PHS - MAINTENANCE BUILDINGSEISMIC STRENGTHENING PROGRAM/
MEASURE E BOND PROGRAM
INVESTIGATION, ANALYSIS, AND PRELIMINARY
CONCEPT
October 24, 2007
R. P. Gallagher AssociatesStructural Engineers
SITE PLAN
(E) WORKSHOP
(E) STORAGE(E) TRAILER
(E) TRANSFORMER(E) TRAILER
PIEDMONT MIDDLE SCHOOL
STRUCTURAL
STRUCTURES DO NOT MEET ASCE 31
WOOD BUILDING AND TRAILERS WILL LIKELY
FALL OFF SUPPORTS
PREFAB UNLIKELY TO COLLAPSE, BUT MAY BE DAMAGED
MEZZANINES DO NOT MEET CODE
MANY NONSTRUCTURAL HAZARDS
CONTINUED OPERATIONS SEVERELY IMPAIRED OR PREVENTED AFTER EARTHQUAKE
ESSENTIAL IN PREPAREDNESS AND RECOVERY OPERATION
PATH OF TRAVEL NON COMPLIANT
NO ACCESSIBLE ROUTE
LACK OF CODE COMPLIANT DIRECTIONAL SIGNAGE
STAIRS ARE NON COMPLIANT
NO RAMP FOR WHEELCHAIR ACCESS
NO ACCESSIBLE PARKING
ADA / ACCESSIBILITY
EXTERIOR SIDES OF EXIT DOORS DO NOT HAVE HANDRAILS OR LANDINGS
LACK OF PROPER EXHAUST SYSTEMS
LACK OF OSHA COMPLIANCE
NO FIRE ALARM
UNSAFE STORAGE
FIRE & LIFE SAFETY
VARIOUS OPTIONS:
REPAIR EXISTING BUILDINGS
REMOVE WOOD FRAME BUILDINGS AND TRAILERS, REPLACE WITH NEW BUILDINGS
REPLACE ALL BUILDINGS
EXISTING
NEW
1. NEW WORKSHOP/ UPGRADED METAL BUILDING
PROJECT COST: $ 1 – 1.8 Million
OUTCOMES:
More functional
5 Standard parking spaces
Meets ASCE 41
2,000 sf
2,000 sf
EXISTING
NEW
2. NEW WORKSHOP/ STORAGE/ OFFICES
PROJECT COST: $ 2.7 Million
OUTCOMES:
4000 sf new building
Code compliant
5 truck parking spaces plus 3 standard parking spaces
Efficient layout
4,000 sf
PHS – MAINTENANCE BUILDING
PRISCILLA MECKLEY – ARCHULETA
MIKE WASSERMANN
JOHN NELSON
RON GALLAGHER
* For more information, visit http://www.pusdbond.orgR. P. Gallagher Associates