Roma 16 maggio 2006 Commissione I
•Detector status•Pisa commitments
•Analysis•Laboratory tests
TileCal Status report (ATLAS-Pisa)
Roma 16 maggio 2006 Commissione I
TileCal installation
• Barrel installed (end Oct. 2005) and instrumented, commissioning in progress.
• EBC installed, in place (1 Feb. 2006), being instrumented, gap scintillator installed.
• EBA being installed, Lar cylinder in place, will be ready for commissioning end May.
Roma 16 maggio 2006 Commissione I
Barrel (1)• Barrel is cabled
• All the FE electronics has been mounted and is working
• DAQ is moving smoothly from the portable (MOBIDAQ) to the final one (RODs)
• First Cosmic Ray data has been taken with MDT using a limited azimuthal region (power supply/cooling problem)
Roma 16 maggio 2006 Commissione I
An event MDT/Tile
Roma 16 maggio 2006 Commissione I
Barrel (2)
Still some problems are delaying the barrel commissioning:
– Cooling pipes just arrived – LVPS have been fixed but However the system has not
been extensively tested. We are aware that other faults could show up.
– HV trips on drawers (7% of drawers have occasional trips) have been understood (humidity+dust), a working solution has been proposed (slowly blow dry air). Still investigating the origin of the problem.
Roma 16 maggio 2006 Commissione I
EBC almost in place
Roma 16 maggio 2006 Commissione I
EBC + EBA
• EBC installation completed (1/2/06) – Geometry within tolerances.– Commissioning is proceeding (control and trigger
cables, piping…)– Moved “near” the Barrel. Tile/Lar relative position are
off by 12mm in z wrt nominal. Impact on B-field have been analysed. Decision was made to position EBC as near to barrel as possible. EBA in nominal position
– EBA is being assembled in the pit. On schedule, expected ready by end May 2006.
Roma 16 maggio 2006 Commissione I
EBC being completed
Roma 16 maggio 2006 Commissione I
EBC almost in place
Roma 16 maggio 2006 Commissione I
EBA being installed
Roma 16 maggio 2006 Commissione I
Pisa responsibilities
We are well represented in all this activities.
Iacopo Vivarelli online tools (tests on commiss.)
Chiara Roda co-convener of JetEtMiss group
Anna Lupi TileCal software
Andrea Dotti online monitoring (presenter)
Nino Del Prete TileCal IB chair
Roma 16 maggio 2006 Commissione I
Activities at CERN (2006)
1. trigger cabling LB (July-August) (techs)2. Test all LB (LVPS, HV tests, FE) (Jan-Dec) (Iacopo,
Francesca, Maria)3. Barrel timing with laser (Sept./Nov) (Iacopo, Paolo)4. DAQ/Monitor (Aug./Dec). (Chiara, Andrea)5. Cosmics Run (standalone, with MDT and/or Lar) fall 2006
(all)6. Installation/commisioning EBC, EBA (The same amount
of work as for LB) (know how from LB)
Roma 16 maggio 2006 Commissione I
Other activities in Pisa
Physics studies: VBF Higgs : Hbar
Jet calibration
Comparison G4/CTB
Low energy pions in CTB
Laboratory measurements: (PMT/Fibres) synergy with the
Computer Science Dpt of Univ Pisa
Roma 16 maggio 2006 Commissione I
hET miss
HVBF(120 GeV) hh
fbhhBRHBRVBFsig 125)()( BR (tau hadrons) : 65% ; BR(hh) : 42.25
%
VBF H = 300 fb
Signal signature :- 2 high pt forward jets , - 2 central tau jet ,- ET
miss
4 jets & ETmiss
Backgrounds: QCD (~9 mb), Z/*+jets (1700 pb) , ttbar (550 pb)Crucial the tau identification: collaboration with Milano, Freiburg, Toronto
V.Cavasinni, F.Sarri, I. Vivarelli
Roma 16 maggio 2006 Commissione I
Cut Signalefficienc
yEvents
QCDefficienc
yEvents
Z+jetsefficienc
yEvents
Ttbarefficienc
yEvents
4jet (2 tau), Et
miss > 45 GeV
4.4% 3.4 10-8 4.6 10-3 7.3 10-4
Pt tau (45,35)
1.14% 2.3 10-11 5.8 10-4 1.1 10-4
Pt forward (60,40)
0.72% 7.4 10-12 2.2 10-4 6.8 10-5
forward 0.37% 4.7 10-13 1.3 10-5 2.4 10-6
Cuts 0.25% 7.5 10-14 5.8 10-6 0.5 10-6
Mjj (700 GeV) 0.22% 5.8 10-14 5.0 10-6 4 10-7
Jet veto (30 GeV)
0.2% 7.3
3.2 10-14 9
3.2 10-6
671.7 10-7
4.4
Mass window 0.15%
61.7 10-15
0.55 1.6 10-7
3.3 0
SUMMARY ATLFAST 30 fb-1
In p
rogr
ess
Validation with full simulation started
Roma 16 maggio 2006 Commissione I
Jet calibration
The H1 method : jet energy is the sum of weighted cell energy.
QCD 2 jets events has been used to compute weights using “topoclusters” and cone algorithm (R=0.7).
The method/weights prooved to be good also for calibrating jets with different cones (R=0.4) and different samples (t-tbar) and seems to work well also for CTB data.
This algorithm is robust and stable and is implemented in ATHENA.
Roma 16 maggio 2006 Commissione I
Similar good results using the same weghts obtained witha Cone0.4, ttbar events, and CTB data
Roma 16 maggio 2006 Commissione I
Very Low Energy CTB
CTB has collected data at low energy (3-9 Gev/c)
• It is important to measure the calorimeters response to a low energy pion (a jet = many low energy pions)
• It is difficult for many experimental problems:
• particle identification (e, pion, mu)
• the beam has a parasitic high energy muon component
• energy calibration is still not properly understood
The work is still in progress.
(M. Canneri, V. Cavasinni, F. Sarri, I. Vivarelli)
Roma 16 maggio 2006 Commissione I
CTB set up for VLE
Our aim: obtain the purest pion sample from VLE data.The VLE beam is made of electrons, pions and muons
(μ at the same η of the run and off axis).Electrons are easy to separate.
ALL sub-detector are exploited for the muon selection
Muon tag BC-2
Sec. targetDipole magnets CHRV2, LE
VLE particles
HE muons
BC-1 BC1 BC2
Beam stopBC0
Quadrupole magnets
ID
Muon wall
LAr Tile
Cryostat scint.
Muon Halo
S1 S2/3
MDT/RPC
Roma 16 maggio 2006 Commissione I
LE Muon identification in TileCal (likelihood)
)()()( 332211 EPEPEPL (Pi(E) energy distr. in Tile layer i)
MC DATA
PionsPions
The shape of L allows a rejection of muons.MC do not quite reproduce data (more later).
Roma 16 maggio 2006 Commissione I
Energy ε for μ off axis ε for μ by likelihood μ-contamination e-contamination
(GeV) (%) (%) |likelihood|<30 (%) [μ (1-εmu lik)] /π (%) /π 9 92.4 ± 0.6 89.7 ± 1.0 15.0 0.6
7 85.8 ± 0.8 99.3 ± 0.1 2.7 0
5 94.0 ± 0.7 99.48 ± 0.07 10.2 0.3
3 83.6 ± 2.2 99.83 ± 0.03 11.1 0.6
Efficiencies and contamination
Electrons are easily identified by beam Cerenkov.Muons can be identified using L or by MDT etc.
In p
rogr
ess
Roma 16 maggio 2006 Commissione I
A CTB “TAU jet”
• 3 pion of 7 GeV superimposed in LaR TILE
Roma 16 maggio 2006 Commissione I
Test beam data, Energy deposit: G4 vs EXP, muons (1), the em scale
(V.Kazanine)
MOP value EXP: 3340±60 MC : 3399±6
Energy deposition in the calorimeters (log and lin scales)
Lar+Tile Lar+Tile
Roma 16 maggio 2006 Commissione I
Energy deposit: G4 vs EXP, pions (1)
• All cells in TileCal are used while in LAr only the cells within ±0.2 eta and ±0.2 phi LAr window (eta = 0.25, phi = 0) are used;• The cut on the energy at cells is Ecell > 2 sigma noise;• Energy deposition in the calorimeter is the sum over selected cells;• The energy deposition at Cryo is approximated as :
1 . 47 ETileA E BackLArTotal energy deposit. The correction on energy deposition at Cryo is included.
Lar+Tile
Roma 16 maggio 2006 Commissione I
Francesca Sarri, Giulio Usai
PMTs STABILITYPMTs STABILITY
We have measured in our lab the gain, QE, noise etc of 24 PMT (the same used in TileCal), illuminated with continuous light simulating LHC at L=1034 cm-2s-
1.
Led light yield monitored by two photodiodes.
Surprisingly the gain of all PMT increased with time at a rate of about 0.5-0.7 % per month.
No instrumental effect was found. Moreover the precise Cs calibration in different CTB periods confirms the effect also quantitatively
Roma 16 maggio 2006 Commissione I
Almost 14 months(April05-May06)
Vnom:= Gain(Vnom) = 105
Gain(V) ~ V
Light source changed, because of LED and LED driver broken at the end of Jan’06.
Status up to 2006
Labo:
Vn/Vn = -.41±0.13 (3mnts estimate) (measured untill Jan’06)
Cs Calibration (at theCTB):
Vn/Vn = -.36±0.04 (3mnts)
Roma 16 maggio 2006 Commissione I
Summary: NOV’05-JAN’06
Average slope of 15 PMTs, NomVol drop estimate in 3 months
Average slope of 15 PMTs, PMT/PHD rise estimate in 3 months.
mean : - 0.36 % rms : 0.22 %
mean : 1.6 % rms : 0.8 %
NomVol drop (%) PMT/PhD (%)
Roma 16 maggio 2006 Commissione I
The curved fibre ageing
50 cm
N. Del Prete, Francesca Sarri
Roma 16 maggio 2006 Commissione I
Fibre ageing
Step motor
Shutter
PMT
At each step, the PMT current is measured.Then the wheel is positioned in the different locations for more precise measurements.
The precision in the ratio Fibra1/Fibra2 is about 6 10-4 sistematics under study
Roma 16 maggio 2006 Commissione I
Backup slides
Roma 16 maggio 2006 Commissione I
Monitor and Presenter
•Presentations on the progress of the monitoring working group presented at CHEP06 by A.Dotti and W.Vandelli.
Roma 16 maggio 2006 Commissione I
RPC
We use the RPC in order to try to understand the fake by MDT on electronevents (many events have more than 13 hits in MDT).They could be muons that are outside Tile calorimeter acceptance.
RPC
Roma 16 maggio 2006 Commissione I
RPC geometry
Zone of inefficiency for muons by Tile
Only the bottom halfof the RPC (negative y)is working in the runs
Roma 16 maggio 2006 Commissione I
Pions : sADC_Cherenkov2<620 && N hits in TRT <4 && not μ(mouns: signal in MDT or MuonWall or MuonTag)E Tile in the cone 0.19< η <0.61, all φ; E Lar in the cone 0.19 < η <0.61, -0.1< φ < 0.1
Energy Distributions for pions
Pions at 9 GeV
Roma 16 maggio 2006 Commissione I
red : full AODs, black fast AODs.
In progress:-Validate ATLFAST with full simulation-New parametrization for tau-ID (with the Toronto Group)
QCD SIGNAL
Roma 16 maggio 2006 Commissione I
Same weights applied also to the ttbar events, Rome sample
Roma 16 maggio 2006 Commissione I
The same weights (determined in QCD MC events) work well for different cone definitions, for different samples and also
(preliminary) on Combined Test Beam data. This method seems more robust than the “standard” ATLAS jet calibration
Roma 16 maggio 2006 Commissione I
First steps on CTB comparison: G4 vs EXP
Vassili Kazanine (Budker Institute Novosibirsk, a former (and future) FAI in Pisa)
The simulation of calorimeters in G4 has been the subject of previous studies (Anna, Andrea) using TileCal standalone (TB vs G4).Now G4 simulation of CTB is available and Vassili has taken up the issue of comparing data and MC.
The energy scale seems to be under control and the total energy deposition in Tile+Lar is well reproduced, but: • the energy in Lar is predicted too large and in tile too small• once more we have the problem of the longitudinal shower shape not correctly predicted by G4.
Roma 16 maggio 2006 Commissione I
Richieste: ME
Stato delle spese ad oggi:
ME: assegnato 109 k€ speso ad oggi 55K€ (51%)manca ancora il contributo tecnici per commissioning (7 mu)
E’ richiesta la presenza continua al CERN di Vivarelli e Dotti. Questo non e’ compatibile col finanziamento attuale.
Abbiamo richiesto una integrazione di 6 mu per arrivare a fine anno.
Roma 16 maggio 2006 Commissione I
DAQ A new, friendly, DAQ system was built using a CAEN Brigde (V1792) which interface VME to a PC where the DAQ system runs through ROOT.
A student (Marco Raglianti) from the Computer Science Department has designed this nice and simple system as part of his “tesi di tirocinio”.
The Bridge has become a powerful development system. C++ programs can be fully tested, in ROOT, and then compiled and run on single board PC in VME.
What is missing are VME units (ADC etc.): we use old CAMAC units that we have interfaced to VME. Often these units are faulty...
Roma 16 maggio 2006 Commissione I
Preliminary.The precision of the method is OK. The problem is
the mechanical stability (LED position, optical couplings etc.).
Time (h)
10-3
rms = 6 10-4