Download - REAR ELEVATION NOT FOR CONSTRUCTION · rear elevation n/a jim love and laura mcdonald love / mcdonald residence 06/28/2019 mnw checker 34 commonwealth ave, boston, ma, 02116 construction

Transcript
Page 1: REAR ELEVATION NOT FOR CONSTRUCTION · rear elevation n/a jim love and laura mcdonald love / mcdonald residence 06/28/2019 mnw checker 34 commonwealth ave, boston, ma, 02116 construction

DN

123

LEVEL 10' - 0"

LEVEL 213' - 0"

LEVEL 327' - 0"

LEVEL 440' - 0"

9' - 4 15/16" 9' - 2 11/16"

18' - 7 5/8"

13

' - 0

"1

4' -

0"

13

' - 0

"

123

LEVEL 10' - 0"

LEVEL 213' - 0"

LEVEL 327' - 0"

LEVEL 440' - 0"

9' - 4 15/16" 9' - 2 11/16"

18' - 7 5/8"

13

' - 0

"1

4' -

0"

13

' - 0

"

72794

72694

72995

72895

75196

PROPOSED DRYER

EXHAUST VENT 6" DUCT

WITH MATTE BLACK VENT

CAP 36" FROM ANY

OPENING

PROPOSED ERV EXHAUST

VENT 6" DUCT WITH MATTE

BLACK VENT CAP

PROPOSED VENT FOR ERV

INTAKE 6" DUCT WITH MATTE

BLACK VENT CAP

A2031

0' -

8"

10

' - 4

1/2

"

8" 46 7/8" 8" 47 1/2" 8" 51 1/2"

PROPOSED ERV INTAKE VENT

PROPOSED DRYER EXHAUST VENT

PROPOSED ERV EXHUAST VENT

Scale

Project number

Date

Drawn by

Checked by

KEY PLAN:

Project Status

SAM KACHMAR ARCHITECTS2019CSAM KACHMAR

ARCHITECTS

(p)978-270-8441kachmardesign.com357 HURON AVE.

CAMBRIDGE MA, 02138

NO

T F

OR

CO

NS

TR

UC

TIO

N

As indicated

7/2

/20

19 1

:41

:39

PM

A201

RE

AR

ELE

VA

TIO

N

N/A

LO

VE

/ M

cD

ON

ALD

RE

SID

EN

CE

JIM

LO

VE

AN

D L

AU

RA

McD

ON

ALD

06/28/2019

MNW

Checker

34 C

OM

MO

NW

EA

LT

H A

VE

,B

OS

TO

N, M

A, 02116

CONSTRUCTIONDOCUMENTS

1/4" = 1'-0"1

REAR ELEVATION - EXISTING1/4" = 1'-0"

2REAR ELEVATION - PROPOSED

4ENLARGED AXON - REAR ELEVATION

EXISTING IMAGE OF OTHER VENTS THROUGHOUT

THE BACK ALLEY OF COMMONWEALTH AVE

(PUBLIC ALLEY 437) - VENT STYLED TO MATCH

Page 2: REAR ELEVATION NOT FOR CONSTRUCTION · rear elevation n/a jim love and laura mcdonald love / mcdonald residence 06/28/2019 mnw checker 34 commonwealth ave, boston, ma, 02116 construction

2

LEVEL 327' - 0"

8"

22 3

/4"

17" 8" 17"17 1/4" 8" 17 1/4"

VENTS ALIGNED CENTERED

ABOVE THE WINDOW AND

DOOR

VENTS ALIGNED AT SAME

HEIGHT - TO ACHIEVE

REQUIRED OFFSET FROM

OPENING ON THE FACADE

8"

124 1

/2"

46 1/2"41 5

/16"

8"47 1/2"8"46 7/8"8"

10

' - 8

1/2

"

8"

28 1

/2"

PROPOSED DRYER

EXHAUST VENT 6" DUCT

WITH MATTE BLACK VENT

CAP 36" FROM ANY

OPENING

PROPOSED ERV EXHAUST

VENT 6" DUCT WITH MATTE

BLACK VENT CAP

PROPOSED VENT FOR ERV

INTAKE 6" DUCT WITH MATTE

BLACK VENT CAP

PROPOSED DRYER

EXHAUST VENT 6" DUCT

WITH MATTE BLACK VENT

CAP 36" FROM ANY

OPENING

PROPOSED ERV EXHAUST

VENT 6" DUCT WITH MATTE

BLACK VENT CAP

PROPOSED VENT FOR ERV

INTAKE 6" DUCT WITH MATTE

BLACK VENT CAP

F

10

' - 0

"

10

7/8

"

6"

EXISTING

CEILING -

DEMOLISHED

6" VENTS WITH

EXTERIOR INTAKES

OR EXHAUSTS

PROPOSED 10'

TALL CEILING TO

ACCOMIDATE

DUCTWORK

6"

12

5 1

/2"

23

3/4

"

2"

Scale

Project number

Date

Drawn by

Checked by

STRUCTURAL ENGINEER:

REGISTRATIONS:

Project Status

SAM KACHMAR ARCHITECTS2019CSAM KACHMAR

ARCHITECTS

(p)978-270-8441kachmardesign.com357 HURON AVE.

CAMBRIDGE MA, 02138

NO

T F

OR

CO

NS

TR

UC

TIO

N

1/2" = 1'-0"

7/2

/20

19 1

:41

:42

PM

A203

RE

AR

ELE

VA

TIO

N -

VE

NT

DE

TA

ILS

N/A

LO

VE

/ M

cD

ON

ALD

RE

SID

EN

CE

JIM

LO

VE

AN

D L

AU

RA

McD

ON

ALD

06/28/2019

Author

Checker

34 C

OM

MO

NW

EA

LT

H A

VE

,B

OS

TO

N, M

A, 02116

CONSTRUCTIONDOCUMENTS

1/2" = 1'-0"1

REAR ELEVATION - PROPOSED - VENTING DETAILS

2ENLARGED AXON - REAR ELEVATION VENTS

EXISTING DECK PHOTO

1/2" = 1'-0"3

VENTS SIDE ELEVATION

PROPOSED

RENDERS OF

BACK DECK &

PROPOSED ERV /

DRYER INTAKE

AND EXHUAST

VENTS