Download - Surabhi Flats

Transcript
  • 8/8/2019 Surabhi Flats

    1/5

    Selva ganesh Constructions (p) Ltd

    Old No 132, New No 88, Flat No F1, II floor Eldams Road,

    Teynampet, Ch-18. Phone-044-24355271/72

    www.selvaganeshconstructions.com

    Projec t Name: SG SURABHI

    Front eleva tion ;

  • 8/8/2019 Surabhi Flats

    2/5

    Projec t address

    Door No 33 kutti naicken street chintadaripet Chennai-2

    Projec t de tails ;

    Ground floor A -988 sq.ft - sold

    First floor A- 934 sq.ft

    First floor B - 835 sq.ft

    Second floor A- 934 sq.ft SOLDSecond floor B - 835 sq.ft

    Spec ial Fea tures

    a) Each floor has only two 2BHK Flats.b) Each 2BHK flat of 825to 988 sq ft as per vasthu.c) 500 meter away from new secretariat.d) 1500 meters from LIC.

    Loc ation map ;

    Just 300 Meters Form Loco Railway Station

  • 8/8/2019 Surabhi Flats

    3/5

    Spec iation

    a) RCC column framed structure plinth beam 9 exterior brick walls and4 brick partition walls.

    b) Designer and aesthetic architectural finish.c) Covered car park.d) Staircase with MS handrail.e) Two Motors one for metro water and another for bore water.f) Overhead tank and one large underground sump with capacity to hold

    one tanker load water.

    g) Compound wall with designer gate.h) Three phase electric power connection.i) Vitrified ceramic tile flooring of HR Johnson (or) Kajaria (or) Asian (or)

    equivalent.

    j) Teak wood door frame for main door and other doors and windows.k) Polish for main door.l) Enamel paint for other doors and windows.m) Paint acrylic emulsion (super coat of ICI or equivalent).n) Sufficient electrical points of 5 amps / 15 amps modular switch / sockets

    of Anchor / MDA or equivalent.

    o) Chrome plated ceramic disc sanitary fittings with ISI mark.p) White / EWC / Parry ware / Hind ware / Johnson etc.q) Individual water pipeline for ground water and metro water overhead

    tank.

    Projec t status;

    Under construction

  • 8/8/2019 Surabhi Flats

    4/5

    Availability;

    Only three Flats

    Floor plan;

    Typical 1st and 2nd floor

  • 8/8/2019 Surabhi Flats

    5/5

    SCHEDULE OF PAYMENTS

    confirmation of booking 10%

    At the time of registration of land(within 30 days from the date of agreement) 25%

    On completion of foundation 15%

    On completion of ground floor roof slab 10%

    On completion of first floor roof slab 10%

    On completion of ground floor brick work 10%

    On completion of first floor brick work 5%

    on completion of internal plastering 5%

    on completion of external plastering 5%

    One month before possession 5%

    EXTRA EXPENSES;

    Registration Charges.

    Legal Fees, Documentation Charges & Incidental Expenses.

    Service Connection Charges, Fees, Deposits and Incidental Expenses forElectricity, Water Supply, Drainage Water treatment plant and SewageDisposal System

    Contribution to Building Maintenance Fund