Indoor Unit Mounting - Front
1. Observe RF safety precautions2. Do not block the vents3. Do not set up the equipment on carpet,
heated floor or bare concrete.4. Do not cover the equipment with table cloth,rubber or plastic material.
5. Do not set up the equipment in bookshelvesor locker, etc.
6. Do not place books, paper, etc on and againstthe equipment.
7. Do not install sideways or slanting -ventilation.
8. Clean, dry place where temperature andhumidity remain stable, non-condensing.
9. If necessary, install the equipment in anairtight room or shelter
10. Do not apply air directly from the air-conditioner to the equipment as this maycause condensation.
11. For measures against the damage from saltwater to an ODU, consult with NEC.
INSTALLATION
8/10/2019 Pasolink Neo Installation
4/38
Modem Cabling
INSTALLATION
GroundingScrew
IF Connector
XPIC DEMConnection
XPICControl
PowerSupply
8/10/2019 Pasolink Neo Installation
5/38
4, Crimpingtool
2, Earthingcable
green-yellow,4mm diametertwisted or rigid
cable
1, Supply cable2x0,7mm diameter
twisted, covered
wire
5, Termination
1, Each equipments power supply cable have to bebuilt in separated line.2, Connecting to the frame and to the equipment,and/or connecting the equipment to the earthing point
3, Fuse: 6.3 A, a spare is located in the modem
INSTALLATION
8/10/2019 Pasolink Neo Installation
6/38
8/10/2019 Pasolink Neo Installation
7/38
Connectors for the IF cable
INSTALLATION
INSTALLATION
8/10/2019 Pasolink Neo Installation
8/38
Connectors for the IF cable-2INSTALLATION
8/10/2019 Pasolink Neo Installation
9/38
Installationexamples
Aftersoldering
INSTALLATION
8/10/2019 Pasolink Neo Installation
10/38
I/O BoardsLinecom provides several types of I/O components for thedistribution of signals to/from the PASOLINK NEO equipment
For NEO PDH interface types
PDH-16E1 interface PDH-48E1 interface
For different capacities 16x2 Mbps 32x2 Mbps 48x2 Mbps
Both balanced and unbalanced Different connector types
BNC 1.6/5.6 SMB
1.0/2.3 D-SUB RJ45
Different module sizes 1/2U or 1U high I/O Boards are available
INSTALLATION
8/10/2019 Pasolink Neo Installation
11/38
I/O BoardsI/O Boards for unbalanced signal distribution coaxial connectors
1U Connector Board for 16x2Mcapacity BNC connectors
-1/2/3 I/O Boards for16/32/48xE1 capacity
1U I/O Board for 16x2M capacity Siemens (1.6/5.6) connectors
-1/2/3 I/O Boards for16/32/48xE1 capacity
1/2U high I/O Board for 16x2M SMBconnectors
-1+1/2U height by 48x2M fullcapacity1U high I/O Board for 48x2M SMBconnectors
-48x2M full capacitydistribution in 1U height
INSTALLATION
8/10/2019 Pasolink Neo Installation
12/38
I/O Boards 1U Connector Board for 48x2Mcapacity RJ45 connectors
-48x2M full capacitydistribution in 1U height
1/2U high I/O Board for 16x2M RJ45connectors
-1+1/2U height by 48x2M full
capacity1/2U high I/O Board frame for 48x2M DSUB connectors
-for fixing of DSUB37connectors of MDR cables
I/O Boards for balanced signal distribution DSUB, RJ45 connectors
Interconnect cable forNEO PDH 16E1 INTFC
Interconnect cable forNEO PDH 48E1 INTFC
INSTALLATION
8/10/2019 Pasolink Neo Installation
13/38
8/10/2019 Pasolink Neo Installation
14/38
IF Cable types
50+2Characteristic Impedance
1000Voltage Withstand(AC V/MIN.)
1000Insulation Resistance M .KM,>=
9,15,953,411,4Outer Conductor ( /km)
8/10/2019 Pasolink Neo Installation
15/38
Grounding
INSTALLATION
8/10/2019 Pasolink Neo Installation
16/38
Grounding
INSTALLATION
8/10/2019 Pasolink Neo Installation
17/38
8/10/2019 Pasolink Neo Installation
18/38
Cable EquippingClip examples
Service loop
INSTALLATION
8/10/2019 Pasolink Neo Installation
19/38
Waterproofing ODU connectorINSTALLATION
8/10/2019 Pasolink Neo Installation
20/38
DADE Operation
The DADE control applies in 1+1 configuration to adjust the delay time for RX hitless switchingwhen the INTFC status is indicating out of phase. The DADE adjustment is needed in initiallineup or when the IF CABLE is replaced. A readjustment is not needed when the INTFC statusis indicated in-phase.
DADE: Automatically adjusts delay time based on eitherNo.1 signal or No.2 signal selected by the RX SW underthe out of phase condition of the INTFC status. TheDADE control is processed assuring no interruption oftraffic.
Offset DADE: Automatically adjusts delay time based oneither No.1 signal or No.2 signal selected by RX SWunder the out of phase condition of the INTFC status. Theoffset memory minimizes the latency delay, thereforetraffic interruption can occur at switchover as the two
signals may not be 100% in phase.
DADE off: Set when DADE function is not used. Forparticularly, when low bit rate (10 to 20 MB) transmissionis applied to the system, the DADE control is not required.
RX 1
RX 2
ODU
ODU
DEM
DEM
HitlessSwitch
DADE VariableDelay
l2
l1
l1
8/10/2019 Pasolink Neo Installation
21/38
ODU &Antenna
Mounting
INSTALLATION
8/10/2019 Pasolink Neo Installation
22/38
8/10/2019 Pasolink Neo Installation
23/38
ODU Antenna Connection 1+0
INSTALLATION
8/10/2019 Pasolink Neo Installation
24/38
ODU Antenna Connection 1+16/7/8 GHz
INSTALLATION
8/10/2019 Pasolink Neo Installation
25/38
INSTALLATION
8/10/2019 Pasolink Neo Installation
26/38
ODU Antenna connection XPIC
6/7/8 GHz Remote Mount Dual Pol. SystemODU Pole Mount Bracket and
6/7/8 GHz ODU has N-Type Coaxial Interface asshown, but could also use a waveguide interface to a
dual polarised antenna
6/7/8 GHz Remote Mounting of 1+1 ODUwith two antennas
INSTALLATION
8/10/2019 Pasolink Neo Installation
27/38
INSTALLATION
8/10/2019 Pasolink Neo Installation
28/38
Hybrid Combiner6-8GHz version and 11-52GHz version
INSTALLATION
INSTALLATION
8/10/2019 Pasolink Neo Installation
29/38
Mounting ofHybrid, ODU
& Antenna1+1 System
New HybridTorqueto 3Nm
INSTALLATION
INSTALLATION
8/10/2019 Pasolink Neo Installation
30/38
Hybrid Polarization Changing
Horizontal Polarisation
Vertical Polarisation
INSTALLATION
8/10/2019 Pasolink Neo Installation
31/38
OMT11-38GHz
8/10/2019 Pasolink Neo Installation
32/38
INSTALLATION
8/10/2019 Pasolink Neo Installation
33/38
Antenna
Alignment
INSTALLATION
8/10/2019 Pasolink Neo Installation
34/38
Antenna Alignment
Antenna alignment requires technicians at both sites, withcommunication between them.
INSTALLATION
8/10/2019 Pasolink Neo Installation
35/38
Antenna Alignment (1/2)1. Point antennas at both sites at each other
as closely as possible.
2. Use binoculars, etc. as necessary. It maybe necessary to lightly loosen the antennanuts.
3. Power up the radios at both sites.
4. Designate one site as the transmitter site.
5. If the equipment is working in MTPC mode,leave it, as it is.
6. If the equipment is working in ATPC mode,set the ATPC Manual control to on.
7. At the receiver site (the other site) monitorthe AGC voltage on the ODU with a digitalvoltmeterl. If you use a voltmeter, you haveto use a converter to connect it to the Ftype male connector of the ODU. RX LEV Monitor
Point
INSTALLATION
8/10/2019 Pasolink Neo Installation
36/38
Antenna Alignment (2/2)7. Adjust the azimuth and elevation angle of the antenna alternately so that the
measured voltage becomes maximum. The antenna alignment procedure differs inthe case of different antennas, which were developed by different vendors. Be sureto move the antenna the find the main lobe. Between the two sub lobes (two lowervoltage values) is the main lobe.
This picture shows a simplified radiation pattern of an antenna:
8. The typical values of the measured voltages are : 23,5 V DC (RX lev.= -50dBm..-28 dBm)
AGC MeasurementINSTALLATION
8/10/2019 Pasolink Neo Installation
37/38
AGC Measurement
8/10/2019 Pasolink Neo Installation