Performance Review Institute Qualified Products Listing
January 30, 2014
Definitions
• QUALIFIED PRODUCTS LIST (QPL): A listing of products from manufacturers who have received a PRI product qualification to a specific aerospace standard for specific product designations and plant locations.
• QUALIFIED PRODUCT GROUP (QPG): A committee mandated by the QPMC responsible for assessing whether manufacturer's products comply with the relevant aerospace standard. The committee is composed of members from Original Equipment Manufacturers (OEMs) and Government Agencies.
• QUALIFIED PRODUCT MANAGEMENT COUNCIL (QPMC): The committee that manages the Qualified Product Process/Program.
2
PRI QPL Program Background
QPL - A document which lists qualified manufacturers who have met the product qualification test requirements to a specified industry standard for specific part numbers and plant locations
1996 1998 2014Pilot program Industry Managed
PRI QPL Program
DoD Acquisition Reform Military specifications with QPL’s
posed a problem for non-government
standards to convert
Preserve value-added aerospace specification requirements
PRI championed pilot program, with
organizational concept SAE committee volunteers
Pilot program success PRI QPL program formally
established Standard Development
Organization (SDO) guidelines created and
approved by SAE Aerospace Council -
1999
More than 30,000
products/parts 8 active Qualified Product Groups
TODAY. . .
3
Purpose of the Aerospace QPL Program
• Maintain a list of manufacturer’s critical products where those products have been qualified as meeting specific industry standards.
• To manage the review process of submitted data and other materials reviewed by the QPG.
4
Motivation
• Users (OEMs/Government/Airlines)– Collaboration with other OEMs/Government/Airlines– Reduce costs by reduced need for in-house/outside lab testing– Uses consistent qualification procedures/standards– Maximize competition without the loss of quality– Avoid cost associated with maintaining User QPLs (testing,
qualification, administration)• Suppliers
– Typically lower costs than when qualifying products to User standards/specifications
– Utilize initial qualification data to a wider industry base– Eliminate redundant testing and qualification processes– Ensure fairness among suppliers– Utilize consistent approach to qualification of product
5
Industry-Managed QPL Structure
Policy
Strategic/
Tactical
Executive Leaders•Legal Entity•Set Policy•Provide the Vision
Senior Leaders & Managers•Oversee Operation of QPL Program•Establish & Implement Policy & Procedures•QPG Coordination & Development•Identify, Develop and Deploy ImprovementTechnical Experts
Determine Requirements Develop Documents Accepts Test Plan and Report Final Decision on QPL Listing
Process responsibilities clearly defined
Qualified Product Management Council
(QPMC)
StandardsDeveloping
Organization (SDO)
PRI Board of Directors
Standard Technical Committees
Knowledgeable Parties With Interest
Maintain Technical Standards,
Recommended Practices, etc.
6
Technical
QPGsFluid Distribution
Systems (G-3)Elastomer Seals
(AMS CE)Sealants (G-9)
Organic Coatings (G-8)
Propulsion Lubricants (E-34)
Propulsion Standards (E25)
CACRCAdvanced
Composites (P-17)
Role of PRI
• Coordinate operations/procedures of the QPMC and QPGs
• Coordinate activities throughout the QPG review and report processing
• Maintain and Control QPLs• Maintain customer records during and
after review• Maintain confidentiality
Administrator of the QPL program
7
2014 Board of Directors
Stan Adachi The Boeing Company
Richard A. Amato GE Aviation
Etienne Galen Snecma (Safran Group)
Michael J. Hayward Northrop Grumman Aerospace Systems
Mario Langlois (Chairman) Bombardier Aerospace
Tony Maguire BAE Systems PLC
January 2014
Ron Meester Honeywell Aerospace
Anna “Graham” Morast Pratt & Whitney, UTC
Andy Page Rolls-Royce plc
David L. Schutt SAE International
Junji Tsuji Ishikawajima-Harima Heavy Industries
Li Wei Aviation Industry Corporation of China
Jianqiang Xu COMAC8
Role of QPMC
• Provide direction for the administration of the PRI-QPL qualification program
• Provide an effective administrative structure to manage QPLs utilizing existing task groups, committee’s, etc. and provide feedback to industry in the form of guides or advisories
• Coordinate and communicate major QPL activities throughout the industry
• Ensure consistency in QPG operating procedures
• Resolve appeals of QPG decisions
9
Qualified Product Management Council
• Jerry BrownMaterials & Processes EngineerLockheed Martin Aeronautics Co.
• Kent DeFranco (Chairman)Materials Engineer, Sr. StaffLockheed Martin Aeronautics Co.
• Ross Downing (Vice Chairman)Principal EngineerThe Boeing Company
• Alan FletcherMaterials Engineer, Systems Support
Div.US Air Force
• Robert HainlineMechanical & Structural EngineerThe Boeing Company
• Tim KoczanskiDefense Standardization Program
Office
• Manuel Koucouthakis
Principal Engineer
Honeywell• Gary Landry
Program Manager, Design Systems
Pratt & Whitney• Carl Levandusky
General Engineer
Naval Air Warfare Center• James Lewis (Secretariat)
Program Manager
Performance Review Institute
• Paul Wittman
Certification Manager
Middle River Aircraft Systems
10Accurate as of January 2014
Policy and Procedures
PROGRAMDOCUMENT
PD2000
PROGRAMDOCUMENT
PD2001
GOVERNANCE AND ADMINISTRATION OF AN INDUSTRY MANAGEDPRODUCT QUALIFICATION PROGRAM
11
MANUFACTURER REQUEST FOR PRODUCT APPROVAL ANDQUALIFICATION PROCESS
Role of Qualified Product Group
• Meet and review data in a timely manner as required by procedure
• Establish procedures for the review • Review data for conformance to
requirements• Define and approve data sources• Disposition each qualification submittal• Forward evaluation reports to PRI
12
Current Qualified Product Groups
• Sealants * (SAE G-9)– Polysulfide, Polythioether and Adhesion Promoters
• Commercial Aircraft Composite Repair (SAE CACRC)– Composite Repair Materials, Processes and Methods
• Elastomer Seals * (SAE AMS-CE)– O-Rings, Plate Seals, Gaskets and other Compression Seals
• Fluid Distribution Systems Components * (SAE G-3)– Couplings, Fittings, Hose, Tubing and Installation Procedures
• Organic Coatings (SAE G-8)– Primers, Topcoats, Specialty Coatings e.g. Fuel Tank Coatings, Rain
Erosion Coatings• Propulsion Lubricants (SAE E-34)
– Synthetic Turbine Engine Lubricants• General Standards for Aerospace and Propulsion Systems (SAE E-25)
– Solid Film Lubricant• Polymeric Advanced Composite* (SAE P-17)
* Require a Nadcap Audit
13
The QPL Process
14
QPL Approval Process – Initial
Supplier SubmitsApplication
And Applicable Data to PRI
PRI forwardsSubmission
to QPG
QPG Reviews
Data
AdditionalInformationRequested
PRI CommunicatesRequest for
Additional Information To Supplier
Approval Granted
Yes
No
15
As to the Supplier….
• Obtain a copy of the applicable standard at www.sae.org
• Obtain a copy of the applicable Program Document at www.eAuditNet.com / Resources / Documents / Public Documents / QPL Programs
• Pay special attention to requirements, such as:– AS/EN/JISQ9100– ISO/IEC 17025 Lab– QPG witness– Test plan requirements per the specification/PD
document
16
And then….
• Go to www.eAuditNet.com to initiate a “Project”.
• Instructional PowerPoint Document– Resources / Documents / Public Documents /
QPL Programs / “QPL User Guide – Supplier”
Documents to be marked as Proprietary.
17
The Nadcap Audit Process
18
Nadcap
• Nadcap – The leading worldwide cooperative program of major companies designed to manage a cost effective consensus approach to special processes and products and provide continuous improvement within the aerospace and automotive industries.
19
Require a Nadcap Audit
• Is a Nadcap Audit required?– SAE Committee determines if the
Nadcap Audit is required
20
Information to Requestthe Establishment
of a PRI QPG
21
Primes Involved in the QPG
• Determine the structure and relationship between– SAE Committee and– the yet to be established QPG [Minimum
of 3 primes required]
22
Key Players
• SAE Committee Members Planning to Participate in the QPL Project Reviews
– Contact & Company Name
23
Program Information
• Number of Suppliers Impacted• Applicable Current Specification Numbers
and List of Potential Specifications• Potential QPL Projects (workload)• Timeline for Completion/Publication of the
Specification
24
Program Information (continued)
• Is an AS/EN/JISQ9100 approved quality system required?
• Is it required to conduct the testing at an ISO/IEC 17025 accredited laboratory with applicable scope?
25
Program Information (continued)
• What information is required on the on-line QPL listing?
• Is a Nadcap Audit required for the qualification?
• What are the requalification/recertification/ periodic testing/sampling requirements?
• Will grandfathering of materials be applicable?
26
Request for Development of a QPG
• Formal Letter to the QPMC • Formal Presentation at the QPMC
Spring or Fall Meeting– Time for approval– Time for implementation
27
Letter Template
eAuditNet.com
Register in eAuditNet
29
eAuditNet Support - +1 724-772-8679
On-Line QPL
Under “Resources” select, “Online QPL”.
30
www.eauditnet.com
• On-Line PRI-QPL
Select Specific QPG
Select a Specific Manufacturer or SAE
Standard
Click “Search”
31
OR
Download Search Data
Download to an Excel Spreadsheet
32
QPL Documents in eAuditNet
Click as follows:
•Resources•Documents•Public Documents•QPL Programs
33
PRI eAuditNet Website Link
• Link PRI On-Line QPL Search to SAE Standards Website– Button would indicate “click here to purchase the SAE
specification”
Link to SAE to Purchase the
Standard
34
SAE Website Link
• Link SAE Standards website to PRI QPL– Button would indicate “PRI-QPL”
Link to eAuditNet
35
CACRC QPL Search Results
36
Questions????