The Network Strategy Plan
José VarelaSenior ATM Expert
23/01/2013
User Forum 2013
2
� EC nominated Eurocontrol as Network Manager for ATM network functions
� DNM exercises NM Functions inside the Agency (DG decision)
� EU Implementing rule: Functions of the NM � Route Design� Coordination of scarce resources (frequency and codes)� ATFM
� Preparing NSP (including NM PP) and NOP
� Specific Governance: NMB with SSC opinions� Adoption of Route design plan; ATFCM procedures; actions on scarce resources� Adoption of NSP ( including NM PP) and NOP� Adoption of NM Budget ( 85 to 90 % of DNM budget)
The NSP defines the guiding principles for the network operationand its long term perspective
Our Mandate as Network Manager
3
CDM Consultation and Approval Process
NSP 0.1
NSP 0.2NSP 0.x
NSP 1.0
EC
SSC
NMB
NDOP
Teams
PRB
Endorsement
Consultation
4
Develop, maintain and implement a Network Strategy Plan in compliance with the performance scheme provided for in Regulation (EU) No 691/2010 and the European ATM master plan and taking into account any relevant ICAO Air Navigation Plans
Network Management Function IR
NSP
ATM Master PlanPerformance targets
ICAO Air Navigation Plans
5
Structure of NSP
6 Main OPS drivers from a network perspective
10 Strategic Objectives (SO)
Actions for SO implementation
7,000
8,000
9,000
10,000
11,000
12,000
13,000
14,000
15,000
16,000
17,000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Year
Eu
rop
ean
IFR
Mo
vem
ents
(00
0s)
Actuals 2005 Forecast Latest Forecast
Growth from 2005 to 2020 now forecast at 29% vs 2005 forecast of 73%
2005 Forecast
Latest Traffic Forecast
Economy and traffic trends
6
The Strategic Operational Drivers
Flexible Airspace Structure
Free Route implementation
Flexible& reactive Capacity
Management
IncreaseOperationalPredictability
MeasureOperational
Performance
7
Main areas of work > Strategic Objectives
CDM
Information sharing
NM Performance Plan
Airports
Safety
Scarce Resources
Human Resources
Address RP2 (2015-2019)
Network Management
ATM Network Operations
Preparing the Future
Operations Planning
Operations
8
� 2014: Cooperative Decision-Making process, able to amend the plans as required by the performance needs.
� 2013: All functions (ATFM, Scarce resources, RND, Crisis Mgt) and operational tasks (FPL, ASM, EAD) are covered by a Network Handbook
� 2013: Monitoring and reporting available at NMB and NDOP levels.
9
� 2014: Network Information flows available to support Operations Planning and Operations (SO4 and SO5)
� 2014: Full deployment of IP network for ATM applications (FMTP/OLDI), VoIP, SUR data etc) and messaging directory services.
� 2015: VDL Mode 2 infrastructure deployed in support of CPDLC Datalink (EU IR)� 2014: Comply with the existing interoperability rules and to ensure a common
understanding of the new rules and standards being elaborated.� 2014: Improve interoperability by enabling use of services; providing evidence of service
performance.� 2014: Consolidate the use of EAD as a central reference for AIM data
10
� 2014: NM to comply with the targets defined in the NMPP
11
� 2014: Achieve the target for En-route Capacity
� 2014: Achieve the flight efficiency target for route design and for flight planning
� 2014: ATM local enablers implemented to achieve the performance objectives where required
� 2015: Data-Link available in all ATC Centres above FL 285 (EU IR)
12
� 2014: Achieve the network capacity and flight efficiency targets
� 2014: Standard procedures available demonstrating benefits on ATM performance (network delay attribution)
� 2014: Short-Term ATFM Measures (STAMs) used for critical capacity areas.� 2104: Flight efficiency KPI (FPL) achieved
� 2014: Shared airspace situation available at network and FAB level
13
� 2014: Reduce arrival delays to 0.5 minutes
� 2014: Agreed procedure between NM, ANSP and fully coordinated airports covering airport slots, analysis of turn-around related delays and their impact, operational relationship and KPIs
� 2014: 25% of traffic subject to DPI. � 2014: Airport CDM implemented on 20 of the top 40 traffic airports
� 2014: Agreed procedure for monitoring ASMA KPI
14
� 2014: Deploy Risk Analysis Tool in all main ANSPs (to be used for assessing Separation Minima Infringements, Runway Incursions and ATM Specific Occurrences.)
� 2014: 3 million visitors of SKYbrary from 1 million visitors in 2011.� 2014: Establishment of a network Top 5 Operational safety risks and work on ATM
contributing factors to reduce the operational safety risks.� 2014: Define “level 3” ground-based safety nets by end of 2013� 2016: Implementation of effective "level 2" ground-based safety nets in all EUROCONTROL
member States.� 2014: All ANSPs and FABs Safety Management/Standard of Excellence Level 3. Support,
by the end of 2014, the measurement of Safety Culture within the remaining 14 ANSPs not yet covered..
� 2014: Safety Culture Measurement and Improvement plans in all ANSPs. ANSPs and NM will jointly develop and implement the Safety Human Performance Action Plan (up to 2014).
15
� 2014: VHF frequencies assignment not creating critical delay for airspace improvements.
� 2014: Removal of Network capacity and safety constraints from the shortage of available transponder codes
16
� 2014: Reduce ATFM delays by implementing capacity management processes.
� 2014: FAB report identifying capabilities, possibilities and limitations for staff mobility.
� 2014: Each FAB has completed a review to establish what is possible for cross unit ATS.
� 2014: NM has developed a common repository of policies and rules of implementation, including mitigations.
17
SO 10: Prepare the Network Management and the Network Operations for RP 2
17
Management of ATM changes:
� A plan for implementation addressing RP2 performance Objectives;
� A concept for technology implementation at network level
Technology changes required to achieve 2019 network performance:
� ATC tools in support of Free Routeing;
� Initial Business Trajectory and support communication tools (initial SWIM) to improve Tactical Flow and Capacity Management;
� Network Operations Portal, Airport Operations Plan, structured aeronautical information and initial SWIM in support of the Network operations Planning;
�Data Link in support of Controller workload;
�Airport tools to optimise existing airport infrastructure;
�Improvement of Safety tools.
18
NSP Version 2
� The NSP will be updated to take account of technological, institutional and economic developments and the performance objectives of the second reference period.
� This will be achieved by December 2013.
� Economic context� Traffic decrease� Decreasing revenues
� Social issues
Top Related