Civil Structures and Civil Structures and Equipment ArrangementsEquipment Arrangements
Johan Slabber
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 2
Discussion TopicsDiscussion Topics
• Site Arrangement
• Reactor BuildingContainment System
Citadel
Conventional Island
• Auxiliary Buildings
• General Arrangements
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 3
Site BuildingsSite Buildings
Cooling Water
PlantroomCooling Towers
Transformer Bay
Administration Building
Module Building
Services Building
Ancillary Building
Reactor BuildingRPV
Citadel
PCUCitadel
Laydown
SPECIFICATION
Height total 65.3 mHeight above ground 42.8 mDepth below ground 22.5 mWidth 37 mTotal width (loading bayincluded) 46m
Length NI 67mLength NI (SSS additional) 74mLength CI 36mTotal length (CI included) 110m
Nuclear IslandConventional
Island
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 5
External LoadsExternal Loads
The following external loads are considered in the plant design:Wind LoadsTornado LoadsAtmospheric Temperature LoadsPrecipitation Loads (rainfall and snow)External Flood LoadsInternal Flood LoadsMissile LoadsAircraft Crash LoadsSeismic Loads (Safe Shutdown Earthquake [SSE] = 0.4 g Peak Ground Acceleration (PGA) horizontal and 0.27 g PGA vertical (under review for DPP))
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 6
Containment SystemContainment System
The Containment System is comprised of:Citadel
– Reactor Cavity
– PCU Citadel
Vented Confinement Building
Pressure Relief System
Specialized Doorways Subsystem
HVAC System Filtration
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 7
Containment System FunctionsContainment System Functions
Containment System functions include:Protection of reactor, spent fuel, and safety related SSCs from external loads and missilesProtection of the reactor, spent fuel, and safety related SSCs from high energy HPB breaks and other internal hazards (e.g. fires and floods)Mitigation of fission product releases via vented and filtered confinement approachLimit air ingress to the MPS following a HPB breachAdditional functions to support access, maintenance, personnel safety, and health physics
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 8
Confinement PhilosophyConfinement Philosophy
Confinement
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 9
Depressurization Routes
HICS
2x13m2 Shafts1
2
34
5
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 10
Vent Shaft LayoutVent Shaft Layout
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 11
Specialized DoorsSpecialized Doors
The functions of the Specialized Doors include:Facilitate access to reactor building areas
Support building confinement functions – Limit air ingress into the Citadel, post event, for HPB breaks
– Limit the release of fission products to atmosphere
Support zoning within reactor building – Fire
– Flood
– PRS pressure
– HVAC static pressure zones
– Radiation protection
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 12
Conventional Island (Generator House)Conventional Island (Generator House)
The Generator House performs the following primary functions:
Provides access to the generator during operation and maintenanceHouses the ancillary plant serving the generator, e.g. breaker, SFCHouses the generator transformer and unit transformer bussbarsHouses the two redundant trains of electrical systems interfacing with the Nuclear IslandHouses the two lube oil systems serving the turbine, compressors and generator in the controlled and non-controlled areas
February 28 – March 2, 2006 PBMR Safety and Design Familiarization© Copyright 2006 by PBMR (Pty) Ltd. 13
Auxiliary BuildingsAuxiliary Buildings
• Diesel Generator Building
• Diesel Fuel Building
• Lube Oil Storage Building
• Cooling Water (CW) Plant Room
• Fire Pump House
• Fire Protection System (FPS) Water Storage Tanks
Level –22.5m
HICS ICS C&I
Sump
FHSS Scrap Fuel Storage
CCS/CBCS BC
Open
ICS Tanks
Open
FHSS SFT M
aintenance
HoistHoist Lobby
FHSS D
ust Filter M
aintenance
FHSS SFT M
aintenance
HVAC
Lift LobbyLift
Stair
Emergency Stairs CBCS
Stair
HICS Valves
Open
CBCS
PRS Shute
PRS Shute
ACS Piping
FHSS Maintenance
Level –18.75m
HICS HPS LabFHSS lifting v-block
CCS/CBCS BC
Open
Open
HICS Valves
Open
FHSS Filter and StorageFHSS SFT (6),
UFT, GST
FHSS SFT (6), installed after 12y
Open
FHSS pipe servitude
CCS
Aux BC
Level –15.0m
HICS ICS Compressors (5)
Open
Open
FHSS AGS
FHSS pipe servitude
FHSS CUD
Open
Open
Hot Outlet Pipe
HICS DSRS Compressors (2)
HICS DSRS
HLW storage
Level –9.25m
HICS HPS Main
Open
Open
Waste Storage
FHSS pipe servitude
Special Tools
Open
HICS HPS C&I
Level –5.3m
HICS HPS Laydown
CCS/CBCS Power Panels
StairOpen
FHSS pipe servitude
Open
Open
HVAC Top Cavity HICS DSRSACS Pipes
Open
Pre-cooler
Inter-coolerLift AEPS Cable
Servitude PLICS Pipe Servitude
HICS ICS Filters (1&2)
Level +0.7m
HICS N2 Storage
FHSS Fresh Fuel
FHSS SFT Pipes
FHSS pipe servitude
Controlled Access
Open
PEMR HICS N inject
HICS Cryogenic
Open
PLICSRecuperators PEMR Power Supply
HICS HMS
Loading Bay (NI)
TGS Oil System (contaminated
TGS Oil System (un-contaminated
Busbars
Loading Bay (CI)
HICS HMS Compressor
FHSS SFT Relieve Valves
Level +5.2m
Open
FHSS pipe servitude
PEMR
HVAC
PCU Instrumentation
Loading Bay (NI)
Loading Bay Hatch
PCU Instrumentation
C&I Engineering room
Instu. Calibr
SFT Distribution
SFT Cooling
Generator Maintenance
Level +7.8/6.8m
Generator
Pre/Inter-cooler hatches
Compressor – St 1 & 2
Turbine Gearbox
PCU Laydown
PCU Laydown
Level +12.3m
FHSS Maintenance
FHSS pipe servitude
FHSS Workshop
Loading Bay CI HatchIAEA
HVAC Z2 Air intake
Decontamination
Count Room
LaydownBelow
Loading Bay NI Hatch
Open(2.7m)
LaydownBelow
Level +15.5m
FHSS Valve Blocks
FHSS pipe servitude
FHSS Maintenance
RCS ST
LaydownHatches
Decontamination
Open
Loading Bay NI Hatch
Open
Laydown
Laydown
Level +19.0m
HVAC Access
HVAC Z3 Intake
FHSS Valve Blocks
Open
Contaminated Laydown Area
Open
Open
LaydownPlatform
Level +24.5m
NS
RCCS Tank Pipes
FHSS Valve BlocksContaminated
Laydown Area RPS
BUMS RPS Cabling
WHS SW Storage
Level +29.0m
RU Laydown
RCCS Tanks
HVAC Z2
Exaust
RU Laydown
Level +33.5m
RCCS Tanks
HVAC Z3
Exaust