Prospect for Fusion Energy in the 21st Century:the 21st Century:
Why? When? How?Why? When? How?
Farrokh NajmabadiFarrokh NajmabadiProfessor of Electrical & Computer EngineeringDirector, Center for Energy ResearchUC San Diego
University of Wisconsin, MadisonSeptember 20, 2010
We are transitioning from the Era of Fusion Science tothe Era of Fusion Science to the Era of Fusion Power
Large-scale fusion facilities beyond ITER and NIF can only be justified in the context of their contribution to world energy supply We will haveenergy supply. We will have Different Customers (e.g., Power Producers) Different criteria for success (e.g., Commercial viability)
Ti i ( I th k t d?) Timing (e.g., Is there a market need?)
Fusion is NOT the only game in town!
Is the currently envisioned fusion development path allows Is the currently envisioned fusion development path allows us the flexibility to respond to this changing circumstances? Developing alternative plans and small changes in R&D Developing alternative plans and small changes in R&D
today can have profound difference a decade from now.
Why?Why?Energy and Well Being
M t f th d t i f IEA W ld E O tl k 2006Most of the data is from IEA World Energy Outlook 2006
World uses a lot of energy!World uses a lot of energy!
World Primary Energy consumption is 14 TW (2004) World Primary Energy consumption is 14 TW (2004) Equivalent to ~0.5 EJ or 11.2 Billion Ton of Oil Equivalent pa World energy [electricity] market ~ $4.5 trillion [$1.5 trillion] pa
World energy use is expected to grow 50% by 2030. Growth is necessary in developing countries to lift billions of
people out of poverty
80% of world energy is from burning fossil fuels
Use is very unevenly distributed (average 2.4 kW per person)USA 10 500 WattsUSA - 10,500 WattsCalifornia - 7,300 WattsUK - 5,200 WattsChina - 1,650 Watts (growing 10% pa)China 1,650 Watts (growing 10% pa)India - 700 WattsBangladesh - 210 Watts
Energy use increases with
US
Economic Development
Australia
10kW
Russia
S. Korea IrelandFrance
UKJapan
B ilChina
MexicoGreeceMalaysia
BrazilIndia
With industrialization of emerging nations, energy use is expected to grow ~ 4 fold in this century (average 1.6% annual growth rate)
Energy supply will be dominated by fossil fuels for the foreseeable future
’04 – ’30 Annual
16 000
18,000Mtoe
OtherRenew ables
Growth Rate (%)
6.5
1 3
10 000
12,000
14,000
16,000 Biomass &w aste
Hydro
1.3
2.0
0 7
4 000
6,000
8,000
10,000 Nuclear
Gas
0.7
2.0
1 3
0
2,000
4,000
1980 2004 2010 2015 2030
Oil
Coal
Total
1.3
1.8
1.6980 00 0 0 0 5 030
Source: IEA World Energy Outlook 2006 Reference Case (Business as Usual)
World Primary Energy Demand is expect to grow substantially
oe)
man
d (M
tone
rgy
Dem
Wor
ld E
n
0.5 EJ
Data from IAE World Energy Outlook 2006 Reference (Red) and Alternative (Blue) scenarios.
World population is projected to grow from 6.4B (2004) to 8.1B (2030)
World uses (& needs) a lot of energy!World uses (& needs) a lot of energy!
World Primary Energy consumption is 14 TW (2004)y gy p ( ) Equivalent to ~0.5 EJ or 11.2 Billion Ton of Oil Equivalent pa World energy [electricity] market ~ $4.5 trillion [$1.5 trillion] pa
World energy use is expected to grow 50% by 2030 World energy use is expected to grow 50% by 2030.
80% of world energy is from burning fossil fuels
Energy Efficiency has a huge scope but demand is rising faster due Energy Efficiency has a huge scope but demand is rising faster due to long turn-over time.
Conditions for Sustainability/Growth:Conditions for Sustainability/Growth: Large supply of the energy resource (TW scale) Acceptable land/resource usage Minimal by-product stream Economically feasible technology
Fusion Engineering Grand Challenge
When:When:Power Plant Needs and State of Current AchievementsState of Current Achievements
Technical Readiness Levels provides a basis
Level Generic Description
for assessing the development strategy
ase
1 Basic principles observed and formulated.
2 Technology concepts and/or applications formulated.
Analytical and experimental demonstration of critical function and/ortion
onm
ent
Sci
ence
Pha
3 Analytical and experimental demonstration of critical function and/or proof of concept.
4 Component and/or bench-scale validation in a laboratory environment.
5 Component and/or breadboard validation in a relevant environment.ed in
tegr
at
ty o
f env
iro
& A
pplie
d S
5 Component and/or breadboard validation in a relevant environment.
6 System/subsystem model or prototype demonstration in relevant environment.
7 System prototype demonstration in an operational environment.Incr
ease
sed
Fide
lit
Bas
ic
Validation
8 Actual system completed and qualified through test and demonstration.
9 Actual system proven through successful mission operations.Incr
eas Validation
Phase
Developed by NASA and are adopted by US DOD and DOE. TRLs are very helpful in defining R&D steps and facilities.
Example: TRLs for Plasma Facing Components
Issue-Specific Description Facilitiesp p
1 System studies to define tradeoffs and requirements on heat flux level, particle flux level, effects on PFC's (temperature, mass transfer).
Design studies, basic research
2 PFC concepts including armor and cooling configuration explored. Critical parameters characterized.
Code development, applied researchPower-plant relevant high-temperature gas-cooled PFC
3Data from coupon-scale heat and particle flux experiments; modeling of governing heat and mass transfer processes as demonstration of function of PFC concept.
Small-scale facilities:e.g., e-beam and plasma simulators
4Bench-scale validation of PFC concept through submodule testing in lab environment simulating heat fluxes or particle fluxes at prototypical levels
Larger-scale facilities for submodule testing, High temperature + all expected range of
Power plant relevant high temperature gas cooled PFC
4 environment simulating heat fluxes or particle fluxes at prototypical levels over long times.
High-temperature + all expected range of conditions
5Integrated module testing of the PFC concept in an environment simulating the integration of heat fluxes and particle fluxes at prototypical levels over long times.
Integrated large facility:Prototypical plasma particle flux+heat flux (e.g. an upgraded DIII-D/JET?)
6Integrated testing of the PFC concept subsystem in an environment simulating the integration of heat fluxes and particle fluxes at prototypical levels over long times.
Integrated large facility: Prototypical plasma particle flux+heat flux
7 Prototypic PFC system demonstration in a fusion machine. Fusion machineITER (w/ prototypic divertor), CTF
Low-temperature water-cooled PFC
( p yp ),
8 Actual PFC system demonstration qualification in a fusion machine over long operating times.
CTF
9 Actual PFC system operation to end-of-life in fusion reactor with prototypical conditions and all interfacing subsystems.
DEMO
Application to power plant systems highlights early stage of fusionhighlights early stage of fusion technology development
TRL1 2 3 4 5 6 7 8 9
Power managementPlasma power distributionHeat and particle flux handlingHigh temperature and power conversionPower core fabricationPower core lifetimeSafety and environmentTritium control and confinementActivation product controlActivation product controlRadioactive waste managementReliable/stable plant operationsPlasma controlPlant integrated controlFuel cycle controlMaintenance
CompletedIn Progress Basic & Applied Science Phase
S D /
For Details See ARIES Web site: http://aries.ucsd.edu (TRL Report)
System demonstration and validation in operational environment Demo/1st power plant
ITER will provide substantial progress gin some areas (plasma, safety)
TRL1 2 3 4 5 6 7 8 9
Power managementPlasma power distribution
Heat and particle flux handlingHeat and particle flux handling
High temperature and power conversionPower core fabricationPower core lifetimeSafety and environmentTritium control and confinementTritium control and confinementActivation product controlRadioactive waste managementReliable/stable plant operationsPlasma controlPlant integrated controlgFuel cycle controlMaintenance
CompletedIn Progress
ITER
Absence of power-plant relevant technologies and limited capabilities severely limits ITER’s contributions in many areas.
Currently envisioned development path has many shortcomings
Reference “Fast Track” Scenario:e e e ce ast ac Sce a o10 years + 10 years + 10 years 30-35 yearsbuild ITER exploit ITER build+ IFMIF + IFMIF DEMO IFMIF IFMIF DEMO
(Technology Validation)
ITER construction TBM Experimental 1) Large & expensive facility Fundingco st uct odelay, First DT plasma 2026?IFMIF?
TBM Experimental Program is not defined!+10-20 years~ 2026-2040
1) Large & expensive facility, Funding, EDA, construction ~ 20 years.2) Requires > 10 years of operation~ 2060-2070
2070: Decision to field 1st commercial plant barring NO SETBACK
Bottle neck: Sequential Approach relying on expensive machines! Huge risk in each step!
How:How:Use Modern Product Development Techniques!Development Techniques!
Fusion Energy Development Focuses on Facilities Rather than the Needed Science
Current fusion development plans relies on large scale, expensive facilities:* Long lead times, $$$ Expensive operation time Limited number of concepts that can be tested Integrated tests either succeed or fail, this is an expensive and
ti i h t ti i ttime-consuming approach to optimize concepts.
* Observations by ARIES Industrial Advisory Committee, 2007.
This is in contrast with the normal development path of any product in which the status of R&D necessitates a facility for experimentation.
We should Focus on Developing a Faster F i E D l t P th!Fusion Energy Development Path!
Use modern approaches for to “product development” (e.g., Use modern approaches for to product development (e.g., science-based engineering development vs “cook and look”) Extensive “out-of-pile” testing to understand fundamental processes Extensive use of simulation techniques to explore many of Extensive use of simulation techniques to explore many of
synergetic effects and define new experiments.
Experiment planning such that it highlights multi-physics interaction (instead of traditional approach of testing integrated systems to(instead of traditional approach of testing integrated systems to failure repeatedly).
Aiming for validation in a fully integrated system
Can we divide what needs to be done into separate “pieces” R&D can be done in parallel (shorter development time) Reduced requirements on the test stand (cheaper/faster!) Issues: 1) Integration Risk, 2) Feasibility/cost?
Example of modern engineering development
Ai ft i d i th i ft th h Aircraft companies now design the aircraft through CAD/CFD/Structural analysis codes with verification in wind tunnel and actual flight.
“Conventional” alloy development is a slow and expansive process
e g 55oC improvement in upper operating temperature e.g., 55 C improvement in upper operating temperature of steel after 40 years of development.
Computational thermodynamics calculations can lead to composition and heat treatment optimizationto composition and heat treatment optimization, drastically reducing the time and expanses (See S. Zinkle presentation at 2007 FPA meeting posted on fire Web site)Web site).
Addressing feasibility of high heat transfer capability of gas-cooledtransfer capability of gas-cooled high-heat-flux components
A T t b d i f di t d l bl f 10MW/ 2 f A T-tube design for divertor modules capable of > 10MW/m2 of heat load was developed (ARIES/FZK collaboration).
$80k university experiment at Georgia Tech (2 Master Students) f d d d th ARIES t t t thi twas funded under the ARIES program to test this concept.
Scientific basis for the concept was tested under similar dimensionlesstested under similar dimensionless parameters
Experiments confirmed the predicted high heat transfer coefficient. Experiments confirmed the predicted high heat transfer coefficient. Found better coolant routings and illuminated difficulties in
manufacturing.
Example of Initiatives to address fusion engineering sconces issues
Plasma facing components and plasma material interaction University based groups to develop and test high-heat University based groups to develop and test high heat
flux component concepts Linear plasmas device with capability of several MW/m2
heat and relevant particle flux on “component-size” testheat and relevant particle flux on component size test articles.
Radiation-resistant material Radiation resistant material User facilities based on existing neutron sources (e.g.,
SNS) with extensive university participation to define experimentsexperiments.
Example of Initiatives to address fusion engineering sconces issues
Fusion Nuclear Engineering Address the man-power and limited single-effect data base
immediately by starting a program to fund university-based research in FNT (RFP for 3-4 proposals totaling $2M/y, build to $5-6M/year in 3 years).
Start planning for user-facilities in national labs for proof-of-principle and multi-effect tests in national labs (e.g., He loop, LiPb loop, heat sources, etc.) to be constructed in 3-4
tiyears time.
A faster fusion development program requires decoupling of fusionrequires decoupling of fusion technology development from ITER
ITER construction delay, First DT plasma 2021?IFMIF?
ITER burning plasma experiments 2026-2035Sat. tokamaks 2016-2035
Aggressive science-
IFMIF (…-2030)
1st of a kindggbased R&D utilizing out-of-pile experiments10 years (2020)Funding Limited
Driven CTF (low Q)6 years construction10 years operation (2020-2035)
1 of a kind Commercial power plant
2035: Decision to field 1st commercial plant
g ( )
Key is aggressive science-based engineering up-front
In summary: Why? How (not to)?In summary: Why? How (not to)?
World needs a lot of new supply of energy World needs a lot of new supply of energy. Fusion is NOT the only game in town. But, it can fit all criteria for energy growth if we solve the
fusion engineering grand challenge!
All published Fusion Development Paths are based on large p p gand expensive facilities. This cook and look approach is doomed to failure: Requires expensive nuclear facilities with long lead times.q p g Leads to large Risks between steps. Needs extensive run-time in each step.
N tt ti t i & t h l i t b f No attention to science & technology requirements before fielding a step.
In summary: How? When?In summary: How?, When?
We need to develop a fusion energy roadmap (“Fusion Nuclear p gy p (Sciences” road-map). Large-scale facility should be only validation facilities. Required science and engineering basis for any large facilityRequired science and engineering basis for any large facility
should be clearly defined and included in such a Road-map. We need to start implementing such a road-map to show that we
are serious (only the “pace” is set by funding). We need to start work-force development.
Increased funding and emphasis for fusion have always been Increased funding and emphasis for fusion have always been driven by external factors. We need to be prepared to take advantage of these opportunities. It is possible to field fusion power plant before 2050, but we lay the It is possible to field fusion power plant before 2050, but we lay the
ground work now!
Thank you!
Top Related