DYNAMIC POSITIONING CONFERENCE
October 9-10, 2012
THRUSTERS SESSION
Challenges in Ship Design to Maintain
Thrusters Inside Shi
,
Beacon Finland
http://session_thrusters.pdf/http://session_thrusters.pdf/7/26/2019 Thrusters Nylund Pp
2/18
Challenges in Ship Design when Maintaining Thrustersinside ship
Tom Nylund
Timo Rintala
7/26/2019 Thrusters Nylund Pp
3/18
Presentation Objectives
Overall Service Demands for a Thruster
Principles and Function of different Thruster Containers
/Canisters Challenges in Ship Design related to Thruster Canisters and
Thruster Maintenance inside ship
7/26/2019 Thrusters Nylund Pp
4/18
Overall Service Demands for Thrusters
Maintenance situations:
Annual Inspections
Cleaning and Inspection of Propeller Replacement of Propeller Shaft Seal life time 3-5 years
ep acemen o z mu ng ea , ep acemen o no es
Overhaul requirements from Classification every 5 years (condition
monitoring 10 ears)
Unexpected service needs underwater collisions, etc.
7/26/2019 Thrusters Nylund Pp
5/18
Objectives for Installing Thruster Canisters
rs an s ers ns a e n o r s ps n e year
2000
Objectives for Installation
Improve vessel productivity throughreduction of capacity down time
and safe
Reduce maintenance related costs
No need for commercial diver assistanceDrillship Jack Ryan
7/26/2019 Thrusters Nylund Pp
6/18
Original Canister Principles and Function
Shallow water operation
Reduce vessel resistance in transit
Maintenance purposes Requirements for retraction and use
,
supported by a guide system
Locking systems for ultimate positions Seal arrangement to have a dry trunk space
7/26/2019 Thrusters Nylund Pp
7/18
Original Canister Principles and Function
All Thruster functions inside the Canister
Main drive, lubrication system, steering hydraulics, control
,
The cooling water, lubrication oil, power supplies, control cables,
bilge system must be carried through umbilicals to the canister
Forced ventilation to the canister and exhaust air from the canister
7/26/2019 Thrusters Nylund Pp
8/18
Service opportunities with Original Canister
Right angle gear inspection
Anode re lacement
Cleaning and inspection of propeller
The canister offers the possibility to underwater installation of a
complete thruster unit
7/26/2019 Thrusters Nylund Pp
9/18
No. Owner Country Ship Delivery
1 Global Marine (Transocean) USA 2000
2 Global Marine (Transocean) USA 2000
3 Transocean USA 2010
4 DeepSea Metro Greece 2011
6 Noble USA 2013
7 Noble USA 2013
8 Ensco USA 2014
9 Ensco USA 2014
10 Noble USA 2014
11 Noble USA 201412 Rowan USA 2013
13 Rowan USA 2014
14 Rowan USA 2014
7/26/2019 Thrusters Nylund Pp
10/18
New Canister Designs
Shorter version of the original
canister to fit vessels with
sma er ept
Fits inside the hull in retracted
position
Same service and inspection
functions as for the original
7/26/2019 Thrusters Nylund Pp
11/18
Un erwater Service Space
Thruster Trunk separated from servicespace y u ea oors
Trunk closed by WT bottom hatch
Sea water is um ed out of the trunk
The WT bulkhead door is opened andthe service space is ready for use
during service work
7/26/2019 Thrusters Nylund Pp
12/18
7/26/2019 Thrusters Nylund Pp
13/18
a n enance pace erv ng ree
Thrusters
The trunks are
the servicespace by WT
7/26/2019 Thrusters Nylund Pp
14/18
Features and Feasibility of Underwater Service Space
, . .
Replacement of Propeller
Replacement of Propeller shaft and seal
Replacement of Azimuthing seal Replacement of Anodes
ec o amages an ea ages
Classification inspections
Drillships, FPSO, FPDSO, FLNG, etc.
7/26/2019 Thrusters Nylund Pp
15/18
Comparison of Maintenance Possibilities
Replacement of propeller
shaft seal
Full service
Replacement of anodes
7/26/2019 Thrusters Nylund Pp
16/18
Design Challenge Space Definition
Operational requirements
Understandin of the ossibilities the Canister offers
Definition of the Thruster size and type
Definition of the maintenance work to be done
Available on-deck space and supporting constructions
Space requirements of Auxiliaries operating the Canister
7/26/2019 Thrusters Nylund Pp
17/18
Conclusions
and cost savings
The initial phase of the design is most critical for the outcome of the
t ruster es gn
Understanding the canister features
Deciding the preferred service work
Defining the elementary components
Space dedicated to canisters pays off increased popularity
7/26/2019 Thrusters Nylund Pp
18/18
Drillship Deepwater Champion
Furnished with six thrustercanisters