[email protected]+44(0)113 252 8883
Rapid Net Installation Guide
Compliant with BS EN 1263 - 1, ANSI/ASSE A10.11 - 2010 & OSHA 1926.105Ingenious solutions for on-site safety requirements Quality assured and tested by Lloyds British Standards
32
RAPID NET | CONTENTS
Rapid Net installation | Alternate fixing solution | Drill & FixDEBRIS CONTAINMENT & FALL ARREST Steps 1 & 2 - Assembling the net ................................................................................ Page 27 Steps 3 & 4 - Securing the net to the frame ................................................................ Page 28 Steps 5 & 6 - Lifting the net into place ........................................................................ Page 29 Step 7 - Placing the net ............................................................................................... Page 30 Steps 8 & 9 - Drilling & fixing top bracket ................................................................... Page 31 Step 10 - Adjusting the bottom bracket ...................................................................... Page 32 Steps 11 & 12 - Drilling & fixing bottom bracket ......................................................... Page 33 Step 13 - Removing the lifting bar .............................................................................. Page 34 Steps 14 & 15 - Preparing the net for opening ............................................................ Page 35 Steps 16 & 17 - Opening the net ................................................................................. Page 36 Step 18 - Locking the net in open position .................................................................. Page 37
Rapid Net installation | Rapid Post & Rapid Post Extra DEBRIS CONTAINMENT ONLY Steps 1 & 2 - Assembling the net ................................................................................. Page 14 Steps 3 & 4 - Securing the net to the frame .................................................................. Page 15 Steps 5 & 6 - Attaching the lifting bar ........................................................................... Page 16 Step 7 - Lifting the net into place ................................................................................. Page 17 Step 8 - Drilling for the top bracket .............................................................................. Page 18 Steps 9 & 10 - Fixing top brackets using Rapid Post & Rapid Post boot ......................... Page 19 Step 11 - Adjusting the bottom bracket ........................................................................ Page 20 Steps 12 & 13 - Drilling & fixing bottom bracket ........................................................... Page 21 Step 14 - Removing the lifting bar ................................................................................ Page 22 Steps 15 & 16 - Preparing the net for opening .............................................................. Page 23 Steps 17 & 18 - Opening the net .................................................................................. Page 24 Step 19 - Locking the net in open position ................................................................... Page 25
Safety guidance notes & Rapid Net compliance ....................................................................... Page 04Rapid-Net Usage notes ........................................................................................................... Page 05List / Details of Rapid Net components ................................................................................... Page 06Installation equipment | Rapid Post / Rapid Post Extra & Drill & Fix........................................ Page 07 Packing dimensions / Adjusting telescopic uprights ................................................................ Page 08Section through building | Minimum & maximum acceptable floor heights ............................ Page 09Net overlap | Adjusting top bracket settings & minimum & maximum net overlap .......... Pages 10/11Rapid Net bracket positions .................................................................................................... Page 12
RAPID NET | CONTENTS
Rapid Net | Lifting Device Installation Guide Lifting Device Components ......................................................................................... Page 39 Step 1 - Unpacking the lifting device ........................................................................... Page 40 Step 2 - Erecting the rolling frame ............................................................................... Page 41 Steps 3 & 4 - Attaching hoist frame to pulley frame ..................................................... Page 42 Steps 5 & 6 - Securing hoist frame to pulley frame ...................................................... Page 43 Steps 7 & 8 - Attaching hoist frame/pulley frame to rolling frame ............................... Page 44 Steps 9 & 10 - Securing the hoist frame to rolling frame............................................... Page 45 Step 11 - Attaching hoist to lifting device .................................................................... Page 46 Step 12 - Postioning the lifting device ......................................................................... Page 47 Steps 13 & 14 - Securing the lifting device ............................................................ Pages 48/49 Step 15 - Adjusting the lifting frame pulley ............................................................... Pages 50
Rapid Net installation | Extra Height Insert InstallationDEBRIS CONTAINMENT ONLY Extra Height Upright | Components ............................................................................ Page 53 Steps 1 - 4 - Removing the telescopic insert and bottom mount .................................. Page 54 Steps 5 - 7 - Attaching Extra Height Insert ................................................................... Page 55
54
RAPID NET | SAFETY GUIDANCE
COMPLIANCERapid Net has been tested in accordance with the BS EN 1263 - 1, ANSI/ASSE A10.11 - 2010 & OSHA 1926.105 standards covering both Fall Arrest and Debris Containment and has been
found to meet all necessary requirements.
The Rapid Net system should be used in accordance with the manufacturers guidance notes.
» When installing, re-positioning or dismantling the Rapid Net, Operatives should use industry approved fall restraint systems.
» In addition to the required Fall restraint systems, appropriate PPE must be worn when working with this product
» Never mix Rapid Net components with any other manufacturers components. Only the manufacturers specified fixings, fasteners and system components should be used with the Rapid Net.
» Adverse weather conditions such as wind speeds in excess of the stated safe working procedures for site should be considered by Operatives before deploying the Rapid Net. Under no circumstances should the net be raised or re-positioned using the Rapid Winch in said conditions.
» The Rapid Net system should be in the closed position during snowstorms as accumulated snow will reduce the overall performance of the net.
» Accumulated snow or debris should be removed from a safe working surface on a daily basis.
» In the event of the Rapid Net System arresting the fall of persons or significant falls of material, the project specific rescue plan should be implemented and the Rapid Net System should be replaced immediately.
» It is the responsibility of the end user to carry out daily inspections & conform to all local regulations.
SAFETY GUIDANCE
RAPID NET | USAGE
COMPLIANCEAny equipment that has been subject to an impact load should be scapped immediately.
The Rapid Net System is primarily to be used for debris containment.
The Rapid-Net can be used for Debris containment in the following scenarios:
» On floor to floor heights ranging from a minimum of 2.6m / 8'7" to a maximum of 4.8m / 16'0"
» On floor to ceiling heights up to 14"1" using the Rapid Post / Rapid Post Extra and the Rapid Boot.
» On floor to floor heights up to 16'0" using the standard telescopic insert
» On floor to floor heights up to 19'10" using the drill and fix solution and the extra height telescopic inserts (RM797)
The Rapid-Net can be used for fall arrest in the following scenarios:
» On floor to floor heights ranging from a minimum of 2.6m / 8'7" to a maximum of 4.8m / 16'0" using the drill and fix installation method.
The Rapid Net can be used to catch personel up to 20'0" below the wetdeck/working level.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
76
INSTALLATION EQUIPMENT REQUIRED
You will need for installation for Concrete Anchor
Battery Impact Gun (or 110v Drill) | 1
Masonry Drill 1/2" | Minimum of 1
3/4 Socket & Wrench | Minimum of 1
1/2 Socket & Wrench | Minimum of 1
Anchor choice:
Red Head LDT Tapcon, 1/2", min. embedment depth 3" | 6 UCAN TORPEDO UTB 123, 1/2", min. embedment depth 3" | 6 UNIFIX Thunderbolt ZZV71792, 1/2 ", min. embedment depth 4" | 6
For installation with Rapid Post / Rapid Post Extra and NA118 Rapid Post Boot For use with post tension slabs (AS DEBRIS CONTAINMENT ONLY), you will need... Masonry Drill 1/2" | Minimum of 1
IMPORTANT NOTE:
» Anchors are specified for installation in normal weight concrete, minimum compressive strength 3000 psi.
» For installation in other conditions, such as lightweight concrete please contact the manufacturer.
NA118
RAPID NET | COMPONENTS
PART A | RM783 | Scaffold tube | 26kg / 571/4lbs each | 2 per net
PART B | RM792 | Support Arm | 26.5kg / 581/2lbs each | 2 per net
PART C | RM786 | Retainer Bracket | 7.5kg / 161/2lbs each | 2 per net
PART D | RM787 | Top Bracket | 1.5kg / 31/2lbs each | 2 per net
PART E | RM788 | Bottom Bracket | 1.5kg / 31/2lbs each | 2 per net
PART F | RM789 | Bridge | 4kg / 83/4lbs | 2 per net
PART G | RM790 | Top Clamp | 2.5kg / 51/2lbs | 2 per net
PART H | RM791 | End Clamp | 1.5kg / 31/4lbs | 2 per net
PART I | RM792 | Telescopic Upright | 23.5kgs / 513/4lbs | 2 per net
PART J | RM793| Net | 70 x 70 x 6mm nylon mesh, overlaid
with 20 x 20 x 2mm nylon mesh
| 14kg / 31lbs | 1 per net
Miscellaneous | M12 Bolt, Nyloc nut and 2x washers | 18 per net
Rope, 6m / 20' | 2 per net
RM792
RM788
RM789
RM790
RM791
RM786 RM792
RM787
RM793
RM783
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
98
RAPID NET | SECTION THROUGH BUILDING
6m /
20' 0
"M
IN 2
.6m
/ 8'
7"
MAX
4.8
m /
16' 0
"
MAX
IMU
M T
ESTE
D HE
IGHT
FO
R FA
LL A
RRES
T
3.5m / 11' 5"
FALL
ARR
EST
CUT-
OFF
6M
/ 20
'0"
DEBR
IS C
ON
TAIN
MEN
T CU
T-O
FF 1
2M /
40'0
"
RAPID NET | PACKING DIMENSIONS
RAPID NET | TELESCOPIC UPRIGHTS
200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8"
200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8" 200mm / 8"
Before installing the Rapid Net, the telescopic uprights need to be adjusted to the correct floor heights. The telescopic inner tube has 12 settings, in increments of 200mm / 8" and should be adjusted to the correct setting before installation commences. To adjust the telescopic upright, loosen and remove the nut and bolt shown above, slide the inner tube to the required setting and reinsert and tighten the nut and bolt. The bottom bracket of the net frame can be adjusted during installation to compensate for any remaining gaps in the floor to ceiling height. For Instructions regarding the extra height telescopic uprights, see page 54.
Overall Packing Dimensions for one Rapid Net.
Left hand & Right hand Net Frame arms.
Rapid Net, secured to 2 x 6m / 20' scaffold tubes.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
1110
RAPID NET | NET OVERLAP
Minimum overlap of 2 Rapid Nets is 750mm / 2' 6 ".
Maximum overlap of 2 Rapid Nets is 1000mm / 3' 3".
To alter the top bracket (Part D) from setting A to setting B, remove the nut and bolt securing the top bracket, slide the plate down 75mm / 3" and reinsert and securely tighten the nut and bolt.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
RAPID NET | NET OVERLAP
Any length of nets need to have the top brackets set to alternating positions so that the scaffold tubes securing the net will not clash and the appropriate net overlap can be achieved. E.g. Setting A, Setting B, Setting A...etc.
TOP BRACKET | SETTING B TOP BRACKET | SETTING A
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
1312
RAPID NET RAPID POST & RAPID POST EXTRA
INSTALLATION GUIDEDEBRIS ONLY
RAPID NET | BRACKET POSITIONS
EDGE PROTECTION FEDERATION
epf
A3
IF IN DOUBT ASK
BYDATEREV DESCRIPTION
DRAWN CHECKED DATE
TITLE:
CLIENT:
DRAWING No.
PROJECT:
REVIN(6)FILE LOCATION: Z:\ANIMATION\INSTALLATION GUIDE - LIGHTWEIGHT NET\LIGHTWEIGHT NET - REVB\RAPID NET - HOLE DIAGRAM - TOP & BOTTOM MOUNT
RAPID-EPS RAPID-Edge Protection Systems Ltd.T: 0113 252 8883 | F : 0113 307 4990 | W: rapideps.comUNIT D TREEFIELD INDUSTRIAL ESTATE, GELDERD ROAD, GILDERSOME, LEEDS, LS27 7JU
2014 COPYRIGHT IN THIS DRAWING BELONGS TO RAPID EDGE PROTECTIONSYSTEMS LTD. AND SHOULD NOT BE COPIED OR SHOWN TO THIRD PARTIESWITHOUT THE EXPRESS PERMISSION OF RAPID EDGE PROTECTION SYSTEMS LTD.
200 Stovall Street
Aluma Systems
Linear Quote Drawing | Typical Floor
GB 24th Jan '18 ·
40mm/158" 40mm/15
8"
25m
m/1
"
25m
m/1
"
25m
m/1
"75
mm
/3"
15mm/58"
15mm/58"25mm/1"
25mm/1"
EDGE PROTECTION FEDERATION
epf
A3
IF IN DOUBT ASK
BYDATEREV DESCRIPTION
DRAWN CHECKED DATE
TITLE:
CLIENT:
DRAWING No.
PROJECT:
REVIN(7)FILE LOCATION: Z:\ANIMATION\INSTALLATION GUIDE - LIGHTWEIGHT NET\LIGHTWEIGHT NET - REVB\RAPID NET - HOLE DIAGRAM - TOP & BOTTOM MOUNT
RAPID-EPS RAPID-Edge Protection Systems Ltd.T: 0113 252 8883 | F : 0113 307 4990 | W: rapideps.comUNIT D TREEFIELD INDUSTRIAL ESTATE, GELDERD ROAD, GILDERSOME, LEEDS, LS27 7JU
2014 COPYRIGHT IN THIS DRAWING BELONGS TO RAPID EDGE PROTECTIONSYSTEMS LTD. AND SHOULD NOT BE COPIED OR SHOWN TO THIRD PARTIESWITHOUT THE EXPRESS PERMISSION OF RAPID EDGE PROTECTION SYSTEMS LTD.
200 Stovall Street
Aluma Systems
Linear Quote Drawing | Typical Floor
GB 24th Jan '18 ·
40mm/158" 95mm/33
4" 25mm/1"25mm/1"
15mm/58"
40m
m/1
5 8"40
mm
/15 8"
15m
m/5 8"
25m
m/1
"25
mm
/1"
85m
m/3
3 8"
During installation of the Rapid-Net using either the Rapid Post/ Rapid Post Extra or Drill & Fix options, please use these guidance notes to ensure that the brackets for the Rapid-Net are correctly positioned before installation.
Top Brackets | Hole Positions & Bracket Placement
Bottom Brackets | Hole Positions & Bracket Placement
For use on floor to ceiling heights up to 14"1" using the Rapid Post / Rapid Post Extra and the Rapid Boot.
IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
1514
RAPID NET | INSTALLATION | RP & RP-XDEBRIS ONLY
STEP 2 | Place the assembled net frame arms at the required centres and place the scaffold tubes (PART A) into the clamps (PARTS G & H) at the top and bottom of the net support arms.
RAPID NET | INSTALLATION | RP & RP-XDEBRIS ONLY
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
STEP 1 | If not already assembled, unroll the net (PART J) and lay out on the floor. Insert scaffold tubes (PART A) into both ends of the net using a under/over pattern in the larger mesh.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
APPROX. 4m / 13 ft
CLAMPS MUST BE SECURELY TIGHTENED
STEP 3 | Once the net (PART J) is properly centered, close the scaffold clamps (PARTS G & H) at the top and bottom of the net support arms, securing the net in place.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 4 | Tie 2 ropes around the top scaffold tube, one situated near each net support arm. These will be used later in the installation to assist in correctly opening the net.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
CLAMPS MUST BE SECURELY TIGHTENED
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
1716
RAPID NET | INSTALLATION | RP & RP-X RAPID NET | INSTALLATION | RP & RP-X
STEP 5 | Wrap the ends of the ropes around the bottom scaffold tube so that they are secured to the net frame for the duration of the installation.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
STEP 6 | Attach the lifting bar to the net frame using the provided hoops on the bridge (PART F) attached to the top brackets (PART D).
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION DEBRIS ONLY
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
STEP 7 | Lift the net and place the top brackets (PART D) so that the net frame sits comfortably on the concrete slab.
DETAIL | Detail showing how the top brackets (PART D) and net frame should sit against the slab edge when properly situated.
Ensure full face contact with both vertical & horizontal edges.
DEBRIS ONLY
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
1918
RAPID NET | INSTALLATION | RP & RP-X RAPID NET | INSTALLATION | RP & RP-X
STEP 8 | Drill 1 x Ø12.5mm / Ø1/2" hole, 25mm / 1" deep. Use the center hole in the bracket (PART D) as specified below.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
DETAIL | Detail showing which hole in the top bracket (PART D) should be used when installing the Rapid Post & Rapid Post Boot.
DEBRIS ONLY
STEP 9 | Place a Rapid Post into the Rapid Boot with the bottom hook of the post at 90° to the screws in the boot. Tighten the screws to secure the Rapid Post into the Rapid Boot.
STEP 10 | Place the peg in base of the Rapid Boot through the top bracket into the previously drilled hole. Install the Rapid Post as per the Rapid Post installation guide.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
DEBRIS ONLY
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
2120
RAPID NET | INSTALLATION | RP & RP-X
STEP 11 | Loosen the nut and bolt on the bottom bracket (PART E), slide into position on the slab and tighten the nut and bolt again to secure the bottom bracket in place.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
DETAIL | Detail showing how the bottom bracket (PART E) should sit on the edge of the concrete slab when properly installed.
Ensure full face contact with both vertical & horizontal edges.
RAPID NET | INSTALLATION | RP & RP-X
STEP 13 | As with the top brackets (PART D), install a Rapid Post into the Rapid Boot and install the Rapid post as per the Rapid Post installation guide.
DEBRIS ONLY
STEP 12 | Drill 1 x Ø12.5mm / Ø1/2" hole, 25mm / 1" deep. Use hole in the bracket (PART E) shown above in yellow or the retainer bracket (PART C) will clash with the Rapid post when opening the net.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 9: Drill 1 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 10: Secure bottom brackets to concrete slab using 1 x ØM12.5 x 100mm /Ø 12" x4" bolt (Thunderbolt or equivalent).
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 9: Drill 1 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 10: Secure bottom brackets to concrete slab using 1 x ØM12.5 x 100mm /Ø 12" x4" bolt (Thunderbolt or equivalent).
DEBRIS ONLY
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
2322
RAPID NET | INSTALLATION | RP & RP-X
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
RAPID NET | INSTALLATION | RP & RP-X
STEP 14 | Once both brackets (PARTS D & E) have been properly secured to the concrete frame, the lifting bar can be disconnected from the net.IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.
IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
DEBRIS ONLY
STEP 15 | Unwrap the ropes from the bottom scaffold tube so that they can be used to help extend the net into the open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 13: Replace Pin & R-clip into both retainer brackets to secure net in open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 11: Once frame is properly secured, remove R-clip & Pin from the retainerbrackets on both support arms.
STEP 12: Using 2 people, lift retainer brackets off metal pegs using provided handlesand extend net into open position.
STEP 16 | Once the frame is properly secured and the ropes unwrapped from the scaffold tubes, remove the R-clip and Pin from the retainer brackets (PART C) on both support arms.
DEBRIS ONLY
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
2524
RAPID NET | INSTALLATION | RP & RP-X
STEP 17 | Two people should use the ropes attached to the top scaffold tube to lower the net into its open position. This needs to be done concurrently with STEP 18.
STEP 18 | Using 2 people on the lower floor, lift the retainer brackets (PART C) off the metal pegs using the provided handles and extend the net into the open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 11: Once frame is properly secured, remove R-clip & Pin from the retainerbrackets on both support arms.
STEP 12: Using 2 people, lift retainer brackets off metal pegs using provided handlesand extend net into open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 13: Replace Pin & R-clip into both retainer brackets to secure net in open position.
RAPID NET | INSTALLATION | RP & RP-X
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 13: Replace Pin & R-clip into both retainer brackets to secure net in open position.
STEP 14: Installation complete.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 13: Replace Pin & R-clip into both retainer brackets to secure net in open position.
STEP 14: Installation complete.
THE RAPID NET IS NOW INSTALLED.
STEP 19 | Replace the Rapid pin and R-clip into both retainer brackets (PART C) to secure the net in the open position. Loosely secure the ropes to the bottom scaffold tube.
DETAIL | Check that both retainer brackets (PART C) have been secured in the correct positions as shown above.
DEBRIS ONLY DEBRIS ONLY
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
2726
RAPID NET ALTERNATE FIXING METHOD
DRILL & FIX INSTALLATION GUIDEDEBRIS AND FALL ARREST
RAPID NET | INSTALLATION | DRILL & FIX
STEP 2 | Place the assembled net frame arms at the required centres and place the scaffold tubes (PART A) into the clamps (PARTS G & H) at the top and bottom of the net support arms.
DEBRIS AND FALL ARREST
For use as debris containment or fall arrest on floor to floor heights ranging from a minimum of 2.6m /
8'7" to a maximum of 4.8m / 16'0" using the standard telescopic inserts
For use as debris containment on floor to floor heights up to 19'10" using the extra height telescopic
inserts IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
STEP 1 | If not already assembled, unroll the net (PART J) and lay out on the floor. Insert scaffold tubes (PART A) into both ends of the net.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
APPROX. 4m / 13 ft
CLAMPS MUST BE SECURELY TIGHTENED
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.
2928
RAPID NET | INSTALLATION | DRILL & FIXDEBRIS AND FALL ARREST
RAPID NET | INSTALLATION | DRILL & FIXDEBRIS AND FALL ARREST
STEP 3 | Once the net (PART J) is properly centered, close the scaffold clamps (PARTS G & H) at the top and bottom of the net support arms, securing the net in place.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
CLAMPS MUST BE SECURELY TIGHTENED
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 4 | Tie 2 ropes around the top scaffold tube, one situated near each net support arm. These will be used later in the installation to assist in correctly opening the net.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 5 | Wrap the ends of the ropes around the bottom scaffold tube so that they are secured to the net frame for the duration of the installation.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
STEP 6 | Attach the lifting bar to the net frame using the provided hoops on the bridge (PART F) attached to the top brackets (PART D).
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
3130
RAPID NET | INSTALLATION | DRILL & FIX
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
STEP 7 | Lift the net and place the top brackets (PART D) so that the net frame sits comfortably on the concrete slab.
DETAIL | Detail showing how the top brackets (PART D) and net frame should sit against the slab edge when properly situated.
Ensure full face contact with both vertical & horizontal edges.
DEBRIS AND FALL ARRESTRAPID NET | INSTALLATION | DRILL & FIX
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
STEP 8 | Drill 2 x Ø12.5mm / Ø1/2" hole, 90mm / 31/2" deep. Any 2 of the 4 holes in the bracket (PART D) can be used to avoid rebar.
STEP 9 | Secure the top bracket (PART D) to the concrete slab using 2 x ØM12.5 x 75mm /Ø1/2" x 3" bolt.
DEBRIS AND FALL ARREST
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
3332
RAPID NET | INSTALLATION | DRILL & FIX
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
DETAIL | Detail showing how the bottom bracket (PART E) should sit on the edge of the concrete slab when properly installed.
Ensure full face contact with both vertical & horizontal edges.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
STEP 10 | Loosen the nut and bolt securing the bottom bracket (PART E), slide into position on the slab and tighten the nut and bolt again to secure the bottom bracket in place.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
RAPID NET | INSTALLATION | DRILL & FIX
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 9: Drill 1 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 10: Secure bottom brackets to concrete slab using 1 x ØM12.5 x 100mm /Ø 12" x4" bolt (Thunderbolt or equivalent).
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 9: Drill 1 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 10: Secure bottom brackets to concrete slab using 1 x ØM12.5 x 100mm /Ø 12" x4" bolt (Thunderbolt or equivalent).
STEP 11 | Drill 1 x Ø12.5mm / Ø1/2" hole, 90mm / 31/2" deep. Any 2 of the 4 holes in the bracket (PART E) can be used to avoid rebar.
STEP 12 | Secure the bottom bracket (PART E) to the concrete slab using 1 x ØM12.5 x 75mm /Ø1/2" x 4" bolt.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
DEBRIS AND FALL ARREST DEBRIS AND FALL ARREST
3534
RAPID NET | INSTALLATION | DRILL & FIX
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
RAPID NET | INSTALLATION | DRILL & FIX
STEP 13 | Once both brackets (PARTS D & E) have been properly secured to the concrete frame, the lifting bar can be disconnected from the net.IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.
IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 7: Once the top brackets have been secured to the concrete slab, the spreaderbeam can be disconnected.
STEP 5: Drill 2 x Ø12.5mm / Ø 12" hole, 115mm / 4 12" deep. Alternate holes in bracketcan be used to avoid rebar.
STEP 6: Secure top brackets to concrete slab using 2 x ØM12.5 x 100mm /Ø 12" x 4" bolt(Thunderbolt or equivalent).
STEP 8: Loosen nut and bolt securing bottom bracket and slide into position so thatbracket sits comfortably against concrete slab. Once in place, tighten nut and bolt tosecure bracket in correct position.
DEBRIS AND FALL ARREST
STEP 14 | Unwrap the ropes from the bottom scaffold tube so that they can be used to help extend the net into the open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 13: Replace Pin & R-clip into both retainer brackets to secure net in open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 11: Once frame is properly secured, remove R-clip & Pin from the retainerbrackets on both support arms.
STEP 12: Using 2 people, lift retainer brackets off metal pegs using provided handlesand extend net into open position.
STEP 15 | Once the frame is properly secured and the ropes unwrapped from the scaffold tubes, remove the R-clip and Pin from the retainer brackets (PART C) on both support arms.
DEBRIS AND FALL ARREST
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
3736
RAPID NET | INSTALLATION | DRILL & FIX RAPID NET | INSTALLATION | DRILL & FIX
STEP 18 | Replace the Rapid pin and R-clip into both retainer brackets (PART C) to secure the net in the open position. Loosely secure the ropes to the bottom scaffold tube.
STEP 16 | Two people should use the ropes attached to the top scaffold tube to lower the net into its open position. This needs to be done concurrently with STEP 17.
STEP 17 | Using 2 people on the lower floor, lift the retainer brackets (PART C) off the metal pegs using the provided handles and extend the net into the open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 11: Once frame is properly secured, remove R-clip & Pin from the retainerbrackets on both support arms.
STEP 12: Using 2 people, lift retainer brackets off metal pegs using provided handlesand extend net into open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 13: Replace Pin & R-clip into both retainer brackets to secure net in open position.
DEBRIS AND FALL ARREST
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 13: Replace Pin & R-clip into both retainer brackets to secure net in open position.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 13: Replace Pin & R-clip into both retainer brackets to secure net in open position.
DETAIL | Check that both retainer brackets (PART C) have been secured in the correct positions as shown above.
THE RAPID NET IS NOW INSTALLED.
DEBRIS AND FALL ARREST
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
3938
LIFTING DEVICE | COMPONENTS
NA117 | Pulley Frame | 32.8kg / 721/2lbs each
PART C | 1 per device
NA117 | Hoist Frame |27.9kg / 611/2lbs each
PART B | 1 per device
NA117 | Rolling Frame | 34.1kg / 611/2lbs each
PART A | 1 per device
NA116 | Lifting Beam | 49kg / 108lbs each
PART D | 1 per device
HOIST | Columbia AC Electric Hoist HD Series ( 2000lbs)
21.7kg - 25kgs / 48lbs - 55lbs each | 1 per device
RAPID NET LIFTING DEVICE
INSTALLATION GUIDE
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.
4140
RAPID NET | LIFTING DEVICERAPID NET | LIFTING DEVICE
STEP 1 | Place the lifting device frame on floor ready to be unpacked. The frame should be assembled on the level that the top brackets of the net will be installed on.
STEP 2 | Once the hoist and pulley frames (Parts B & C) have been removed from rolling frame (Part A), the legs can be rotated 90 degrees to stand the rolling frame in position.
DETAIL | When the legs of the rolling frame are in the correct position, the uprights should sit against the highlighted plate shown above.
DETAIL | Once the parts of the lifting device have been unpacked and assembled, the lifting device can be moved into position nearer the slab edge.
All Personel to have proper PPE during installation.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
4342
RAPID NET | LIFTING DEVICERAPID NET | LIFTING DEVICE
STEP 3 | Remove the long pin and R-clip from the the hoist frame (Part C).
STEP 5 | Reinsert the long pin & R-clip that was removed from the hoist frame to secure the hoist and pulley frames together.
STEP 6 | Remove the long pin and R-clip from the rolling frame. This will be used later to secure the hoist and pulley frame (Parts B & C) to the rolling frame.
STEP 4 | Insert the hoist frame (Part C) into the pulley frame (Part B) as shown. The joining plates on each frame should sit against each other when properly installed.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
4544
RAPID NET | LIFTING DEVICERAPID NET | LIFTING DEVICE
STEP 7 | Remove the R-clips from the top of the uprights on the rolling frame (Part A). These will be used later to secure the hoist & pulley frame to the rolling frame.
STEP 9 | The holes at the base of the hoist frame should line up with the holes in the steel on the rolling frame, as shown above.
STEP 10 | Reinsert the long pin and R-clip at the base of the rolling frame to finish assembling the lifting device frame.
Step 8 | Place the assembled frames (Part B & C) as shown onto the rolling frame uprights. The holes in the angled plate should sit over the short pins on the rolling frame. The R-clips can then be reinserted into the short pins on the rolling frame.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
4746
RAPID NET | LIFTING DEVICERAPID NET | LIFTING DEVICE
STEP 11 | Once the lifting device frame has been properly assembled, the winch can be attached to the hoist plate and the line threaded through the pulley wheel.
STEP 12 | Once fully assembled, the lifting device can now be moved into position nearer to the slab edge. The front of the feet on the rolling frame should be situated 250mm/10" from the edge of the slab. The pulley can be further adjusted as the net is being lifting into place.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
4948
RAPID NET | LIFTING DEVICERAPID NET | LIFTING DEVICE
STEP 13 | The lifting device can be secured in place using Rapid Posts or Rapid Post Extras, depending on the floor to ceiling height.
STEP 14 |Once both Rapid Posts have been installed, the installation of the lifting device is complete. The device can now be used to lift the Rapid Net into position.
DETAIL | The left side Rapid Post must be installed first as the handle on the Rapid Post will clash with the right side Rapid post during installation.
Install the Rapid Post as per the Rapid Post installation guide.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
5150
RAPID NET | LIFTING DEVICERAPID NET | LIFTING DEVICE
STEP 15 | The drive nut shown on the lifting device arm can be adjusted to extend or retract the pulley arm, based on the users preference.
ADDITIONAL | Once the Rapid Net has been successfully installed, the lifting device does not need to be disassembled to be used again on the same working level. The lifting device can be pivoted onto the wheels on the front of the rolling frame and easily moved to where the next Rapid Net will need to be lifted.
Simply remove the Rapid Posts from the lifting device, move to wherever it is required and reinstall the Rapid Posts as per STEPS 14 & 15
DETAIL | The pulley arm can be extended a maximum of 450mm / 1' 6" to assist with safely lifting the Rapid Net in position.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
5352
RAPID NET EXTRA HEIGHT TELESCOPIC UPRIGHT
INSTALLATION GUIDEDEBRIS NETS ONLY
RAPID NET | EXTRA HEIGHT UPRIGHT
EXTRA HEIGHT TELESCOPIC UPRIGHT While the Rapid Net frame arms come installed with 2400mm / 7'101/2" telescopic uprights, these can be swapped out for the extra height telescopic uprights before installing the Rapid Net.
This allows the Rapid Net to be used as a Debris Net on floor to floor heights up to 6000mm / 19'10".
RM792 (Inner) | Telescopic Insert
7.9kg / 171/2lbs each PART A
RM788 | Bottom Bracket
1.5kg / 31/2lbs each PART B
RM797 | Extra Height Telescopic Insert
12.6kg / 273/5lbs each PART C
PART A PART B
PART C
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.
5554
RAPID NET | EXTRA HEIGHT UPRIGHT
STEP 1 | Untighten and remove the nut
and bolt securing the bottom mount
(Part B) and standard telescopic insert
(Part A) to the net frame.
STEP 2 | Remove the insert and bottom
mount (Parts A & B) from within the net
frame. Once removed, untighten the nut
and bolt securing the bottom mount (Part B) to the telescopic insert (Part A).
STEP 3 | Once the nut and bolt have
been removed, slide the bottom mount
(Part B) out from within the telescopic
insert.
STEP 4 | Replace the standard telescopic
insert (Part A) with the extra height
telescopic insert (Part C) and place the
bottom mount (Part B) into the base of
the extra height insert.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
STEP 1: Secure Scaffold tube with net attached into scaffold clamps at the base of thenet support arms and close clamps. CLAMPS MUST BE SECURELY TIGHTENED.
IMPORTANT: DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER.IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
LIGHTWEIGHT NET | INSTALLATION
STEP 2: Repeat STEP 1 using the scaffold clamps at the top of the net support arms.CLAMPS MUST BE SECURELY TIGHTENED.
STEP 3: Attach the spreader beam to the net frame using the provided hoopson the top brackets and lift the net into place.
STEP 4: Place top brackets so that the net frame sits comfortably on the edge of theslab.
RAPID NET | EXTRA HEIGHT UPRIGHT
STEP 5 | Once the bottom mount (Part B) has been placed into the extra height
insert (Part C), secure the bottom mount
using the original nut and bolt.
STEP 7 | Secure the extra height insert
into the net frame using the original
nut and bolt. This will complete the
installation of the extra height telescopic
insert.
STEP 6 | Once the bottom mount (Part B) is secured to the extra height insert
(Part C), slide the insert back into the net
frame at the appropriate length for the
floor to floor height.
IMPORTANT | DISASSEMBLY PROCESS MUST FOLLOW THE INSTRUCTIONS IN REVERSE ORDER. IMPORTANT | IMPROPER INSTALLATION OR REMOVAL COULD RESULT IN SERIOUS INJURY OR DEATH.
Rapid-EPS LimitedUnit D, Treefield Industrial EstateGelderd Road, GildersomeLeeds, LS27 7JU
Head Office +44 (0) 1132 528883 Installation Guide - Rapid Net_Rev C.2