I N D E X
SECTION – I TECHNICAL
Chapter – 1 : Scope of Supply
Chapter – 2 : Technical Specifications
Chapter – 3 : Performance Parameters
Chapter – 4 : Utilities to be provided by Purchaser
Chapter – 5 : Limits of Tender and Exclusions
Chapter – 6 : List of sub-suppliers
Chapter – 7 : List of Tools and Tackles
Chapter – 8 : Drawing & Documentation Schedule
Chapter – 9 : Q A P
Chapter – 10 : Recommended Steam Purity chart
SECTION – II COMMERCIAL
Chapter – 1 : Price, delivery and special terms
Chapter – 2 : General terms and conditions of sale
8/9/2019 Triveni Offer_17.1 MW
5/52
Page 5 of 52
SECTION – ICHAPTER – 1
SCOPE OF SUPPLY
I. MECHANICAL
Steam Turbine
Multistage, Nozzle governed, Horizontal spindle, two bearings, Impulse/Reaction typeInjection cum Condensing steam turbine (Non API) with:- Hydraulically operated Stop & Emergency Valve with integral steam strainer for inlet- Hydraulically operated Throttle/Governing valves for inlet steam flow control.- In built exhaust hood spray system.
Gearbox- Double helical, single reduction Gearbox with hardened & ground gears. The design will be
with a service factor of 1.3 AGMA.
Couplings
- Non-lubricated, steel laminated flexible type, high-speed coupling and low speed couplingswith coupling guards.
Governing System
- Electronic governor (Wood ward 505 E) complete with electro-hydraulic actuators andmagnetic speed pick ups
- Hydraulic accumulator- Control oil filter- Interconnecting control oil piping
Condensing System
Condensing system comprising of:- Shell & Tube type, horizontal, divided water box (with sacrificial anodes) type condenser
with integral hot-well- Steam jet air ejector system complete with:Twin stage main ejectors (1 working + 1 standby)Start up ejector (hogging) with silencerInter and after condenser
- Vertical Condensate extraction pumps of Canister type(CEP) with motors (2 x 100%capacity)
- Rupture disc for condenser protection for full flow.- Expansion bellow with spool piece between turbine exhaust and condenser inlet- Condensate piping from hot well through CEPs & ejector condensers upto re-circulation
valve with pipe supports, strainers, steam traps, drains, vents and isolation provisions.- Dry air/vapor line within specified battery limit.- GVC with complete piping for gland seal and leakage returns to GVC and GVC drains to
nearest drain point along with required steam traps and valves etc.
8/9/2019 Triveni Offer_17.1 MW
6/52
Page 6 of 52
Lubrication System
Forced feed lubrication system, common for Turbine, Gearbox & Alternator comprising of:
- Lube oil tank provided with cleaning doors and air breather- Main Oil Pump (MOP) driven by gearbox low speed shaft- A.C. Motor driven auxiliary oil pump (AOP) for flooding the bearings during start-up and
wired through a pressure switch for automatic cut-in and cut-out in the event of main oilpump not supplying required quantity of oil.
- A.C. Motor driven auxiliary Control oil pump (ACOP) (1 working + 1 standby) to supply oilto Control system.
- D. C. Motor driven Emergency lube Oil Pump (EOP) with auto cut-in & cut-out facility- Suction strainers for MOP, AOP & EOP.- Pressure relief valves for discharge of MOP, AOP, and lube oil line
- Oil coolers (1 working + 1 standby) with on-line changeover arrangement- Oil filters (1 working + 1 standby) with on-line change-over arrangement- AC motor driven oil mist separator mounted on oil tank- Pressure regulating valve to achieve desired lube oil pressure- Set of complete lube oil piping within the limits of the turbine base frame and sufficient to
meet the requirement of the ordered equipment. (The MOC of lube oil pipe will be SS-304ERW downstream the filter).Note: JOP is not required for this rating turbine and hence not considered.
Accessories
- Motorized barring gear arrangement.- Base plate for turbine and gearbox- Insulation for Turbine hot parts (lagging & cladding)- Set of foundation bolts- Set of commissioning spares- Set of special tools & tackles for maintenance- Vibration monitoring system for high speed train.- GVC with complete piping for gland seal and leakage returns to GVC and GVC drains to
nearest drain point along with required steam traps and valves etc.
8/9/2019 Triveni Offer_17.1 MW
7/52
8/9/2019 Triveni Offer_17.1 MW
8/52
8/9/2019 Triveni Offer_17.1 MW
9/52
Page 9 of 52
PS Pr Switch Auto start/stop of ACOP Control Oil skid1
PS Pr Switch AOP & ACOP motor interlock Lube Oil Skid1
PS Pr Switch LP Trip SV-203 Discharge pressureSwitch
Turbine controlpanel. 1
PS Pr Switch Control Oil After LP Trip pressureSwitch
Field1
RTD Resistance tempdetector.
Exhaust hood temperatureElement-1
Field1
RTD Resistance tempdetector.
Exhaust hood temperatureElement-2
Field1
RTD Resistance temp
detector.
Exhaust hood temperature
Element-3
Field
1RTD Resistance temp
detector.Exhaust hood temperatureElement-4
Field1
RTD Resistance tempdetector.
Turbine journal bearings, steamend.
Turbine skid1
RTD Resistance tempdetector.
Turbine journal bearings, exhaustend.
Turbine skid1
RTD Resistance tempdetector.
Control Oil Temperature BeforeNRV
Turbine skid1
RTD Resistance tempdetector.
Turbine thrust bearing active top Turbine skid1
RTD Resistance tempdetector.
Turbine thrust bearing non-activetop
Turbine skid1
RTD Resistance tempdetector.
Gearbox bearings. Gearbox6
RTD Resistance tempdetector.
Alternator winding Alternator4
RTD Resistance tempdetector.
Alternator bearing Alternator2
RTD Resistance tempdetector.
Alternator air temp Alternator4
RTD Resistance tempdetector.
Lube oil temp before cooler Turbine skid1
RTD Resistance tempdetector.
Lube oil temp after cooler Turbine skid1
RTD Resistance tempdetector.
Oil Tank Temperature Oil tank1
SV Solenoid valve Turbine tripping Turbine skid1
SV Solenoid valve Turbine tripping Turbine skid 1
8/9/2019 Triveni Offer_17.1 MW
10/52
8/9/2019 Triveni Offer_17.1 MW
11/52
Page 11 of 52
XI Radial VibIndicator
Turbine rotor fore bearingvibration, X-axis
TCP1
XI Radial Vib
Indicator
Turbine rotor fore bearing
vibration, Y-axis
TCP1
XI Radial VibIndicator Turbine rotor after bearing
vibration, X-axis
TCP1
XI Radial VibIndicator Turbine rotor after bearing
vibration, Y-axis
TCP1
XI Radial VibIndicator
Turbine pinion fore bearingvibration, X-axis
TCP 1
XI Radial VibIndicator
Turbine pinion fore bearingvibration, Y-axis
TCP 1
XI Radial VibIndicator
Turbine pinion after bearingvibration, X-axis
TCP 1
XI Radial VibIndicator
Turbine pinion after bearingvibration, Y-axis
TCP 1
Condensate Instruments
Tag No. Equipment Application LocationQty.
I/P Current to Pres. converter Hotwell level control Field1
LCV Level control valve Hotwell re-circulation line Field1
LCV Level control valve Hotwell bypass line Field1
LG Level Gauge Hotwell level indication Field1
LSH Level switch Hotwell level high Field1
LSHH Level switch Hotwell level very high Field1
LSL Level switch Hotwell level low Field1
LSLL Level switch Hotwell level very low Field1
LT Level transmitter Hotwell Level Loose supply1
PG Pr Gauge Discharge of CEP-300 Field1
PG Pr Gauge Discharge of CEP-301 Field1
PG Pr Gauge Condensate pr after LCV-301 Field1
PG Pr Gauge Motive steam inlet header Ejector1
8/9/2019 Triveni Offer_17.1 MW
12/52
Page 12 of 52
PG Pr Gauge Motive steam inlet to hoggerejector, EJ-400
Ejector1
PG Pr Gauge Hogger ejector pr Ejector1
PG Pr Gauge Motive steam inlet to Ejector,EJ-401, 403;
Ejector1
PG Pr Gauge Motive steam inlet to EJ-402,404.
Ejector1
PG Pr Gauge Shell pr of ejector condensor,SSC-400
Ejector1
PG Pr Gauge Ejector suction header Ejector1
PG Pr Gauge Condensate inlet to Ejector
condenser, SSC-400
Field
1PG Pr Gauge LCV line pr indicator Field
1
PS Pr Switch Condenser shell pressurehigh alarm
Gauge panel1
PS Pr Switch Condenser shell pressurevery high trip and alarm
Gauge panel1
PS Pr Switch Auto start of standby CEP Loose supply1
PT Pr Transmitter Condenser Header prindicator
Field1
TG Temp Gauge Hotwell Outlet Field1
TG Temp Gauge CEP discharge header Field1
TG Temp Gauge Motive steam inlet headerline
Ejector1
TG Temp Gauge Condensate outlet fromEjector condenser, SSC-401
Field1
AFR-300 Air Filter Regulator Air supply to CV's Loose supply 1
AFR-301 Air Filter Regulator Air supply to I/P 300 Loose supply 1
Turbine Control Panel
TC Panel shall house electronic governor, alarm annunciator for turbine faults, temperaturescanner for turbine & gearbox bearing oil temperature monitoring, remote controls for allauxiliary motors of turbine (AOP,ACOP, EOP and barring gear), turbine safety interlocks &trip logic and turbine speed controls (push buttons).
8/9/2019 Triveni Offer_17.1 MW
13/52
Page 13 of 52
Turbine Gauge Panel
TG Panel shall house the pressure and temperature gauges for various operatingparameters. Impulse piping with fittings shall be supplied loose for interconnectionbetween field tap-off points and gauge panel.
DC motor (EOP) starter panel cum DCDB
DC motor starter panel shall house feeder & control circuit for EOP motor.
Local push button station
Local control stations with on/off push buttons for:
AOP motorEOP motorBarring Gear motorCEP-1 & CEP-2Air Blower motorOil mist separator motor
Safety devices
- Over speed trip:Type : Eccentric spring loaded oil dump valve
- Low lube oil pressure trip:Type : Spring loaded spool valve combined with LP trip
- Low control oil pressure trip:Type : Spring loaded spool valve combined with LP trip
- High thrust wear trip:Type : Through vibration monitoring system
- High exhaust pressure trip:
Type : Through pressure switch and solenoid trip
- Hand trip:Type : Block & dump valve in trip oil lineOperation : Local hand lever
- Solenoid trip:Type : Solenoid operated block & dump valveOperation : De-energise to open & trip
8/9/2019 Triveni Offer_17.1 MW
14/52
Page 14 of 52
SECTION - IICHAPTER – 2
TECHNICAL SPECIFICATIONS
I. MECHANICAL
STEAM TURBINEDesign:
Type : Multistage, impulse/Reaction, nozzle governedInjection cum condensing type.
Casing split : HorizontalRotor type : Machined out of solid alloy forging rotor with
integral disks.
Shaft seal : LabyrinthNo. of governing valves : Three (Inlet)Bearing support : Double pedestalRated power : 17100 kW
Oil system:- Oil:
Governing oil pressure : 25 kg/cm 2gLube oil pressure : 1.5 Kg/Cm 2gOil type : Servo prime ISO VG-46 / 57 / 68Oil quantity for initial fill
and flushing : 22100LitersOil reservoir capacity : 10500 Liters (integral)Retention time : 5 minutesMaterial of oil reservoir : Carbon steelMaterial of oil piping fromPumps to filters : Carbon steelMaterial of oil piping fromFilters to bearings : SS-304 ERWMaterial of oil piping fromBearings to reservoir : Carbon steel
- Main oil pump:Type : GearOperating speed : 1500 rpmDriver : Gearbox low speed shaftMaterial of body : CIMaterial of end cover : CIMaterial of drive gear : EN 36 / EN 40
- Auxiliary oil pump :Type : GearOperating speed : 1440 rpm
Driver : AC motorMaterial of body : CIMaterial of end cover : CIMaterial of drive gear : EN 36 / EN 40
8/9/2019 Triveni Offer_17.1 MW
15/52
Page 15 of 52
- Main Control oil pump:Type : GearOperating speed : 1440 rpm
Capacity : 200 Liters/minuteDriver : A.C. MotorMaterial of body : CIMaterial of end cover : CIMaterial of drive gear : EN 36 / EN 40
- Auxiliary Control oil pump:Type : GearOperating speed : 1440 rpmCapacity : 200 Liters/minuteDriver : A.C. Motor
Material of body : CIMaterial of end cover : CIMaterial of drive gear : EN 36 / EN 40
- Emergency oil pump:Type : GearOperating speed : 1500 rpmCapacity : 300 Liters/minuteDriver : DC motor (5.5 kW, 110 V, DC)Material of body : CIMaterial of end cover : CI
Material of drive gear : EN 36 / EN 40
- Oil cooler:Design code : HEIType : Plate Heat ExchangerOil inlet temperature : 60 0COil outlet temperature : 46 0CMounting : Saddle support
- Lube oil filter:Element type : Micro-felt
Oil filtration Capacity : 10 – 15 micronsMounting : Foot
- Oil Mist Separator:
Capacity : 60 m 3/hrDriver : AC MotorMounting : Flange
Bearings:
- Journal BearingsType : Tilting padMaterial : White metal with steel Babbitt
8/9/2019 Triveni Offer_17.1 MW
16/52
Page 16 of 52
- Thrust BearingsType : Tilting padMaterial : White metal with steel Babbitt
Governing System:- Governor:
Type : Electronic (Wood ward)Inputs (critical) : 2 speeds from MPU-1 & 2Control range : 80 to 110% of rated speedControl accuracy : As per NEMA class DSpeed droop : 3 to 6% (programmable)Power supply : 110 V DCAccessories : 2 Magnetic speed pick-ups (MPU)
1 electro-hydraulic actuator
- Hydraulic Accumulator:Type : BladderWorking fluid : Pre-charged NitrogenCapacity : 20 Liters
- Governing oil filter:Element type : Micro-feltOil flow Capacity : 200 Liters/minuteOil filtration Capacity : 10 – 15 microns
GEARBOX
Design:Type : Double helical, single reductionOutput speed : 1500 RPMS.F. : 1.3Accessory : Air breather
COUPLINGS
- High Speed Coupling
Type : Flexible element- Low Speed Coupling
Type : Flexible element with shear pins
ACCESSORIES
- Barring gear:Type : Auto disengageDriver : AC motor
Noise level : 90 dB(A)
8/9/2019 Triveni Offer_17.1 MW
17/52
Page 17 of 52
CONDENSING SYSTEM
STEAM SURFACE CONDENSER
Type : Shell and tubeConstruction : Divided water boxCleanliness factor : 0.85Hotwell retention time : 2 minutesTube fixing : Expanded jointsTube material : SS 304 ERW (22 Bwg)Tube sheet material : IS-2062 Gr.BWater box & Shell material : IS-2062 Gr.B
STEAM JET AIR EJECTORS
Suction medium : Air / VapourSystem elements : Twin stage, 2 x 100% main ejectors
Single stage, 1 x 100% start-up ejector1 x 100% inter /after condenser
Accessory : Integral steam strainersTime to reach 60% vacuumwith start-up ejector : 20 minutesMaterial of nozzle : AISI-304Material of shell & diffuser : CSMaterial of tubes : SS-304 ERW
Material of tube sheet : IS-2062Material of silencer : CS
CONDENSATE EXTRACTION PUMPS
Type : CentrifugalMounting : HorizontalSuction pressure : Same as condenser pressureDischarge pressure : 80 MWCOperating speed : 2900 RPMDriver : AC motor (415 V, 3 Phase)
Type of bearings : Anti-frictionType of seal : MechanicalType of coupling : FlexibleType of lubrication : OilMaterial of casing : CIMaterial of impeller : CF8MMaterial of shaft : C45Material of shaft sleeve : AISI 316
EXPANSION BELLOWType : Rectangular with flow liner
Design code : Universal type rectangular expansion jointsMaterial of bellows element : SS-304Material of liner : SS-304Material of flanges : IS-2062
8/9/2019 Triveni Offer_17.1 MW
18/52
8/9/2019 Triveni Offer_17.1 MW
19/52
Page 19 of 52
Water leakage detector:Location : Bottom of cooler
Quantity : 1 No. per coolerAVR CUM EXCITATION PANEL
Design:Control type : DigitalControl modes : 2 Auto + 1 manualVoltage adj. Range : +/- 10%Regulation : +/- 0.5%Dead time : Less than 30 mS
Features:
- Compounding- Auto PF controller- Remote voltage control- Auto-Manual follow-up- Under frequency protection- Field flashing provision
AVR cum excitation panel shall be complete with generator voltmeter, field voltmeter, fieldammeter, PF meter, Auto/Manual selector switch, AC supply & DC supply on /off controlswitches, indicating lamps and space heater with thermostat.
GENERATOR RELAY PANELGenerator relay panel shall house the following:- Numeric Relay (MICOM-343) for generator protection:
DESCRIPTION TAG NO. Under voltage protection relay 27 Reverse active power protection relay 32P Loss of excitation (Field failure) protection relay 40G Auxiliary relays & timers for loss of excitation protectionrelay
40X27/40G
T1/40G T2/40G Negative phase sequence protection relay 46 Voltage controlled over current protection relay 51V Over voltage protection relay 59 Timer for over voltage protection relay 2-59 PT fuse failure sensing relays 60A Stator earth fault protection relay 64 Under & over frequency protection relay 81 Differential protection relay 87 Df/dt, Vector surge P341
8/9/2019 Triveni Offer_17.1 MW
20/52
Page 20 of 52
- Discrete Relays:DESCRIPTION TAG NO.
Voltage balancing Relay-Metering PT 60B Voltage balancing Relay-Metering PT 60C DC Supply Supervision Relay 80DC High Speed Trip Relay for Generator 86G High Speed Trip Relay for Grid 86L High Speed Trip Relay for Turbine 86T High Speed Trip Relay Supervision Relay for Generator 95G High Speed Trip Relay Supervision Relay for Grid 95L High Speed Trip Relay Supervision Relay for Turbine 95T
- Temperature scanner for monitoring generator winding and bearing temperature- Alarm annunciator for generator fault monitoring
The panel shall be complete with AC supply & DC supply on /off control switches,indicating lamps and panel space heater with thermostat.
General:Type : Simplex, dead front & free standingDimensions in mm (Approx.) : 1000 (L) x 1000 (D) x 2200 (H)Weight (Approx.) : 800 KG
8/9/2019 Triveni Offer_17.1 MW
21/52
Page 21 of 52
GENERATOR CONTROL (METERING CUM SYNCHRONISING) PANELGenerator control panel shall house the following:
- MetersType : DigitalSystem : 3 phase, 4 wire, unbalanced loadReference standard : IS-1248Ammeters : 3 Nos.Voltmeter : 1 No. with selector switchKW meter : 1 No.KVA meter : 1 No.KVAR meter : 1 No.PF meter : 1 No.Frequency meter : 1 No.
Trivector meter : 1 No.
- Synchronising equipmentDouble voltmeter : 1 No.Double frequency meter : 1 No.Synchroscope : 1 No.Check synchronizingRelay : 1 No.Aux. relays forSynchronising scheme : 1 SetAuto Synchronizer : 1 No.
The panel shall be complete with synchronising selector switches, breaker control (T/N/C)switches, push buttons, AC supply & DC supply on /off control switches, indicating lampsand panel space heater with thermostat.
General:Type : Desk & free standingDimensions in mm (Approx.) : 1200 (L) x 1100 (D) x 2310 (H)Weight (Approx.) : 750 KG
LA, SC & PT PANEL
LA, SC & PT panel shall house the following:- Lightning arrestorDischarge current : 10 kAQuantity : 3 Nos. (1 per phase)
- Surge capacitorCapacitance per phase : 0.25 FQuantity : 3 Nos. (1 per phase)
- Potential transformersFor Quantity Secondary output Class
Protection 3 Nos. 110 V 3 PMetering 3 Nos. 110 V 0.5Excitation 1 No. 220 V +/- 5 %
regulation
8/9/2019 Triveni Offer_17.1 MW
22/52
Page 22 of 52
The panel shall be complete with AC supply on /off control switch, illuminating lamp withlimit switch for each PT compartment, indicating lamps and space heater with thermostat.
General :Type : Simplex, modular & free standingTerminal box : To suit HT CablesMaterial of busbars : AluminiumDimensions in mm : 1800 (L) x 1650 (D) x 2350 (H)Weight : 1,000 KG
NEUTRAL GROUNDING RESISTOR PANELNGTR panel shall house the following:
- Resistor
Type : Naturally air cooledRated current : 100 ADuty rating : 10 secondsResistor grid type : Punched steelTemperature rise : 375 0 C over ambient (max.)Mounting & fixing ofResistor units : Mounted on grid rods; fixed and assembled in tiers
separated by porcelain insulators- Neutral isolator
Operation : Manual.No. of poles : One
Limit switches : 2 Nos. (for on / off positions)
- Earth connectionType : Porcelain insulated 12 mm terminal studsQuantity : Two Nos.
- Current transformersFor Quantity Secondary output Class
Differentialprotection
6 Nos. 1 A PS
Earth fault
protection
1 No. 1 A 5 P 10
Metering 3 Nos. 1 A 0.5Compounding 1 No. 1 A 1
The panel shall be complete with AC supply & DC supply on /off control switch,illuminating lamp with limit switch for each PT compartment, indicating lamps and spaceheater with thermostat.
General:Type : Simplex, dead front & free standingTerminal box : To suit HT CablesMaterial of busbars : AluminiumDimensions in mm : 1500 (L) x 1000 (D) x 1400 (H)Weight : 1,000 KG
8/9/2019 Triveni Offer_17.1 MW
23/52
8/9/2019 Triveni Offer_17.1 MW
24/52
Page 24 of 52
Lube oilControl oil
- Temperature gauges for:
Inlet steamInjection steamExhaust steam
GENERAL SPECIFICATIONS OF INSTRUMENTS:
- Pressure and Temperature GaugesDial : 150 mm circularScale : 270 Deg. arc with black pointerType : Bourdon (pressure gauge)
Mercury in steel (temperature gauge)
Accuracy : +/- 1 %Over range protection : 125 %Accessories : Shatter proof safety glass
- Pressure SwitchSensor type : BellowsMaterial of case : Die cast aluminiumMaterial of bellows : SS-316
- Pressure TransmitterType : 2 wire, capacitance & electronic
Input : DirectOutput : 4 – 20 mAMaterial for processconnection internals : SS-316
- Resistance Temperature Detectors:Element type : PT-100, 3 wire
- Solenoid ValvePower supply : 110 V DCOperation : De-energise to open
Type : 2 way, universal ports
- Level SwitchType : Magnetic floatMaterial of body & float : AISI-304Material of case : Die cast Aluminium
- Level TransmitterType : DP transmitter
(2 wire, capacitance & electronic)Input : 0 to 750 mm WC
Output : 4 – 20 mAMaterial for processconnection internals : SS-316
8/9/2019 Triveni Offer_17.1 MW
25/52
Page 25 of 52
- Level Control ValveType : Single seat and globeEnd connection : Flanged
Actuator type : Pneumatic diaphragm with springPacking material : PTFEPlug characteristic : Equal percentagePlug material : SS-316+StellitedSeat ring material : SS-316+StellitedDiaphragm material : Neoprene rubberStem material : AISI-304Yoke material : Cast steelAction : Air to close (Re-circulation line)
Air to open (By-pass line)Accessory : Positioner
Air lock-up relayHand wheel
- Level Indicating Cum ControllerType : PID ControlInput : 4 – 20 mAOutput : 4 – 20 mAInput & output display : Digital bargraphPower supply : 230 V, AC, Single phase
- Current to Pneumatic Converter
Supply : Air at 1.5 Kg/cm2gInput : 4 – 20 mA
Output : 0.2 to 1.0 Kg/cm 2g (air)Enclosure : Die-cast aluminium alloy bodyAccessory : Pressure gauges for supply & output
- Temperature ScannerPower supply : 230 V, AC, Single phaseInput : PT-100, 3 wire RTDDisplay : Channel No. & bearing / winding
temperature
Display mode : Auto / ManualScan rate : ProgrammableAccuracy : +/- 1 Deg.C
- Alarm AnnunciatorType : Modular, plug-in cards, interchangeableInput protection : Optical isolation provided through opto couplersColour of window : Milky white (pre-trip alarm)
Red (Trip alarm)Power supply : 110 V DCFault initiation : Make to alarm
Accessories : Electronic hooter and Push buttons for Test,Acknowledge & Reset
8/9/2019 Triveni Offer_17.1 MW
26/52
Page 26 of 52
- Air Filter RegulatorFilter element : 5 micronsElement material : Sintered bronze
Body material : Cast aluminium
8/9/2019 Triveni Offer_17.1 MW
27/52
Page 27 of 52
SECTION - ICHAPTER – 3
PERFORMANCE DATA
Please refer the enclosed HMBD
Note:
1. The above consumption data apply at steady state conditions, with the control valve fully open,deposit free blading and clean surface of cooling equipment in accordance with the Triveniperformance Test Procedure which is based on the IEC-PART-II code.
2. This consumption does not include the power and steam requirements of the condensing plantand auxiliary equipments. Instrumentation tolerance of +or- 3% is allowed as per theinternational testing practices.
3. The data furnished are based on nominal steam parameters at turbine inlet, Injection and exhaustflange.
4. Steam quantity should be maintained at inlet and Injection points for guarantee point asmentioned elsewhere in the bid.
5. The following are not included in the auxiliary power consumption furnished in Auxiliary powerguarantee.a) All standby equipment.b) All electrical actuators and motorized valvec) Other intermittent equipment
6. The steam consumption for and auxiliary equipments such as ejector motive steam, gland-sealingsteam etc. is not included in the steam consumption figure for turbine performance.
7. Auxiliary power consumption indicated is at motor input terminals.
8/9/2019 Triveni Offer_17.1 MW
28/52
Page 28 of 52
SECTION – ICHAPTER – 4
UTILITIES TO BE PROVIDED BY THE PURCHASER
A. STEAM (SATURATED)
CONSUMER / PURPOSE INTERMITTENTDEMAND
CONTINUOUSDEMAND
Turbine gland sealing system at10 kg/cm 2
300 kg/hr(during start-up)
N/A
Ejector system @ 10 kg/cm2g 600 kg/hr 350kg/hr
B. COOLING WATER (FRESH)
Inlet pressure : 2.5 kg/cm 2gInlet temperature : 32 0CTemperature rise ( T) : 8 0C
CONSUMER / PURPOSE CONTINUOUSDEMAND
Turbine oil cooler 120 m 3/hrGenerator air cooler 120 m 3/hrGland Vent Condenser Condensate cooled
C. INSTRUMENTATION AIR
1. For control purpose : 10 SCFM at 7.0 kg/cm 2
D. AC POWER
Power supply : 415 V, 50 Hz, TP & N
CONSUMER INTERMITTENTDEMAND
CONTINUOUSDEMAND
AOP Motor 22 kW(During start-up & shut-down)
N/A
Air Blower Motor N/A 2.2 kWOil mist separatorMotor
N/A 0.75 kW
Barring Gear Motor 22 kW(During shut-down)
N/A
ACOP Motor 22 kW N/AACOP Motor N/A 22 kWCEP Motor N/A DDE
Note : All utility figures mentioned above are indicative only. The actual requirement shallbe furnished during detailed engineering.
8/9/2019 Triveni Offer_17.1 MW
29/52
Page 29 of 52
SECTION - ICHAPTER – 5
LIMITS OF TENDER & EXCLUSIONS
LIMITS OF TENDER:
The offer is complete within the following limits beyond which Purchaser shall arrange any andall equipments:
1. Inlet flange of Stop and emergency valve of the turbine.2. Injection flange (Along with FCV, Strainer, QCNRV, ISV are loose supply)3. Re-circulation valve of condensate line.4. Inlet and outlet flanges of the cooling water connections of oil cooler, generator air
cooler and surface condenser.5. At the inlet of ejector and gland sealing for auxiliary steam.6. Turbine drains with drain cocks terminated at nearest drain point.7. Instruments, air connections within the battery limit of not more than 5 meters from
the turbine.8. Utility / Auxiliary power at the control panel terminals.9. At the incoming terminal of Alternator.10. At the incoming terminals to each motors.
EXCLUSIONS:
The following items are not included in seller’s scope of supply and shall be arranged bypurchaser:
1. Steam and cooling water piping.2. Any piping and valves outside the above limits.3. Platforms, ladders of floor/platforms, foundation or civil work, supply of
embedment’ s, inserts (other than foundation bolts for STG) of any nature includingtheir design. Routing design for piping and supports.
4. Routing design for piping and supports5. Grouting and grouting material.6. All HT, LT power, control and instruments cables along with cable termination kits,
glands, lugs etc and cable trays for same.7. Bus Duct.8. Utility/Auxiliary & emergency power and air supply.9. Inlet isolation valve and PRDS for auxiliary steam supply.10. Electrical distribution system, outdoor switch yard & associated equipments.11. MCC, PLC panels & PLC based instruments and UPS for panels12. De-aerator, Cooling Tower, related instruments and piping.13. Oil centrifuge14. Battery & Battery charger cum DC Distribution Panel15. Blanking Device for steam blowing16. Vacuum breaker valve
17. Any Valves, instruments other than the list mentioned in scope of supply18. Centralized oil storage system along with Tanks, piping, Transfer pumps etc.19. VCB Panel20. Co2 Fire extinguisher for Generator (Only provision shall be provided).
8/9/2019 Triveni Offer_17.1 MW
30/52
Page 30 of 52
21. Fire detection, alarm and protection system.22. Crane gantry.23. Complete earthing and earth pits.
24. First fill of oil and Flushing oil25. All/any statutory approvals.26. Unloading of turbine, gear box, alternator and other auxiliaries at site27. Any item not specifically mentioned in our offer.
8/9/2019 Triveni Offer_17.1 MW
31/52
Page 31 of 52
SECTION - ICHAPTER – 6
LIST OF TOOLS AND TACKLES
Sl.No Description qty
1 ALLEN-KEY-SET-1.5TO19 MM(13NOS) 1
2 ALLEN KEY- SIZE - 3 / 32" 1
3 ALLEN KEY- SIZE - 1 / 8" 1
4 DOUBLE-END-SPANNER-27 X 32 1
5 DOUBLE-END-SPANNER-14 X 15 1
6 DOUBLE-END-SPANNER-18 X 19 17 DOUBLE-END-SPANNER-24 X 26 1
8 DOUBLE-END-SPANNER-24 X 27 1
9 DOUBLE-END-SPANNER-30 X 32 1
10 DOUBLE-END-SPANNER-36 X 41 1
11 DOUBLE-END-SPANNER-41 X 46 1
12 SINGLE-END-SPANNER-85 MM 1
13 SINGLE-END-SPANNER-60 MM 1
14 SINGLE-END-SPANNER-70 MM 1
15 SINGLE-END-SPANNER-80 MM 1
16 RING SPANNER-24 X 27 1
17 RING-SPANNER-30 X 32 1
18 RING-SPANNER- 41X46 1
19 SINGLE-END-SPANNER-50 MM 1
20 ADJUSTABLE SPANNER-6" 1
21 SCREW DRIVER 6" NO:925 1
22 SCREW DRIVER 12" NO: 929 1
23 SPANNER- HEAVY DUTY SLEDGERING 65MM 1
24 SPANNER- HEAVY DUTY SLEDGERING 36MM 1
25 DOUBLE-END-SPANNER-32 X 36 1
26 OVER SPEED TRIP CAP REMOVAL BOLT 1
8/9/2019 Triveni Offer_17.1 MW
32/52
Page 32 of 52
SECTION -ICHAPTER - 7
LIST OF SUB-VENDORS
ITEM MAKE / VENDOR
Air filter regulator Shavo norgren / PlackaCouplings Euroflex /Rathi turbo fluxDP Gauge with switch SwitzerHydraulic Accumulator Fawcett / EPE Process / Hydex makeInstrument Isolation Valves Kaushik EnterpriseI-P converters ABB/ MTL
Level gauge & Level switches Chemtrol/V Automat/Levcon PlataLevel Indicator cum controller ABBOil Coolers ALFA LAVAL / Eskay / Mazda /Positron/ Southern
Lubricants /Oil Filters Industrial Enterprises / Micro Pour/ Inter normanOil Pumps-Gear type Delta /Oil Pumps-screw type Alecton/TusacoPressure & Temp. Gauges GIC / Forbes Marshall / WareePressure Relief Valves RK Controls /ASVIN/NirmalPressure switches SwitzerPressure, Level, and DP/FlowTransmitters
Yokogawa / Rosemount/ABB/Tata Honeywell
RTD & Thermocouple GIC / DetrivSolenoid valve ASCOTemperature Scanner AccsysVapour Extractor Emvee /LaxmiAC Motors KEC / Compton /Siemens / ABBFlow Relief Valves FaingerHigh pressure valves Steel StrongLevel control valves MIL/ Forbes marshall/ Dembla/ Mazda (Circor
flow)/Chemtrols
Low pressure valves Steel StrongSteam traps Spirax Marshall / PennantStrainers Procedyne/Valtech/precision/pennant/Gujarath Auto FiltAC Generator –HT VA TECH/TDPS/WEGAC Generator –LT MARELLI/BHEL/KEC/AVK/WEG/LEROY SOMERACB Panel Square Automation, Mumbai/ Vee Vee Controls, BangaloreACDB Panel Vee Vee controls , Bangalore/ Sqaure Automation,MumbaiAVR- Analog SANELEC –BangaloreAVR-Digital SANELEC -Bangalore(Basler-Make)/ABB- BangaloreBattery Amaraja, Thirupathi /Exide /HBLnife ,SecundrabadBattery Charger Amararaja, Tirupathi/ Universal , Bangalore/HRL NifeBBT-HT Enpro Engineering, Chennai /Vee Vee ControlsBBT-LT Square Automation, Mumbai/ Enpro Engineering, Chennai/
Vee Vee Controls
8/9/2019 Triveni Offer_17.1 MW
33/52
8/9/2019 Triveni Offer_17.1 MW
34/52
Page 34 of 52
SECTION - ICHAPTER – 8
DRAWING AND DOCUMENTATION SCHEDULE
DRAWING / DOCUMENTATIONDESCRIPTION
INFORMATION (I) / APPROVAL (A)
FINAL
P&I diagrams:- Steam, Condensate & ejector system- Governing & lube oil system- Cooling water system, Turbo visory
scheme.
2 sets (A) 4 sets
Foundation Block Plan 2 sets (A) 4 setsPower House Lay-out 2 sets (A) 4 setsElectrical Single line diagram 2 sets (A) 4 setsGA Drawing of Turbine 2 sets (I) 4 setsGA Drawing of Alternator 2 sets (I) 4 setsGA & Schematics of AVR Panel 2 sets (I) 4 setsGA & Schematics of LAPT & NGR Panels 2 sets (I) 4 setsGA & Schematics of Relay Panel 2 sets (I) 4 setsGA & Schematics of MCS Panel 2 sets (I) 4 setsGA & Schematics of TCP & TGP 2 sets (I) 4 setsGA & Schematics of TG Aux. MCC 2 sets (I) 4 setsGA & Schematics of DC Motor starter 2 sets (I) 4 setsGA & Schematics of Battery charger 2 sets (I) 4 setsPerformance curve -- 4 setsElectronic governor program chart -- 4 setsRelay setting chart -- 4 setsCable Schedule -- 4 setsMaintenance manuals -- 4 sets
NOTE :
1. Drawings shall be submitted for information / approval within 8 to 12 weeks from date ofreceipt of technically & commercially clear purchase order/LOI along with advance. Youshall approve all drawings submitted for approval within a period of 15 days of submissionfailing which our delivery will get affected.
2. Final drawings and documents shall be submitted along with supply of equipment.
8/9/2019 Triveni Offer_17.1 MW
35/52
Page 35 of 52
SECTION - ICHAPTER – 9
Q A PLAN
EQUIPMENT DESCRIPTION TESTS
Complete assembled turbine 1. Visual & dimensional checks2. No-load run test & functional check on safety
devices3. Vibration check4. Noise level check5. Open inspection & dynamic rotor balancing
(after no-load run test)Complete assembled generator 1. Visual & dimensional checks2. OCC & SCC test3. Over speed test4. Vibration check5. Noise level check6. HV test7. Measurement of winding resistance and
insulation resistance8. Measurement of shaft voltage
LAPT panel / NGR panel /AVR
panel / Relay panel / Met. cumsynch. panel / TCP / Battery chargerpanel / Aux. MCC
1. Visual & dimensional checks
2. Operational & functional tests3. HV test4. Measurement of insulation resistances
Turbine Gauge Panel 1. Visual & dimensional checks2. Range calibration
Instruments 1. Visual & dimensional checks2. Operational & functional tests3. Range calibration
NOTE : 1. Material test certificates from manufacturers shall be submitted for majorcomponents of turbine and other bought-out items along with supply.
2. We have not envisaged any “customer hold point” in QAP and delivery & pricequoted are on the same basis.
8/9/2019 Triveni Offer_17.1 MW
36/52
Page 36 of 52
SECTION-ICHAPTER 10
RECOMMENDED STEAM PURITY
Technically pure steam is of such quality, that it does not cause deposits in the steam pre-heaters, in the fittings, heaters as well as in the turbine, which might require the intentionalshut-down of the boiler or some part of the equipment, for their cleaning, outside of the normalequipment maintenance program.
The recommended or limit values of the purity of steam are stated in the following table. Thevalues are given in the maximal allowable day average concentrations. The concentration of thechlorine ions may be max. 3 µ g.l-1.
IDENTIFIER Unit Recommended values Limit values
Specific electrical conductivity at 25oC
1) S.cm
-1 0.3 1Silicon dioxide (SiO 2) g.l-1 20
Sodium and potassium (Na + + K+) g.l-1 10 35Total Fe contents (Fe) g.l-1 20Ammonia (NH 3) mg.l -1 1Copper-total Cu g/kg 3
1) Measured after the flow through strong acidic H-katex.
NOTE: The measurement of the electrical conductivity at 25 0 C ( S/cm -1) must be donewithout the presence of operational chemical agents, e.g. ammonia or hydrazine,which tends to increase the conductivity. This is why the measurement ofspecific electrical conductivity has to be done after the flow of the samplethrough the strong acidic H-katex, which is the filter that keeps all cations of thechemical compounds. By the filtration chemically pure water can be obtained.
RECOMMENDED STEAM PURITY – LIMITS
Continuous Start UPConductivity Micro-Ohms/cm at 25 0cDrum 0.3 1.0Once through 0.2 0.5SiO. ppb, max. 20 50Fe. ppb, max. 20 50Cu. ppb, max. 3 10
Na + K, ppb, max.Upto 800 PSIG 20 20801 to 1450 PSIG 10 101451 to 2400 PSIG 5 5Over 2400 PSIG 3 3
NOTE : THE ABOVE DATA IS ADAPTED FROM NEMA STANDARD PUBLICATIONNO. SM23 (1985) PAGE 40 SECTION 10.7
8/9/2019 Triveni Offer_17.1 MW
37/52
Page 37 of 52
SECTION-II CHAPTER-1SPECIAL COMMERCIAL TERMS & CONDITIONS OF SALE
THIS OFFER IS SUBJECT TO THE CONDITIONS MENTIONED
HEREUNDER:
Table of Clauses1. Tender Price2. Terms of Delivery3. Terms of Payment4. Validity
1. Tender Price
a) For SupplyEx-works price for the supply of one number of 17.1 MW TG set isINR 15, 500,000/- (Rupees Fifteen Crore and Fifty Lakhs Only).
This ex-works price is for delivery of packed material at our/our sub-supplier’s works and subjected to our scope of sup ply, Battery limits andlist of deviations furnished else-where in the bid.
b) For Supervision of erection and Commissioning
Lump sum price for the Supervision of Erection and Commissioning ofthe offered one number TG is INR 15, 00, 000/- (Rupees Fifteen lakhsonly).
The above prices are for scope of supply of equipment and services asdescribed in Section-I and will be confined to the limits defined thereinread in conjunction with the exclusions attached hereto.
The above quoted prices shall be firm for completion of supplies and oferection and commissioning within the schedules agreed in the Contract,
reckoned from the effective Date of the Contract. If either the suppliesor/and the erection and commissioning works are delayed beyond theschedules agreed in the Contract, then the above quoted prices are subjectto escalation, the quantum of escalation to be mutually discussed andagreed upon.
The above prices are on the basis that the Supplier gets all the inputs fromthe Purchaser in time for carrying out E & C activity uninterruptedly, afterthe first mobilization. In case if the Supplier has to de-mobilise theerection resources for reasons attributable to the Purchaser, then re-
mobilisation will be at extra cost, which will be discussed and mutuallyagreed.
8/9/2019 Triveni Offer_17.1 MW
38/52
Page 38 of 52
2. Terms of Delivery
The equipment shall be delivered on ex-works basis within 12 monthsreckoned from the effective date of the Contract.
The equipment shall be delivered, erected and commissioned within 18months reckoned from the effective date of the Contract provided allinputs of the Purchaser are made available for carrying out uninterruptederection and commissioning work.
The effective date of the Contract is the date on which the first advancepayment is received by the Supplier, subsequent to the receipt of a
technically and commercially clear contract.
Above delivery, supervision of erection and commissioning schedules aresubject to the following:
(a) The Purchaser meets his obligations as provided in the contract.
(b) The Purchaser makes timely payments as per the Contract.
(c) Force Majeure conditions as detailed in the Contract.
3. Terms of Payments
a) For Supply
10% of the purchase order value shall be paid as advance along with LOIor the purchase order.
10% of the purchase order value shall be paid within 7 days of submissionof GA drawing of Turbine, Gear Box, Alternator and standard PID.
10% of the Purchase order value within 7 days of submission of unpricedpurchase order copy for generator, gearbox and condenser.
10% of the Purchase order value 7 days before the start of assembly ofturbine
Balance 60% of the total purchase order value along with 100% taxes andduties within 7 days of submission of proforma invoice on pro-rata basisbefore dispatch.
The delivery schedules agreed upon are subject to the payments being receivedas per the above schedule and as per the mutually agreed billing schedule.
8/9/2019 Triveni Offer_17.1 MW
39/52
Page 39 of 52
b) For erection and Commissioning
20% of the purchase order value shall be paid as advance along with LOIor the purchase order.
20% of the purchase order value shall be paid within 7 days from the dateof site mobilization.
60% of the purchase order value shall be paid along with 100% ofapplicable taxes, etc within 7 days against completion of mutually agreedmilestone on prorata basis.
4. Validty
The above quoted prices are valid up to 30 days from the date of this quotation,for your acceptance and placement of technically and commercially clear orderfor the entire scope of supply and services covered in this tender, together withthe initial advance payment. Beyond this date these are subject to ourconfirmation.The prices quoted above are firm for completion of supply and erection andcommissioning,In case the completion of supply or the commencement of the erection
work or the completion of the commissioning are delayed for reasons notattributable to the Supplier, these prices have to be enhanced at a rate to beagreed upon during the course of execution of the contract
* * * * * * * * * *
8/9/2019 Triveni Offer_17.1 MW
40/52
Page 40 of 52
Section II Chapter 2
General terms and ConditionsTable of Clauses
1. Taxes and Duties2. Transportation, Unloading and Storage at site3. Insurance4. Storage prior to despatch5. Variation Orders
6. Purchasers’ General Obli gations7. Suppliers’ General Obligations 8. Inspection and Testing9. Warranty10. Commissioning and Taking over11. Performance Guarantee Tests12. Liquidated Damages (LD)13. Limitation of Liabilities14. Force majeure15. Suspension
16. Termination of Contracts17. Title of goods18. Confidentiality19. Patent Indemnity20. Arbitration21. Jurisdiction22. Bankruptcy
1. Taxes and Duties
The above quoted prices are exclusive of excise duty, sales tax, service tax,educational cess, octroi, entry tax, VAT, turn over Tax, works contract tax andany other taxes, duties and levies which may be imposed by Govt.Authorities from time to time. All such taxes, duties and levies and any kindof cess etc shall be paid by the Purchaser at actual, as applicable at the time ofdispatch.
Any statutory variations, shall be payable by the Purchaser at actual, subjectto the condition that the Supplier has submitted documentary proof of suchstatutory variations.
All Taxes, duties, levies, octroi, entry taxes, etc on free supplies, if any, shallbe reimbursed by the Purchaser at actual.
8/9/2019 Triveni Offer_17.1 MW
41/52
Page 41 of 52
Concessional rate of sales tax wherever applicable will be considered andcharged. Purchaser shall provide valid declaration forms. In the absence of
declaration forms, the Purchaser will have to pay full sales tax.
2. Transportation, Unloading and Storage at site
The delivery of the equipment shall be taken at the Supplier’s or their sub -supplier’sworks.All material will be despatched on freight to pay basis through the transportarranged by the Purchaser for conveying the consignments to the Purchaser’s site.
Receiving of the consignment, unloading and proper storing, at site shall bearranged by the Purchaser unless specified otherwise. Proper storage facilities, toolsand tackles, crane, lifting ropes, in-plant transportation etc. required for unloadingand storage shall be arranged by the Purchaser at his cost. If unloading is delayed,demurrage charges etc. shall be borne and settled directly with the transporter by thePurchaser.However if inland freight is exceptionally arranged by the Supplier at therequest and on behalf of the Purchaser through the Supplier’s regulartransporters, the Purchaser shall pay the costs prior to the dispatch of eachconsignment.
3. Insurance
The Purchaser at his expense shall arrange, secure and maintaincomprehensive insurances covering inland transit, unloading, handling atsite, storage, erection & commissioning at site, including third party risks.Copy of the Insurance policy taken shall be provided to supplier
The Purchaser shall place a separate Purchase Orders on the Supplier forrepair and / or replacement of the parts damaged or lost. If such a repair orreplacement is prolonged, consequential extension to the time for completiontogether with extra costs shall be agreed to by the Purchaser.
4. Storage prior to despatch
The Purchaser shall issue final despatch instructions as per the contract.However, if the Supplier does not receive the despatch instructions asprovided in the contract or if the Purchaser does not take delivery of thegoods within 7 days of notification of readiness of the goods for despatch, theSupplier is entitled to move the goods into a storage at the risk and cost of thePurchaser. In such an event the Purchaser shall pay Storage charges @ 2 % permonth or part thereof of the contract Price, until the goods are released for
8/9/2019 Triveni Offer_17.1 MW
42/52
Page 42 of 52
despatch from the storage. Risk shall pass on to the Purchaser on storage, buttitle shall only pass on in accordance with the provision of Title of Goodsclause.
5. Variation Orders
The Purchaser may instruct the Supplier in writing to perform variations orcarry out additional works. If so agreed by the Supplier in writing, suchadditional works or performance of variations shall be carried out as thoughthese variations or additional works were incorporated in the Contract.
If such variations or additional works entail additional costs and/or time, thesame shall be intimated by the Supplier to the Purchaser. Accordingly the
Contract price and/or time schedule shall be amended by the Purchaserbefore such variation orders and additional works are carried out by theSupplier.
6. Purchaser’s Obligation:
a. The Purchaser shall provide to the Supplier, on time, all inputs such as butnot limited to any approval, instruction, technical and commercial data,material, civil works, access to site or other thing which are not expresslystated to be the Supplier’s responsibility but are essential for the
performance of the Supplier’s obligations
b. The Purchaser shall obtain and provide to the Supplier if required, anyauthorization, license or approvals from any regulatory authority forwhich the Supplier is not expressly made responsible in the contract.
c. The Purchaser shall handover to the Supplier completed STG buildingincluding overhead crane by completing all civil works atleast 90 daysprior to the contractual commissioning date to the Supplier.
d. The Purchaser shall provide to the Supplier for his exclusive use under hiscustody a secured and lockable storage space at site to store the Suppliersown equipments, tools and tackles etc. and office rooms with all facilitieslike electricity, water, telephone, fax, internet etc. for the Suppliers siteoperations free of cost. The purchaser shall also provide a leveledcompacted open space to carry out pre-erection work.
e. The Purchaser shall provide free boarding and lodging facilities to theSupplier’s Engineer’s / Supervisor’s and space for labor colony.
f. The Purchaser shall obtain any necessary essentiality certificate / EPCGlicense / invalidation letter, wherever relevant and shall give allreasonable assistance to the Supplier in obtaining any work permit, visa or
8/9/2019 Triveni Offer_17.1 MW
43/52
8/9/2019 Triveni Offer_17.1 MW
44/52
Page 44 of 52
The products manufactured at the Suppliers works are subject to carefulinspection and testing at the works, according to the Supplier’s standard
inspection and testing practices. Only when the products pass throughsuccessfully such inspection and tests, the products are kept ready fordispatch. Suppliers standard testing practise includes MRT(Mechanical Steam Run Test) of turbine at factory before dispatch.
In case the Purchaser indicates at the time of signing of the contract his desireto attend any of these tests or any other additional tests if provided in thecontract, the Supplier shall notify the Purchaser 7 days in advance ofconducting these tests.
If the purchaser expresses his willngness to witness MRT, thepurchaser shall pay an additional cost of Rs. 6,00,000.00/- (INR SixLakhs Only).
In the event of any delay on the Purchaser’s part in attending such tests afterseven days notice from the Supplier’s side, the Purchaser’s absence shallconstitute a “Waiver” and the tests will proceed in the Purchaser’s absence.The certificates given by the Supplier shall be conclusive evidence of suchtests. All such tests will be deemed to have been approved by the purchaser.Thereafter the products will be released for packing and forwarding.
Repetition of any of these tests is subject to the Suppli er’s confirmation andwill entail additional costs and time extension.
9. Warranty
The equipment supplied is warrantied for a period of twelve calendar monthsfrom the date of commissioning of the equipment or eighteen calendarmonths from the date of dispatch whichever occurs earlier. During thiswarranty period should any defect be found in design, material orworkmanship in goods of our own manufacture, the Supplier’s shallpromptly remove the defects and at its cost repair, replace or otherwise makegood at the Supplier’s sole discretion. The Supplier shall not be responsiblefor repair, replacement or making good of any defects or any damage to theequipments arising out of or resulting from any of the following causes;a. Improper movement of material, handling at site, installation,commissioning, operation and maintenance not according to the Suppliersadvice by the Purchaserb. Operation of the equipment outside the specifications provided in theContractc. Normal wear and tear.
8/9/2019 Triveni Offer_17.1 MW
45/52
Page 45 of 52
The Supplier’s obligation s hall not extend to failures caused by fair wear andtear, designs and specifications and items which are outside the Supplier’sscope of supply (whether commented on by the Supplier or not), accidents,
misuse, neglect, or repairs or modifications to the goods which have beenmade without the Supplier’s approval and / or omissions / commissionsattributable to purchaser. The Supplier’s obligation is subject to the Supplierbeing given prompt notice by the Purchaser of the appearance of the defectand a reasonable opportunity to investigate it.
Unless otherwise agreed in writing the Supplier shall have no liability for thecosts of dismantling, transportation, re-assembly and re-installation of anygoods affected under this warranty or undertaking or for the costs oftransportation. These costs shall be borne by the Purchaser or reimbursed to
the Supplier on presentation of its invoice.
The Supplier’s liabilities and the Purchaser’s remedies in respect of defects inthe goods or services and any damage to the goods resulting there fromwhether arising from breach of contract or warranty, negligence or otherwiseare solely and exclusively as stated in this Supplier’s warranty clause, and theSupplier shall have no liability of any kind for any such defects or damagewhich appear after expiry of the warranty period described above.
Items, which are replaced during the warranty period shall become the
property of the Supplier and the Purchaser shall promptly return to theSuppliers works, at his cost. The warranty for the replaced item shall expirealong with the contractual warranty period.
The Purchaser shall afford the Supplier access necessary access to theequipment and the site to enable the Supplier to perform its obligations underthis clause without any cost to the Supplier.
10. Commissioning and Taking over
No sooner the charging of the Generator breaker with the available plant loadis demonstrated, commissioning is deemed to have been completed.Thereafter, the Purchaser shall take over the plant for commercial operationrelieving the Supplier from the contractual obligation with respect tocommissioning
In the event the STG set is not commissioned due to reasons not attributableto the Supplier, within 3 months from the date of last major dispatch (Turbineor Generator), the STG set will be deemed to have been commissioned.
11. Performance Guarantee Tests
8/9/2019 Triveni Offer_17.1 MW
46/52
Page 46 of 52
On completion of commissioning, Supplier shall mobilize its team andintimate the readiness to carry out the performance test. Purchase shall makeavailable the steam parameters, load and other utilities, manpower as
required to carry out the test. The test shall be carried out for 4 hrs.
If the purchaser is not able to provide the necessary inputs required forconducting guarantee test, the Supplier shall de-mobilise. Re-mobilisation ofthe team to carry out performance test shall be at purchaser’s expenses.
In the event the performance test is not carried out due to reasons notattributable to the Supplier, within 3 months from the date of commissioning,the performance test shall deemed to be carried out and the Supplier shall berelieved of its contractual liabilities.
12. Liquidated Damages (LD)
a) LD for Delay
LD for delay becomes applicable only after providing 2 months grace periodto the contractual delivery schedule or mutually agreed extensions thereof. Ifthe delivery is delayed beyond the above grace period from the contractualdelivery schedule or mutually agreed extensions thereof, for reasons solelyattributable to the Supplier and only if the Purchaser has suffered a proven
loss exclusively attributable to the delay, then the Supplier shall be liable topay as Liquidated Damages, and not as penalty, a sum calculated at the rateof 0.5 % of ex-works price of the delayed portion of supply, for each week ofdelay, or part thereof, up to a maximum limit of 5% of the ex-works price forsupply.
LD for delay in delivery can only be enforceable if the Purchaser hasprovided in time all technical and commercial inputs as elaborated in thecontract.
LD for delay shall be applicable separately, unit-wise. LD is not applicable forthe spare parts if covered in the scope of delivery.
b) LD for Shortfall in Performance
If the guaranteed Gross Power Output at the generator terminals has not beendemonstrated by the Supplier as specified in the Contract, for reasonsattributable solely to the Supplier, then the Supplier shall be liable to pay asLiquidated Damages, at the rate of 0.5 % of ex-works contract price, for every1 % shortfall or part thereof in gross Power Output, up to maximum limit of 5% of ex-works contract price.
8/9/2019 Triveni Offer_17.1 MW
47/52
Page 47 of 52
If the guaranteed Specific steam consumption has not been demonstrated bythe Supplier as specified in the Contract, for reasons attributable solely to theSupplier, then the Supplier shall be liable to pay as Liquidated Damages, at
the rate of 0.5 % of ex-works contract price, for every 1 % increase or partthereof in specific steam consumption, up to maximum limit of 5 % of ex-works contract price.
The guaranteed parameters are valid only for steady state conditions, at fullyopen control valves, deposit free turbine blades, and a clean surface on thecooling equipment, in accordance with the rules given in Purchaserperformance Test Procedure which is based on the ASME - PTC 6 code / DIN1943.
The Supplier is not liable to pay any LD for shortfall in performance if any ofthe required inputs from boiler and other auxiliaries to the TG set as specifiedin Technical Specification have not been provided by the Purchaser or there isno conclusive evidence that the shortfall is exclusively due to the deficiencyin the TG performance.
The combined maximum ceiling of LD on account of delay in delivery andshortfall in performance will be 7.5 % of the contract ex-works supply price.
13. Limitation of Liability
The Supplier shall not be liable to the Purchaser, whether in contract, tort(including but not limited to negligence), or otherwise, for any indirect orconsequential loss or damage, loss of use, loss of production, or loss of profits orinterest costs, loss of contracts, provided that this shall not apply to anyobligation of the Supplier to pay liquidated damages to the Purchaser.
14. Force Majeure
Definition of force majeure and effect on Delivery
If, despite all efforts and measures considered reasonable, either Party is preventedfrom fulfilling his contractual obligations within the period agreed on, owing to areason beyond his control and which could not be foreseen when the Contract wassigned, the date by which the contractual obligations have been scheduled to befulfilled shall be postponed by a period equal in length to that during which thereason concerned and its direct consequences demonstrably continue to affect.
Examples of force majeureStrike with considerable effects, not brought about by either Party, fire, not resultingfrom neglect as regards fire protection, war, unforeseen measures by authoritiesindependent of the Parties, mobilization or other unexpected call-ups of armedforces of the corresponding magnitude, requisition, confiscation, currency
restrictions, export and import embargoes, riots and insurrection, breakdown ofpublic traffic, restrictions in the use of power or other corresponding event meetingthe above requirements, shall be considered force majeure.
8/9/2019 Triveni Offer_17.1 MW
48/52
Page 48 of 52
Sub-suppliersDelayed or defective delivery by a sub-supplier shall not be considered forcemajeure unless the sub-supplier meets the requirements referred to above in respect
of force majeure. Additional costsEach Party shall meet the additional expenses incurred by him as a result of forcemajeure. The Parties shall act in a manner aimed at causing as little loss as possibleto the other Party.
Obligation of notificationWhen force majeure occurs, the Party shall promptly notify the other Party inwriting. Such notification shall include information on the prevailing circumstancesand an estimate of the effects of the circumstances as regards the Party’s possibilitiesof meeting his contractual obligations, and information on the estimated periodwithin which he will be able to meet these obligations. The necessary evidence shall
be enclosed with the notification or be supplied within a reasonable period of time.When the force majeure event referred to above ceases to exist, the Party shall notifywithout delay the other Party in writing. The notification shall indicate the time bywhich the contracting party concerned estimates to be able to meet his contractualobligations.If a Party neglects the notification to the other Party in accordance with the above orfails to notify promptly, he shall compensate the losses suffered by the other Partyowing to such neglect or delay.
15. Suspension
If purchaser fail to make any payment when due or perform on time any ofpurchas er’s other obligations under the contract, supplier shall be entitled tosuspend performance of the contract until the failure is remedied. The timefor performance of the contract by supplier shall be extended accordingly andany cost (including financial costs, storage and demurrage or any othercharges) thereby incurred by supplier shall be paid by purchaser.
If performance of the contract is for any reason suspended by purchaser andsuch suspension continues for more than 3 months, supplier shall be entitledat any time during that continued suspension by not less than 30 days'written notice to terminate the contract forthwith, in which event theprovisions of the Termination Clause shall apply.
In all cases where delay of failure in performance of the contract is due toforce majeure, then in such case supplier shall be entitled to an extension oftime for performance of this contract for a period corresponding to the periodof delay by or in consequence of the operation (in whole or in part).
16. Termination of Contract
Purchaser may at any time terminate the contract, in whole or in part by
giving written notice to supplier. The notice of termination shall specify thattermination is for Purchaser's convenience, the extent to which performance
8/9/2019 Triveni Offer_17.1 MW
49/52
Page 49 of 52
of work under the contract is terminated, and the date upon which suchtermination becomes effective.
Equipment, which is complete and ready for dispatch within 30 days aftersupplier acknowledge receipt of the notice of termination shall be purchasedby Purchaser at the stated contract prices and subject to contract terms.
For the remaining goods purchaser may cancel the contract and pay tosupplier an agreed amount for partially completed goods and for materialsand parts previously procured by supplier for the purpose of the contract,together with a reasonable allowance for overhead and profit and areasonable compensation, based on mutual discussions, for the financialcommitments made by supplier for fulfilling their obligations under this
contract including for example commitments already made with sub-suppliers.
In the event of cancellation Purchaser shall not have any claim on designs anddrawings lying ready with supplier and will remain supplier's property.
17. Title of Goods
Title of the goods will automatically get transferred to purchaser as soon asthe goods leave supplier’s works / supplier’s sub -vendor’s works and the
documents evidencing the title and the dispatch are transferred in purchaserfavor. However supplier’s obligations will cea se only on the commissioningof the equipment.
The components will get dispatched ex-works in convenient transportableunits as manufactured; depending upon the sequence, size, transportationfacilities etc., and each such component shall be treated as contracted goodsand payment for the goods made pro-rata.
The Title (legal and beneficial ownership) in the goods shall not pass to thePurchaser until the Supplier has been paid the contract price in full. All risksof loss or damage to the goods shall nevertheless continue to be with thePurchaser on delivery.
18. Confidentiality
All designs, drawings and other technical information relating to the goods orservices, including the software provided by the Supplier under the contract,and the intellectual property rights therein made or acquired by the Supplier
prior to or during the preparation of the proposal or tender or in the course ofwork on the contract shall be and remain the property of the Supplier or theoriginal software providers.
8/9/2019 Triveni Offer_17.1 MW
50/52
Page 50 of 52
Such technical information shall be kept confidential by the Purchaser, itsemployees, agents or subcontractors, shall not be copied, modified or
disclosed by any of them and shall not be used by them for purposes otherthan operation and maintenance of the goods. In the event that the Purchaserdoes not accept the Supplier’s tender it shall return to the Supplier alltechnical information supplied by the Supplier together with any copiesmade.
From the effective date of the contract, the Supplier grants to the Purchaserthe non-exclusive and non-transferable right to use the technical information,including software, provided by the Supplier for the life of the goodssupplied under the contract for the purposes of their operation and
maintenance and for no other purpose.
19. Patent Indemnity
In the event of any claim being made or action being brought against thePurchaser in respect of infringement of patents by the Supplier for goodssupplied to the Purchaser hereunder, the Purchaser shall notify the Supplierimmediately. The Supplier shall be at liberty, with the Purchaser’s assistance,if required, but at the Supplier’s own expense, to conduct all negotiations forthe settlement of the same or any litigation that may arise there from. The
Supplier shall indemnify the Purchaser in respect of any such claim. Suchindemnity shall not cover any use of the equipment or any part for thepurpose other than what is indicated in the Contract or to be reasonablyinferred from the Contract, any infringement resulting from the use of theequipment or any part thereof, or any products produced thereby inassociation or combination with any other equipment or material notsupplied by the supplier, pursuant to the Contract.
In a similar way, the Purchaser shall indemnify the Supplier and holdharmless the Supplier from and against any claim being made or action being
brought against the Supplier in respect of infringement of patents by thePurchaser arising out of or in connection with any design, data, drawing,specification or other documents or materials provided or designed by or onbehalf of the Purchaser.
20. Arbitration
All disputes, or difference whatsoever arising between us and yourselves, inconnection with the contract, which cannot be settled through mutualnegotiations in good faith, either of us may give the other notice in writing of
the existence of such question, dispute or difference.
8/9/2019 Triveni Offer_17.1 MW
51/52
8/9/2019 Triveni Offer_17.1 MW
52/52
Top Related