Download - Panera & R Taco Panera/UAGP Panera R... · 2016. 5. 20. · Building Area Assembly Panera: Building Area Total:6,500 sf Building Area3 8A,s0s0e0m2S,b2Fl0y0R sTfaco: Architect will

Transcript
Page 1: Panera & R Taco Panera/UAGP Panera R... · 2016. 5. 20. · Building Area Assembly Panera: Building Area Total:6,500 sf Building Area3 8A,s0s0e0m2S,b2Fl0y0R sTfaco: Architect will

Dua

ne M

eyer

s AIA

A

rchi

tect

Revisions

560

PR 2

422

Unc

erta

in, T

X 75

661

903.

484.

4040

drm

eyer

s@m

ac.c

om

Revisions

20 May 2016

Pane

ra B

read

& R

usty

Tac

o Sh

ell

Gra

nd P

rairi

e, T

exas

20 May 2016

Shell Building forPanera & R Taco

Lot 5 Block 3Westchester East Addition

Grand Prairie, Texas 75052Dallas County

A2 (Assembly)Type of Construction:

Allowable

Occupancy Classification:

NA

Building Height in Stories:Building Height in Feet:No. of Exits Required per Tenant:Tenant Separation:

2

IBC Code Requirements

24' - 0"

Project

22 HR

4,300 sf

1

38,000 SF

375 ft

Type V-B/sprinklered

GOVERNMENTAL AGENCIESCity of Grand Prairie206 West Church StreetGrand Prairie, TX 75050972 237 [email protected]

City of Grand Prairie Building Codes2015 International Building Code2015 International Plumbing Code2015 International Mechanical Code2015 International Fire Code2014 National Electric Code2015 International Energy Code2015 Fuel and Gas Code

Building Area Assembly Panera:

Building Area Total: 6,500 sf

2,200 sf38,000 SFBuilding Area Assembly R Taco:

Architect will prepare a color board for the approval of the Owner from thecolor samples submitted by the Contractor.

Submit electronic project photos with captions and progress summaryreports weekly to the Owner, the Architect and the Civil.

Con

trac

tor's

Req

uire

d C

heck

Lis

t Contractor shall have on desk in job site a copy of the City/County approvedplans.project documents

Contractor shall have on desk in job site a copy of the Fire Marshall approvedplans (if separate from City documents).

Submit accurate Pay Applications of Work exectued, inaccurate PayApplications will be rejected, not adjusted

tenant documents

changes

Submit all Change Requests in writing to Architect and/or Civil for evaluation.DO NOT proceed with any changes to the Work until written authorization hasbeen granted by the Architect and/or Civil and the Owner.

geotechnical

Tenant Lease Exhibits are contained in the Project Manual, become familiarwith these documents to understand the required level of finish for eachTenant. Notify Architect immediately of any discrepancies noted betweenLease Exhibit, Architectural Plans and Tenant Finish Planskeep CD Log of all pertinent Tenant Finish Drawings, send copy to Architectfor verification

pay applications Submit a Schedule of Values to the Architect and Civil Engineer prior toConstruction per Specifications

subcontractors Submit a list, including all contact information, of Subcontractors andSuppliers to be used on the project. If Subs or Suppliers change during thecourse of the Work notify the Architect of the change.

submittals Submit a minimum of 4 Shop Drawings or Submittals for each category ofWork.

Review and stamp the Shop Drawings or Submittals with your commentsbefore submitting them to the Architect for review.

DO NOT proceed with any phase of construction without approved ShopDrawings or Submittals.

Submit substitutions for approval if work components vary from those itemsspecified.

The Geotechnical Report is contained in the Project Manual, become familiarwith it to understand the required level of subgrade preparation required forthis project. Notify Architect, Civil Engineer & Geotechnical Engineerimmediately of any discrepancies or subgrade issues at the site that aredifferent than noted in the report.

DO NOT vary from Subgrade Preparation as documented in the GeotechnicalReport, Structural Drawings, Civil Drawings and Specifications w/o writtenauthorization from the Architect, Civil Engineer and Structural Engineer

Contractor shall ceate a Construction Documents (CD) log listing eachdocument and posting the effective date. Include Addendae, Change Ordersand Clarification Drawings. Send copy monthly or as it changes for review byArchitect.

Submit RFI's in writing to the Archtect or Civil. Maintain a log of RFI'sindicating their status.

Submit all ALL written comments issued by the City jurisdiction to theArchitect and the Civil.

Contractor shall remove any Drawings not sealed by the Architect orEngineers of record from the site.

Contractor Responsibilities

DO NOT initiate construction on any Tenant space until you have a set ofchecked Tenant Finish Drawings distributed from Architect's Office.

General Contractor to provide testing per Specifications. Submit copies of allConstruction Testing Reports to Architect, Structural and Civil Engineerimmediately upon their publication. DO NOT submit duplicate reports.

DO NOT front load Pay Applications. G703 shall be consistent withSubcontractors/Suppliers Contracts and Lien Waivers

Provide a 4' x 8' mock up of exterior wall for approval by Owner and Architect.

Follow the procedures set up in the Project Manual.

project management Provide and maintain an experienced and qualified Project Superintendent onsite throughout the duration of construction.

DO NOT proceed with color selections without the written approval of theArchitect.

Provide and maintain an experienced and qualified Project Manger in theoffice throughout the duration of construction.

Project DirectoryOWNERUDC Global, LLC630 E Southlake Blvd, Suite 110Southlake, TX 76092817 912 1731

OWNER CONTACTWade Strain817 733 [email protected]

ARCHITECTDuane Meyers Architect560 PR 2422Uncertain, TX [email protected]

STRUCTURALFenner Consulting LLC1543 Grimmett DriveShreveport, LA 71107318.222.2600Texas Firm Registration F-2532Gary Fenner

MEPFrank P. Skipper, P.E.Professional Engineer'3808 Northridge CourtIrving, TX 75038Texas Firm Registration #F-12758

CIVIL (under separate Contract)Civil Point Engineers, Inc.3102 Maple AvenueDallas TX 75201972.554.1100Texas Firm Registration #9723John Bezner

GEOTECH (under separate Contract)ATC Group Services LLC1841 West Oak Parkway, Suite FMarietta, Georgia 30062Texas Firm Registration #F-003653

ConstructionDocument Index

A1.01 Cover Sheet

Civil Under Separate ContractC1 Civil Cover SheetC2 SurveyC3 Demo PlanC4 General NotesC5 Site PlanC6 Site Plan OverallC7 Utility PlanC8 Grading PlanC9 Drainage Area MapC10 Erosion Control PlanC11 DetailsC12 GP Standard DetailsC13 GP Standard DetailsC14 GP Standard DetailsC15 GP Standard Details

Landscape Under Separate ContractIR1 Irrigation PlanIR2 Details & SpecsL1 Landscape PlanL2 Details & Specs

A1.02 Lease ExhibitA2.01 Floor PlanA2.02 Roof PlanA3.01 ElevationsA3.02 ElevationsA3.03 Rendered ElevationsA3.04 Storefront ElevationsA4.01 Bldg SectionsA4.02 Wall SectionsA4.03 Wall SectionsA4.04 Wall SectionsA4.05 Wall SectionsA4.06 Wall SectionsA4.07 Wall SectionsA4.08 Wall DetailsA4.09 Wall DetailsA4.10 Roof Details

ADA1 Accessibility DetailsADA2 Accessibility DetailsADA3 Accessibility DetailsADA4 Accessibility Details

S1.01 Foundation DetailsS1.02 Framing DetailsS1.03 Framing DetailsS1.04 Site Lighting & DumpsterS2.01 Foundation PlanS2.02 Framing PlanS2.03 Truss Profiles & Notes

MEP1 SpecificationsMEP2 Notes & SymbolsMEP3 Utility Site Plan & Details

E1.1 Electrical PlanE2.1 Electrical Riser Diagram

P1.1 Plumbing Plan & NotesP1.2 Plumbing Roof PlanP2.1 Plumbing DetailsP2.2 Plumbing DetailsP3.1 Plumbing Notes & Schedules

ProjectLocation

ProjectLocation

A1.01Local MapVicinity Map