HASIL PEMBANGUNAN
PEMBANGUNAN SALURAN AIR RW 05
RW 1 Gorong-gorong (50%)
RW 1 GORONG-GORONG
RW 1 PEMBANGUNAN TPT (0%)
RW 1 TPT (50%)
RW 2-3 rehap paving (0%)
RW 2-3 Rhb damping jalan (0%)
RW 2-3 Rhp damping jalan (0%)
RW 2-3 Rhp damping jalan (50%)
RW 4 Saluran air (0%)
RW 4 saluran air (40 %)
RW 5 Pemasangan box cluivert (0%)
RW 5 saluran air (50%)
RW 7 saluran air (0%)
RW 7 SALURAN AIR (50%)
RW 7 SALURAN AIR (100%)