Reliability and Security Technical Committee UpdateGreg Ford, Chair Member Representatives Committee MeetingFebruary 5, 2020
RELIABILITY | RESILIENCE | SECURITY2
• Approved Committee Structure• Chair and Vice Chair, Nominating Subcommittee• Sector Nominations• At-Large Nominations• Transition Plan
Discussion Topics
RELIABILITY | RESILIENCE | SECURITY3
• Create Reliability and Security Technical Committee (RSTC)• Retain existing subcommittees, working groups, and task forces
Approved Committee Structure
NERC Board
OC Subcommittees, Working Groups,
Task Forces
Reliability and Security Technical Committee
PC Subcommittees, Working Groups,
Task Forces
CIPC Subcommittees, Working Groups,
Task Forces
RELIABILITY | RESILIENCE | SECURITY4
• The Board appointed the officers of the RSTC at the November board meeting. Both positions are for two-year terms Chair: Greg Ford, Georgia System Operations Vice Chair: David Zwergel, MISO
• Per the RSTC proposal, the nominating subcommittee developed a proposed slate of At-Large members to the NERC Board
• For the initial seating of At-Large members, the Nominating Subcommittee consisted of: NERC Board Vice Chair NERC CEO RSTC Chair RSTC Vice Chair MRC Vice Chair
Chair, Vice Chair and Nominating Subcommittee
RELIABILITY | RESILIENCE | SECURITY5
• The Sector Nomination period was held November 12 – December 6, 2019
• Nominees were sought for two representatives from Sectors 1-10, 12.• All Sector Election material can be found here:
https://www.nerc.com/comm/RSTC/Pages/2019-RSTC-Election.aspx• The following sectors had more than two nominees: Sector 1 – Investor Owned Utility Sector 2 – State/Municipal Utility Sector 4 – Federal or Provincial Utility/Power Marketing Administration Sector 6 – Merchant Electricity Generator Sector 7 – Electricity Marketer Sector 8 – Large End Use Electricity Customer Sector 9 – Small End Use Electricity Customer
• Sector elections were December 9-20, 2019
Sector Nominations
RELIABILITY | RESILIENCE | SECURITY6
• The final Sector slate, pending Board approval at its February 6, 2020 meeting:
Sector Representatives
Sector Elected Members1. Investor-owned utility Greg Stone (Duke Energy) – 2020-2023
Kayla Messamore (Evergy) – 2020-2022
2. State/municipal utility Saul Rojas (NYPA) – 2020-2023Chris Shepherd (Gannett Fleming) – 2020-2022
3. Cooperative utility Marc Child (Great River Energy) – 2020-2023Ben Engelby (Arizona G&T Cooperatives) – 2020-2022
4. Federal or provincial utility/Federal
Power Marketing Administration
Robert Reinmuller (Hydro One) – 2020-2023Edison Elizeh (Bonneville Power) – 2020-2022
5. Transmission dependent utility John Stephens (City Utilities of Springfield) – 2020-2023Carl Turner (Florida Municipal Power) – 2020-2022
6. Merchant electricity generator Allen Schriver (NextEra Energy) – 2020-2023Sheranee Nedd (Public Service Enterprise Group) – 2020-2022
7. Electricity Marketer Kyle Vander Helm (Tenaska, Inc.) – 2020-2023Jodirah Green (ACES Power) – 2020-2022
8. Large end-use electricity customer John Hughes (Electricity Consumers Resource Council) – 2020-2023Venona Greaff (Occidental Chemical) – 2020-2022
9. Small end-use electricity customer Darryl Lawrence (PA Office of Consumer Advocate) – 2020-2023David Mulcahy (Modern Energy) – 2020-2022
10. Independent system operator/regional transmission organization
Wesley Yeomans (NY Independent System Operator) – 2020-2023Christine Hasha (ERCOT) – 2020-2022
12. State Government Christine Ericson (Illinois Commerce Commission) – 2020-2023Cezar Panait (Minnesota Public Utilities Commission) – 2020-2022
RELIABILITY | RESILIENCE | SECURITY7
• The At-Large Nomination period was held December 27, 2019 through January 10, 2020
• All At-Large Election material can be found here: https://www.nerc.com/comm/RSTC/Pages/2019-At-Large-Nominations.aspx
• The Nominating Subcommittee reviewed all At-Large nominees and recommend a slate of 10 nominees for NERC Board appointment
• Factors considered: Interconnection Diversity Canadian Representation Broad spectrum of entity sector/size Areas of expertise such as operations, planning and security
At-Large Nominations
RELIABILITY | RESILIENCE | SECURITY8
• At-Large Nominees, Company and Terms: Patrick Doyle, Hydro Quebec – 2020-2023 David Jacobson, Manitoba Hydro – 2020-2023 Sandra Ellis, Pacific Gas & Electric Company – 2020-2023 Rich Hydzik, Avista – 2020-2023 Todd Lucas, Southern Company – 2020-2023 Wayne Guttormson, Sask Power – 2020-2022 Lloyd Linke, WAPA, Upper Great Plains Region – 2020-2022 Brian Evans-Mongeon, Utility Service – 2020-2022 Jeff Harrison, Associated Electric Cooperative – 2020-2022 Peter Brandien, ISO NE – 2020-2022
At-Large Nominations
RELIABILITY | RESILIENCE | SECURITY9
Transition Plan Highlights Completed
• Past meeting agenda/notes packages posted on SET web page https://www.nerc.com/comm/Pages/Stakeholder-Engagement-Team.aspx
• November 5, 2019 – Board approved Proposal, Charter, and Transition Plan; appointed chair and vice chair
• November 6, 2019 – Open Sector nomination period • December 6, 2019 – Sector nomination period ends. Sector
elections ended December 20, 2019• December 27, 2019 – January 10, 2020 – At-Large nomination
period • January, 2020 – Nominating Subcommittee to develop slate of
At-Large nominees for presentation to the Board
RELIABILITY | RESILIENCE | SECURITY10
Transition Plan Highlights Going Forward
• February 6, 2020 – Board appoints RSTC members (Sector and At-Large). Two year terms will expire in June of alternating years following initial terms (two or three years)
• February 7–May 29, 2020 – RSTC develops transition plan and work plans for RSTC and subcommittees
• March 3-4, 2020 – OC, PC, and CIPC will meet for final work plan and any other approvals. The RSTC will meet March 4, 2020 for the inaugural meeting
• June 10-11, 2020 –The RSTC will hold initial regular meeting
RELIABILITY | RESILIENCE | SECURITY11
Future Work
• Board appointed Chair and Vice Chair will review October, 2019 Policy Input for potential implementation plan enhancements
• Chair and Vice Chair coordinating with OC, PC and CIPC leadership on transition plan details
• Appoint Executive Committee• More detailed Work Plan development will begin
RELIABILITY | RESILIENCE | SECURITY12
RELIABILITY | RESILIENCE | SECURITY
ERO Enterprise Effectiveness Survey UpdateKristin Iwanechko, Associate Director, Regional and Stakeholder RelationsMember Representatives Committee MeetingFebruary 5, 2020
RELIABILITY | RESILIENCE | SECURITY2
• Survey issued as one measure of the effectiveness of the ERO Enterprise in executing program activities
• Reevaluated survey approach for effectiveness and efficiency• Current approach Complicated Inefficient Ineffective Duplicative
ERO Enterprise Effectiveness Survey
RELIABILITY | RESILIENCE | SECURITY3
• Focus on more targeted efforts to maintain effective engagement Discontinue ERO Enterprise Effectiveness Survey E-ISAC to conduct targeted surveys to E-ISAC members Compliance and Certification Committee reviewing its survey questions
and reevaluating how it receives input on stakeholder perceptions Continue to receive industry feedback through existing avenues
• Actively work to minimize survey burden on industry Coordinate the need for and timing of surveys to minimize overlaps Coordinate with Regional Entity survey efforts
Approach for Future Surveys
RELIABILITY | RESILIENCE | SECURITY4
RELIABILITY | RESILIENCE | SECURITY
EMP Strategic RecommendationsHoward Gugel, Vice President of Engineering and StandardsMember Representatives Committee MeetingFebruary 5, 2020
RELIABILITY | RESILIENCE | SECURITY2
EMP Phased Approach
Phase 1• Strategic Recommendations
Phase 2• Technical Committee Work
Phase 3• Standard Drafting Team (if applicable)
RELIABILITY | RESILIENCE | SECURITY3
Key Task Force Milestones – Phase 1
June July August October November
• Numerous TF calls• Face-to-face
meeting (Washington DC)
• Numerous TF calls• Charter development• Technical workshop (ATL)
• Develop Strategic Recommendations
• Post for industry comment (30 days, end of August)
• Review industry comments• Present recommendations with
action items and next steps to appropriate committee
• Present recommendations to Board of Trustees
Phase 2
RELIABILITY | RESILIENCE | SECURITY4
• EMP Task Force report to Reliability and Security Technical Committee
• EMP Task Force priorities Establish performance expectations Provide guidance on asset hardening Provide guidance to industry for supporting systems and equipment for
recovery
• ERO Enterprise priorities Support additional research to close gaps Develop tools and methods for assessing electromagnetic pulse impacts
NERC Staff Recommendations
RELIABILITY | RESILIENCE | SECURITY5
• Agree with the recommendations?• Agree with the priority levels?• Additional recommendations for consideration?
Policy Input Request
RELIABILITY | RESILIENCE | SECURITY6
Summary of Policy Input
• Support EMP Task Force continuation with work plan• Recognize boundaries• Review December 20, 2019 US federal law• Reconcile policy input letter and Task Force recommendations• Potential broader scope (communications and fleet)• Implement holistically with respect to resiliency
RELIABILITY | RESILIENCE | SECURITY7
Summary of Policy Input
• Consideration of Distributed Energy Resources and battery management systems
• Involve the Nuclear Regulatory Commission in any impact to nuclear plants
• Global ranking should be established• Action should be taken on all recommendations• Reason for EMP Task Force omitted• Responsible parties different from Task Force recommendations
RELIABILITY | RESILIENCE | SECURITY8
Changes based on policy input
• Add “to regularly coordinate and collaborate with governmental authorities to procure and effectively disseminate information needed by industry” to Task Force recommendation for clarity
• Require detailed work plan EMP Task Force NERC staff
RELIABILITY | RESILIENCE | SECURITY9
RELIABILITY | RESILIENCE | SECURITY
Supply Chain Risk Assessment
Howard Gugel, Vice President of Engineering and StandardsMember Representatives Committee MeetingFebruary 5, 2020
RELIABILITY | RESILIENCE | SECURITY2
• Support effective and efficient implementation (e.g. CIP V5 transition)
• Supply chain risk study• Communicate supply chain risks to industry • Forum and Association white papers• Plan to evaluate effectiveness of supply chain standards
Board Resolution
RELIABILITY | RESILIENCE | SECURITY3
• Include in Supply Chain Standards Electronic access controls for medium and high impact Bulk Electric System
(BES) Cyber Systems Physical access controls for medium and high impact BES Cyber Systems
• Do not include in Supply Chain Standards Electronic access monitoring and logging Physical access monitoring and logging Protected Cyber Assets(PCAs)
• Collect more data on low impact BES Cyber Systems• Develop guidelines with CIPC Supply Chain Working Group
(SCWG) Application to lows Evaluation of PCAs
Recommendations from Study
RELIABILITY | RESILIENCE | SECURITY4
• Issued on August 19• Responses due October 3• Applicable to entities in CIP-002-5.1a• Focused on low impact BES
Data Request Issued
RELIABILITY | RESILIENCE | SECURITY5
BES Cyber Assets
RELIABILITY | RESILIENCE | SECURITY6
BES Cyber Assets with Medium and High
RELIABILITY | RESILIENCE | SECURITY7
BES Cyber Assets with Lows Only
RELIABILITY | RESILIENCE | SECURITY8
• Most low impact assets reside in organizations with higher impact assets
• Many are not planning to apply supply chain risk management plans to low impact assets
• Most low impact assets are individually lowest risk, but a coordinated attack could impact reliability
• Significant percentage of generation resources allow third party access
• Significant percentage of “low only” transmission stations and substations allow third party access
Observations
RELIABILITY | RESILIENCE | SECURITY9
• Include low impact BES Cyber Systems with remote electronic access connectivity in future modification of Supply Chain Standards
Recommendation
RELIABILITY | RESILIENCE | SECURITY10
• Agree with the recommendation?• Alternate cost effective way to address the risk?
Policy Input Request
RELIABILITY | RESILIENCE | SECURITY11
• Premature to act until highs and mediums implemented Modifications should wait until at least July 2021
• Unclear whether existing CIP-003 risk mitigation was considered See electronic access controls in CIP-003-7, Attachment 1 Consider augmenting CIP-003 Adding lows in Supply Chain Standards conflicts with CIP-002 model Conflicts with “no inventory” approach for lows
• Risk conclusions need more thorough technical analysis• Additional data needed
Summary of Policy Input
RELIABILITY | RESILIENCE | SECURITY12
• Coordination with entities that use third party access to have monitoring and controls in place to limit the exposure
• Not a supply chain risk, but connectivity risk• Focus on entry points• Focus on risk, not a particular standard• Survey did not take into account existing strategies
Summary of Policy Input
RELIABILITY | RESILIENCE | SECURITY13
• Continual revisions add to risk• Concern about lack of consideration of SCWG input• Adds burden to challenged supplier/vendor relationship • Use the NATF industry collaboration initiative• Supply chain certification program for vendors
Summary of Policy Input
RELIABILITY | RESILIENCE | SECURITY14
• Confine changes to CIP-003• Include policies to: Detect known or suspected malicious communications for both inbound
and outbound communications Determine active vendor remote access sessions Disable active vendor remote access
• After implementation of Supply Chain Standards Evaluate effectiveness Consider adding supply chain policy in CIP-003 for low impact BES Cyber
Systems
Changes Based on Policy Input
RELIABILITY | RESILIENCE | SECURITY15
Recent FERC ActivityAndy DodgeDirector, Office of Electric ReliabilityFederal Energy Regulatory CommissionFebruary 5, 2020
The views expressed in this presentation are my own and do not represent those of the Commission or any individual Commissioner
NERC Five-Year Performance Assessment
• Order in RR19-7 issued 1/23/20• Accepts NERC’s filing and finds that NERC and REs continue to satisfy
statutory and regulatory criteria for ERO certification• Recognizes the achievements of NERC and the REs over the last five
years, including risk-based approach focusing ERO resources on matters of most significance to reliability
• Identifies improvements and provides directives on NERC’s:• Provide oversight of the Regional Entities per the Rules of Procedure• Document the process for developing and evaluating reliability and
security guidelines• Oversight and performance metrics for E-ISAC• Update sanction guidelines• Develop and document the organization certification program
• Directs NERC to submit a compliance filing within 90 days and a second compliance filing within 180 days revising its Rules of Procedure 2
Reliability Standard TPL-001-5:Transmission System Planning Performance• Final rule issued in RM19-10-000 issued 1/23/20• Improves upon currently-effective TPL-001-4 by providing for:
• More comprehensive study of single points of failure of protection systems
• Stability analysis to assess the impact of the possible unavailability of long lead time equipment
• More complete consideration of factors for study of planned maintenance outages
• Declines to pursue other proposals from NOPR• Effective 60 days after publication in Federal Register
3
Reliability Standard CIP-012-1: Communications Between Control Centers
• Final Rule in RM18-20-000 issued 1/23/20• Approves Reliability Standard CIP-012-1 because it is largely
responsive to the Commission’s directive in Order No. 822 and improves the cyber security posture of responsible entities
• Requires responsible entities to protect the confidentiality and integrity of Real-time Assessment and Real-time monitoring data transmitted between bulk electric system Control Centers
• Directs NERC to develop and submit modifications to the Reliability Standards to require protections regarding the availability of communication links and data communicated between bulk electric system Control Centers
• Declines to adopt other directive in NOPR regarding identification of data
• Effective 60 days after publication in Federal Register4
Standards Efficiency Review Phase I
• NOPR issued in RM19-16 and RM19-17 on 1/23/20• Proposes to approve the retirement of 74 Reliability Standard
requirements associated largely with the calculation of Available Transfer Capacity
• Proposes to remand one requirement submitted for retirement by NERC (VAR-001-6 R2) because it is the only requirement that requires the scheduling of reactive power
• Seeks additional information from NERC on two requirements submitted for retirement (FAC-008-3 Requirements R7 and R8) regarding identifying the most limiting element of a facility and sharing facility ratings
• Comments due 60 days after publication in Federal Register
5
Compliance Filings on Reform of Generator Interconnection Procedures & Agreements• Order No. 845 Final Rule in RM17-8 issued 2/21/19
• Adopted 10 reforms to improve certainty for interconnection customers, promote more informed interconnection decisions and enhance the interconnection process
• Required each public utility transmission provider to submit a compliance filing by 5/22/19
• Commission acted on first batch of filings on 11/21/19 and second batch on 12/19/19
• Third batch of orders on compliance for Order No. 845 issued 1/23/20
• Commission partially accepted compliance filings and directing further compliance filings for seven utilities and SPP
6
Compliance Filings on Storage Rule
• Enacted in February 2018, Order No. 841 requires RTOs and ISOs to develop rules to remove barriers to participation of electric storage resources in the capacity, energy and ancillary services markets operated by RTOs/ISOs
• Each organized power market must revise its tariff to establish a participation model with market rules to recognize the physical and operational characteristics of electric storage resources and facilitate their participation in markets
• Deadline for initial compliance filings was 12/3/19• Commission issued orders on compliance:
• NYISO, 12/19/19• CAISO, ISO-NE and MISO, 11/21/19• PJM and SPP, 10/17/19
7
Grid-Enhancing Technologies Workshop
• Staff-led workshop in AD19-19 held 11/5-6/19 at FERC headquarters• Grid-enhancing technologies include, but are not limited to: power
flow control and transmission switching equipment, storage technologies and advanced line rating methodologies
• Panels addressed GETs that increase the capacity, efficiency or reliability of transmission facilities and explored:• How GETs are currently used in transmission planning and
operations• The challenges to deployment and implementation of GETs• Regulatory approaches and actions the Commission can take to
facilitate adoption of GETs• Post workshop comments due 2/14/20
8
• Thank you!
• Questions?
9
RELIABILITY | RESILIENCE | SECURITY
Framework for Risk Identification & Mitigation
Mark Lauby, Senior Vice President & Chief EngineerMember Representatives Committee MeetingFebruary 5, 2020
RELIABILITY | RESILIENCE | SECURITY2
Declaration & Problem
• Declaration:The Electric Reliability Organization (ERO) Enterprise requires a consistent framework to address and prioritize known and emerging reliability risks
• Problem Statement: ERO Enterprise has continued to lead industry in reliability and security
initiatives to identify known and emerging risks and their mitigation The reliability toolkit for risk mitigation the ERO currently deploys includes,
for example: webinars and conferences, lessons learned, Alerts, Guidelines, and standard development.
A framework is needed to that provides a transparent process using industry and ERO Enterprise experts
Framework must include: risk identification, deployment of mitigation strategies, to monitoring the success of these mitigations
RELIABILITY | RESILIENCE | SECURITY3
Six-Step Framework
1. Risk Identification2. Risk Prioritization3. Mitigation Identification and Evaluation4. Mitigation Deployment5. Measurement of Success6. Monitor Residual Risk
RELIABILITY | RESILIENCE | SECURITY4
Risk Identification
RELIABILITY | RESILIENCE | SECURITY5
Risk Prioritization
RELIABILITY | RESILIENCE | SECURITY6
Mitigation Identification and Evaluation
RELIABILITY | RESILIENCE | SECURITY7
Mitigation Deployment
RELIABILITY | RESILIENCE | SECURITY8
Measurement of Success
RELIABILITY | RESILIENCE | SECURITY9
Monitor Residual Risk
RELIABILITY | RESILIENCE | SECURITY10
Monitor Residual Risk
RELIABILITY | RESILIENCE | SECURITY11
Monitor Residual Risk
RELIABILITY | RESILIENCE | SECURITY12
Monitor Residual Risk
RELIABILITY | RESILIENCE | SECURITY13
Reliability Toolkit: Guiding Principles
1. Reliability Standards address sustained risks with moderate impacts which are probable, and severe impacts which are probable or improbable.
2. Reliability Guidelines used to address sustained risks that are probable or improbable. Guidelines are also used for items not in the ERO Enterprise’s jurisdiction, or are practices that improve reliability beyond standards.
3. Lessons Learned used for sustain risks or a one-and-done activities with moderate impacts and are both probable and improbable.
4. Alerts will be used for time sensitive information, for information, to request action or direct action.
5. A combination of tools can be used towards gaining industry action, setting the stage for standards as well as addressing a risk while a Standard is being developed. Likelihood, pervasiveness, and severity have a bearing when a Reliability Standard is required.
RELIABILITY | RESILIENCE | SECURITY14
Reliability Tools: Risk Likelihood and Impact
RELIABILITY | RESILIENCE | SECURITY15
Reliability Tools: Risk Likelihood and Impact
RELIABILITY | RESILIENCE | SECURITY16
Reliability Tools: Risk Likelihood and Impact
RELIABILITY | RESILIENCE | SECURITY17
Reliability Tools: Risk Likelihood and Impact
RELIABILITY | RESILIENCE | SECURITY18
Reliability Tools: Risk Likelihood and Impact
RELIABILITY | RESILIENCE | SECURITY19
Risk Management Timeframe
RELIABILITY | RESILIENCE | SECURITY20
Risk Management Timeframe
RELIABILITY | RESILIENCE | SECURITY21
Risk Management Timeframe
RELIABILITY | RESILIENCE | SECURITY22
Risk Management Timeframe
RELIABILITY | RESILIENCE | SECURITY23
Risk Management Timeframe
RELIABILITY | RESILIENCE | SECURITY24
Risk Management Timeframe
RELIABILITY | RESILIENCE | SECURITY25
Risk Management Timeframe
RELIABILITY | RESILIENCE | SECURITY26
Grid Transformation Impacts on Reliability Framework
SYLVAIN CLERMONT – Director, Operational Technologies ConvergenceHydro-Québec TransÉnergie
ERIC UDREN – Executive Advisor, Quanta Technology LLC
HOWARD GUGEL – VP Engineering and standards,NERC
MUKUND KAUSHIK – Director of Digital, Southern California Edison
NERC Member Representative Committee| February 5, 2020
2 Hydro-Québec
Transformations in:• Power generation, transmission and
distribution• Energy consumption habits• Utility business model
Factors contributing to this:• Climate change• Technology• Desire to make power system more
efficient• Aging infrastructures
We are in the midst of an energy transition
3 Hydro-Québec
Major Trends: the 3 Ds
DECENTRALIZATION– Utility customers are
becoming prosumers– Electric vehicles– Microgrids– Demand-side
management– Solar panels, energy
storage
DIGITALIZATION– Digital substations– Advanced analytics– Assets performance
management– Increased infrastructure
automation– Smarter grids– Increase cybersecurity
DECARBONIZATION– Declining renewable
costs– Declining Energy storage
costs
4 Hydro-Québec
Possible evolutions1. The introduction of a new
technological platform enabling, in particular, the remote control of assets (intelligent electronic devices, IED);
2. The move towards dynamic asset management;
3. The move towards autonomous, adaptive, predictable and flexible operations.
Possible applications
• Situational Awareness
• Internet of Things
• Dynamic State Estimators (local and centralized)
• Numerical Twin
• Artificial Intelligence
• Dynamic Load Forecast
• Augmented Reality
Digitalization
5 Hydro-Québec
• Standards and standards development
• Compliance
• Reliability Assessments
What is the reliability framework?
6 Hydro-Québec
–Cloud-based solutions–Virtualization–Cybersecurity with Intelligent Electronic Devices (IED)–Traceability of supply chain with high level of
numerical devices–Dynamic Relay Setting–Communication between substations–Flood of data–Wide area synchrophasor
What are the impacts on the reliability framework?
7 Hydro-Québec
• Eric Udren• Executive Advisor – Quanta
Technology LLC
• Howard Gugel• VP Engineering and standards –
NERC
• Mukund Kaushik• Director of Digital – Southern
California Edison
Panelists
Top Related