Ska Presentation
RLB and Ska
Who is using it?
Who’s interested?
Client Spotlight-UoL
Case Studies:
ADT Workplace
University of Liverpool
BREEAM V Ska
How we do the assessment.
Potential Pitfalls of Ska
Today’s Presentation
Ska Presentation
RLB History with Ska
First accredited in 2010.
2 assessors initially, now up to 4 with
more proposed.
Varying sectors- public, education,
healthcare and private companies.
Carried out circa 30 assessments
across the team.
Development Partner of Ska HE and
Ska Residences.
Ska Presentation
The RLB Delivery Team
ManchesterSam BenskyLachlan FultonJason Brownlee
BirminghamLee Higgs
LondonSam Bensky+2 further assessorsIn 2014/2015
Ska Presentation
Clients currently Embracing Ska
Ska Presentation
Interested Clients
Ska Presentation
Client Spotlight- UoL• First engaged in 2012.• Included as part of Estates Strategy
as an alternative to BREEAM.• Instructed to ‘hold hands’ with the
design team.• 3 projects so far instructed:
– Guild Building Refurbishment
– Senate Drum Building– Melville Grove Student
Residences. • General target- Ska Silver –
compared to BREEAM ‘Very Good’.
Ska Presentation
Case Study | LGoS | University of Liverpool
• 2500m2 mixed refurbishment of retail/restaurant/WC facilities et
• £4m value (approx.• Only assessed relevant areas
of refurbishment.• RLB instructed at RIBA Stage
C• Silver target award enabled
flexibility.• Good practice includes:
• Lighting design.• Use of CHP.• Remote Monitoring• Floor finishes.
Ska Presentation
Case Study | 1 New York Street | Manchester
• Fit out of office accommodation in Manchester City Centre.
• 2000m2 of office accommodation over 3 floors.
• 1st project in North West to achieve Ska Gold
• Many Sustainable Good Practice Measures implemented including:
• LED Lighting
• Split energy metering with remote monitoring capability.
• Sustainable timber sources.
• Existing furniture from old office re-used and recycled.
• 90% of waste diverted from landfill.
• Project has resulted in dramatic reduction in staff churn- 44%
Ska Presentation
• Initial Assessment of Specification/Drawings etc.
•Allows Ska Assessor to comment on design.
• Project Awarded a hypothetical score.
Design
Stage
• Initial comments/scoring taken forward to be reassessed at design.
• Verification with site inspections/presentation of
invoices/commissioning certificates etc.
• Certification carried out.
Handover
Stage
• Re-assessment of certain GPM’s 1 year on.
• Not compulsory- Good Practice
Occupancy Stage
Our role during the Assessment Stages
Ska Presentation
Widely recognis
ed
Wider funding access
Administered by
BRE
Only Relevant to fit out scope
Aimed at smaller projects
Simple and easy to use
Cost Effective
Ska Presentation
Benefits to our clients
• CSR• Employee Engagement• Reduce Energy Costs• Reduce CO2 usage• Enhanced Capital
Allowances• Facilitates Design
Standards• Engagement in
Assessment Process• Low implementation costs• Kickstarting stalling
projects.
Ska Presentation
Kickstarting Stalling Projects
Case Study 1
Office Building | Reading
• 4000m2 of office accommodation in Reading.
• Proposed Building constructed 1988
• Estate Strategy -BREEAM Very good
• PTE £500k over client budget. Project Stalling with only 3 months left to exercise break on existing accommodation
• By using Ska- £50k saving on professional fees, omission of £300k of ‘un-necessary work’ further £150k saved on value engineering.
Ska Presentation
Kickstarting Stalling ProjectsCase Study 2
Hospital | North West England
• PCT looking to purchase old school site for new hospital.
• Estate Strategy BREEAM Very Good • Main school building- constructed C19- GII*
Listed.• Over budget based on ‘unnecessary
enhancements to account for listed building.• Proposal-
• Listed building to be refurbished as admin accommodation- Ska Assessed.
• New build – hospital accommodation – BREEAM
• Removing listed section of the project from BREEAM- anticipated saving £500k*
Ska Presentation
Addressing client concerns How much does it
cost?
“Yes, but what about added construction
costs?”
“Not as much as you think! £3k-£10k depending on scope of works.”
“Depending on the award you target, we believe Ska can almost be cost neutral to a contract.”
“Do I need to do it?!!”“In a nutshell, of course not,
it doesn’t yet form part of planning conditions as BREEAM does,
however many organisations are using it as part of the their CSR/Sustainable polices.”“Is it a viable alternative
to BREEAM?”
“Yes, definitely and depending on the scheme, we have used Ska to help
get projects off the ground.”
Ska Presentation
Sam Bensky MRICSTel: 07920 848668Email: [email protected]
Lachlan Fulton MIEMACenvTel: 07585 400820Email: [email protected]
Any Questions??