8/10/2019 Safety Valves for power plant
1/56
Safety ValvesErection &
Commisioning-Athiannavi. ESM/Engg-Valves, BHEL-richy
8/10/2019 Safety Valves for power plant
2/56
Valve is a mechanicaltool used for controllingthe fluid flowparameters in a
pressurised system.These valves areoperateddaily/continuously in asystem.
8/10/2019 Safety Valves for power plant
3/56
But Safety valve is safety device. It isnot operated daily or continuously.
Safety valves are meant for safety only.
Safety valve is a over pressure protection
equipment.
In a best system, Safety valves are to bemaintained in working condition but not
to be operated.
8/10/2019 Safety Valves for power plant
4/56
Reasons for raising pressure in a systemReasons for raising pressure in a systemReasons for raising pressure in a systemReasons for raising pressure in a system1.1.1.1. AccumulationAccumulationAccumulationAccumulation ofofofof fluid within afluid within afluid within afluid within a
boundary.boundary.boundary.boundary.2.2.2.2. ChangeChangeChangeChange in specific volume due toin specific volume due toin specific volume due toin specific volume due to
heatheatheatheat absorption.absorption.absorption.absorption.3.3.3.3. Change in fluid velocityChange in fluid velocityChange in fluid velocityChange in fluid velocity withinwithinwithinwithin
shorter duration of time.shorter duration of time.shorter duration of time.shorter duration of time.
8/10/2019 Safety Valves for power plant
5/56
8/10/2019 Safety Valves for power plant
6/56
8/10/2019 Safety Valves for power plant
7/56
SAFETY VALVE 1700 SERIES
8/10/2019 Safety Valves for power plant
8/56
8/10/2019 Safety Valves for power plant
9/56
8/10/2019 Safety Valves for power plant
10/56
8/10/2019 Safety Valves for power plant
11/56
8/10/2019 Safety Valves for power plant
12/56
8/10/2019 Safety Valves for power plant
13/56
8/10/2019 Safety Valves for power plant
14/56
8/10/2019 Safety Valves for power plant
15/56
8/10/2019 Safety Valves for power plant
16/56
8/10/2019 Safety Valves for power plant
17/56
1) Do not go near discharge side of a safety valve.
2) Body drain and cover plate vent must be piped
to a safe area. If left open, steam will escape and
present a burn hazard to personnel near the valve.) !lways gag a safety valve before ma"ing ring
ad#ustments.
$) %hen pulling hand lever for inspection purpose,a rope should be attached to the handle of sufficient
length &minimum ' to 1( m long) to protect the
operator from escaping steam, dust, fly ash etc.,
SAFETY
8/10/2019 Safety Valves for power plant
18/56
Exercise caution when examining asafety valve for audible leaage. S!"E#$E%TE& STE%' is ()T VISIB*E.
Safety valves should be mounted toprovide ade+uate access, - aroundthe valve plus overhead, for disassembly
and maintenance.
!se ear0muffs during the ad1ustment ofvalves.
!se hand gloves during ad1ustment ofvalve in the hot condition.
SAFETY
8/10/2019 Safety Valves for power plant
19/56
Ensure the disc is available. Identifythe disc and store it safely with &!se+uence re+uired for assembly.2hec for disc identification beforeassembly.
2hec for tag no. or &! no. as per
pacing slip. (on0availability ordiscrepancy must be informed to themanufacturing unit. 2hec for test
certificates for each safety valve. 2hec whether the inlet si3e, orifice,
material grade, set pressure etc. are
as per the boiler Setting &iagram.
STORAGE
8/10/2019 Safety Valves for power plant
20/56
2hec that the seals are intact on ring pin,spring ad1uster and overlap collar. 2hec for
transit damages, if any.
Ensure that the end covers are ept inposition and removed only 1ust before
erecting in place. 'eticulous care should betaen to ensure dirt or foreign particles donot enter into the inlet or outlet of the valve.
Ensure the valves are stored in crates onsleepers in a covered area with the inlet sidedownwards. Valves should never be laid onthe side to avoid damage to internals.
STORAGE
8/10/2019 Safety Valves for power plant
21/56
Identify and hand over the $ydro test plugs tothe user after the $ydraulic test is completed.
Ensure the valves are never sub1ected to
impact by bumping or dropping during loadingand unloading and disassembly and assemblyof valve.
&o not lift valve with lever or spring. Slingvalve as per )4'.
Valves should be erected with spindle verticalwithin a tolerance of 5 from the vertical
plane.
Ensure proper pre0heating and post heating,stress relieving and (&T procedures arefollowed when welding to the stub.
ERECTION
8/10/2019 Safety Valves for power plant
22/56
Ensure that the vent pipe is separately supportedand does not touch the drip pan unit and that thereis sufficient allowance for expansion in hori3ontaland vertical directions.
Ensure the cover plate vent and drain areconnected with pipe of ade+uate si3e to safelocations.
Extend the vent pipe over roof to avoid rain watercollection into drip pan. Insulate the inlet and bodyup to the cover plate.
%fter hydrostatic test of boiler, remove hydro testplug and ensure disc is replaced and valvereassembled without affecting setting as per theprocedure given in )4' manual.
ERECTION
8/10/2019 Safety Valves for power plant
23/56
!se cali"rate# $ress%re ga%ges for safetyvalve floating. loat the lo'est set safety valvefirst, gag the valve after setting is over an#
float the ne(t higher set valve an# so on till allvalves are floate# an# chec)e# for the set$ress%re 'ithin *+ tolerance level.
ry to achieve the setting 'ithin a minim%m
no. of $o$s a"o%t $o$s.
A$$ly gag-loa# finger tight in hot con#ition toavoi# s$in#le "en#ing.
emove gags after floating of safety valves.
Chec) an# ens%re s%fficient a$$roach an#maintenance s$ace all aro%n# the valve.
Commissioning
8/10/2019 Safety Valves for power plant
24/56
8/10/2019 Safety Valves for power plant
25/56
8/10/2019 Safety Valves for power plant
26/56
8/10/2019 Safety Valves for power plant
27/56
8/10/2019 Safety Valves for power plant
28/56
8/10/2019 Safety Valves for power plant
29/56
8/10/2019 Safety Valves for power plant
30/56
8/10/2019 Safety Valves for power plant
31/56
8/10/2019 Safety Valves for power plant
32/56
1) Ambient temperature
2) Discharge Stack Binding against drip pan elbow (Cold & Hot conditions).
3) Vibration of the header from upstream bends.
4) Lesser operating Gap.
5) Very Short Blow down setting.
6) Improper Locking of Ring pins, Spring Adjuster & Release Collar.
Valve operation
8/10/2019 Safety Valves for power plant
33/56
Excessive pressure loss at the inlet of the safety valve will cause extremely rapid opening and
closing of the valve, which is known as chattering .Chattering may result in lowered capacity as
well as damage to the seating surface of the valve. Severe Chattering can also cause damage to otherparts of the valve.
To reduce chatter, the area of the inlet nozzle should he at least equivalent to the inlet area of the
safety valve and that nozzle should be short as possible.
The inlet nozzle corners must be rounded to a radius of minimum 25% of the diameter opening.
Ensure the pressure drop to the inlet of the valve should not be greater than 50% of the expected
blow down of the safety valve.
Safety valves should be installed at least eight to ten pipe diameters downstream from any bend in a
streamline. This distance should be increased if the direction of the change of the steam flow is fromvertical upwards to horizontal in such a manner as to increase density of the flow in the area directly
beneath the safety valve nozzles.
Safety valves should not be installed closer than eight to ten pipe diameters either upstream or
downstream from diverging or converging Y fittings In cases where piping configuration renders
the two above recommendation impractical or impossible, the downstream corners of the nozzleinlets should be rounded, leaving the upstream corners square. The nozzle entrance should be
rounded so that the radius at the downstream corner will be equal to one-fourth of the nozzle
diameter. The radius should be reduced gradually leaving only a small portion of the upstream
corner sharp.
8/10/2019 Safety Valves for power plant
34/56
The safety valve nozzle should never be installed in a steam line in a position directly opposite a
branch line of equivalent size.
Excessive steam line vibrations are known to produce shifts in safety valve set pressures. Results
of sizable vibrations will be to introduce possible chatter with ultimate damage to the valve.
Exhaust, drain and cover plate vent piping must be installed so that they will not impose any
stresses on the safety valve. These stresses can produce distortion and leakage at pressures below
the set point.
Discharge piping should not be supported by the valve. The maximum weight on the outlet of thevalve should not exceed the weight of a discharge flange, elbow and drip pan unit.
Clearances between the valve exhaust piping and the discharge stack should be sufficient to
prevent contact when considering thermal expansion of the boiler, valve, discharge stack and
increased stack movement due to vibration and temperature when the valve is relieving.
Steam flowing vertically out of the discharge elbow produces a downward reaction on the elbow,
in proportion on the quantity of steam flowing and its velocity. In large, high capacity valves this
force can equal several thousand kilograms and can produce severe stresses in the valve necks.
The bending stresses are determined by the amount of the reactive forces, combined with the
moment arm, or horizontal distance between the vertical centreline of the valve and the vertical
centre line of the outlet elbow.
In no case should discharge piping be of a smaller size than the valve outlet .The length of thedischarge stack will govern its size and with increased lengths, stack diameters will increase. This
will prevent blow back from the discharge stack. Excessive water being pulled through the valve
will also produce a blow back under certain conditions and should be investigated prior to faulting
the discharge stack.
8/10/2019 Safety Valves for power plant
35/56
For optimum performance, safety valves must be serviced regularly and maintained. So that
servicing can be properly handled safety valve should be located for easy access. Sufficient
working space should be provided around the safety valve to permit access to adjusting rings. Iftwo or more safety valves are located close together, the outlets should be parallel, to offer as
much protection as possible to personnel repairing or working close to the safety valve. Cross
beams may be provide above valve centre line for easy disassembly of safety valves.
For valves being installed that are tested for set pressure with the use of a hydro set, it should be
realized that only the set pressure is being verified. Other factors such as blow down, lift, reactionforce, proper inlet welding, proper discharge stack sizes and effects of thermal expansion cannot
be determined.
Because foreign material passing into and through a safety valve may damage it, the system on
which the valve is tested and finally installed must also be inspected and cleaned. New systems,
especially, are prone to contain welding beads, pipe scale, and other foreign materials which areinadvertently trapped during construction and destroy the sealing surfaces the first few times the
valve opens. Wherever possible, the system should be purged thoroughly before the safety valve is
installed.
It is recommended that the safety valve be isolated during hydrostatic testing of the boiler either
by blanking off the valve, gagging the valve, or installation of hydrostatic test plugs. i.e. For weld-end inlet valves, completely assembled valves may be installed without necessity for disassembly.
Vertical alignment should be within 1 from a vertical plane. During welding, where possible, the
valve neck should be insulated to reduce thermal effects. When stress relieving, the same will
apply. In all cases the valve neck should be insulated at least up to the inlet neck-valve body bowl
juncture.
8/10/2019 Safety Valves for power plant
36/56
8/10/2019 Safety Valves for power plant
37/56
1) To change the popping pressure of the valve removethe cap and lever assembly, loosen the locknut and turn
the spring adjuster clockwise to increase pressure.
2) After each adjustment of the spring adjuster the
locknut should be tightened.
3) The arm on top spring washer should always be free
from bearing against the yoke rod. This can be
accomplished by holding a screwdriver between the arm
and the rod to prevent any movement of the top springwasher while adjusting the spring adjuster.
Popping Point Adjustment
8/10/2019 Safety Valves for power plant
38/56
1) Always gag the Safety Valve for protection, in case boiler
pressure rises while making ring adjustments. Adjusting ring
lock pins are threaded into the valve body and engage notches
which are cut into the rings. To adjust either ring thecorresponding ring pin must be removed. A screw driver can be
used to turn the rings.
2) Spare ring pins when supplied will be of excess length and
have to be individually ground to match each valve. The tip of
the pin should not touch the bottom of the ring notches.
Ring Adjustments
8/10/2019 Safety Valves for power plant
39/56
1) Using a reference plane is established where the adjusting ring is level with thebushing seat. From this setting, factory adjustments are made by adjusting one notch
downward for each 42.2 kg/sq.cm of set pressure. Ring position should be checked prior
to testing. Slight deviations from these settings are possible because of tests conducted
in the plant. NOTE: This provides a starting point only.
2) The lower ring is used to obtain a clean popping action and to cushion the closing
action of the valve. DO NOT ATTEMPT TO ADJUST BLOWDOWN WITH THE
LOWER RING.
3) The ideal position must then be found for the set of operating conditions present. If
simmer is present or valve fails to lift, the lower ring should be moved upward slowly,one notch at a time to remove the simmer. The most ideal position for the lower ring is
the lowest position that does not introduce simmer or a buzzing sound. In this
connection, it is imperative that extreme care be used in conditioning the seat surfaces.
4) Ensuring correct alignment, and establishing the proper clearance, so that
mechanical causes of simmer will be reduced to a minimum.
Lower Ring Adjustment
8/10/2019 Safety Valves for power plant
40/56
1) When shipped from the factory, upper adjusting rings are set level with the bushingseat.
2) This should be checked prior to field setting and should be regarded as a starting
position only.
3) It is possible that this position is not strictly in seat level, because of testing at the
plant. Starting position for blow down check should place bottom surface of upper ringlevel with bushing seat. Since the bushing seat is not visible through the service ports. It is
necessary to use a cross-reference relationship. Raise the upper ring until its bottom
surface in level with the disc holder, which is visible through the ports. Then, referring to
O&M manual, lower the upper ring the required number of notches. This will place the
upper ring on a plane with the bushing seat. This is the starting point for blow down tests.
4) Further adjustments may be necessary depending on test results. When further
adjustments are required to obtain final blow down setting, the upper adjusting ring should
be moved 5-10 notches at a time
5) The upper ring is used to obtain full lift at the popping pressure. However, its position
also determines the point at which the valve begins to drop out of full lift and starts the
closing portion of its cycle.
Upper Ring Adjustment
8/10/2019 Safety Valves for power plant
41/56
1) It will further be noted that there is a distinct difference between the actual
overlap setting on the valve and the point at which the overlap begins to take
effect.
2) This can be understood since the area in the overlap vent begins to reduce
considerably ahead of the point where upper corner of the overlap level actually
enters the floating washer.
3) Excessively high overlap settings are liable to cause seat damage when the
valve closes. It is therefore desirable to set the upper ring in such a position as
to cause the valve to stay in full lift for as short time as possible most desirous
complete.
Overlap Setting
8/10/2019 Safety Valves for power plant
42/56
1) When steam safety valves are subjected to an excessively high water level,
the valve can be expected to have a long blow down which the upper ring
adjusting ring position will be unable to correct.
2) It is recommended that the cause of high water level be corrected so valves
may function correctly at the intended conditions. If a super heater valve is set
with low temperature steam, it is advisable to for increase the blow down to
compensate the change in the density and other thermal effects taking place when
the steam is brought up to working temperature.
3) An approximate rule is to add 0.5% of set pressure to the blow down foreach 55.6C of steam temperature below the final temperature.
High water level
8/10/2019 Safety Valves for power plant
43/56
After testing the valve for proper set point and blow
down, the ring pins, and top lever pin will be sealedfor all external adjustments. Seals shall be installed by
the manufacturer at the time of initial shipment and
after field adjustment or repair of the valves either bythe manufacturer, his authorized representative
repairer, or the user
Sealing Valves after Test
Bl d
8/10/2019 Safety Valves for power plant
44/56
1) The lower and upper adjusting ring pins of any particular valve is not
interchangeable.
2) Spare ring pins when supplied will be of excess length. These pins are to be
ground at site so as to match the valve under maintenance. The tip of pin shouldNOT touch the bottom of the ring notch. Also the pins should not bear against the
rings.
3) DO NOT attempt to adjust blow down with the lower ring.
4) The upper adjusting ring should not be set below the seat level and the lower
adjusting ring should not be set above the seat level. Lock both the ring pin
settings using a seal wire to avoid disturbance during system/valve operation and
line vibrations.
5) It is possible to raise the upper ring too far and prohibit attainment of full
lift.
Blow down
8/10/2019 Safety Valves for power plant
45/56
1) Excessive line vibrations, presence of foreign particles,
discharge piping stress, back pressure, reaction force etc., can lead
to pin failure over a prolonged period of exposure. The ring pins
being the most critical spare part, it is desirable that one pin pervalve (for drum, SH and RH SVs) and one ring per four valves is
stocked as essential spares by customer.
2) To reduce blow down MOVE RING UP (TURN COUNTERCLOCKWISE).
3) To increase blow down MOVE RING DOWN (TURN
CLOCKWISE).
Pin failure
8/10/2019 Safety Valves for power plant
46/56
1) Safety Valve can be easily disassembled for inspection, reconditioning
seats, or replacing internal parts, without altering the spring load and hence the
set pressure.
2) Be sure that the there is no steam pressure in the drum or header thenproceed.
3) To retain the spring setting of the valve when and only when, a disc is to
be replaced. Remove the top lever pin and top lever. Loosen cap set screw andlift off cap and drop lever assembly. Remove the cotter pin and turn the
Release collar down until it is tight against the top of the spring adjuster, then
back off turn. Install cotter pin in lower hole of spindle. Remove the two top
yoke rod nuts and the four cover plate stud nuts, and lift the spindle, spring and
spring washers, cover plate, disc and disc holder assembly out of the valve.
DISASSEMBLY
8/10/2019 Safety Valves for power plant
47/56
Users scope
8/10/2019 Safety Valves for power plant
48/56
1) Quantity of steam being discharged through the valve, i.e. the actual
installation capacity exceeding that of the test boiler, thus permitting the valve
to flow its full rated capacity.
2) Quality of steam being discharged.3) Discharge piping stresses
4) Back pressure.
5) Ambient temperature.
6) Shipping or storage damage.7) Improper gagging.
8) Improper bolting of flanges
9) Damage due to foreign material in the steam.
10) Damage, during disassembly and assembly in the field
Users scope
CHATTER
8/10/2019 Safety Valves for power plant
49/56
Causes RemedyPRV Oversized for the
Installation - Actual flow is
less than 25% of Rated
Capacity
Check the Required Capacity & Replace PRV if necessary
Starvation (insufficient
flow)
Valve lift may be restricted to reduce the valve rated capacity if possible. Contact Valve
Engg.Short Blow down setting Increase the Blow down setting.
Wrong Adjusting Ring
Setting - Upper Adjusting
Ring is too High
Lower Upper Adjusting Ring to Even With or Slightly Below Seat Level
Inlet Piping Undersized for
PRV - "Starving" the PRV
Increase Inlet Piping to at least Inlet Size of PRV inlet. A valve should never be installed
on a fitting having a smaller inside diameter than the inlet connection of the valve
Outlet Piping Excessive
Length - More Built-Up
Back Pressure
Redesign Outlet Piping so that Back Pressure does not Develop.
Outlet Piping Undersized for
PRV - More Built-Up Back
Pressure
Increase Outlet Piping to at least Outlet Size of PRV
Pressure Drop in Inlet
connecting Pipe is more
Redesign Inlet Piping so that Pressure Drop is less than 3% of Set Pressure. Check and
confirming the proper welding at valve inlet.
CHATTER
8/10/2019 Safety Valves for power plant
50/56
Causes Remedy
Provided offset for
thermal expansion is not
correct
Modify the Discharge Piping arrangement if required, for providing a
minimum Clearance of 25 mm in HOT condition to take care of Thermal
Expansion of exhaust pipe as well as any changes by site during erection of
Exhaust pipe or drain connectios.Chattering Reduce the chattering by proper adjustment
More pressure drop in
the exhaust piping
Modify the exhaust piping routing to reduce the pressure drop if required.
The gap betweenexhaust pipe and Drip-
Pan is not sufficient
Ensure proper clearance of 25 mm minimum, such that exhaust piping do notbind on the drip pan (valve outlet) so that loads are not transferring to valve.
More back flow from
exhaust piping.
Ensure the proper erection of exhaust pipe and silencer.
Downward force is notinline with axis
Modify the Discharge Piping arrangement if required, for providing aminimum Clearance of 25 mm in HOT condition to take care of Thermal
Expansion of exhaust pipe as well as any changes by site during erection of
Exhaust pipe or drain connectios.
Material failure Ensure the proper material/ heat treatment
DRIP PAN / DISC DAMAGE
8/10/2019 Safety Valves for power plant
51/56
Causes Remedy
Not properly installed Gags should be applied such that its legs are
seating properly to the Yoke bottom
machined surface and the gag stem is
seating on the Spindle Centre. You are
requested to take personal Care during this
activity, especially for the SHSVs.
During floating of the Drum Safety valves, it
has been observed that the pressure at the SH
SV inlet is also almost same as that of the
drum pressure. This is due to absence of flow
through the SH coils, the pressure drop is
almost zero and the pressures at SH and
drum is almost same. In this the SH SV (in
gagged condition) is experiencing a high
pressure and coupled with vibration may
result in gag slippage if not properly
installed.
If the Drum SVs are floated first, then the
SH SV set pr. can be temporarily increased
by spring adjustor tightening and then
properly Gagging the SHSVs to prevent gag
slippage. Then the SH SVs setting can be
relaxed and then floated to avoid the
problem referred by you.
GAG SLIPPAGE
8/10/2019 Safety Valves for power plant
52/56
Causes Remedy
One major reason for high blow
down in Drum Safety Valves is
the Drum water level available at
the time of floating. If water
levels are kept above normal
then the chances of water lifting
during valve floating is there
which would result in high blowdowns.
Try to maintain drum water levels at nearest to
lower limit during floating.
Upper adjusting ring would have
been disturbed
Check with the position of the Upper adjusting
ring with ref. to other Safety Valves (set with
normal blow down) available on the boilerDrum. In case of any difference, we will get to
know the required adjustment. Normally on a
drum safety valve we need not have to adjust
the OLC for getting the required blow down.
High Blow down in Drum Safety Valve
Leaking/Passing
8/10/2019 Safety Valves for power plant
53/56
Causes Remedy
Setting disturbed Adjust the Spring Adjuster and lock the position by the Locknut.
Seat or disc damage Lap/Change the disc/seat. Seat cutting to be done if required.
Seat damaged by Improper
Gagging
Rectify the seat damage by lapping
Long simmer Adjust the Lower Adjusting Ring position.
Physical obstruction in seat Blowout the obstruction by opening the valve with the provided manual lifting lever.
Spindle is bent by cold
gagging or over gagging
Rectify/Change the spindle.
Improper tightening of Lock
Nut.
Ensure proper tightening so that proper locking of the spring adjuster is ensured.
High ambient temperature Ambient temperature is to be reduced by identifying the source of heat. The ambient
temperature near by the safety valve should be 40C maximum.
Impurity in steam/Foreign
particles damages the seat.
Change/lap the disc/seat. Seat cutting to be done if required. Maintain the steam condition
without impurities. For servicing/seat-cutting please contact BHEL/Valves Services
Department.
Wrong working pressure
which is closer than 6% of
set pressure difference
Increase the set pressure or reduce the working pressure to have "6% of set pressure"
operational gap.
The gap between exhaust
pipe and Drip-Pan is not
sufficient
Ensure proper clearance of 25 mm minimum, such that exhaust piping do not bind on the
drip pan (valve outlet) so that loads are not transferring to valve.
Leaking/Passing
N t ti t l
8/10/2019 Safety Valves for power plant
54/56
Causes RemedyRelease collar is
left unlocked.
The release collar if left unlocked could rotate and come
down. If system vibration is more or during valve lifting this
can happen and the release collar would sit on top of the
lever/spring adjustor and prevent the valve from reseatingeven at very low pressures of the system. Spare spindles,
supplied to sites as replacement / spares, this hole is to be
drilled on spindle in site only after setting of the release collar
or by measurement.
More External
Load on Safety
Valve Body/Outlet
by DischargePiping or Drain
connections.
Modify the Discharge Piping arrangement if required, for
providing a minimum Clearance of 25 mm in HOT condition
to take care of Thermal Expansion of exhaust pipe as well as
any changes by site during erection of Exhaust pipe or drainconnections.
Not reseating even at very low pressures
Ring Pin Broken
8/10/2019 Safety Valves for power plant
55/56
Causes Remedy
The Lock Pin should
bear against the Ring.
Spare ring pins when supplied will be of excess length. These pins
are to be ground at site so as to match the valve under maintenance.
The tip of pin should NOT touch the bottom of the ring notch. Also
the pins should not bear against the rings.
Material failure Ensure the proper material/ heat treatment
Excessive Line
Vibration
If vibration exists due to turbulent flow or improper piping support,
correct the pipe supports to arrest the line vibration.
More Back Pressure Redesign Outlet Piping so that Back Pressure does not Develop, if
required.
More External Load
on Safety Valve
Body/Outlet by
Discharge Piping or
Drain connections.
Modify the Discharge Piping arrangement if required, for providing a
minimum Clearance of 25 mm in HOT condition to take care of
Thermal Expansion of exhaust pipe as well as any changes by site
during erection of Exhaust pipe or drain connections.
Exhaust pipe
expansion clearances
is not sufficient
Ensure proper clearance such that exhaust piping do not bind on the
drip pan so that loads are not transferring to valve.
g
8/10/2019 Safety Valves for power plant
56/56
$ave a nice day6
ThankY
$ave a nice day6