Download - The introduction to zhengzhou Dearye AAC Project

Transcript
Page 1: The introduction to zhengzhou Dearye AAC Project

Zhengzhou Dearye Heavy Machine Manufacturing Co., Ltd.

Address: Jinnan San Road and 107 Way, Economic and Technological Development Zone, Zhengzhou, China.Tel: +86-371-66162089 Fax: +86-371-86020709 Website: http://www.aacmachine.com.cnE-mail: [email protected]

T

Page 2: The introduction to zhengzhou Dearye AAC Project

Contents

Company Certificate2

Company Introduction1

AAC Production line3

Delivery Pictures4

Production Department5

Page 3: The introduction to zhengzhou Dearye AAC Project

Company Introduction

Zhengzhou Dearye Heavy Industrial Machinery Manufacturing Co., Ltd. is a modern new and high-tech enterprise established in jointly with a state-lever research institute, integrating scientific research, production and marketing. Located at the Economic and Technical Development Zone of Zhengzhou, capital of Henan province.

• Our company mainly supply all kinds of the Brick Making Production Line, such as DY1250, DY1100 and DYS Series (DYS850,DYS430), And the energy saving environment protection green AAC Block Product Line ( 100,000~400,000m³ ) . Most of all the machine not only has National Patent, but has passed the ISO9001:2000 Quality System Certification.

Page 4: The introduction to zhengzhou Dearye AAC Project

Company Certificate

ISO9001 SGS National Patent

Page 5: The introduction to zhengzhou Dearye AAC Project

AAC Production Line

Page 6: The introduction to zhengzhou Dearye AAC Project

Raw Material Proportion Of Fly Ash AAC Block Production Line

Fly ash AAC block raw material proportion

Parameter Name Parameter Value

fly ash 73%

cement 3%

lime 18-22%

gypsum 3%

Aluminum powder paste 0.08%

Page 7: The introduction to zhengzhou Dearye AAC Project

Raw Material Proportion Of Sand AAC Block Production Line

Sand AAC block raw material proportion

Parameter Name Parameter Value

Sand 63%

cement 10%

lime 18-22%

gypsum 3%

Aluminum powder paste 0.08%

Page 8: The introduction to zhengzhou Dearye AAC Project

一、 Raw Material Preparation Stage

Page 9: The introduction to zhengzhou Dearye AAC Project

二、 Batching and Pouring

Page 10: The introduction to zhengzhou Dearye AAC Project

三、 Grouping and Maintaining Process

Page 11: The introduction to zhengzhou Dearye AAC Project

四、 demoulding Process

Page 12: The introduction to zhengzhou Dearye AAC Project

五、 Cutting Machine ( vertical&horizontal )

Page 13: The introduction to zhengzhou Dearye AAC Project

六、 Steam Curing in Autoclaves

Page 14: The introduction to zhengzhou Dearye AAC Project

七、 Steam Curing in Autoclaves

Page 15: The introduction to zhengzhou Dearye AAC Project

八、 Final Products Packaging

Page 16: The introduction to zhengzhou Dearye AAC Project

Delivery Pictures

Page 17: The introduction to zhengzhou Dearye AAC Project
Page 18: The introduction to zhengzhou Dearye AAC Project
Page 19: The introduction to zhengzhou Dearye AAC Project

Company Sight

Page 20: The introduction to zhengzhou Dearye AAC Project

production department

Page 21: The introduction to zhengzhou Dearye AAC Project

production department

Page 22: The introduction to zhengzhou Dearye AAC Project

production department

Page 23: The introduction to zhengzhou Dearye AAC Project

production department

Page 24: The introduction to zhengzhou Dearye AAC Project

production department

Page 25: The introduction to zhengzhou Dearye AAC Project

You Are Welcome!

Page 26: The introduction to zhengzhou Dearye AAC Project

Thanks !