach : RRC: Initial Direct Transfer + RANAP: Initial UE message

Description:At this point the UE is RRC

connected in Cell_DCH and can make its first NAS request. In this case it sends a PMM Attach Request (with follow on set), which is transported via RRC and RANAP Initial DT messages.

Main IE’s:1. Msg Type, CN Domain ID,

NAS message

2.. LAI, SAI, RAC, Sig. Conn. ID, RNC ID, NAS -PDU

Description:At this point the UE is RRC

connected in Cell_DCH and can make its first NAS request. In this case it sends a PMM Attach Request (with follow on set), which is transported via RRC and RANAP Initial DT messages.

Main IE’s:1. Msg Type, CN Domain ID,

NAS message

2.. LAI, SAI, RAC, Sig. Conn. ID, RNC ID, NAS -PDU

RRC Initial D T

(PMM Attach Request)

RRC Connection Setup

RANAP Initial UE(PMM Attach Request)

(SCCP Con Req.)[1] [2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 61: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 61 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPMM Attach : PMM: Attach RequestPMM Attach : PMM: Attach Request

Description:The NAS message carried by

RRC and RANAP DT contains the UE Attach Request. This message identifies the UE to the CN and provides details of its Network and Radio Capabilities.

Main IE’s:1. UE Network Capability, UE

Radio Capability, P-TMSI and RAI, Attach Type with follow on bit set. P-TMSI Signature

Description:The NAS message carried by

RRC and RANAP DT contains the UE Attach Request. This message identifies the UE to the CN and provides details of its Network and Radio Capabilities.

Main IE’s:1. UE Network Capability, UE

Radio Capability, P-TMSI and RAI, Attach Type with follow on bit set. P-TMSI Signature

RRC Connection Setup

RRC Initial D T

(PMM Attach Request)

RANAP Initial UE(PMM Attach Request)

(SCCP Con Req.)[1] [2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 62: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 62 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPMM Attach : SCCP: Connection ConfirmPMM Attach : SCCP: Connection Confirm

Description:

Main IE’s:

Description:

Main IE’s:

RANAP Initial UE(PMM Attach Request)

(SCCP Con Req.)

RRC Initial DT

(PMM Attach Request)

RRC Connection Setup

SCCP Connection Conf[1]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 63: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 63 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPMM Attach : RANAP / RRC: Authentication + Security Mode PMM Attach : RANAP / RRC: Authentication + Security Mode

Description:For First Call Authentication may

not be done. Manual configuration of the VLR, USIM may be done instead. The Security mode procedure is only partially supported, the messages will be exchanged between the different NE’s , but No Ciphering or Integrity checking will be done.

Main IE’s:1. RAND, AUTH

2. RES

Description:For First Call Authentication may

not be done. Manual configuration of the VLR, USIM may be done instead. The Security mode procedure is only partially supported, the messages will be exchanged between the different NE’s , but No Ciphering or Integrity checking will be done.

Main IE’s:1. RAND, AUTH

2. RES

RRC Connection Setup

Authentication

RRCSecurity Mode Command

RANAPSecurity Mode

Command

RRCSecurity Mode Complete

RANAPSecurity Mode

Complete

(PMM Attach Request)

RRC Initial DTRANAP Initial UE

(PMM Attach Request)

(SCCP Con Req.)

SCCP Connection Conf

[1]

[4]

[2]

[3]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 64: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 64 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewIdentity Request Procedure: NAS: Identity RequestIdentity Request Procedure: NAS: Identity Request

Type: NAS (PMM)

Purpose: Identity Request: Used by the CN to request the UE identity. Can be of type;

[IMSI, IMEI, IEMISV, TMSI]

Identity Response: UE reply to the Identity request can be of type;

[IMSI, IMEI, IEMISV, TMSI]

Main IE’s:

Req: Identity Request Type

Res: Mobile Identity

Type: NAS (PMM)

Purpose: Identity Request: Used by the CN to request the UE identity. Can be of type;

[IMSI, IMEI, IEMISV, TMSI]

Identity Response: UE reply to the Identity request can be of type;

[IMSI, IMEI, IEMISV, TMSI]

Main IE’s:

Req: Identity Request Type

Res: Mobile Identity

Identity Request Procedure

Identity Request Procedure

Authentication

Authentication

Security Mode

Security Mode

RRC DL DT(Identity Request)

RANAP DT(Identity Request)

RRC UL D T

(Identity Response.)RANAP DT

(Identity Request)

UEUE Node BNode B RNCRNC SGSNSGSN

Page 65: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 65 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewIdentity, Authentication and Security Mode Commands Identity, Authentication and Security Mode Commands

Type: NAS (PMM)

Purpose: UE AuthenticationNetwork AuthenticationIntegrity Key exchangeCiphering Key Exchange

Main IE’s:Req: CK Sequence Number RAND AUTN

Res: CK Sequence Number RES

Type: NAS (PMM)

Purpose: UE AuthenticationNetwork AuthenticationIntegrity Key exchangeCiphering Key Exchange

Main IE’s:Req: CK Sequence Number RAND AUTN

Res: CK Sequence Number RES

Identity Request Procedure

Identity Request Procedure

Authentication

Authentication

Security Mode

Security Mode

RRC DL DT(Identity Request)

RANAP DT(Identity Request)

RRC UL D T

(Identity Response.)RANAP DT

(Identity Request)

RRC DL DT(Authentication Request)

RANAP DT(Authentication Request)

RRC UL D T

(Authentication Response)RANAP DT

(Authentication Response)

UEUE Node BNode B RNCRNC SGSNSGSN

Page 66: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 66 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewIdentity, Authentication and Security Mode Commands Identity, Authentication and Security Mode Commands

Type: RANAP DTRRC DTPurpose: Selection of Integrity and Ciphering Algorithms (by RNC)

Control Of Integrity and Ciphering Operation.

Main IE’s:SM Command: 1. Algorithm List, IK2. Integrity Check Info Integrity prot. mode info Domain ID

SM Complete: 1.UL Integrity protection info2. Chosen Integrity Algorithm

Type: RANAP DTRRC DTPurpose: Selection of Integrity and Ciphering Algorithms (by RNC)

Control Of Integrity and Ciphering Operation.

Main IE’s:SM Command: 1. Algorithm List, IK2. Integrity Check Info Integrity prot. mode info Domain ID

SM Complete: 1.UL Integrity protection info2. Chosen Integrity Algorithm

Identity Request Procedure

Identity Request Procedure

Authentication

Authentication

Security Mode

Security Mode

RRCSecurity Mode Command

RANAPSecurity Mode

Command

RRC

Security Mode Complete RANAP Security Mode Complete

RRC DL DT(Identity Request)

RANAP DT(Identity Request)

RRC Initial D T

(Identity Response.)RANAP DT

(Identity Request)

RRC DL DT(Authentication Request)

RANAP DT(Authentication Request)

RRC UL D T

(Authentication Response)RANAP DT

(Authentication Response)

UEUE Node BNode B RNCRNC SGSNSGSN

Page 67: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 67 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPMM Attach : RANAP: Common ID PMM Attach : RANAP: Common ID

Description:This RANAP message is sent to

the RNC from the CN in order to establish a common unique reference to the UE.

Main IE’s:1. IMSI

Description:This RANAP message is sent to

the RNC from the CN in order to establish a common unique reference to the UE.

Main IE’s:1. IMSI

Authentication

RRCSecurity Mode Command

RANAPSecurity Mode

Command

RRCSecurity Mode Complete

RANAPSecurity Mode

Complete

RANAP Common ID

(PMM Attach Request)

RRC Initial DTRANAP Initial UE

(PMM Attach Request)

(SCCP Con Req.)

SCCP Connection Conf

[1]

UEUE Node BNode B RNCRNC SGSNSGSN

RRC Connection Setup

Page 68: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 68 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPMM Attach : PMM: Attach AcceptPMM Attach : PMM: Attach Accept

Description:Once the Iu connection has been

established and the UE successfully authenticated then the CN sends an Attach Accept to the UE. This message may include the allocation of a new P-TMSI.

Main IE’s: 1. Attach Result, RAI,

P-TMSI

Description:Once the Iu connection has been

established and the UE successfully authenticated then the CN sends an Attach Accept to the UE. This message may include the allocation of a new P-TMSI.

Main IE’s: 1. Attach Result, RAI,

P-TMSI

RRC Connection Setup

Authentication

RRCSecurity Mode Command

RANAPSecurity Mode

Command

RRCSecurity Mode Complete

RANAPSecurity Mode

Complete

RANAP Common ID

RRC DL DT(PMM Attach Accept)

RANAP DT(PMM Attach Accept)

(PMM Attach Request)

RRC Initial DTRANAP Initial UE

(PMM Attach Request)

(SCCP Con Req.)

SCCP Connection Conf

[1][2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 69: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 69 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPMM Attach : PMM: Attach Complete PMM Attach : PMM: Attach Complete

Description:If the CN Allocated a new P-

TMSI in the Attach Accept message then the UE responds with an attach complete message. This confirms receipt of the new temporary identity.

Main IE’s: Attach Complete indication

Description:If the CN Allocated a new P-

TMSI in the Attach Accept message then the UE responds with an attach complete message. This confirms receipt of the new temporary identity.

Main IE’s: Attach Complete indication

RRC Connection Setup

Authentication

RRCSecurity Mode Command

RANAPSecurity Mode

Command

RRCSecurity Mode Complete

RANAPSecurity Mode

Complete

RANAP Common ID

RRC DL DT(PMM Attach Accept)

RANAP DT(PMM Attach Accept)

RRC UL DT(PMM Attach Complete) RANAP DT

(PMM Attach Complete)

(PMM Attach Request)

RRC Initial DTRANAP Initial UE

(PMM Attach Request)

(SCCP Con Req.)

SCCP Connection Conf

[2][1]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 70: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 70 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDN

UE State: RRC Connected PMM Attached SM Inactive

Connections: Signalling :- DCCH RRC Iu User :- none

UE State: RRC Connected PMM Attached SM Inactive

Connections: Signalling :- DCCH RRC Iu User :- none

Check Point ThreeUE Attached – No PDP Contexts – RRC Connected

RRC Connection (DCCH) Iu Connection

Page 71: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 71 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: SM: Activate PDP Context Request PDP Context Activation: SM: Activate PDP Context Request

Description:The UE starts this procedure

RRC and PMM Connected. The follow on flag was set during the attach procedure so the RRC connection is still in place. This is used to send the NAS SM Activate PDP context request message to the CN. This message indicates the Context reference, the requested QoS, PDP Address and APN.

Main IE’s:Transaction ID,

NSAPI, QoS, PDP Address, APN

Description:The UE starts this procedure

RRC and PMM Connected. The follow on flag was set during the attach procedure so the RRC connection is still in place. This is used to send the NAS SM Activate PDP context request message to the CN. This message indicates the Context reference, the requested QoS, PDP Address and APN.

Main IE’s:Transaction ID,

NSAPI, QoS, PDP Address, APN

RRC Connection Setup

PMM Attach Procedure

RRC UL DT(Activate PDP Context Req)

RANAP DT(Activate PDP Context

Req)[1] [2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 72: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 72 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: RANAP: RAB Assignment Request PDP Context Activation: RANAP: RAB Assignment Request

Description:On receipt of the request the

SGSN imitates the set-up of the DTCH required to support this Context. It does this by sending a RAB assignment request to the RNC indicating the RAB configuration and also passing the UL GTP tunnel Paramaters.

Main IE’s:RAB ID, RAB Paramaters, User

Plane Info, GTP-U IP Address, UL TEID

Description:On receipt of the request the

SGSN imitates the set-up of the DTCH required to support this Context. It does this by sending a RAB assignment request to the RNC indicating the RAB configuration and also passing the UL GTP tunnel Paramaters.

Main IE’s:RAB ID, RAB Paramaters, User

Plane Info, GTP-U IP Address, UL TEID

RRC Connection Setup

PMM Attach Procedure

RRC UL DT(Activate PDP Context Req)

RANAP DT(Activate PDP Context

Req)RANAP

RAB Assignment Req.[1]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 73: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 73 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: NBAP: RL Reconfigure Prepare / Ready PDP Context Activation: NBAP: RL Reconfigure Prepare / Ready

Description:The UE already has a Radio Link

set-up, this procedure requires that a DTCH be added to the configuration, therefore the RNC sends a RL reconfigure request to the Node B.

The Node B confirms with RL Reconfigure Ready, but does not implement the changes yet.

Main IE’s:DCH’s to add,

Configuration Info FP mode ToAWS ToAWE DCH ID TFS

RL ID

Description:The UE already has a Radio Link

set-up, this procedure requires that a DTCH be added to the configuration, therefore the RNC sends a RL reconfigure request to the Node B.

The Node B confirms with RL Reconfigure Ready, but does not implement the changes yet.

Main IE’s:DCH’s to add,

Configuration Info FP mode ToAWS ToAWE DCH ID TFS

RL ID

RRC Connection Setup

PMM Attach Procedure

RRC UL DT(Activate PDP Context Req)

RANAP DT(Activate PDP Context

Req)RANAP

RAB Assignment Req.NBAP

RL Reconfigure Prepare

NBAPRL Reconfigure Ready

[1]

[2]

UEUE Node BNode B RNCRNC SGSNSGSN

Page 74: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 74 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: ALCAP: AAL2 Bearer Set-UpPDP Context Activation: ALCAP: AAL2 Bearer Set-Up

Description:Once the RL has been

reconfigured in the Node B the RNC sets-up the AAL2 bearer to carry it. As before this done via ALCAP Establish procedures and is followed by FP synchronisation.

Description:Once the RL has been

reconfigured in the Node B the RNC sets-up the AAL2 bearer to carry it. As before this done via ALCAP Establish procedures and is followed by FP synchronisation.

RRC Connection Setup

PMM Attach Procedure

RANAPRAB Assignment Req.

NBAPRL Reconfigure Prepare

NBAPRL Reconfigure Ready

RRC UL DT(Activate PDP Context Req)

RANAP DT(Activate PDP Context

Req)

UEUE Node BNode B RNCRNC SGSNSGSN

ALCAP AAL2 Bearer Set-up and

Synchronisation

Page 75: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 75 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: NBAP: RL Reconfigure CommitPDP Context Activation: NBAP: RL Reconfigure Commit

Description:When the AAL2 connection is

ready the RNC instructs the Node B to commit the changes it had prepared in the reconfiguration.

The Commit message indicates the Frame number at which the change should occur.

Main IE’s:Transaction Id, CFN

Description:When the AAL2 connection is

ready the RNC instructs the Node B to commit the changes it had prepared in the reconfiguration.

The Commit message indicates the Frame number at which the change should occur.

Main IE’s:Transaction Id, CFN

RRC Connection Setup

PMM Attach Procedure

RANAPRAB Assignment Req.

NBAPRL Reconfigure Prepare

NBAPRL Reconfigure Ready

NBAPRL Reconfigure Commit

RRC UL DT(Activate PDP Context Req)

RANAP DT(Activate PDP Context

Req)

[1]

UEUE Node BNode B RNCRNC SGSNSGSN

ALCAP AAL2 Bearer Set-up and

Synchronisation

Page 76: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 76 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: RRC: Radio Bearer Set-UpPDP Context Activation: RRC: Radio Bearer Set-Up

Description:The UTRAN has been

configured for the new DTCH, so the UE can now be instructed to set-up the Radio Bearer. The RNC does this via an RRC RB set-up request. This includes the same CFN as indicated to the Node B.

Main IE’s: Transaction ID, CFN, State

Indicator,

RB Set-up infoRAB ID, CN Domain ID, PDCP info, RLC Info, TFC, TFS

Description:The UTRAN has been

configured for the new DTCH, so the UE can now be instructed to set-up the Radio Bearer. The RNC does this via an RRC RB set-up request. This includes the same CFN as indicated to the Node B.

Main IE’s: Transaction ID, CFN, State

Indicator,

RB Set-up infoRAB ID, CN Domain ID, PDCP info, RLC Info, TFC, TFS

RRC Connection Setup

PMM Attach Procedure

RANAPRAB Assignment Req.

NBAPRL Reconfigure Prepare

NBAPRL Reconfigure Ready

NBAPRL Reconfigure Commit

RRC Radio Bearer Setup(DCCH)

RRC UL DT(Activate PDP Context Req)

RANAP DT(Activate PDP Context

Req)

[1]

UEUE Node BNode B RNCRNC SGSNSGSN

ALCAP AAL2 Bearer Set-up and

Synchronisation

Page 77: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 77 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: RRC: Radio Bearer Set-Up CompletePDP Context Activation: RRC: Radio Bearer Set-Up Complete

Description:Once the UE has configured the

RB it returns a confirmation message in the form of an RRC RB set-up Complete.

Main IE’s: Transaction ID

Description:Once the UE has configured the

RB it returns a confirmation message in the form of an RRC RB set-up Complete.

Main IE’s: Transaction ID

RRC Connection Setup

PMM Attach Procedure

RANAPRAB Assignment Req.

NBAPRL Reconfigure Prepare

NBAPRL Reconfigure Ready

NBAPRL Reconfigure Commit

RRC Radio Bearer Setup(DCCH)

RRC RB Setup Comp(DCCH)

RRC UL DT(Activate PDP Context Req)

RANAP DT(Activate PDP Context

Req)

[1]

UEUE Node BNode B RNCRNC SGSNSGSN

ALCAP AAL2 Bearer Set-up and

Synchronisation

Page 78: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 78 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: RANAP: RAB Assignment ResponsePDP Context Activation: RANAP: RAB Assignment Response

Description:Receipt of the set-up complete

message by the RNC indicates that RAB assignment procedure is complete, it indicates this back to the SGSN via a RANAP RAB assignment response, that also includes the DL addressing for the GTP-U connection.

Main IE’s: NSAPI, RNC GTP-U IP

Address, DL TEID

Description:Receipt of the set-up complete

message by the RNC indicates that RAB assignment procedure is complete, it indicates this back to the SGSN via a RANAP RAB assignment response, that also includes the DL addressing for the GTP-U connection.

Main IE’s: NSAPI, RNC GTP-U IP

Address, DL TEID

RRC Connection Setup

PMM Attach Procedure

RANAPRAB Assignment Req.

NBAPRL Reconfigure Prepare

NBAPRL Reconfigure Ready

NBAPRL Reconfigure Commit

RRC Radio Bearer Setup(DCCH)

RRC RB Setup Comp(DCCH)

RRC UL DT(Activate PDP Context Req)

RANAP DT(Activate PDP Context

Req)

RANAPRAB Assignment Resp

[1]

UEUE Node BNode B RNCRNC SGSNSGSN

ALCAP AAL2 Bearer Set-up and

Synchronisation

Page 79: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 79 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: GTP-C: Create PDP Context RequestPDP Context Activation: GTP-C: Create PDP Context Request

Description:The final part of the connection

can now be established this is the connection to the AP indicated in the PDP activation request. The SGSN identifies the correct GGSN and sends it a Create PDP context Request.

Main IE’s: IMSI, Restart Counter, Data

TEID, Control TEID, Data IP Addr, Control IP Addr, NSAPI, APN, QoS profile, PDP Address

Description:The final part of the connection

can now be established this is the connection to the AP indicated in the PDP activation request. The SGSN identifies the correct GGSN and sends it a Create PDP context Request.

Main IE’s: IMSI, Restart Counter, Data

TEID, Control TEID, Data IP Addr, Control IP Addr, NSAPI, APN, QoS profile, PDP Address

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

GTP-CCreate PDP Context

Request

[1]

RRC Connection Setup

PMM Attach Procedure

Context Activation Request and RAB Set-Up

Page 80: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 80 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: GTP-C: Create PDP Context ResponsePDP Context Activation: GTP-C: Create PDP Context Response

Description:Once the Context has been

created in the GGSN it returns a Create PDP Context Response, indicating the UL GTP Paramaters, QoS profile and UE PDP address

Main IE’s:Restart Counter, Data TEID,

Control TEID, Data IP Addr, Control IP Addr, QoS profile,

PDP Address

Description:Once the Context has been

created in the GGSN it returns a Create PDP Context Response, indicating the UL GTP Paramaters, QoS profile and UE PDP address

Main IE’s:Restart Counter, Data TEID,

Control TEID, Data IP Addr, Control IP Addr, QoS profile,

PDP Address

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

GTP-CCreate PDP Context

Request

GTP-CCreate PDP Context

Response

[1]

RRC Connection Setup

PMM Attach Procedure

Context Activation Request and RAB Set-Up

Page 81: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 81 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: SM: Activate PDP Context AcceptPDP Context Activation: SM: Activate PDP Context Accept

Description:The Context s now active and all

the transport bearers are in place, the SGSN can therefore complete the procedure by sending the UE an Activate PDP context Accept. This message is also used to inform the UE of the offered QoS settings and PDP Address.

Main IE’s: Transaction ID, QoS

Paramaters, Radio Priority,

PDP Address,

Description:The Context s now active and all

the transport bearers are in place, the SGSN can therefore complete the procedure by sending the UE an Activate PDP context Accept. This message is also used to inform the UE of the offered QoS settings and PDP Address.

Main IE’s: Transaction ID, QoS

Paramaters, Radio Priority,

PDP Address,

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

GTP-CCreate PDP Context

Request

GTP-CCreate PDP Context

Response

[1]

[2]

RANAP DT(Act PDP Context

Acc)RRC DL DT(Act PDP Context

Acc)

RRC Connection Setup

PMM Attach Procedure

Context Activation Request and RAB Set-Up

Page 82: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 82 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Procedure OverviewPDP Context Activation: Procedure CompletePDP Context Activation: Procedure Complete

At this point;

The PDP context has been created in the SGSN, GGSN, and at the UE

The UE is now SM Active, PMM Attached and RRC Connected. It has dedicated signalling and user plane connections, and an IP address. Data transfer can now begin

At this point;

The PDP context has been created in the SGSN, GGSN, and at the UE

The UE is now SM Active, PMM Attached and RRC Connected. It has dedicated signalling and user plane connections, and an IP address. Data transfer can now begin

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

GGSN PDP Context Create and UE PDP Context Activation Accept

RRC Connection Setup

PMM Attach Procedure

Context Activation Request and RAB Set-Up

PS Call ActivePS Call Active

Page 83: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 83 (164)

PART 5 - UE INITIATED CALL SET-UP (PS)

Check Point FourUE Attached – One PDP Context

UE State: RRC Connected PMM Attached SM Active

Connections: Signalling :- DCCH RRC Iu GTP-C User :- DTCH GTP-U

UE State: RRC Connected PMM Attached SM Active

Connections: Signalling :- DCCH RRC Iu GTP-C User :- DTCH GTP-U

RRC Connection (DCCH) Iu Connection GTP-C Connection

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDN

DTCH GTP-U Connection GTP-U Connection

Page 84: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 84 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure Overview.In this Procedure the UE is attached to the Network with a single PDP Context Active. The call tear down is Mobile Originated (mo) and is shown in two parts, PDP context deactivate then Detach.The following steps need to be executed in order for a mo call tear down to complete;

1. PDP Context Deactivate request from UE 2. Radio Link Setup 3. Iub Transport Bearer Setup 4. DCH-FP Synchronisation 5. Connection Setup 6. Attach Procedure 7. Authentication and Security Procedures 8. PDP Context Activation Procedure 9. Radio Link and RAB Configuration 10. Data Transfer

Page 85: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 85 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: SM: Deactivate PDP Context RequestPDP Context Deactivation: SM: Deactivate PDP Context Request

Description:The first step in call teardown is

to deactivate the PDP context. This is a Session Management (NAS) message sent by the UE and carried by DT messages to the Core Network.

Main IE’s:SM: Deactivate PDP Context

Request

Transaction ID, Type, Cause

Description:The first step in call teardown is

to deactivate the PDP context. This is a Session Management (NAS) message sent by the UE and carried by DT messages to the Core Network.

Main IE’s:SM: Deactivate PDP Context

Request

Transaction ID, Type, Cause

RRC UL DT(Deact PDP Context Req) RANAP DT

(Deact PDP Context Req)

[1][2]

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

Page 86: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 86 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: GTP-C: Delete PDP Context RequestPDP Context Deactivation: GTP-C: Delete PDP Context Request

Description:Once the Core Network has

received the deactivate request, it starts the teardown procedure by requesting the GGSN to delete this context. This is done via the GTP-C connection that exists for this UE. The context (normally there might be more than one) is identified by its NSAPI.

Main IE’s:UL TEID, NSAPI

Description:Once the Core Network has

received the deactivate request, it starts the teardown procedure by requesting the GGSN to delete this context. This is done via the GTP-C connection that exists for this UE. The context (normally there might be more than one) is identified by its NSAPI.

Main IE’s:UL TEID, NSAPI

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

GTP-CDelete PDP Context

Request

RRC UL DT(Deact PDP Context Req) RANAP DT

(Deact PDP Context Req)[1]

Page 87: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 87 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: GTP-C: Delete PDP Context ResponsePDP Context Deactivation: GTP-C: Delete PDP Context Response

Description:Once the GGSN has deleted the

PDP context for the UE associated with the GTP-C connection and the Context associated with the NSAPI, it responds to the SGSN with the Delete PDP context Response. This simply indicates that the request has been accepted.

Main IE’s:DL TEID, Cause

Description:Once the GGSN has deleted the

PDP context for the UE associated with the GTP-C connection and the Context associated with the NSAPI, it responds to the SGSN with the Delete PDP context Response. This simply indicates that the request has been accepted.

Main IE’s:DL TEID, Cause

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

GTP-CDelete PDP Context

Request

RRC UL DT(Deact PDP Context Req) RANAP DT

(Deact PDP Context Req)

GTP-CDelete PDP Context

Response

[1]

Page 88: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 88 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: PMM: Deactivate PDP Context AcceptPDP Context Deactivation: PMM: Deactivate PDP Context Accept

Description:The SGSN now confirms to the

UE that the Deactivate PDP context request has been accepted. This is done via a Session Management (NAS) message carried in DL DT messages. The Type IE indicates a

Main IE’s:SM: Deactivate PDP Context

Accept;

Transaction ID, Type

Description:The SGSN now confirms to the

UE that the Deactivate PDP context request has been accepted. This is done via a Session Management (NAS) message carried in DL DT messages. The Type IE indicates a

Main IE’s:SM: Deactivate PDP Context

Accept;

Transaction ID, Type

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

GTP-CDelete PDP Context

Request

RRC UL DT(Deact PDP Context Req) RANAP DT

(Deact PDP Context Req)

GTP-CDelete PDP Context

ResponseRANAP DT

(Deact PDP Context Acc)RRC DL DT(Deact PDP Context Acc)

[1]

[2]

Page 89: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 89 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: RANAP: Iu Release CommandPDP Context Deactivation: RANAP: Iu Release Command

Description:Once the PDP context has been

deactivate in the GGSN and the UE has been notified the SGSN initiates the release of the associated RAB’s. Because this is the only PDP context for this UE the Iu release Procedure is carried out rather than the RAB Assignment (with release) procedure.

Main IE’s:1. Message Type, Cause

(normal release)

2. Message Type (successful outcome)

Description:Once the PDP context has been

deactivate in the GGSN and the UE has been notified the SGSN initiates the release of the associated RAB’s. Because this is the only PDP context for this UE the Iu release Procedure is carried out rather than the RAB Assignment (with release) procedure.

Main IE’s:1. Message Type, Cause

(normal release)

2. Message Type (successful outcome)

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

PDP Context Deactivation Request / Accept and GGSN PDP Context Deletion

RANAPIu Release Complete

RANAPIu Release Command

[1]

[2]

Page 90: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 90 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: RRC: RRC Connection ReleasePDP Context Deactivation: RRC: RRC Connection Release

Description:The RNC responds to the Iu

release command, by releasing the RRC connection to the UE. This is done via the RRC Connection Release message.. This message indicates a Normal Event RRC Connection release.. It also includes a Threshold value N308, used by the UE to set the no of responses it should return.

Main IE’s:Message Type, Transaction ID,

N308, Release Cause

Description:The RNC responds to the Iu

release command, by releasing the RRC connection to the UE. This is done via the RRC Connection Release message.. This message indicates a Normal Event RRC Connection release.. It also includes a Threshold value N308, used by the UE to set the no of responses it should return.

Main IE’s:Message Type, Transaction ID,

N308, Release Cause

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

PDP Context Deactivation Request / Accept and GGSN PDP Context Deletion

RANAPIu Release Complete

RANAPIu Release Command

[1]RRC

Connection Release

Page 91: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 91 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: RRC: RRC Connection Release CompletePDP Context Deactivation: RRC: RRC Connection Release Complete

Description:The UE responds to the

connection release request with one or more RRC Connection Release Complete messages.

Main IE’s:Message Type, Transaction ID

Description:The UE responds to the

connection release request with one or more RRC Connection Release Complete messages.

Main IE’s:Message Type, Transaction ID

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

PDP Context Deactivation Request / Accept and GGSN PDP Context Deletion

RANAPIu Release Complete

RANAPIu Release Command

[1]

RRC Connection Release

RRCConn Release Complete

Page 92: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 92 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: NBAP: RL Deletion Request / ResponsePDP Context Deactivation: NBAP: RL Deletion Request / Response

Description:After the UE has confirmed the

RRC Connection Release, the RNC indicates to the Node B to release the Radio Links for this UE. This is an NBAP procedure using RL Deletion Request / Response messages.

Main IE’s:1. Node B and RNC context

ID’s, Message Type, Transaction ID, RL Information (RL ID’s)

2. RNC context ID, Message Type, Transaction ID

Description:After the UE has confirmed the

RRC Connection Release, the RNC indicates to the Node B to release the Radio Links for this UE. This is an NBAP procedure using RL Deletion Request / Response messages.

Main IE’s:1. Node B and RNC context

ID’s, Message Type, Transaction ID, RL Information (RL ID’s)

2. RNC context ID, Message Type, Transaction ID

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

PDP Context Deactivation Request / Accept and GGSN PDP Context Deletion

RANAPIu Release Complete

RANAPIu Release Command

RRC Connection Release

RRCConn Release Complete

NBAPRL Deletion Response

NBAPRL Deletion Request

[1]

[2]

Page 93: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 93 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: ALCAP: Release Request / ConfirmPDP Context Deactivation: ALCAP: Release Request / Confirm

Description:Once the Radio Link has been

deleted the RNC needs to remove the associate d AAL2 bearers. This is an ALCAP procedure that uses Release Request and Confirm messages.

Main IE’s:1. DSAID, Cause (normal),

Binding ID

2. DSAID

Description:Once the Radio Link has been

deleted the RNC needs to remove the associate d AAL2 bearers. This is an ALCAP procedure that uses Release Request and Confirm messages.

Main IE’s:1. DSAID, Cause (normal),

Binding ID

2. DSAID

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

PDP Context Deactivation Request / Accept and GGSN PDP Context Deletion

RANAPIu Release Complete

RANAPIu Release Command

RRC Connection Release

RRCConn Release Complete

NBAPRL Deletion Response

NBAPRL Deletion Request

ALCAPRelease Confirm

ALCAPRelease Request

[1]

[2]

Page 94: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 94 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPDP Context Deactivation: Deactivate PDP Context CompletePDP Context Deactivation: Deactivate PDP Context Complete

At this point;

The PDP context has been deleted in the SGSN, GGSN, and at the UE

The RRC connection has been released

All associated Radio Links have been released in the UTRAN

All associated AAL2 connections have been released

The UE is now SM Inactive, PMM Idle and RRC Idle. It is still PS attached, but is currently without any dedicated signalling or user connections, has no network recognised IP address and cannot send data.

At this point;

The PDP context has been deleted in the SGSN, GGSN, and at the UE

The RRC connection has been released

All associated Radio Links have been released in the UTRAN

All associated AAL2 connections have been released

The UE is now SM Inactive, PMM Idle and RRC Idle. It is still PS attached, but is currently without any dedicated signalling or user connections, has no network recognised IP address and cannot send data.

UEUE Node B

Node B RNCRNC SGSNSGSN GGSNGGSN

PDP Context ActivePDP Context Active

PDP Context Deactivation Request / Accept and GGSN PDP Context Deletion

Iu Release Procedure (RAB and RRC Connection Released)

PDP Context Deactivation Procedure Complete

PDP Context Deactivation Procedure Complete

Page 95: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 95 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPMM Detach: PMM: Detach Request + SCCP Connection set-upPMM Detach: PMM: Detach Request + SCCP Connection set-up

Description:If the UE now wishes to detach

from the network it can carry out a detach procedure. In order to do this it first needs to re-establish an RRC signalling connection. This procedure is the same as that outlined previously. Then using this RRC connection it sends a PMM Detach Request to the SGSN. This procedure also establishes a new SCCP (Iu) connection.

Main IE’s:Message Type, Detach Type, P-

TMSI

Description:If the UE now wishes to detach

from the network it can carry out a detach procedure. In order to do this it first needs to re-establish an RRC signalling connection. This procedure is the same as that outlined previously. Then using this RRC connection it sends a PMM Detach Request to the SGSN. This procedure also establishes a new SCCP (Iu) connection.

Main IE’s:Message Type, Detach Type, P-

TMSI

UEUE Node BNode B RNCRNC SGSNSGSN

RRC Initial DT(PMM Detach Request)

RRC Connection Set-Up Procedure

SCCP Connection Confirm

[1] [2]

[3]

SCCP Connection Request

RANAP Initial UE(PMM Detach Request)

Page 96: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 96 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPMM Detach: PMM: Detach AcceptPMM Detach: PMM: Detach Accept

Description:After the SGSN has received the

Detach request it may decide to authenticate the UE. For first call this may not be done. The SGSN then sends a PMM: Detach Accept to the UE confirming the detach. The force to standby is a GPRS mobility indicator, but is mandatory for both GPRS and UMTS. For UMTS it is set to “Force to standby not indicated”.

Main IE’s:Message Type, Force to standby

indicator

Description:After the SGSN has received the

Detach request it may decide to authenticate the UE. For first call this may not be done. The SGSN then sends a PMM: Detach Accept to the UE confirming the detach. The force to standby is a GPRS mobility indicator, but is mandatory for both GPRS and UMTS. For UMTS it is set to “Force to standby not indicated”.

Main IE’s:Message Type, Force to standby

indicator

UEUE Node BNode B RNCRNC SGSNSGSN

RRC Connection Set-Up Procedure

RRC DL DT(PMM Attach Accept)

RANAP Initial UE(PMM Detach Accept)

SCCP Connection Confirm

RRC Initial DT(PMM Detach Request) SCCP Connection

Request

RANAP Initial UE(PMM Detach Request)

Page 97: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 97 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPMM Detach: RANAP: Iu Release Command / CompletePMM Detach: RANAP: Iu Release Command / Complete

Description:The Iu and RRC connections

previously configured to carry the Detach request can now be released. This is initiated by the SGSN with an Iu release procedure.

Main IE’s:1. Message Type, Cause

(normal release)

2. Message Type (successful outcome)

Description:The Iu and RRC connections

previously configured to carry the Detach request can now be released. This is initiated by the SGSN with an Iu release procedure.

Main IE’s:1. Message Type, Cause

(normal release)

2. Message Type (successful outcome)

UEUE Node BNode B RNCRNC SGSNSGSN

RANAPIu Release Complete

[1]

[2]

RANAPIu Release Command

RRC DL DT(PMM Attach Accept)

RRC Connection Set-Up Procedure

RANAP Initial UE(PMM Detach Accept)

SCCP Connection Confirm

RRC Initial DT(PMM Detach Request) SCCP Connection

Request

RANAP Initial UE(PMM Detach Request)

Page 98: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 98 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPMM Detach: RRC: RRC Connection Release / Release CompletePMM Detach: RRC: RRC Connection Release / Release Complete

Description:The RNC responds to the Iu

release command, by releasing the RRC connection to the UE. This is done via the RRC Connection Release message. indicating a Normal Connection release.. It also includes a Threshold value N308, used by the UE to set the maximum number of responses it should return.

The UE responds with one or more RRC Connection Release Complete messages.

Main IE’s:1. Message Type, Transaction

ID, N308, Release Cause

2. Message Type, Transaction ID

Description:The RNC responds to the Iu

release command, by releasing the RRC connection to the UE. This is done via the RRC Connection Release message. indicating a Normal Connection release.. It also includes a Threshold value N308, used by the UE to set the maximum number of responses it should return.

The UE responds with one or more RRC Connection Release Complete messages.

Main IE’s:1. Message Type, Transaction

ID, N308, Release Cause

2. Message Type, Transaction ID

UEUE Node BNode B RNCRNC SGSNSGSN

RRC Connection Release(DCCH)

RRC Conn Rel Complete(DCCH)

RANAPIu Release Complete[1]

[2]

RRC Connection Set-Up Procedure

RANAPIu Release Command

RANAPIu Release Command

RRC DL DT(PMM Attach Accept)

RANAP Initial UE(PMM Detach Accept)

SCCP Connection Confirm

RRC Initial DT(PMM Detach Request) SCCP Connection

Request

RANAP Initial UE(PMM Detach Request)

Page 99: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 99 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPMM Detach: NBAP: RL Deletion Request / Deletion CompletePMM Detach: NBAP: RL Deletion Request / Deletion Complete

Description:After the UE has confirmed the

RRC Connection Release, the RNC indicates to the Node B to release the Radio Links for this UE. This is an NBAP procedure using RL Deletion Request / Response messages.

Main IE’s:1. Node B and RNC context

ID’s, Message Type, Transaction ID, RL Information (RL ID’s)

2. RNC context ID, Message Type, Transaction ID

Description:After the UE has confirmed the

RRC Connection Release, the RNC indicates to the Node B to release the Radio Links for this UE. This is an NBAP procedure using RL Deletion Request / Response messages.

Main IE’s:1. Node B and RNC context

ID’s, Message Type, Transaction ID, RL Information (RL ID’s)

2. RNC context ID, Message Type, Transaction ID

UEUE Node BNode B RNCRNC SGSNSGSN

NBAPRL Deletion Request

NBAPRL Deletion Complete

RRC Connection Release(DCCH)

RRC Conn Rel Complete(DCCH)

[1]

[2]

RRC Connection Set-Up Procedure

RANAPIu Release Command

RANAPIu Release Command

RRC DL DT(PMM Attach Accept)

RANAP Initial UE(PMM Detach Accept)

SCCP Connection Confirm

RRC Initial DT(PMM Detach Request) SCCP Connection

Request

RANAP Initial UE(PMM Detach Request)

RANAPIu Release Complete

Page 100: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 100 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewPMM Detach: ALCAP: Release Request / Release ConfirmPMM Detach: ALCAP: Release Request / Release Confirm

Description:Once the Radio Link has been

deleted the RNC needs to remove the associate d AAL2 bearers. This is an ALCAP procedure that uses Release Request and Confirm messages.

Main IE’s:1. DSAID, Cause (normal),

Binding ID

2. DSAID

Description:Once the Radio Link has been

deleted the RNC needs to remove the associate d AAL2 bearers. This is an ALCAP procedure that uses Release Request and Confirm messages.

Main IE’s:1. DSAID, Cause (normal),

Binding ID

2. DSAID

UEUE Node BNode B RNCRNC SGSNSGSN

ALCAPRelease Request

ALCAPRelease Confirm

NBAPRL Deletion Request

RRC Connection Release(DCCH)

RRC Conn Rel Complete(DCCH)

NBAPRL Deletion Complete

[1]

[2]

RANAPIu Release Complete

RRC Connection Set-Up Procedure

RANAPIu Release Command

RANAPIu Release Command

RRC DL DT(PMM Attach Accept)

RANAP Initial UE(PMM Detach Accept)

SCCP Connection Confirm

RRC Initial DT(PMM Detach Request) SCCP Connection

Request

RANAP Initial UE(PMM Detach Request)

Page 101: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 101 (164)

PART 6 - UE INITIATED CALL TEAR DOWN (PS)

Procedure OverviewMessages (14): PS Call Tear Down CompleteMessages (14): PS Call Tear Down Complete

This is the end of the PS call tear down procedure;

The PDP context has been deleted

The UE has been GPRS detached

The RRC connection has been released

All associated Radio Links have been released in the UTRAN

All associated AAL2 connections have been released

The UE is now SM Inactive, PMM Detached and RRC Idle. It is without any dedicated signalling or user connections, has no network recognised IP address and cannot send data.

This is the end of the PS call tear down procedure;

The PDP context has been deleted

The UE has been GPRS detached

The RRC connection has been released

All associated Radio Links have been released in the UTRAN

All associated AAL2 connections have been released

The UE is now SM Inactive, PMM Detached and RRC Idle. It is without any dedicated signalling or user connections, has no network recognised IP address and cannot send data.

UEUE Node BNode B RNCRNC SGSNSGSN

PDP Context ActivePDP Context Active

PDP Context Deactivate / RAB Release / RRC Connection Release

CC: Call ReleasePS Call Tear Down Complete

PS Call Tear Down Complete

RRC Connection set-Up / PMM Detach / RRC Connection Release

Page 102: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 102 (164)

DISCUSSION

› Any Questions ?

Page 103: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 103 (164)

REFERENCES – STD DOCUMENT REFERENCES

– 3GPP TS 25.410 Iu Interface– 3GPP TS 25.413 RANAP Protocol– 3GPP TS 25.420 Iur Interface– 3GPP TS 25.423 RNSAP Protocol – 3GPP TS 25.430 Iub Interface– 3GPP TS 25.433 NBAP Protocol– 3GPP TS 25.415 UTRAN Iu Interface User Plane Protocols– 3GPP TS 25.426 Iur & Iub Interface Data Transport Signalling for DCH– 3GPP TS 25.007 Mobile radio interface sig. Layer 3; General Aspects– 3GPP TS 25.008 Mobile radio interface sig. Layer 3; CN Protocols– ITU-T I.363.2 AAL2 Specification– ITU-T I.363.5 AAL5 Specification– ITU-T Q.2630.1 ALCAP

Page 104: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 104 (164)

REFERENCES – INTERNAL DOCUMENT REFERENCES

– SRD-UTRAN-CSU-1 ‘SRD for Call Setup’– SRD-UTRAN-CPR-1 ‘SRD for Call Proceeding’– SRD-UTRAN-CTD-1 ‘SRD for Call teardown’– SRD-UTRAN-POW-1 ‘SRD for Power Control’– SRD-UTRAN-RCC-1 ‘SRD for Radio Channel Coding’– SRD-UTRAN-HO-1 ‘SRD for Handover’

Page 105: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 105 (164)

APPENDICES

› Appendix A: Part 1 - Node B Initialisation and Cell “Camp On”

› Appendix B: Part 2 - UE Camp On & Location Update

Page 106: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 106 (164)

APPENDIX A: PART 1

Node B Initialisation and Cell “Camp on”

Page 107: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 107 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.1) Audit Procedure: Audit Required Indication Message1.1) Audit Procedure: Audit Required Indication Message

Type: NBAP

Purpose:After the SSCOP layer is established via the exchange of BGN/BGAK PDU’s, the Node B tells RNC that it has one or more cells that need to be configured.

Channels:SSCF/SSCOP/AAL5

Main IE’s:› Transaction ID

Type: NBAP

Purpose:After the SSCOP layer is established via the exchange of BGN/BGAK PDU’s, the Node B tells RNC that it has one or more cells that need to be configured.

Channels:SSCF/SSCOP/AAL5

Main IE’s:› Transaction ID

Audit Required Indication

UEUE Node B

Node B RNCRNC MSCMSC

[1]

Page 108: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 108 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.2) Audit Procedure: Audit Request Message1.2) Audit Procedure: Audit Request Message

Type: NBAP

Purpose:RNC requests an Audit of the Node B configuration.

Channels:SSCF/SSCOP/AAL5

Main IE’s:›Transaction ID

Type: NBAP

Purpose:RNC requests an Audit of the Node B configuration.

Channels:SSCF/SSCOP/AAL5

Main IE’s:›Transaction ID

Audit Request

UEUE Node B

Node B RNCRNC MSCMSC

Audit Required Indication

[1]

Page 109: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 109 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.3) Audit Procedure: Audit Response Message1.3) Audit Procedure: Audit Response Message

Type: NBAP

Purpose:Node B informs the RNC of its Cell and Channel Configuration

Channels: SSCF/SSCOP/AAL5

Main IE’s:›Transaction ID›Node B Capacity›Cell ID’s›Channel Information...

Type: NBAP

Purpose:Node B informs the RNC of its Cell and Channel Configuration

Channels: SSCF/SSCOP/AAL5

Main IE’s:›Transaction ID›Node B Capacity›Cell ID’s›Channel Information...

Audit Response

UEUE Node B

Node B RNCRNC MSCMSC

Audit Request

Audit Required Indication

[1]

Page 110: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 110 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.4) Cell Set-up Procedure: Resource Status Indication1.4) Cell Set-up Procedure: Resource Status Indication

Type: NBAP

Purpose: Node B informs the

RNC that it has added a cell(s) and that it (they) need to be configured.

Channels: SSCF/SSCOP/AAL5

Main IE’s:› Transaction ID› No Failure› Local Cell Added

Type: NBAP

Purpose: Node B informs the

RNC that it has added a cell(s) and that it (they) need to be configured.

Channels: SSCF/SSCOP/AAL5

Main IE’s:› Transaction ID› No Failure› Local Cell Added

Resource Status Indication

UEUE Node B

Node B RNCRNC MSCMSC

Audit Request Procedure

[1]

Page 111: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 111 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.5) Cell Set-up Procedure: Cell Set-up Request1.5) Cell Set-up Procedure: Cell Set-up Request

Type: NBAP

Purpose: Node B informs the

RNC that it has added a cell(s) and that it (they) need to be configured.

Channels:

SSCF/SSCOP/AAL5

Main IE’s:› Transaction ID

› Cell & Local Cell ID

› Scrambling Codes

› Sync and Power Info

Type: NBAP

Purpose: Node B informs the

RNC that it has added a cell(s) and that it (they) need to be configured.

Channels:

SSCF/SSCOP/AAL5

Main IE’s:› Transaction ID

› Cell & Local Cell ID

› Scrambling Codes

› Sync and Power Info

Cell Setup Request

UEUE Node B

Node B RNCRNC MSCMSC

Resource Status Indication

[1]

Audit Request Procedure

Page 112: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 112 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.6) Cell Set-up Procedure: Cell Set-up Response1.6) Cell Set-up Procedure: Cell Set-up Response

Type: NBAP

Purpose: Node B informs the

RNC that it has added a cell(s) and that it (they) need to be configured.

Channels:

SSCF/SSCOP/AAL5

Main IE’s:› Transaction ID

› Cell Setup Success

Type: NBAP

Purpose: Node B informs the

RNC that it has added a cell(s) and that it (they) need to be configured.

Channels:

SSCF/SSCOP/AAL5

Main IE’s:› Transaction ID

› Cell Setup Success

UEUE Node B

Node B RNCRNC MSCMSC

Cell Set-Up Response

Cell Setup Request

Resource Status Indication

[1]

Audit Request Procedure

Page 113: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 113 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.7) Cell Set-up Procedure: Block Resource Request1.7) Cell Set-up Procedure: Block Resource Request

Type: NBAP

Purpose: Node B requests that

the RNC should list this new cell(s) as blocked until System Info (MIB & SIBs) can be updated and broadcast on BCH.

Channels:

SSCF/SSCOP/AAL5

Main IE’s:› Trans & Cell ID

› Priority Indicator (high)

Type: NBAP

Purpose: Node B requests that

the RNC should list this new cell(s) as blocked until System Info (MIB & SIBs) can be updated and broadcast on BCH.

Channels:

SSCF/SSCOP/AAL5

Main IE’s:› Trans & Cell ID

› Priority Indicator (high)

UEUE Node B

Node B RNCRNC MSCMSC

Cell Set-Up Response

Cell Setup Request

Resource Status Indication

Block Resource Request [1]

Audit Request Procedure

Page 114: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 114 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.8) Cell Set-up Procedure: Block Resource Response1.8) Cell Set-up Procedure: Block Resource Response

Type: NBAP

Purpose: RNC confirms that the

cell(s) are blocked. For this example, this is a new Node B so all the cells will be blocked.

Channels:

SSCF/SSCOP/AAL5

Main IE’s:› Trans & Cell ID

Type: NBAP

Purpose: RNC confirms that the

cell(s) are blocked. For this example, this is a new Node B so all the cells will be blocked.

Channels:

SSCF/SSCOP/AAL5

Main IE’s:› Trans & Cell ID

UEUE Node B

Node B RNCRNC MSCMSC

Cell Set-Up Response

Cell Setup Request

Resource Status Indication

Block Resource Request

Block Resource Response[1]

Audit Request Procedure

Page 115: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 115 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.9) System Information Broadcast Procedure:

System Information Update Request and Response1.9) System Information Broadcast Procedure:

System Information Update Request and Response

Type: NBAP

Purpose: RNC updates the System

Information by sending a series of Sys. Info. Update Request messages which are ack’d by the Node B. SIB blocks are segmented into 246 bit blocks, which are sent (and ack’d) sequentially.

Main IE’s:› MIB/SIB info

› Segment Info

Type: NBAP

Purpose: RNC updates the System

Information by sending a series of Sys. Info. Update Request messages which are ack’d by the Node B. SIB blocks are segmented into 246 bit blocks, which are sent (and ack’d) sequentially.

Main IE’s:› MIB/SIB info

› Segment Info

System Info Update Req. Segment 1System Info Update

Resp.Segment 1

UEUE Node B

Node B RNCRNC MSCMSC

Cell Setup Procedure

System Info Update Req. Segment 2System Info Update

Resp.Segment 2

System Info Update Req. Segment 3System Info Update

Resp.Segment 3 . . etc

[1]

[2]

[3]

[4]

[5]

[6]

Audit Request Procedure

Page 116: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 116 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.10) System Information Broadcast Procedure:

System Information is Broadcast for each cell

1.10) System Information Broadcast Procedure: System Information is Broadcast for each cell

Type: BCH over P-CCPCH

Purpose: The Node B has

received and stored the System Info for each cell (from the RNC) and now broadcasts it throughout the cell.

Transport Format (BCH):› TB size: 246 bits› TTI: 20 ms› Conv. Encoding: 1/2

rate› 16 bit CRC

Type: BCH over P-CCPCH

Purpose: The Node B has

received and stored the System Info for each cell (from the RNC) and now broadcasts it throughout the cell.

Transport Format (BCH):› TB size: 246 bits› TTI: 20 ms› Conv. Encoding: 1/2

rate› 16 bit CRC

BCH: System Info

BCH: System Info

UEUE Node B

Node B RNCRNC MSCMSC

BCH: System Info

Cell Setup Procedure

System Info Update Resp.

Segment 1System Info Update Req. Segment 2System Info Update

Resp.Segment 2

System Info Update Req. Segment 3System Info Update

Resp.Segment 3 . . etc

System Info Update Req. Segment 1

[1]

[2]

[3]

Audit Request Procedure

Page 117: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 117 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.11) Common Transport Channel Set-up Procedure:

Common Transport Channel Set-up Request (PRACH, AICH, RACH)

1.11) Common Transport Channel Set-up Procedure: Common Transport Channel Set-up Request (PRACH, AICH, RACH)

Type: NBAP

Purpose: Common Transport

Channels are set up in two parts. First, the PRACH, AICH, and RACH are configured along with the AAL2 Connection for the RACH Transport Channel.

Main IE’s:› RACH info (TF Set)› AICH info (Codes, SF,

etc)› PRACH (TFCS, SF, etc)

Type: NBAP

Purpose: Common Transport

Channels are set up in two parts. First, the PRACH, AICH, and RACH are configured along with the AAL2 Connection for the RACH Transport Channel.

Main IE’s:› RACH info (TF Set)› AICH info (Codes, SF,

etc)› PRACH (TFCS, SF, etc)

UEUE Node B

Node B RNCRNC MSCMSC

System Information Update

Common Transport CH Set-Up Request

Cell Setup Procedure

Audit Request Procedure

[1]

Page 118: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 118 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.12) Common Transport Channel Set-up Procedure: Common Transport Channel Set-up Response (PRACH, AICH, RACH)

1.12) Common Transport Channel Set-up Procedure: Common Transport Channel Set-up Response (PRACH, AICH, RACH)

Type: NBAP

Purpose: The Node B Ack’s the

1st Com Trans Setup msg which established the PRACH, AICH, & RACH/

Main IE’s: for RACH

› Binding and Com ID

› Transport layer address

Type: NBAP

Purpose: The Node B Ack’s the

1st Com Trans Setup msg which established the PRACH, AICH, & RACH/

Main IE’s: for RACH

› Binding and Com ID

› Transport layer address

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport CHSet-Up Response

Common Transport CH Set-Up Request

System Information Update

Cell Setup Procedure

Audit Request Procedure

[1]

Page 119: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 119 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.13) Common Transport Channel Set-up Procedure:

ALCAP Establish Request (with Binding ID for RACH)

1.13) Common Transport Channel Set-up Procedure: ALCAP Establish Request (with Binding ID for RACH)

Type: ALCAP

Purpose: This message request

the establishment of an AAL2 path over the IuB interface for the RACH. The SUGR parameter contains the Binding ID which was returned to the RNC in the 1st Com Trans Ch Setup Response message

Main IE’s:› OSAID, DSAID + CEID, › SUGR,› AAL2 Destination

Address of Node B

Type: ALCAP

Purpose: This message request

the establishment of an AAL2 path over the IuB interface for the RACH. The SUGR parameter contains the Binding ID which was returned to the RNC in the 1st Com Trans Ch Setup Response message

Main IE’s:› OSAID, DSAID + CEID, › SUGR,› AAL2 Destination

Address of Node B

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport CHSet-Up Response

Common Transport CH Set-Up Request

ALCAP ERQ

System Information Update

Cell Setup Procedure

Audit Request Procedure

[1]

Page 120: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 120 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.14) Common Transport Channel Set-up Procedure:

ALCAP Establish Confirm

1.14) Common Transport Channel Set-up Procedure: ALCAP Establish Confirm

Type: ALCAP

Purpose: This message confirms

the establishment of an AAL2 path over the IuB interface for the RACH.

Main IE’s:› OSAID + DSAID

Type: ALCAP

Purpose: This message confirms

the establishment of an AAL2 path over the IuB interface for the RACH.

Main IE’s:› OSAID + DSAID

UEUE Node B

Node B RNCRNC MSCMSC

ALCAP ECF

ALCAP ERQ

Common Transport CHSet-Up Response

Common Transport CH Set-Up Request

System Information Update

Cell Setup Procedure

Audit Request Procedure

[1]

Page 121: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 121 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.15) Common Transport Channel Set-up Procedure:

Synchronisation over RACH -FP (Framing Protocol)

1.15) Common Transport Channel Set-up Procedure: Synchronisation over RACH -FP (Framing Protocol)

Type: RACH- FP

Purpose: Framing Protocol

Synchronisation messages are used to establish precise timing between the Node B and RNC for each channel that is established over the IuB interface.

Main IE’s:› Control messages

contain time stamps to establish the time the message was sent and when it arrived at the opposite node.

Type: RACH- FP

Purpose: Framing Protocol

Synchronisation messages are used to establish precise timing between the Node B and RNC for each channel that is established over the IuB interface.

Main IE’s:› Control messages

contain time stamps to establish the time the message was sent and when it arrived at the opposite node.

UEUE Node B

Node B RNCRNC MSCMSC

ALCAP ECF

ALCAP ERQ

Common Transport CHSet-Up Response

Common Transport CH Set-Up Request

FP DL Synchronisation

FP UL Synchronisation

System Information Update

Cell Setup Procedure

Audit Request Procedure

[1]

[2]

Page 122: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 122 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.16) Common Transport Channel Set-up Procedure:

Common Transport Channel Set-up Request (S-CCPCH, FACH, PCH)

1.16) Common Transport Channel Set-up Procedure: Common Transport Channel Set-up Request (S-CCPCH, FACH, PCH)

Type: NBAP

Purpose: Common Transport

Channels are set up in two parts. The 2nd Com Trans Setup Request message specifies the establishment of the S-CCPCH, FACH, and PCH.

Main IE’s:› FACH info (TF Set)› PCH info (TF Set)› S-CCPCH (TFCS, SF,

TFCI, Codes, etc)

Type: NBAP

Purpose: Common Transport

Channels are set up in two parts. The 2nd Com Trans Setup Request message specifies the establishment of the S-CCPCH, FACH, and PCH.

Main IE’s:› FACH info (TF Set)› PCH info (TF Set)› S-CCPCH (TFCS, SF,

TFCI, Codes, etc)

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport Setup Procedures: PRACH, AICH and RACH + ALCAP for RACH

Common Transport CH Set-Up Request

System Information Update

Cell Setup Procedure

Audit Request Procedure

[1]

Page 123: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 123 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.17) Common Transport Channel Set-up Procedure:

Common Transport Ch. Set-up Response (S-CCPCH, FACH, PCH)

1.17) Common Transport Channel Set-up Procedure: Common Transport Ch. Set-up Response (S-CCPCH, FACH, PCH)

Type: NBAP

Purpose: The Node B Ack’s the

2nd Com Trans Setup msg which established the FACH, PCH & S-CCPCH

Main IE’s: for PCH and FACH

› Binding and Com ID› Transport layer address

Type: NBAP

Purpose: The Node B Ack’s the

2nd Com Trans Setup msg which established the FACH, PCH & S-CCPCH

Main IE’s: for PCH and FACH

› Binding and Com ID› Transport layer address

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport CHSet-Up Response

Common Transport CH Set-Up Request

System Information Update

Cell Setup Procedure

Audit Request Procedure

Common Transport Setup Procedures: PRACH, AICH and RACH + ALCAP for RACH

[1]

Page 124: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 124 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.18) Common Transport Channel Set-up Procedure:

ALCAP Establish Request (with Binding ID for FACH and PCH)

1.18) Common Transport Channel Set-up Procedure: ALCAP Establish Request (with Binding ID for FACH and PCH)

Type: ALCAP

Purpose: This message request the

establishment of an AAL2 path over the IuB interface for the FACH. The SUGR parameter contains the Binding ID which was returned to the RNC in the 2nd Com Trans Ch Setup Response message There will be separate ALCAP procedures for the FACH and the PCH channels.

Main IE’s:› OSAID, DSAID + CEID, › SUGR,› AAL2 Dest. Address of

Node B

Type: ALCAP

Purpose: This message request the

establishment of an AAL2 path over the IuB interface for the FACH. The SUGR parameter contains the Binding ID which was returned to the RNC in the 2nd Com Trans Ch Setup Response message There will be separate ALCAP procedures for the FACH and the PCH channels.

Main IE’s:› OSAID, DSAID + CEID, › SUGR,› AAL2 Dest. Address of

Node B

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport CHSet-Up Response

Common Transport CH Set-Up Request

ALCAP ERQ

System Information Update

Cell Setup Procedure

Audit Request Procedure

Common Transport Setup Procedures: PRACH, AICH and RACH + ALCAP for RACH

[1]

Page 125: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 125 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.19) Common Transport Channel Set-up Procedure:

ALCAP Establish Confirm (FACH and PCH)

1.19) Common Transport Channel Set-up Procedure: ALCAP Establish Confirm (FACH and PCH)

Type: ALCAP

Purpose: This message confirms

the establishment of an AAL2 path over the IuB interface for the FACH and PCH. There will be separate ALCAP procedures for the FACH and the PCH channels.

Main IE’s:› OSAID + DSAID

Type: ALCAP

Purpose: This message confirms

the establishment of an AAL2 path over the IuB interface for the FACH and PCH. There will be separate ALCAP procedures for the FACH and the PCH channels.

Main IE’s:› OSAID + DSAID

UEUE Node B

Node B RNCRNC MSCMSC

ALCAP ECF

ALCAP ERQ

Common Transport CHSet-Up Response

Common Transport CH Set-Up Request

System Information Update

Cell Setup Procedure

Audit Request Procedure

Common Transport Setup Procedures: PRACH, AICH and RACH + ALCAP for RACH

[1]

Page 126: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 126 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.20) Common Transport Channel Set-up Procedure:

Synchronisation over FACH - FP and PCH-FP(Framing Protocol)

1.20) Common Transport Channel Set-up Procedure: Synchronisation over FACH - FP and PCH-FP(Framing Protocol)

Type: FACH-FP

Purpose: Framing Protocol

Synchronisation messages are used to establish precise timing between the Node B and RNC for each channel. There will be separate sync. procedures for the FACH and the PCH channels.

Main IE’s:› Control messages

contain time stamps to establish the time the message was sent and when it arrived at the opposite node.

Type: FACH-FP

Purpose: Framing Protocol

Synchronisation messages are used to establish precise timing between the Node B and RNC for each channel. There will be separate sync. procedures for the FACH and the PCH channels.

Main IE’s:› Control messages

contain time stamps to establish the time the message was sent and when it arrived at the opposite node.

UEUE Node B

Node B RNCRNC MSCMSC

ALCAP ERQ

Common Transport CHSet-Up Response

Common Transport CH Set-Up Request

FP DL Synchronisation

FP UL Synchronisation

System Information Update

Cell Setup Procedure

Audit Request Procedure

Common Transport Setup Procedures: PRACH, AICH and RACH + ALCAP for RACH

ALCAP ECF

[1]

[2]

Page 127: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 127 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.21) Update System Information Procedure:

System Information Update Request (SIB 5 - Channel Updates)

1.21) Update System Information Procedure: System Information Update Request (SIB 5 - Channel Updates)

Type: NBAP

Purpose: The RNC announces

the configuration of the common channels for each cell by changing SIB5. This info is relayed to UE’s via the BCH.

Main IE’s:› References to other

SIBs› PICH Power offset› AICH Power offset› P-CCPCH info› S-CCPCH info

Type: NBAP

Purpose: The RNC announces

the configuration of the common channels for each cell by changing SIB5. This info is relayed to UE’s via the BCH.

Main IE’s:› References to other

SIBs› PICH Power offset› AICH Power offset› P-CCPCH info› S-CCPCH info

System Info Update Req. SIB 5

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport Setup Procedures: PRACH, AICH, S-CCPCH, FACH, PCH and RACH + ALCAP and FP-Sync. for RACH, FACH and PCH

System Information Update

Cell Setup Procedure

Audit Request Procedure

[1]

Page 128: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 128 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.22) Update System Information Procedure:

Resource Status Indication (Service impacting, com ctrl port enabled)

1.22) Update System Information Procedure: Resource Status Indication (Service impacting, com ctrl port enabled)

Type: NBAP

Purpose: The Node B has set up

all the common

transport channels and is ready to unblock the cell(s). It sends ID number of the enabled com control port to the RNC.

Main IE’s:› Trans ID› Com Control Port ID› Service Impacting

Indication

Type: NBAP

Purpose: The Node B has set up

all the common

transport channels and is ready to unblock the cell(s). It sends ID number of the enabled com control port to the RNC.

Main IE’s:› Trans ID› Com Control Port ID› Service Impacting

Indication

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport Setup Procedures: PRACH, AICH, S-CCPCH, FACH, PCH and RACH + ALCAP and FP-Sync. for RACH, FACH and PCH

System Information Update

Cell Setup Procedure

Audit Request Procedure

System Info Update Req. SIB 5

Resource Status Indication[1]

Page 129: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 129 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.23) Update System Information Procedure:

Unblock Resource Indication Message

1.23) Update System Information Procedure: Unblock Resource Indication Message

Type: NBAP

Purpose: The Node B is ready to

unblock the new cell(s).

Main IE’s:› Trans ID› Cell ID› Unblock resource

Type: NBAP

Purpose: The Node B is ready to

unblock the new cell(s).

Main IE’s:› Trans ID› Cell ID› Unblock resource

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport Setup Procedures: PRACH, AICH, S-CCPCH, FACH, PCH and RACH + ALCAP and FP-Sync. for RACH, FACH and PCH

System Information Update

Cell Setup Procedure

Audit Request Procedure

System Info Update Req. SIB 5

Resource Status Indication

Unblock Resource Ind[1]

Page 130: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 130 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.24) Update System Information Procedure:

System Information Update Request (SIB 3 - Cell Unblocked)

1.24) Update System Information Procedure: System Information Update Request (SIB 3 - Cell Unblocked)

Type: NBAP

Purpose: The RNC updates SIB3

to “Unbarred”

Main IE’s:› Cell ID› Transaction ID› SIB 3 Updated to

unbarred

Type: NBAP

Purpose: The RNC updates SIB3

to “Unbarred”

Main IE’s:› Cell ID› Transaction ID› SIB 3 Updated to

unbarred

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport Setup Procedures: PRACH, AICH, S-CCPCH, FACH, PCH and RACH + ALCAP and FP-Sync. for RACH, FACH and PCH

System Information Update

Cell Setup Procedure

Audit Request Procedure

System Info Update Req. SIB 5

Resource Status Indication

Unblock Resource Ind

System Info Update Req. SIB 3 [1]

Page 131: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 131 (164)

PART 1 - NODE B INITIALISATION

Procedure Overview1.25) Update System Information Procedure:

System Information Update Response

1.25) Update System Information Procedure: System Information Update Response

Type: NBAP

Purpose: The RNC updates SIB3

to “Unbarred”

Main IE’s:› Transaction ID

Type: NBAP

Purpose: The RNC updates SIB3

to “Unbarred”

Main IE’s:› Transaction ID

UEUE Node B

Node B RNCRNC MSCMSC

Common Transport Setup Procedures: PRACH, AICH, S-CCPCH, FACH, PCH and RACH + ALCAP and FP-Sync. for RACH, FACH and PCH

System Information Update

Cell Setup Procedure

Audit Request Procedure

System Info Update Req. SIB 5

Resource Status Indication

Unblock Resource Ind

System Info Update Req. SIB 3

System Info Update Resp.[1]

Page 132: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 132 (164)

PART 1 - NODE B INITIALISATION - SUMMARY

UEUE Node B

Node B RNCRNC MSCMSC

Audit Request Procedure

CellSetup Procedure

Common Transport Setup Procedures for PRACH, AICH, S-CCPCH, FACH, PCH and RACH +

ALCAP and FP-Sync. for RACH, FACH and PCH

System Information Update Procedure

System Information Update Request - SIB 5

Update Resources and Unblock Cell

System Information Update Request - SIB 3

Page 133: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 133 (164)

APPENDIX B: PART 2

UE “Camp On” & Location Update

Page 134: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 134 (164)

PART 2 - UE CAMP ON & LOCATION UPDATE

› The UE searches for the Primary SCH, which has the same 256-chip code in every cell.

› Tuning for a maximum on the P-SCH allows the Secondary SCH to be found.› The S-SCH uses 1 of 16 codes which identify the base station.› Once the Secondary SCH code word has been identified, the UE achieves frame

and slot synchronisation.› The UE then finds the primary scrambling codes which belong to the SCH’s code

group.› Both SCH’s are time multiplexed on the Primary Common Control Physical

Channel, which also carries the BCH.› The BCH provides UTRAN or Cell-specific information such as Random Access

codes and slots for the RACH. › The BCH also carries the MIB and SIB’s which were described in the Initialisation

Section.› The UE now has all the information it needs to access the RACH to initiate the

Location Update Procedure (Step 2) or Call Set-up (Step 3)

Page 135: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 135 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

› Random Access Detection Procedure› Radio Signalling Bearer Establish Procedure› Location Update Request Procedure› Identity Request Procedure› Authentication Procedure› Location Update Accept/Reject Procedure› TMSI Reallocation Procedure› Radio Signalling Bearer Release Procedure

Page 136: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 136 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

2.1) Location Update: Random Access Detection Procedure2.1) Location Update: Random Access Detection Procedure

Type: RACH

Purpose: The Node B receives

and stores the System Info for each cell and broadcasts it throughout the cell. The UE reads SIBs from BCH (or FACH) and using the access preamble signature obtained from the BCH, it broadcasts an access request on the RACH. It starts with a low estimate for transmit power and ramps up until it the UE is detected by the Node B.

Type: RACH

Purpose: The Node B receives

and stores the System Info for each cell and broadcasts it throughout the cell. The UE reads SIBs from BCH (or FACH) and using the access preamble signature obtained from the BCH, it broadcasts an access request on the RACH. It starts with a low estimate for transmit power and ramps up until it the UE is detected by the Node B.

UEUE Node B

Node B RNCRNC MSCMSC

BCH: System Info

BCH: System Info

BCH: System Info

Preamble

Preamble

Preamble

[1]

[2]

[3]

[4]

[5]

[6]

Page 137: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 137 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

2.2) Location Update: Random Access Detection Procedure: Access Preamble and AICH Indication

2.2) Location Update: Random Access Detection Procedure: Access Preamble and AICH Indication

Type:

BCH over P-CCPCH

Purpose: The Node B detects the

access request from the UE and returns an Access indication on the AICH.

Type:

BCH over P-CCPCH

Purpose: The Node B detects the

access request from the UE and returns an Access indication on the AICH.

UEUE Node B

Node B RNCRNC MSCMSC

BCH: System Info

BCH: System Info

BCH: System Info

AICH: Access Indication

Preamble

Preamble

[1]

Preamble

Page 138: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 138 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RRC

Channels: CCCH / RACH

Main IE’s:› Initial UE ID› Establishment Cause› Initial UE capability

Type: RRC

Channels: CCCH / RACH

Main IE’s:› Initial UE ID› Establishment Cause› Initial UE capability

UEUE Node B

Node B RNCRNC MSCMSC

RRC Connection Request

(PRACH)

2.3) Location Update: Radio Signalling Bearer Establish Procedure: RRC: Connection Request Message

2.3) Location Update: Radio Signalling Bearer Establish Procedure: RRC: Connection Request Message

Random Access Detection

[1]

Page 139: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 139 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Procedure Overview

UEUE Node B

Node B RNCRNC MSCMSCType: NBAP

Purpose: RNC tells Node B to

configure a Radio Bearer.

Main IE’s:RL Setup Req› Cell ID, › TFS / TFCS› Frequency› UL Scrambling Code› DL Channelisation Code› Power Control Info› RL Setup Response› Transport Layer Add› Sig. Link termination› DL Channelisation Code› DCH Binding ID

Type: NBAP

Purpose: RNC tells Node B to

configure a Radio Bearer.

Main IE’s:RL Setup Req› Cell ID, › TFS / TFCS› Frequency› UL Scrambling Code› DL Channelisation Code› Power Control Info› RL Setup Response› Transport Layer Add› Sig. Link termination› DL Channelisation Code› DCH Binding ID

RL Setup Request

RL Setup Response

2.4) Location Update: Radio Signalling Bearer Establish Procedure: RL Set-up Request and RL Set-up Response Messages

2.4) Location Update: Radio Signalling Bearer Establish Procedure: RL Set-up Request and RL Set-up Response Messages

Random Access Detection

RRC Connection Request

(PRACH)[1]

[2]

Page 140: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 140 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

UEUE Node B

Node B RNCRNC MSCMSCType: ALCAP

Purpose: This message sequence

requests (and confirms) the establishment of an AAL2 path over the IuB interface for a DCCH. The SUGR parameter contains the Binding ID which was returned to the RNC in the 1st Com Trans Ch Setup Response message

Main IE’s:› OSAID, DSAID + CEID, › SUGR,› AAL2 Destination

Address of Node B

Type: ALCAP

Purpose: This message sequence

requests (and confirms) the establishment of an AAL2 path over the IuB interface for a DCCH. The SUGR parameter contains the Binding ID which was returned to the RNC in the 1st Com Trans Ch Setup Response message

Main IE’s:› OSAID, DSAID + CEID, › SUGR,› AAL2 Destination

Address of Node B

Random Access Detection

2.5) Location Update: Radio Signalling Bearer Establish Procedure: Establish Request (ERQ) and Confirm (ECF) Messages

2.5) Location Update: Radio Signalling Bearer Establish Procedure: Establish Request (ERQ) and Confirm (ECF) Messages

RL Setup Request

RL Setup Response

RRC Connection Request

(PRACH)

ALCAP ERQ

ALCAP ECF

[1]

[2]

Page 141: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 141 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Procedure Overview

UEUE Node B

Node B RNCRNC MSCMSCType: DCH-FP

Purpose: Framing Protocol

Synchronisation messages are used to establish precise timing between the Node B and RNC for each channel. There will be separate sync. procedures for all CCCH and DCCH channels.

Main IE’s:› Control messages

contain time stamps to establish the time the message was sent and when it arrived at the opposite node.

Type: DCH-FP

Purpose: Framing Protocol

Synchronisation messages are used to establish precise timing between the Node B and RNC for each channel. There will be separate sync. procedures for all CCCH and DCCH channels.

Main IE’s:› Control messages

contain time stamps to establish the time the message was sent and when it arrived at the opposite node.

Random Access Detection

2.6) Location Update: Radio Signalling Bearer Establish Procedure: DCH-FP DL / UL Synchronisation Messages

2.6) Location Update: Radio Signalling Bearer Establish Procedure: DCH-FP DL / UL Synchronisation Messages

FP DL Synchronisation

FP UL Synchronisation

RL Setup Request

RL Setup Response

RRC Connection Request

(PRACH)

ALCAP ERQ

ALCAP ECF

[1]

[2]

Page 142: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 142 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

UEUE Node B

Node B RNCRNC MSCMSCType: RRC

Purpose RNC informs the UE that the

DCH channel is established. UE Ack’s by replying on the DCCH with a Setup Complete.

Channels: 1. FACH 2. DCCH

Main IE’s:RRC Con Setup› Initial UE ID + RNTI, › CapUpReq, › TFS, +TFCS,› frequency + Power control

info.› DL Scram + Chann codes,

› RRC Con Setup Complete

› UE Capability, › Ciphering + Integrity info

Type: RRC

Purpose RNC informs the UE that the

DCH channel is established. UE Ack’s by replying on the DCCH with a Setup Complete.

Channels: 1. FACH 2. DCCH

Main IE’s:RRC Con Setup› Initial UE ID + RNTI, › CapUpReq, › TFS, +TFCS,› frequency + Power control

info.› DL Scram + Chann codes,

› RRC Con Setup Complete

› UE Capability, › Ciphering + Integrity info

RRC Connection Setup

(FACH)RRC Conn Setup Comp

(DCCH)

Random Access Detection

2.7) Location Update: Radio Signalling Bearer Establish Procedure: RRC Connection Set-up / Complete Messages

2.7) Location Update: Radio Signalling Bearer Establish Procedure: RRC Connection Set-up / Complete Messages

FP DL Synchronisation

FP UL Synchronisation

RL Setup Request

RL Setup Response

RRC Connection Request

(PRACH)

ALCAP ERQ

ALCAP ECF

[1]

[2]

Page 143: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 143 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RRC

Purpose UE initiates a location

update procedure

Channels: DCCH

Main IE’s:› Update Type (normal)› Cipher Key Seq No.› Location Area Info› UE Classmark› UE ID (IMSI or TMSI)

Type: RRC

Purpose UE initiates a location

update procedure

Channels: DCCH

Main IE’s:› Update Type (normal)› Cipher Key Seq No.› Location Area Info› UE Classmark› UE ID (IMSI or TMSI)

UEUE Node B

Node B RNCRNC MSCMSC

Radio Signalling Bearer Establishment Procedure

2.8) Location Update: Location Update Request Procedure: RRC: Initial DT [NAS Location Update Request Message]

2.8) Location Update: Location Update Request Procedure: RRC: Initial DT [NAS Location Update Request Message]

Random Access Detection

RRC: Initial Direct Transfer

(Location Update Request) [1]

Page 144: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 144 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP

Purpose: RNC relays the

Location Update message to the NAS at the CN

Channels: DCCH

Main IE’s:› Update Type (normal)› Cipher Key Seq No.› Location Area Info› UE Classmark› UE ID (IMSI/TMSI)

Type: RANAP

Purpose: RNC relays the

Location Update message to the NAS at the CN

Channels: DCCH

Main IE’s:› Update Type (normal)› Cipher Key Seq No.› Location Area Info› UE Classmark› UE ID (IMSI/TMSI)

UEUE Node B

Node B RNCRNC MSCMSC

RANAP: DT(Location Upd Request)

2.9) Location Update: Location Update Request Procedure: RANAP: DT [NAS Location Update Request Message]

2.9) Location Update: Location Update Request Procedure: RANAP: DT [NAS Location Update Request Message]

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureRRC: Initial Direct Transfer

(Location Update Request) [1]

Page 145: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 145 (164)

UEUE Node B

Node B

MSC/VLR

MSC/VLR

P-MSC/VLR

P-MSC/VLR

RNCRNC

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: MAP

Purpose: The Current MSC/VLR

may or may not have a record of this UE. If it doesn’t, it sends a MAP Send_ID Request to a Previous VLR to retrieve IMSI and authentication data for this UE.

Channels: SS7 Signalling

Main IE’s:

Type: MAP

Purpose: The Current MSC/VLR

may or may not have a record of this UE. If it doesn’t, it sends a MAP Send_ID Request to a Previous VLR to retrieve IMSI and authentication data for this UE.

Channels: SS7 Signalling

Main IE’s:

2.10) Location Update: Location Update Request Procedure: MAP Send_Identification Request

2.10) Location Update: Location Update Request Procedure: MAP Send_Identification Request

Random Access DetectionRadio Signalling Bearer Establishment

Procedure

MAP

Send ID Req.

RANAP: DT

Loc. Upd Req

RRC: Initial Direct Transfer

(Location Update Request)

[1]

Page 146: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 146 (164)

MSC/VLR

MSC/VLR

P-MSC/VLR

P-MSC/VLR

RNCRNCUEUE Node B

Node B

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: MAP

Purpose:The Previous MSC-VLR

replies with the MAP Identification Acknowledge containing the requested UE information. The network may now decide to initiate the NAS Identity Request procedure

Channels: SS7 Signalling

Main IE’s:

Type: MAP

Purpose:The Previous MSC-VLR

replies with the MAP Identification Acknowledge containing the requested UE information. The network may now decide to initiate the NAS Identity Request procedure

Channels: SS7 Signalling

Main IE’s:

2.11) Location Update: Location Update Request Procedure: MAP Send_Identification Acknowledge

2.11) Location Update: Location Update Request Procedure: MAP Send_Identification Acknowledge

Random Access DetectionRadio Signalling Bearer Establishment

Procedure

MAP

Send ID Ack

MAP

Send ID Req.

RANAP: DT

Loc. Upd Req.

RRC: Initial Direct Transfer

(Location Update Request)

[1]

Page 147: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 147 (164)

MSC/VLR

MSC/VLR

P-MSC/VLR

P-MSC/VLR

RNCRNC

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP

Purpose: If the CN decides to

initiate the Identity Request Procedure it sends a RANAP: DT Identity Request to the RNC for forwarding to the UE (via RRC: DT).

Channels: AAL5/ATM

Main IE’s:› ID Type

Type: RANAP

Purpose: If the CN decides to

initiate the Identity Request Procedure it sends a RANAP: DT Identity Request to the RNC for forwarding to the UE (via RRC: DT).

Channels: AAL5/ATM

Main IE’s:› ID Type

UEUE Node B

Node B

2.12) Location Update: Identity Request Procedure: RANAP: Direct Transfer [NAS Identity Request Message]

2.12) Location Update: Identity Request Procedure: RANAP: Direct Transfer [NAS Identity Request Message]

Random Access DetectionRadio Signalling Bearer Establishment

Procedure

RANAP: DT

NAS: Identity Req.

MAP

Send ID Ack

MAP

Send ID Req.

RANAP: DT

Loc. Upd Req.

RRC: Initial Direct Transfer

(Location Update Request)

[1]

Page 148: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 148 (164)

MSC/VLR

MSC/VLR

P-MSC/VLR

P-MSC/VLR

RNCRNC

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RRC

Purpose: The RNC forwards the

Identity Request message to the UE via RRC: Direct Transfer.

Channels: DCCH

Main IE’s:› ID Type

Type: RRC

Purpose: The RNC forwards the

Identity Request message to the UE via RRC: Direct Transfer.

Channels: DCCH

Main IE’s:› ID Type

UEUE Node B

Node B

2.13) Location Update: Identity Request Procedure: RRC: Direct Transfer [NAS Identity Request Message]

2.13) Location Update: Identity Request Procedure: RRC: Direct Transfer [NAS Identity Request Message]

Random Access DetectionRadio Signalling Bearer Establishment

Procedure

RANAP: DT

NAS: Identity Req.RRC: DT DCCH

NAS: Identity Request

MAP

Send ID Ack

MAP

Send ID Req.

RANAP: DT

Loc. Upd Req.

RRC: Initial Direct Transfer

(Location Update Request)

[1]

Page 149: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 149 (164)

MSC/VLR

MSC/VLR

P-MSC/VLR

P-MSC/VLR

RNCRNC

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RRC

Purpose: The UE must be

prepared to respond to an ID Request message at any time while an RR connection exists. It should reply with an Identity Response message which contains the info requested by the CN.

Channels: DCCH

Main IE’s:› ID Type

Type: RRC

Purpose: The UE must be

prepared to respond to an ID Request message at any time while an RR connection exists. It should reply with an Identity Response message which contains the info requested by the CN.

Channels: DCCH

Main IE’s:› ID Type

UEUE Node B

Node B

2.14) Location Update: Identity Request Procedure: RRC: Direct Transfer [NAS Identity Response Message]

2.14) Location Update: Identity Request Procedure: RRC: Direct Transfer [NAS Identity Response Message]

Random Access DetectionRadio Signalling Bearer Establishment

Procedure

RRC: DT DCCH

NAS: Identity Response

RANAP: DT

NAS: Identity Req.RRC: DT DCCH

NAS: Identity Request

MAP

Send ID Ack

MAP

Send ID Req.

RANAP: DT

Loc. Upd Req.

RRC: Initial Direct Transfer

(Location Update Request)

[1]

Page 150: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 150 (164)

MSC/VLR

MSC/VLR

P-MSC/VLR

P-MSC/VLR

RNCRNC

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP

Purpose: The RNC relays the ID

Response message to the CN.

Channels: AAL5/ATM

Main IE’s:› ID Type

Type: RANAP

Purpose: The RNC relays the ID

Response message to the CN.

Channels: AAL5/ATM

Main IE’s:› ID Type

UEUE Node B

Node B

2.15) Location Update: Identity Request Procedure: RANAP: Direct Transfer [NAS Identity Response Message]

2.15) Location Update: Identity Request Procedure: RANAP: Direct Transfer [NAS Identity Response Message]

Random Access DetectionRadio Signalling Bearer Establishment

Procedure

RANAP: DT

Send ID Response

RRC: DT DCCH

NAS: Send ID Response

RANAP: DT

NAS: Identity Req.

MAP

Send ID Ack

MAP

Send ID Req.

RANAP: DT

Loc. Upd Req.

RRC: Initial Direct Transfer

(Location Update Request)

RRC: DT DCCH

NAS: Identity Request

[1]

Page 151: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 151 (164)

RNCRNC MSCMSCUEUE Node B

Node B

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP & RRC

Purpose: The CN may now elect to

initiate the authentication procedure (I.e. if the authentication information requested from the Previous MSC/VLR is not returned in the MAP Send_ID_ACK Message. The CN sends the Authentication Request message and starts T3260. The NAS message is relayed by the RNC via RRC: DT.

Channels: AAL5/ATM -> DCCH

Main IE’s:

Type: RANAP & RRC

Purpose: The CN may now elect to

initiate the authentication procedure (I.e. if the authentication information requested from the Previous MSC/VLR is not returned in the MAP Send_ID_ACK Message. The CN sends the Authentication Request message and starts T3260. The NAS message is relayed by the RNC via RRC: DT.

Channels: AAL5/ATM -> DCCH

Main IE’s:

2.16) Location Update: Authentication Procedure: RANAP: Direct Transfer [NAS Authentication Request Message]

2.16) Location Update: Authentication Procedure: RANAP: Direct Transfer [NAS Authentication Request Message]

Random Access DetectionRadio Signalling Bearer Establishment

Procedure

RANAP: DT

NAS: Auth. Request

Location Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

[1]

Page 152: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 152 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP

Purpose:

Channels: DCCH

Main IEs

Type: RANAP

Purpose:

Channels: DCCH

Main IEs

UEUE Node B

Node B RNCRNC MSCMSC

2.17) Location Update: Authentication Procedure: RRC: Direct Transfer [NAS Authentication Request Message]

2.17) Location Update: Authentication Procedure: RRC: Direct Transfer [NAS Authentication Request Message]

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

RRC: DT DCCH

NAS: Auth Request

RANAP: DT

NAS: Auth Request[1]

Page 153: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 153 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP

Purpose:

Channels: DCCH

Main IEs:

Type: RANAP

Purpose:

Channels: DCCH

Main IEs:

UEUE Node B

Node B RNCRNC MSCMSC

2.18) Location Update: Authentication Procedure: RRC: Direct Transfer [NAS Authentication Response Message]

2.18) Location Update: Authentication Procedure: RRC: Direct Transfer [NAS Authentication Response Message]

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

RRC: DT DCCH

NAS: Auth Request

RANAP: DT

NAS: Auth Request

RRC: DT DCCH

NAS: Auth Response[1]

Page 154: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 154 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP

Purpose:

Channels: DCCH

Main IE’s:

Type: RANAP

Purpose:

Channels: DCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

2.19) Location Update: Authentication Procedure: RANAP: DT [NAS Authentication Response Message]

2.19) Location Update: Authentication Procedure: RANAP: DT [NAS Authentication Response Message]

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

RRC: DT DCCH

NAS: Auth Request

RANAP: DT

NAS: Auth Request

RRC: DT DCCH

NAS: Auth Response RANAP: DTNAS: Auth Response

[1]

Page 155: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 155 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP

Purpose:

Channels: DCCH

Main IE’s:

Type: RANAP

Purpose:

Channels: DCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

Authentication Request Procedure (RRC/RANAP DT) Optional

RANAP: DT Location Update Accept

2.20) Location Update: Location Update Accept Procedure: RANAP: Direct Transfer [NAS Location Update Accept Message]

2.20) Location Update: Location Update Accept Procedure: RANAP: Direct Transfer [NAS Location Update Accept Message]

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

[1]

Page 156: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 156 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RRC

Purpose:

Channels: DCCH

Main IE’s:

Type: RRC

Purpose:

Channels: DCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

RRC: DT Location Update

Accept

2.21) Location Update: Location Update Accept Procedure: RRC: Direct Transfer [NAS Location Update Accept Message]

2.21) Location Update: Location Update Accept Procedure: RRC: Direct Transfer [NAS Location Update Accept Message]

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

Authentication Request Procedure (RRC/RANAP DT) Optional

RANAP: DT Location Update Accept

[1]

Page 157: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 157 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RRC

Purpose:

Channels: DCCH

Main IE’s:

Type: RRC

Purpose:

Channels: DCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

RRC: DT TMSI Reallocation Complete

2.22) Location Update: TMSI Reallocation Complete Procedure: RRC: Direct Transfer [NAS TMSI Reallocation Complete]

2.22) Location Update: TMSI Reallocation Complete Procedure: RRC: Direct Transfer [NAS TMSI Reallocation Complete]

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

Authentication Request Procedure (RRC/RANAP DT) Optional

RRC: DT Location Update

Accept

RANAP: DT Location Update Accept

[1]

Page 158: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 158 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RANAP

Purpose:

Channels: DCCH

Main IE’s:

Type: RANAP

Purpose:

Channels: DCCH

Main IE’s:

UEUE Node B

Node B RNCRNC MSCMSC

RANAP: DT TMSI Reallocation

Accept

2.23) Location Update: TMSI Reallocation Complete Procedure: RANAP: Direct Transfer [NAS TMSI Reallocation Complete]

2.23) Location Update: TMSI Reallocation Complete Procedure: RANAP: Direct Transfer [NAS TMSI Reallocation Complete]

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

Authentication Request Procedure (RRC/RANAP DT) Optional

RRC: DT TMSI Reallocation Complete

RRC: DT Location Update

Accept

RANAP: DT Location Update Accept

[1]

Page 159: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 159 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RRC

Purpose: This message

originates in the RNC and informs the UE that the DCH should be released. One or more of these release messages are sent in the Unack mode.

Channels: DCCH

Main IE’s:› Signalling Flow Info

List› Flow Identifier

Type: RRC

Purpose: This message

originates in the RNC and informs the UE that the DCH should be released. One or more of these release messages are sent in the Unack mode.

Channels: DCCH

Main IE’s:› Signalling Flow Info

List› Flow Identifier

UEUE Node B

Node B RNCRNC MSCMSC

Location Update Accept Procedure (RRC/RANAP DT)TMSI Reallocation Complete Procedure (RRC/RANAP DT)

2.24) Location Update: Radio Signalling Bearer Release Procedure: RRC: Connection Release (Unacknowledged)

2.24) Location Update: Radio Signalling Bearer Release Procedure: RRC: Connection Release (Unacknowledged)

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

Authentication Request Procedure (RRC/RANAP DT) Optional

RRC: Connection Release[1]

Page 160: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 160 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: RRC

Purpose: This message

originates in the UE and informs the RNC that the DCH is released. One or more of these release complete messages are sent in the Unack mode.

Channels: DCCH

Main IE’s:› Signalling Flow Info

List› Flow Identifier

Type: RRC

Purpose: This message

originates in the UE and informs the RNC that the DCH is released. One or more of these release complete messages are sent in the Unack mode.

Channels: DCCH

Main IE’s:› Signalling Flow Info

List› Flow Identifier

UEUE Node B

Node B RNCRNC MSCMSC

2.25) Location Update: Radio Signalling Bearer Release Procedure: RRC: Connection Release Complete (Unacknowledged)

2.25) Location Update: Radio Signalling Bearer Release Procedure: RRC: Connection Release Complete (Unacknowledged)

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

Authentication Request Procedure (RRC/RANAP DT) Optional

Location Update Accept Procedure (RRC/RANAP DT)TMSI Reallocation Complete Procedure (RRC/RANAP DT)

RRC: Connection Complete

RRC: Connection Release

[1]

Page 161: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 161 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: NBAP

Purpose: These messages

request and confirm that the Radio Link resources reserved in the Node B for the DCH be released.

Channels: DCCH

Main IE’s:› Node B

Communication Context ID

› Transaction ID› RL Information › RL ID

Type: NBAP

Purpose: These messages

request and confirm that the Radio Link resources reserved in the Node B for the DCH be released.

Channels: DCCH

Main IE’s:› Node B

Communication Context ID

› Transaction ID› RL Information › RL ID

UEUE Node B

Node B RNCRNC MSCMSC

NBAP: RL Deletion Request

NBAP: RL Del Complete

2.26) Location Update: Radio Signalling Bearer Release Procedure: NBAP: RL Deletion Request / Complete

2.26) Location Update: Radio Signalling Bearer Release Procedure: NBAP: RL Deletion Request / Complete

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

Authentication Request Procedure (RRC/RANAP DT) Optional

Location Update Accept Procedure (RRC/RANAP DT)TMSI Reallocation Complete Procedure (RRC/RANAP DT)

RRC: Release/Release Complete

[1]

[2]

Page 162: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 162 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

Type: ALCAP

Purpose: These messages

request and confirm that the AAL2 bearer over the IuB Interface for the DCH be released.

Channels:

AAL2/ATM

Main IE’s:Release Request› DSAID + Cause› Release Confirm› DSAID

Type: ALCAP

Purpose: These messages

request and confirm that the AAL2 bearer over the IuB Interface for the DCH be released.

Channels:

AAL2/ATM

Main IE’s:Release Request› DSAID + Cause› Release Confirm› DSAID

UEUE Node B

Node B RNCRNC MSCMSC

RRC: Release/Release Complete

2.27) Location Update: Radio Signalling Bearer Release Procedure: ALCAP: Release / Release Confirm

2.27) Location Update: Radio Signalling Bearer Release Procedure: ALCAP: Release / Release Confirm

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

Authentication Request Procedure (RRC/RANAP DT) Optional

Location Update Accept Procedure (RRC/RANAP DT)TMSI Reallocation Complete Procedure (RRC/RANAP DT)

NBAP: RL Deletion/CompleteALCAP: Release Request

ALCAP: Release Confirm

[1]

[2]

Page 163: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 163 (164)

PART 2 - UE LOCATION UPDATE PROCEDURE

UEUE Node B

Node B RNCRNC MSCMSC

ALCAP Release Procedure

Summary

Random Access DetectionRadio Signalling Bearer Establishment

ProcedureLocation Update Request Procedure (RRC/RANAP DT)

Identity Request Procedure (RRC/RANAP DT) Optional

Authentication Request Procedure (RRC/RANAP DT) Optional

Location Update Accept Procedure (RRC/RANAP DT)TMSI Reallocation Complete Procedure (RRC/RANAP DT)

RRC: Release/Release Complete

NBAP: RL Deletion/Complete

Page 164: Umts utran call flow cs and ps

Slide title minimum 32 pt

(32 pt makes 2 rows

Text and bullet level 1 minimum 24 pt

Bullets level 2-5minimum 20 pt

!"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿĀāĂăąĆćĊċČĎďĐđĒĖėĘęĚěĞğĠġĢģĪīĮįİıĶķĹĺĻļĽľŁłŃńŅņŇňŌŐőŒœŔŕŖŗŘřŚśŞşŠšŢţŤťŪūŮůŰűŲųŴŵŶŷŸŹźŻżŽžƒȘșˆˇ˘˙˚˛˜˝ẀẁẃẄẅỲỳ–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥fifl

ĀĀĂĂĄĄĆĆĊĊČČĎĎĐĐĒĒĖĖĘĘĚĚĞĞĠĠĢĢĪĪĮĮİĶĶĹĹĻĻĽĽŃŃŅŅŇŇŌŌŐŐŔŔŖŖŘŘŚŚŞŞŢŢŤŤŪŪŮŮŰŰŲŲŴŴŶŶŹŹŻŻȘș

ΆΈΉΊΌΎΏΐΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨΪΫΆΈΉΊΰαβγδεζηθικλνξορςΣΤΥΦΧΨΩΪΫΌΎΏ

ЁЂЃЄЅІЇЈЉЊЋЌЎЏАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯАБВГДЕЖЗИЙКЛМНОПРСТУФХЦЧШЩЪЫЬЭЮЯЁЂЃЄЅІЇЈЉЊЋЌЎЏѢѢѲѲѴѴҐҐәǽẀẁẂẃẄẅỲỳ№

Do not add objects or text in the footer area

Ericsson Internal | © Ericsson AB 2011 | 2011-05-16 | Page 164 (164)