Emergency Meeting PointBonalbo Hospital, Hospital Road463127 Easting6821458 Northing
Helicopter Landing Area Bonalbo sporting field-28° 44' 17'' Latitude152° 37' 30'' Longitude463402 Easting6820972 Northing
fÑ
Woodworth
s Rd
Morpeth Rd
Richmond Range NP
Claren
ce W
ay
Tabulam Road
Peacock Creek Road
-1
Hoote
ns Ro
adDuck Creek Road
Tungle
bung
Creek R
oadBu
ngdo
ozle
Road
Take
five R
oad
West Track
Claren
ce W
ay
BONALBO
RICHMOND RANGE
BONALBO
455000
455000
460000
460000
465000
465000
470000
470000
6815
000
6815
000
6820
000
6820
000
6825
000
6825
000
6830
000
6830
000
³
0 1,250 2,500 3,750 5,000625Meters
Map Sheets: 1:100,000 Mt Lindsay 9441; Bonalbo 94401:25,000 Woodenbong 9441-3S, Capeen 9440-4NScale: 100,000 Projection: GDA_1994_MGA_Zone_56
Datum: GCS_GDA_1994
Casino Management AreaLocality Map
Compartments 7128-7132 (Morpeth Park Plantation)Bonalbo State Forest
Shannon Creek Rd
ROADSSealedAll Weather, UnsealedDry Weather, UnsealedFour Wheel Drive
Drainage Feature
MAP FEATURES
State ForestPlantationsHarvest Area
Private Plantation Created: 17/03/2016
Andrew KemsleyCreated By:
National Park & Nature Reserve
SAFETY POINTS
Helicopter Landing AreafEmergency Meeting PointÑ
Haulage
7128/3 Rd
7129/1 Rd
7129/2 Rd
7130/1 Rd
7132/3 Rd
7132/2 Rd
18
8
27
7132/1 Rd
S1
C12
C18
C11
Lot: 12DP1062899
Lot: 22DP1027181
Lot: 78DP751062
Lot: 21DP751042
Lot: 75DP751062
Lot: 182DP875828
Lot: 22DP751042
Lot: 1DP1192835
Lot: 11DP1062899
Lot: 1DP110024
Lot: 32DP751042
Lot: 17DP751042
Lot: 2DP857403
Lot: 17DP751042
Lot: 21DP751042
Lot: 22DP751042
Lot: 18DP751042
Lot: 1DP110024
Lot: 81DP751062
Lot: 20DP751042
Lot: 12DP1062899
Lot: 11DP1062899
Lot: 2DP857403
Lot: 31DP751042
Lot: 18DP751042
Lot: 81DP751062
Lot: 20DP751042
Lot: 11DP1062899
Lot: 1DP48496
Lot: 82DP751062
Lot: 32DP751042
Lot: 1DP48496
1
7
9
2
3
546
19
16
14
10
15
13
20
11
22
28
23
24
21
25
26
17
12
Morpeth Roa d
Farm Road
T ower Tra il
Spur Roa d
Ra n ge T ra ck
Lin k T ra ck
Sun ken T ra ck
Creek T ra ck
Ryan Roa d
Victors T ra ck
T rea sure T ra ck
Pea cock T ra il
Rustys Roa d
Alkoom ie T ra ck
Spur T ra ck
Hidden T ra ck
South West T ra ck
Ma zzer Roa d
Southwest tra ck
7128/2 Rd
7030/2 Rd
North Boun da ry T ra il
7128/1 Rd
Pea cock T ra il
Alkoom ie T ra ck
S2
C4
C2
C7
C8
C3
C6
C5
C9
C1
C19C20
C14C15
C10
C16
C17
C13
7131
7128
7130
7129
7132
460000
460000
461000
461000
462000
462000
463000
463000
464000
464000
6816000
6816000
6817000
6817000
6818000
6818000
6819000
6819000
6820000
6820000
FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISIONHARVEST PLAN OPERATIONAL MAP
1:18,000Con tour In terva l 10m
Pla n Na m e: Ca _ 7128_ 7129_ 7130_ 7131_ 7132_ Morpeth
PREPARED BY .................................................................DAT E........................ CHECK ED BY .................................................................DAT E........................
Da te Prin ted: 10/01/2019
JN9017522 (Dun n s White Gum )JN9017523 (Ca m den White Gum )
© Crown Copyright 2013. T he in form a tion a n d da ta con ta in ed in this m a p is to the best of Forestry Corpora tion ’s belief, true a n d correct a t the tim e of publica tion . However, cha n ges in circum sta n ces a fter the publica tion m a y im pa ct upon the a ccura cy of the m a teria l. No wa rra n ty or gua ra n tee is provided by the Sta te of New South Wa les, Forestry Corpora tion a n d its em ployees a n d a gen ts a n d n o lia bility is a ccepted for a n y loss or da m a ge, costs or expen se resultin g from the use or relia n ce upon the in form a tion a n d da ta con ta in ed in this m a p
0 0.5 1 1.5K ilom etres
ú Approved crossin g
úD Closed crossin g
ú Proposed crossin g
H Dry Wea ther Dum p
J Wet Wea ther Dum p
telstra _ ca bleNeighbour
! ! Com pa rtm en ts (Lin e)
D D Electricity T ra n sm ission Lin e - FCNSW
Lida r_ 10m _ con tour_ sha redLida r_ 100m _ con tour_ sha redMGA Grid 100m
LPI_ClassIn dica tive dra in a ge fea tureLIDAR corrected dra in a ge fea ture
RoadsSea ledDry Wea ther, U n sea ledNew Con structionNon Ha ula ge Roa dsLIC IHL4 Exclusion Z on e
LiDAR Slope>30 (<0.25 ha )Powerlin e_ ea sem en tRn 17 Ra in forest
stream_bufferDra in a ge lin e buffer (10m )River buffer (20m )
Species<NA>Spotted Gum - Not a va ila ble for ha rvestCa m den White Gum - Clea rfa ll ha rvestDun n s White Gum - Clea rfa ll ha rvestGra ssla n d a n d n a tive vegeta tion
Ma psheet:BONALBO(9440-4S);T U NGLEBU NG(9440-3N)
BONALBO Sta te ForestNO. 1070Ma n a gem en t Area : CASINOCom pa rtm en ts 7128,7129,7130,7131,7132 VERSION: 1
GDA 1994 MGA Z on e 56
ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park
1
FORESTRY CORPORATION OF NSW
ROADWORKS PLAN
Bonalbo State Forest; Compartments 7128, 7129, 7031, 7132
ASSOCIATED HARVEST PLAN NO. JN9017522 (Dunns White Gum) & JN9017523 (Camden White Gum)
Certification
Prepared by:
Senior Planner SIGNATURE ON FILE
Date: 03.09.2018 Andrew Kemsley
Reviewed by:
Senior Planner SIGNATURE ON FILE
Date: 19.9.2018 Steve Pickering
Approved by:
Planning Supervisor SIGNATURE ON FILE
Date: 19.12.2018 Matthew Kinny
Road Works and Operational Expenditure Approved by:
Roading Manager SIGNATURE ON FILE
Date: 17.12.2018 Craig Busby
Duration of Approval: The above approval is valid until 12 months from date of signature. Contents
1. Cover Page
2. Operational Map
3. Costings
4. Roadworks Plan Text/Prescriptions/Road and crossings work sheets
5. Locality Map
6. Safety Plan HAMEEP
7. Harvesting Plan
8. Harvesting Notification List (Operations Team Leader and Roading Supervisor Only)
ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park
2
This
page
is
intentionally
Blank
ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park
3
1. Objectives 2. Roadworks are required to service plantation harvesting operations within the above
compartments. These compartments are scheduled for harvest in 2018/2019. 3. The operational map shows the location of the proposed works. 4. Attachments: Financial Analysis Spreadsheet gives full details of costs, benefits, material &
plant requirements.
2. Specifications and Legal Conditions This operation must comply with: • Standard Operating Procedures issued by FCNSW. • State Forests of NSW Forest Practices Code - Part 4 Forest Roads and Fire Trails (February
1999). • Technical Guidance Notes for Roadworks. • Plantations and Reafforestation Act (1999). • Plantations and Reafforestation (Code) Regulation (2001), subject to the conditions described in
Attachment 1 of the Authorisation for the timber plantation.
3. Special Conditions
Feature Conditions
Overhead Powerlines Yes- There are overhead powerlines within compartment 7128 as marked indicatively on HPOM. Refer to HP and SSP for detail.
Underground Telstra cable Telstra cables exists within the plantation in compartment 7128 as shown indicatively on the HPOM.
FCNSW and its contractors must:
- Prior to work commencing, areas in the vicinity of Telstra cable must be identified. Use existing markers in the field for identification and Indicative areas are shown on the HPOM. Where there is a risk of damage to a cable a cable locator should be engaged to precisely locate the cable
- When areas identified conduct a risk assessment.
Develop suitable controls such as increasing cover of earth over cables at set locations and restricting crossing machinery over the cables to set locations (as opposed to running along the cable).
Works on council road reserve Conditions apply to intersection of Morpeth Rd / Clarence Way. FCNSW and its contractors must adhere to conditions as attached to roading plan.
Safety Issues (includes hazards, public use of roads)
Yes – Refer to SSP for detail
4. General Conditions
• Tree removal should be undertaken mechanically where possible. Refer to Safety Procedures 4.25 “Manual Tree Felling” and 4.26 “Management of Hazardous Trees & Overhead Hazards”.
• Remove vegetation within 3m of the road prism only where required to maintain safe sight distance and passage of trucks.
• Note: Clearing is generally permitted within 3m of the road prism for all roads. Ground disturbance and tree debris may impact outside this 3m either side of the road prism as is required to effect clearing within 3m of the road prism. Conditions 5, 6 and 47 Schedule 5 of the EPL must apply.
Road Maintenance/upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Cable locator must be used prior to commencing workConditions apply for works in addition to those specified below as per attached document: 'Application to conduct minor works within the road reserve' from Kyogle Council. Road Name
Materials Gravel/road base 96 tConcrete 100 m2Bitumen 30 m2
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital
Install 10mx10m bell shaped concrete intersection with 3mx10m bitumen strip abutting Clarence Way. Build up eastern side of intersection using excess spoil from intersection, using road base where required. Ensure fill batter on eastern side of intersection adjoining the fenceline is compacted.
Date Event
Morpeth Rd & Clarence Way intersection
Road Works
3mx10m bitumen strip
Remove/relocate give way sign
Bridge Clarence Way
move existing/install new cattle grid as required
10mx10m concrete pad
Fenceline
North
Gravel Road from here
Build up road and ensure fill batter is compacted at stable angle
slope
remove height off road
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
Cable locator must be used prior to commencing work
Category Permanent
Off Clarence Way Max Grade 3 DegreesLength 10 metres Max Side slope 3 Degrees
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NOWidening YES Location Entire length
Formation Width 10 m
Realignment YES As required Gravel YES As base material
YES Fill batter on SE side near fenceline must be stablised
YES
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Morpeth Rd/Clarence Way intersection
Date Event
Mitres
Comments:
Roa
dsid
e/B
atte
rs
Batter Repair/Upgrade
Dra
inag
eRoad name
Location
Site
Info
Pave
men
t
Upg
rade
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
Morpeth Rd Category Permanent
Off Clarence Way Max Grade 10 Degrees
Over 10 degrees N/A metresLength 7140 metres Max Side slope 19 Degrees
Cut Batter 2-3 metresWORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location South of dump 21Formation Width 4.5 m
Curve Widening As required Grade Lowering NO NARealignment YES Crossings C9, C11 & C16Reopening NO NAClear veg/debris YES South of dump 21Repair surface NO NACrown/Crossfall YES Install rollovers if crown/crossfall is insufficent Gravel YES Required south of cattle grid
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
YES
YESNONO Sets required: 0NO
Only patch grading and dozer work required north of dump 21.
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Grid Drains
Comments:
Event
Culverts 2 x log culverts requiring removal at E461 277 N6817 315 and installing 24t 75-mm rock
Silt Trapping
Date
Dra
inag
e
Road name Location
Roa
dsid
e/B
atte
rs
MitresROD/Spoon
Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Site
Info
Upg
rade
Pave
men
t
Mai
nten
ance
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
Cable locator must be used prior to commencing work7128/1 Rd Category Permanent
Off Morpeth Rd to dump 3 Max Grade 3 DegreesOver 10 degrees N/A metres
Length 250 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire lengthFormation Width 4.5mCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
Remove gate and fenceline at intersection of 7128/1 Rd & 7128/Rd
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts 0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Date Event
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Cable locator must be used prior to commencing work
7128/2 Rd Category Permanent
Off 7128/2 Rd to dump 4 Max Grade 2 DegreesOver 10 degrees N/A metres
Length 490 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire length Formation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment YES see comments below Reopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
Exact location needs to be slightly varied based on location of Telstra cable
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts 0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Date Event
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
Alkoonie track Category Permanent
Off Morpeth Rd to dump 6 Max Grade 3 DegreesOver 10 degrees N/A metres
Length 140 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
YESYESNO Sets required: 0NO
Fenceline at start off road needs to be cut
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts 0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Date Event
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
7128/3 Rd Category Permanent
Off Morpeth Rd to dump 8 Max Grade 4 DegreesOver 10 degrees N/A metres
Length 250 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
NO
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts 0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Date Event
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
7129/1 Rd Category Permanent
Off Morpeth Rd to dump 10 Max Grade 3 DegreesOver 10 degrees N/A metres
Length 290 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
0
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts 0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Date Event
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
7129/2 Rd Category Permanent
Off Morpeth Rd to dump 13 Max Grade 2 DegreesOver 10 degrees N/A metres
Length 200 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
0
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts 0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Date Event
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
Peacock Trail Category Permanent
Off Morpeth Rd to dump 18 Max Grade 5 DegreesOver 10 degrees N/A metres
Length 660 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required
Grade Lowering NORealignment NOReopening NOClear veg/debris NORepair surface NOCrown/Crossfall NOGravel NO
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO
NO Location/s:
NOYESNO Sets required: 0NO
0
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts 0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Date Event
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
7130/1 Rd Category Permanent
Off Morpeth Rd to dump 17 Max Grade 3 DegreesOver 10 degrees N/Ametres
Length 130 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
0
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Inital
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts 0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Date Event
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
7130/2 Rd Category Permanent
Off Morpeth Rd to dump 19 Max Grade 7 DegreesOver 10 degrees N/A metres
Length 400 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location south of dump 21 Formation Width 4.5MCurve Widening sections
Grade Lowering NO NARealignment YES NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
0
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
InitalDate Event
0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
Southwest track Category Permanent
Morpeth Road to dump 27 Max Grade 6 DegreesOver 10 degrees N/A metres
Length 1010 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
0
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
InitalDate Event
0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
7132/2 Rd Category Permanent
Southwest track to dump 25 Max Grade 4 DegreesOver 10 degrees N/A metres
Length 230 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location entire lengthFormation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
0
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
InitalDate Event
0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
7132/3 Rd Category Permanent
Southwest track to dump 28 Max Grade 6 DegreesOver 10 degrees N/A metres
Length 220 metres Max Side slope 0 DegreesCut Batter 0 metres
WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.
Widening YES Location entire length Formation Width 4.5MCurve Widening as required
Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA
NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA
NO Location/s:
NOYESNO Sets required: 0NO
0
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
InitalDate Event
0
MitresROD/SpoonGrid DrainsSilt Trapping
Comments:
Roa
dsid
e/B
atte
rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade
Dra
inag
e
Culverts
Road name Location
Site
Info
Pave
men
t
Upg
rade
Mai
nten
ance
Road Construction‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾
7132/1 Rd Category Permanent
Off Southwest track near dump 34 to Morpeth Rd
Length 150 metres
Site InformationMass Movement NODispersible NO* *possibile localised dispersible soils. See harvest plan for details.
Side Slope (°) 0>30° slopes NOProximity Drainage 0SpecificationsPrism Width (m) 6Formation Width (m) 4.5
Road Length >10° 0Max Length Batter: 100m
Max Grade (°) 9 Max Height Batter: 1mAngle Cut BatterGravel YES Gravel Length 40DrainageROD/Spoon YES ROD/Spoon No: 0Mitre NOGrid Drain NO Grid Drain No: 0Soil Erosion and Stabilisation ControlsSoil Stabilisation/erosion: Compact fill batters >1m and grass seedSoil Stabilisation Interval: Fortnightly or after storm event
Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):
Date Initial
Road name
Location
Roadside clearance width (m) 2
3/4 (standard)
Event
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C1 Road name Morpeth Rd Drainage Feature 2nd Order Stream Permanency Intermittant Location North of Dump 2, E 463548 N 6820481
Size Stability Status Size Future1200mm stable
Materials Gravel 24 tRock (small) 0 t
Inlet Nil required Rock (large) 0 tOutlet Nil required
Road DrainageInstall ROInstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital
Facing upstream left approachFacing upstream right approach
Existing Crossing Concrete Pipe
Crossing Required
Crossing WorksRemove veg from pavement and install gravel. Install approach drainage
No change
Date Event
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C2 Road name Morpeth RdDrainage Feature 2nd order Stream Permanency Intermittant Location NW of dump 6. E463335 N6819913
Size Stability Status Size Future375 stable
Materials Gravel 24 tRock (small) 0 t
Inlet Nil required Rock (large) 0 tOutlet Nil required Sill logs 2
Road DrainageInstall ROInstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredConcrete pipe
Crossing WorksBuild up pavement if required. Install gravel. Install sill log if required.
No change
Date Event
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C3 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location NE of dump 9. E462733 N6819471
Size Stability Status Size Future375mm unstable 600mm Permanent
Materials Sandbags 60Rock (small) 12 tRock (large) 6 t
Inlet Nil additionalOutlet Install 200mm rock (or greater)
Road DrainageInstall ROInstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital
Crossing RequiredConcrete/plastic pipe
Facing upstream left approachFacing upstream right approach
Existing Crossing Concrete pipe
Crossing WorksRemove 375mm pipe. Install concrete or plastic 600mm pipe (require 4.2m length) with headwalls and baseplate. Alternatively install causeway.
Date Event
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C4 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location NE of dump 11.
E462574 N6819299Size Stability Status Size Future
300 unstable 600 Permanent
Materials Gravel 24 tRock (large) 6 tSandbags 60
Inlet Nil additional Road DrainageOutlet Install 200mm rock (or greater) Install RO
Install RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Crossing RequiredConcrete or plastic pipe
Facing upstream left approachFacing upstream right approach
Existing Crossing Concrete pipe
Crossing Works
Remove 375mm pipe. Install concrete or plastic 600mm pipe (require 4.2m length) with headwalls and baseplate. Alternatively install causeway.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C5 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location SW of dump 11
E462363 N6819080Size Stability Status Size Future
300 stable
Materials Gravel 24 tRock (small) 0 tRock (large) 0 t
Inlet Nil required Outlet Nil required Road Drainage
Install ROInstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredConcrete Pipe
Crossing Works
no change
Clean inlet and outlet. Raise height of road to ensure pipe is not crushed. Install sill logs if required. Install gravel.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C6 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location N of dump 14.
E462155 N6818858Size Stability Status Size Future375mm unstable 600 permanent
Materials Gravel 24 tRock (small) 0 tRock (large) 6 t
Inlet Nil additional Sandbags 60Outlet Install 200mm rock (or greater)Road Drainage
Install ROInstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredConcrete pipe concrete or plastic pipe
Crossing WorksRemove 375mm pipe. Install concrete or plastic 600mm pipe (require 4.2m length) with headwalls and baseplate. Alternatively install causeway.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C7 Road name 0Drainage Feature 2nd order DL Stream Permanency 0Location NE of dump 16
E462300 N6818247Size Stability Status Size Future~200 unstable 750mm permanent
Materials Gravel 24 tRock (small) 0 tRock (large) 6 t
Inlet Nil additional Sandbags 60Outlet Install 250mm rock (or greater)Road Drainage
Falls away within 30mInstall griddrain
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredLog culvert Concrete or plastic pipe
Crossing WorksRemove log culvert. Install concrete or plastic 750mm pipe (require 5m length) with headwalls and baseplate. Use sill logs if required. Alternatively install causeway.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C8 Road name Morpeth Rd Drainage Feature Stream Permanency Intermittant
Location N of dump 21E461296 N6817228Size Stability Status Size Future
Materials Gravel 0 tRock (small) 36 tRock (large) 0 t
Inlet NilOutlet NilRoad Drainage
Install ROInstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital
Crossing Required
Crossing Works
no change
Date Event
4th order DL
Facing upstream left approachFacing upstream right approach
Causeway 8m(W)x6m(L) stable
Causeway requires reshaping to allow water flow. Ensure maximum height of causeway does not exceed 100mm higher then inlet height
Existing Crossing
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C9 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 21
E461321 N6816837Size Stability Status Size Future~200mm unstable 5mWx4mL permanent
Materials Gravel 36 tRock (small) 24 tRock (large) 0 t
Inlet install small rockOutlet install small rockRoad Drainage
install ROinstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Crossing Requiredcauseway
Facing upstream left approachFacing upstream right approach
Existing Crossing Log culvert
Crossing WorksReplace log culvert with causeway. Install rock to causeway and gravel to approaches. Alternatively install 375mm pipe. Requires minor realign. to north approach.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C10 Road name Morpeth Rd Drainage Feature 3rd order DL Stream Permanency Permanent Location S of dump 21
E461362 N6816769Size Stability Status Size Future2000mm unstable
Materials Gravel 0 tRock (small) 48 tRock (large) 0 t
Inlet Nil Outlet Nil Road DrainageFacing upstream left approach Install ROFacing upstream right approach Install grid drain
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Install small rock to hole and edge of road adjacent to pipe inlet and outlet and pack with excavator. Install rock to pavement to raise height, installing sill logs if required. Realign north approach
Existing Crossing Crossing Requiredmetal pipe
Crossing Works
no change - stablise pavement
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C11 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location N of dump 22
E461166 N6816551Size Stability Status Size Future5mWx4mL unstable outlet
Materials Gravel 0 tRock (small) 24 tRock (large) 6 t
Inlet Small rockOutlet Remove woody debris and install large rockRoad Drainage
falls awayinstall rollover
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredCauseway
Crossing Works
causeway with stablised outlet. Require 6m wide
Realign northern approach to crossing. Install small rock to pavement.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C12 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location N of dump 22, S of crossing C11
E461137, N6816520Size Stability Status Size Future6mWx1mL stable 6mWx3mL permanent
Materials Gravel 0 tRock (small) 24 t
Inlet Small rock Rock (large) 0 tOutlet Small rock
Road Drainagefall away within 30minstall grid drain
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing Requiredcauseway causeway
Crossing WorksExcavate approaches to facilitate log haulage. Install small rock to pavement and outlet.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C13 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 23.
E461082, N6815991Size Stability Status Size Future~200 unstable 5mWx5mL Perm
Materials Gravel 0 tRock (small) 36 t
Inlet Small rock Rock (large) 0 tOutlet Small rock
Road Drainageinstall ROinstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredLog culvert causeway
Crossing Works
Replace log culvert with causeway. Install small rock.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C14 Road name Morpeth Rd Drainage Feature Lidar derived drainage - DD at location Stream Permanency Intermittant Location S of dump 23, S of crossing C13
E461214, N6815898Size Stability Status Size Future~200 unstable 5mWx10mL Perm.
Materials Gravel 0 tRock (small) 36 t
Inlet small rock Rock (large) 0 tOutlet small rock
Road Drainagefalls awayinstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredLog culvert causeway
Crossing Works
Replace log culvert with causeway. Install small rock.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C15 Road name Morpeth Rd Drainage Feature 3rd order DL Stream Permanency Intermittant*Location N of dump 24
E461297, N6815804Size Stability Status Size Future5mWx3mL stable 6mWx6mL Permanent
Materials Gravel 0 tRock (small) 36 t
Inlet Install small rock Rock (large) 0 tOutlet Install small rock
Road DrainageInstall ROInstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital
*water presence due to pooling which will not be present after reshaping
Date Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredCauseway causeway
Crossing WorksRemove vegetation to facilitate log haulage. Lower approaches with excavator. Install small rock.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C16 Road name South West TrackDrainage Feature 1st order DL Stream Permanency Intermittant Location SW of dump 24
E461191, N6815623Size Stability Status Size Future5mWx6mL stable Permanent
Materials Gravel 0 tRock (small) 36 t
Inlet install small rock Rock (large) 0 tOutlet install small rock
Road DrainageInstall ROInstall GD
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredCauseway
Install small rock. Realign east approach to facilitate log haulage.
Crossing Works
No change
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C17 Road name 7128/1 Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 2
E463573 N6820136Size Stability Status Size Future5mWx10mL stable permanent
Materials Gravel 0 tRock (small) 48 t
Inlet install small rock Rock (large) 0 tOutlet install small rock
Road Drainageinstall ROinstall RO
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing Requiredcauseway
Crossing Works
Install small rock
causeway - no change
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name Road name Morpeth Rd (old alignment)
Stream Permanency IntermittantDrainage Feature 2nd order Location adjacent to crossings C11 & C12
E461125, N6816566Size Stability Status Size Future8mWx4mLx1mD unstable no change stable
Materials Gravel 0 tRock (small) 0 tRock (large) 0 t
Inlet NilOutlet NilRoad Drainage
Install crossbanks Install crossbanks
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital
C18 - STABLISATION WORKS NOT FOR HAULAGE
Remove unstable sections of debris and bench back banks if required to stablise. Seed and mulch disturbed areas. Install crossbanks either side to restrict access
Date Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredGully stuffer Stable crossing
Crossing Works
Remove unstable sections of debris
Bench back banks if required
Install crossbank
Install crossbank
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C19 Road name 7132/1 Rd Drainage Feature drainage depression Stream Permanency Permanent Location E461373 N6815751
Size Stability Status Size FutureNA NA 15mLx5mWPermanent
Materials Gravel 0 tRock (small) 24 tRock (large) 60 t
Inlet small rockOutlet small rock
Road DrainageFacing upstream left approach rollover/rubberflapFacing upstream right approach Grid drain
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Existing Crossing Crossing RequiredNil present Causeway
Crossing WorksReduce grade eastern approach. Excavate ~100mm along section of causeway. Install geofab and small and large rock. Install approach drainage
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C20 Road name 7132/1 RdDrainage Feature 2nd order DL Stream Permanency Intermittant Location E461414 N6815765
Size Stability Status Size FutureNA NA 600mmx6mW Permanent
Materials Gravel 0 tRock (small) 24 tRock (large) 0 tSand 6 t600mm pipe. Requires approx 6m width. Concrete base plate
Inlet Nil Road DrainageOutlet Install small rock Facing upstream left approach - RO if required
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate
Facing upstream right approach - Utilise RO/RF installed for C19
Existing Crossing Crossing RequiredNil present - construction 600mm pipe
Crossing Works
Excavate approaches as required & install 600mm pipe. Install 50- rock to approaches and install concrete bag headwall. Increase angle of crossing as required to ensure road widening on eastern approach does is not in close proximity to drainage line.
Event
Remove veg as required
Install 50- rock on approaches
Install small rock at outlet
Old road which follows creek line - do not disturb
Close road here
Close road here
Ensure road widening is away from creek to the north
Old existing crossing
Concrete bag headwall
7132/1 Rd
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name Snig crossing 'S1' Road name Unnamed Drainage Feature 1st order Stream Permanency Intermittant Location E of dump 3
E463697, N6820319Size Stability Status Size Future600mm unstable 5mWx3mL Permanent
Materials Gravel 0 tRock (small) 24 tRock (large) 12 t
Inlet Install small rockOutlet Install large rockRoad DrainageFacing upstream left approach Install RO if requiredFacing upstream right approach Install RO if required
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Existing Crossing Crossing Requiredconcrete pipe causeway
Crossing WorksRemove pipe and reshape to allow snigging/4wd access (moderate approach angles permitted). Install small and large rock to surface. Ensure causeway does not exceed 100mm greater height then inlet height.
Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name S2 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location E461714 N6815652
Size Stability Status Size Future6mWx6mL stable permanent
Materials Gravel 0 tRock (small) 0 t
Inlet Nil Rock (large) 6 tOutlet Install rock
install RO on completion of snigging install RO on completion of snigging
Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event
Facing upstream left approachFacing upstream right approach
Existing Crossing Crossing RequiredCauseway
Crossing WorksInstall large rock (300mm+) on outlet. Widen vegetation around crossing.
no change
Road Drainage
Install large rock
Remove veg
Widen outside of corner
ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park
5
6. Operational Control Roading Supervisor to sign here I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan and take responsibility for the implementation of plan conditions as the principle controller of the operation.
I will brief any other operators not present at this briefing prior to them starting any work on site and ensure that risk assessment for the Safety Management Plan is completed for this area prior to operations commencing
Name: Signature:
Position: Date: From
Company: To
Name: Signature:
Position: Date: From
Company: To
Name: Signature:
Position: Date: From
Company: To
Name: Signature:
Position: Date: From
Company: To
Name: Signature:
Position: Date: From
Company: To
ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park
6
7. Handover Briefing I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan.
Position - Company Name Signature Date