Download - OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

Transcript
Page 1: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

GREEN RIVER ELECTRIC CORPORATION OWENSBORO, KENTUCKY

FOR ALL TERRITORY SERVED

PSC KY. N0. __ ~6 ______________ __

ORIGINAL SHEET NO . __ ....::2..:....9A--'----

CANCELLING PSC NO. ____________ _

SHEET NO. _______ _ RULES AND REGULATIONS

ENERGY CURTAILMENT PROCEDURES

Purpose - To provide a plan for reducing the consumption of electric energy on Green River Electric Corporation ' s s y stem in the event of a severe electric energy shortage.

For the purpose of this program, levels have been establ i shed:

the following customer curtailment priority

PUBUC SERVICE COMMISSION I . Essential Health and Safety Uses - as defined in Appendix A OF KENTUCKY

EFFECTIVE II. Residential Use

III . Commercial and Industrial Uses

IV. Nonessential Uses - as defined in Appendix B

V. Interruptible Loads

VI. Direct Load Control

MAR 15 't996

PURSUANT TO 807 KAR 5:011, SECTION 9 (1)

BY· ~ (!. 'ltu.{_ FoR rilPUBUCS£RVJCE COMMISSION

Procedures - Our Wholesale Power Cooperative, Big Rivers Electric Corporation ("BREC"), will notify Green River Electric Corporation ("GREC") in the event of

a severe electric energy shortage and the following steps will be implemented. These steps will be carried out to the e x tent not prohibited b y contractual commitments or by order of the regulatory authorities having jurisdiction .

GREC will take the following actions listed in prior ity order.

1. GREC will initiate Direct Load Control.

2. GREC will interrupt Interruptible Loads.

3. GREC will initiate its Load Reduction Procedure as outlined in Appendix C.

4. GREC will initiate its Voltage Reduction Procedure as outlined in Appendix D.

5 . BREC will notify GREC and both will initiate media appeal for general Voluntary Load Reduction Procedure, Appendix E.

6 . BREC will, in coordination with other electric generation utilities, request the Governor to declare a statewide Energy Emergency .

7 . BREC will request GREC to initiate mandatory load reduction of up to 20 percent in five percent steps, Appendix F .

-DATE OF ISSUE March 15, 1996

, ISSUED BY 12-477 ~4 ~~ NAME OF OFFICER

DATE EFFECTIVE __ M_a_r....:..c_h_1_5...:..,_19_9_6 _____ _

TITLE _..:..P....:..r-=e~s.:...:i d::..e=.:n..:..t.:........::a:..:.n.:..:d::........:G=-e=.:n..:..e=.r:....:a::..:I---=..:.M.:..::a....:..n.:..::a.:...og~....:e....:..r __ _

Page 2: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

e

e

FOR ALL TERRITORY SERVED

PSC KY.N0. __ ~6 ______________ __

ORIGINAL SHEET NO. _ __;2 9;.....;C;.__ __

GREEN RIVER ELECTRIC CORPORATION OWENSBORO, KENTUCKY CANCELLING PSC NO.-------------

SHEET NO. _______ __

RULES AND REGULATIONS

APPENDIX "B"

NONESSENTIAL USES

a. Outdoor flood and advertising lighting, except for the m~n~mum level to protect life and property, and a single illuminated sign identifying commercial facilities when operating after dark.

b.

c.

d.

e.

f .

g.

General interior lighting levels greater than minimum functional levels .

Show-window and display lighting.

Parking-lot lighting above minimum functional levels.

Energy use greater than that necessary to maintain a temperature of not less than 76 degrees during operation of cooling equipment and not more than 68 degrees during operation of heating equipment.

Elevator and escalator use in e x cess of the minimum necessary for non-peak hours of use.

Energy use greater than that which is the minimum required for lighting, heating or cooling of commercial or industrial facilities for maintenance cleaning or business-related activities during non-business hours.

PUBLIC SERVICE COMMISSION OF KENTUCKY

EFFECTIVE

MAR 1 5 1996

PURSUANT TO 807 KAR 5:011. SECTION 9 ( 1)

BY· t/~ C. 'Jtui... FOR T - PUBUC SE!'WICE COMMISSION

-DATE OF ISSUE March 15, 1996 DATE EFFECTIVE March 15, 1996

ISSUED BY n_ .~ TITLE President and General Manager NAME OF OFFICER

Page 3: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

e

FOR ALL TERRITORY SERVED

PSC KY. NO._~G _______ _

ORIGINAL SHEET NO. _::...:29:....;_0 __ _ GREEN RIVER ELECTRIC CORPORATION OWENSBORO, KENTUCKY CANCELLING PSC NO. -------

SHEET NO. ____ _

RULES AND REGULATIONS

APPENDIX "C"

LOAD REDUCTION PROCEDURE

Objective:

To reduce demand at the facilities of Green River Electric Corporation over the time period during which an electric energy shortage is anticipated.

Criteria:

This procedure is implemented when a LOAD REDUCTION ALERT is issued. The President and General Manager, or his designee, has the responsibility of issuing a Load Reduction Alert.

Procedure:

1. The President and General Manager, or his designee, receives notice from BREC of a capacity shortage.

2 . The President and General Manager, or his designee, is responsible for seeing that GREC employ ees participate in achieving the largest load reduction practical while maintaining facility services in a safe manner.

3. Each Department Manager is responsible for achieving the largest load reduction practical while maintaining facility services in a safe manner.

4. Examples of load reduction are :

a. turning off all unnecessary indoor and outdoor lighting

b. turning off microcomputers, printers, copiers and other office equipment except when they are not in use

c . in the winter, setting thermostats no higher than 68 degrees, and in the summer no lower than 76 degrees. PUBLIC SERVICE COMMISSIO~

OF KENTUCKY EfFECTIVE

Page 4: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

GREEN RIVER ELECTRIC CORPORATION OWENSBORO, KENTUCKY

FOR ALL TERRITORY SERVED

PSC KY. N0. ___ 6~--------------

ORIGINAL SHEET N 0. ___,2=-=9:....:....F ____ __

CANCELLING PSC NO. -------------

SHEET NO. _______ __ RULES AND REGULATIONS

APPENDIX "E"

VOLUNTARY LOAD REDUCTION PROCEDURE

Objective:

To reduce demand on Green River Electric Corporation's system over the period during which an electric energy shortage is anticipated through media appeal for consumers to curtail energy use.

Criteria:

This procedure is implemented when requested by BREC Public Relations personnel.

Procedure:

Notify service are radio and television stations of the electrical energy shortage and ask them to make public service announcements as recommended by BREC personnel. An example announcement is as follows:

"Attention all Green River Electric Corporation Customers:

Green River Electric Corporation is experiencing a critical shortage in the supply of electricity, and is requesting that all non-essential electrical appliances and lighting be turned off, and thermostats be lowered/raised immediately until (time of emergency).

Please curtail all unnecessary electricity use at this time.

Thank you for your cooperation."

Notify industrial or large commercial consumers, without interruptible contracts, and request that they curtail their energy use during the emergency.

-DATE OF ISSUE March 15, 1996

ISSUEDBY ~~ NAME OF OFFICER

PUBLIC SERVICE COMMISSION OF KENTUCKY

EfFECTIVE

MAR 15 '1996

PURSUANT TO 807 KAR 5:011 . SECTION 9 (1)

ey- Lh&~ e. >tAd-FOR T~ PUBliC SEIW!CE ebf,#l\@sii5N

DATE EFFECTIVE _.....:M.:..:.a::..:r~c:..:...;h:.........:....l5::...L..,_....:..l9::....:9:....::6~-----

TITLE __ P_r_e_s_i_d_e_n_t_a_n_d_G_e_n_e_r_a_I_M_a_n_a~g.._e_r __ _

Page 5: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

GREEN RIVER ELECTRIC CORPORATION OWENSBORO, KENTUCKY

FOR ALL TERRITORY SERVED

PSC KY. N0._~6_· ______________ _

ORIGINAL SHEET N 0. _...::.2..:....9G;::,__ __

CANCELLING PSC NO. ______ _

SHEET NO. _____ _ RULES AND REGULATIONS

APPENDIX "F"

MANDATORY LOAD CURTAILMENT PROCEDURE

Objective:

To reduce demand on Green River Electric Corporation's system over the period during which an electric energy shortage is anticipated by interrupting firm consumer load in 5%- blocks up to a total of 20%- of the system load.

Criteria:

This procedure is implemented when requested by BREC . (This procedure will only be implemented after the Governor of Kentucky has issued a State of Emergency Order . )

Procedures:

Green River Electric Corporation will immediately utilize Dispatch Center Personnel and SCADA equipment to interrupt service to customer loads to achieve the reduction requested by BREC. Reduction may be achieved by interrupting services to certain nonessential loads for the entire period of the emergency or by rotating outages to various substation feeder circuits . Green River Electric Corporation shall advise all customers of the nature of its mandatory load curtailment process as soon as practical through the use of radio and television announcements or direct contact.

PUBLIC SERVICE COMMISSION OF KENTUCKY

EFFECTIVE

MAR 1 5 1996

PURSUANT TO 807 KAR 5:011. SECTION 9 ( 1)

BY: ~~~e:::.:.i-:'JtuL=== FORT

~DATE OF ISSUE March 15, 1996 DATE EFFECTIVE _ _..;,.;.,M~a-=-rc;:,:,h.,;,_,;,.1-=-5!,_, ,;_1..:..9.:....96=---------

ISSUEDBY ~~ NAME oFOFFICERo

TITLE _ _;P:......:....re=s::.i:...:d:..:e:..:.n..:...;t::........::a:..:..n.:..:d::........:G::.e.::..:....:n-=e.:....r=a:....l ...:.;M:..:.:a::..:n:...:.a=-g=e.:....r __ _

Page 6: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

FOR ALL TERRITORY SERVED Community, Town or City

PSC NO. --~6 _________ _

GREEN RIVER ELECTRIC CORPORATION -OWENSBORO, KENTUCKY THIRTEENTH REVISED SHEET NO. 30

CANCELLING PSC NO. _ ____.:.6 ____ _

TWELFTH REVISED SHEET NO. 30

CLASSIFICATION OF SERVICE

Res Service (Single Phase and Three Phase) And All Other Single Phase Service

APPLICABLE

Service area in Daviess, Hancock, Hopkins, McLean, Henderson, Ohio, Webster, Breckinridge, and Muhlenberg Counties.

AVAILABILITY OF SERVICE

To any consumer within the service area and subject to the established Rules and Regulations and Bylaws of Green River Electric Corporation.

MONTHLY RATE

Customer Charge First 600 KWH, per KWH Next 400 KWH, per KWH All Over 1,000 KWH, per KWH

MINIMUM CHARGE

The minimum monthly charge shall be the applicable customer charge.

FUEL ADJUSTMENT CHARGE

The energy charge in any month shall be increased or decreased by a fuel adjustment charge according to the following formula:

E1 = rate applicable to each KWH sold p

Where F1 is the aggregate charge from the Corporation's wholesale power supplier for fuel adjustment, less any credit for intersystem power sales, in the Corporation's wholesale power contract; where P is the total KWH purchased, less line losses equal to a twelve-month moving average not to exceed ten percent (10%). The rate resulting from this formula shall be applied to each kilowatt hour sold in t current month and each KWH attributable to company use in the current month.

( N) ENVIRONMENTAL SURCHARGE

An additional charge or credit will be made on the kilowatt-hours purchased by the customer in accordance with the environmental surcharge set forth on Sheet 51, Item (1) of this tariff.

RATE PER NIT

$7.91 7.1903¢ 6.3174¢ 5.5684¢

SERVICE COMMISSION Of KENTUCKY

EFFECTIVE

ATE OF ISS~ Oc11::~95 OATE EFFECTIVE October 4, 1995 ~ /'\~ TITLE President and General Manager(1,

SERVICE COMMISSION IN CASE NO. 95-208 ORDER ISSUED BY ~~ f ISSUED BY •AUTHORiTY oFTH PUBLIC DATED OCTOBER 4, 1995.

Page 7: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

FOR ALL TERRITORY SERVED Community, Town or City

PSC NO. _......;6=-------------GREEN RIVER ELECTRIC CORPORATION

-OWENSBORO, KENTUCKY SECOND REVISED SHEET NO. 31A

CANCELLING PSC NO. -~6 ____ _

FIRST REVISED SHEET NO. ----~--~~~~------

31A

CLASSIFICATION OF SERVICE

Residential Service (Single Phase and Three-Phase) Marketing Rate for Electric Thermal Storage

APPLICABLE Service area in Daviess, Hancock, Hopkins, McLean, Henderson, Ohio, Webster, Breckinridge and Muhlenburg counties.

AVAILABILITY OF SERVICE To any customer within the service area a special marketing rate equal to 60% of the last step rate of regular tariff rate for Electric Thermal Storage (ETS) . The marketing rate requires separate metering and the execution of a contract between the customer and the corporation. A sample contract is included following this tariff on Sheet No . 31B and C.

MONTHS October through April

May through September

MONTHLY RATE

ETS Usage, All KWH Per Month

FUEL ADJUSTMENT CHARGE

OFF-PEAK HOURS - CDT 12 : 00 Noon to 5:00P.M.

9:00 P.M. to 6 : 00 A.M . 10:00 P.M. to 10 : 00 A . M.

The energy charge in any month shall be increased or decreased by a fuel adjustment charge according to the following formula :

E1 = Rate Applicable to Each KWH Sold p

Where F1 is the aggregate charge from the Corporation's wholesale power supplier for fuel adjustment, less any credit for intersystem power sales, in the Corporation's wholesale power contract; where P is the total KWH purchased, less line losses equal to a twelve-month moving average not to exceed ten percent (10%) . The rate resulting from this formula shall be applied to each kilowatt hour sold in the current month and each KWH attributable to company use in the current month.

( N) ENVIRONMENTAL SURCHARGE

An additional charge or credit will be made on the kilowatt-hours purchased by the customer in accordance with the environmental surcharge set forth on Sheet 51, Item (1) of this tariff.

TAXES

There shall be added to each applicable customer's bill the Utility Gross Receipts License Tax for schools (KRS 160.617) and the Kentucky Sales Tax (KRS 139.210).

RATE PER IT

$0 . 033410

SERVICE COMMISSION OF KENTUCKY

EFFECTIVE

T ; 4 1995

ATE OF ISS~ 0~95 DATE EFFECTIVE __ O_:.c~to;;....b;....;e'--r---'4 ,'--1...:....9.;:...9 5;....._.. __ __

ISSUED BY tdd& / <

ISSUED BY AUTHORITY OF AN ORDER OF THE CASE NO. 95-208 DATED OCTOBER 4, 1995.

TITLE _...:.P....:.r..:e:..=s~i d=..e=.:n:....:..:..t ..:a:..:.n.:..:d::........;G=-e.::.n:..:..::.er:....:a::..:I:.......:..:.M.:..:a:..:.n.:..:a::..;z.;:::.:..,_-r-Ot \9 PUBLIC SERVICE COMMISSION IN

..1

Page 8: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

e

FORM FOR FILING RATE SCHEDULES FOR ALL TERRITORY SERVED Community, Town or City

PSC NO. 6

ELEVENTH REVISED SHEET NO. 32

GREEN RIVER ELECTRIC CORPORATION CANCELLING PSC NO. 6 NAME OF ISSUING CORPORATION

(R) (R) (R)

TENTH REVISED

CLASSIFICATION OF SERVICE

Three-Phase Demand - commercial, Large Power & Public Buildings Less than 1,000 KW

APPLICABLE

SHEET NO.

Service area in Daviess, Hancock, Hopkins, McLean, Ohio, Henderson, Webster, Breckinridge, and Muhlenberg Counties.

AVAILABILITY OF SERVICE

Available to consumers served by Green River Electric Corporation located on or near its three-phase lines who contract for less than 1,000 KW of demand

MONTHLY RATE

Customer Charge

Plus Demand Charge of: per KW of billing demand

Plus Energy Charges of: First 200 KWH per KW, Per

Next 200 KWH per KW, Per All Over 400 KWH per KW,

KWH KWH Per KWH

DETERMINATION OF BILLING DEMAND

The billing demand shall be ·the maximum kilowatt load used by the consumer for any period of fifteen (15) consecutive minutes during the month for which the bill is rendered as indicated or recorded by a demand meter.

POWER FACTOR ADJUSTMENT

32

RATE PER UNIT

$25 . 00

$5.75

5.2353¢ 4.7121¢ 4.4819¢

The consumer agrees to maintain unity power practical. The Company will permit the use shall result, during normal operation, in a than 90%.

factor as near as of apparatus which power factor not lowel?UBUC SER IIICE COMMISSION

OF ENTUCKY Elif=ECTIVE

AUG 0 1 1994

PURSUANT T< 807 KAR 5:011. SECl ON 9 (1)

BY: r7 ... u/.- (! . >tad_ FOR T~ PIJBUC , ~RIJ!C CO'..&;iSStOO

~DATE OF ISSUE August 3, 1994 DATE EFFECTIVE August 1, 1994

President and General Manager ti_,Y\ \Q ISSUED BY TITLE ~~~~~~~~=-------------NAME OF OFFICER "\

ISSUED BY AUTHORITY OF AN ORDER OF THE PUBLIC SERVICE COMMISSION IN CASE NO. 92-504 ~ DATED JULY 22, 1994.

Page 9: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

GREEN RIVER ELECTRIC CORPORATION .WENSBORO, KENTUCKY

FOR ALL TERRITORY SERVED Community, Town or City

PSC NO. __ 6=--------------

THIRD REVISED SHEET NO. 33B

CANCELLING PSC NO. ---=-6-· ____ _

SECOND REVISED SHEET NO. 33B

CLASSIFICATION OF SERVICE

Three-Phase Demand- Large Power 1,000 KW and Above

APPLICABLE

Service area in Daviess, Hancock, Hopkins, McLean, Ohio, Henderson, Webster, Breckinridge, and Muhlenberg Counties.

AVAILABILITY OF SERVICE

Available to consumers located on or near the corporation's three-phase lines for service at standard distribution voltages and which have a Contract Demand that equals or exceeds 1,000 KW or a metered demand that equals or exceeds 1,000 KW in any of the preceding 12 months.

MONTHLY RATE

Option A - High Load Factor:

Customer Charge

Plus Demand Charge of: per KW of Billing Demand

Plus Energy Charges of: First 200 KWH per KW, per KWH Next 200 KWH per KW, per KWH All Over 400 KWH per KW, per KWH

Secondary Voltage Adder

Option B - Low Load Factor:

Customer Charge

Plus Demand Charge of: per KW of Billing Demand

Plus Energy Charges of: First 150 KWH per KW, per KWH Over 150 KWH per KW, per KWH

Secondary Voltage Adder

PUBLIC SERVICE COMMISSION OF KENTUCKY

EFFECTIVE

fEB 2 6 i996

PURSUANT TO 807 KAR 5:011 SECTION 9 (l) '

BY: ~ r!. >tu.t_ FOR r&.i!CSffNICe CCi. !'.~!<.'~ll'l•!

RATE PER UNIT

$100.00

$ 9.25

3.9949¢ 3.0449¢ 2 . 9449¢

5%

$100.00

$ 5.45

4.8149¢ 4.4949¢

5%

DATE OF !SSUlfuqust 3, 1994

ISSUEDBY ~A~ ISSUED BY ~UTHORITY OF~ EROF N 0. 92-5 0 4 DATED J U L Y 2 2 , 1 9 9 4 •

DATE E FFE CTI VE _:.._:Fe:::..:b:::.:r....::u::..::a:..:....r.L.y_.:2:...::6:..L,--=..:1 9~9:....::6~--

TITLE President and General Manager ql THE PUBLIC SERVICE COMMISSION IN CASE ~_,

C;

Page 10: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

e

FORM FOR FILING RATE SCHEDULES FOR ALL TERRITORY SERVED Conununity, . Town or City

PSC. NO . 6

THIRD REVISED SHEET NO.

GREEN RIVER ELECTRIC CORPORATION CANCELLING PSC NO. 6 NAME OF ISSUING CORPORATION

(R)

~~~

SECOND REVISED SHEET NO.

CLASSIFICATION OF SERVICE

Three-Phase Demand - Large Power 1,000 KW and Above

APPLICABLE

Service area in Daviess, Hancock, Hopkins, McLean, Ohio, Henderson, Webster, Breckinridge, and Muhlenberg Counties.

AVAILABILITY OF SERVICE

Available to consumers located on or near the corporation's three-phase lines for service at standard distribution voltages and which have a Contract Demand that equals or exceeds 1,000 KW or a metered demand that equals or exceeds 1,000 KW in any of the preceding 12 months .

MONTHLY RATE

Option A - High Load Factor:

Customer Charge

Plus Demand Charge of: per KW of Billing Demand

Plus Energy Charges of : First 200 KWH per KW, per KWH Next 200 KWH per KW, per KWH All Over 400 KWH per KW, per KWH

Secondary Voltage Adder

Option B - Low Load Factor:

Customer Charge

Plus Demand Charge of: per KW of Billing Demand

Plus Energy Charges of:

PUBUC SERVICE COMMISSION OF KENTUCKY

EFFECTIVE

(R) First 150 KWH per KW, per KWH (R) Over 150 KWH per KW, per KWH

Secondary Voltage Adder AUG 0 1 1994

PURSUANT TO 807 KAR 5:011 . SECTION 9 ( 1)

sv·~~ e. xJ... FOiH PU-LI1' c-~";:'~';'~QlN . .~, v .... . \. , v~ _ ,If~ '"'"" ~ •

33B

33B

RATE PER UNIT

$100.00

$ 9.25

3 . 9949¢ 3.0449¢ 2.9449¢

5%

$100.00

$ 5.45 ·

4. 8149¢. 4.4949¢

5%

.DATE OF ISSU~ust 3, 1994

ISSUED BY ~ ~~ NAME OF 0~

DATE EFFECTIVE August 1, 1994

TITLE President and General Manager

ISSUED BY AUTHORITY OF AN ORDER OF THE PUBLIC SERVICE COMMISSION IN CAS E NO . 92-504 DATED JULY 22, 1994.

Page 11: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

FORM FOR FILING RATE SCHEDULES FOR ALL TERRI TORY SERVED Community, Town or City

PSC NO. 6 ----~---------------------------

FIRST REVISED SHEET NO. 33C -GREEN RIVER ELECTRIC CORPORATION CANCELLING PSC NO. _ __;6~-------NAME OF ISSUING CORPORATION

ORIGINAL SHEET NO. 33C

CLASSIFICATION OF SERVICE

Three-Phase Demand - Large Power 1,000 KW and Above (Cont.) RATE PER UNIT

OPTIONAL RATE SELECTION

(N) The consumer may choose to take service under Option A or Option B. The option chosen by the consumer will remain in effect for a minimum of twe l ve months. Thereafter, the consumer may ~ upon request, transfer from one opt ion to the other after twelve months of service under the~ option previously chosen.

DETERMINATION OF BILLING DEMAND

(T) The billing demand shall be the greater of : (1) seventy-five (T) percent (75 %) of consumer's highest 30-minute KW demand recorded (T) in the current month or (2) ninety-five percent (95 %) of consumer's (T) highest 3D-minute KW demand recorded in the month in which the (T) corporation's regular tariff wholesale billing demand was established .

POWER FACTOR ADJUSTMENT

The consumer agrees to maintain unity power factor as near as practical . The Company will pennit the use of apparatus which shall result, during nonnal operation, in a power factor not lower than 90%.

Where the customer ' s power factor is l.ess than 90 %, the Company reserves the right to require the customer, at the customer's own expense, to furnish sui tab 1 e corrective equipment to rna in- PUBUC SERVIC COMMISSION tain a power factor of 90 % or higher. At the Company's option, OFKEN UCKY in lieu of the customers providing the above corrective equipment , BTEC~Vf when power factor is less than 90 %, the Company may adjust the maximum measured demand for b i 11 i ng purposes in accordance with JAN J 1991 the following fonnula :

Max . Measured KW x 90% Power Factor ( %)

PU8SUANT TO 8017 KAR 5:011. SECTION 9 (1)

The power factor shall be measured at time of maximum load . BY: ~ ;JL/h.~ PIJBUC~E

-DATE OF ISSU DATE EFFECTIVE January 1, 1991

ISSUED BY TITLE President & General Manager 9(~b b ISSUED BY AUTHORITY OF AN ORDER OF THE PUBLIC SERVICE COMMISSION IN

CASE NO. 90-152 DATED DECEMBER 21, 1990.

Page 12: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

FORM FOR FILING RATE SCHEDULES FOR ALL TERRI TORY SERVED . Community, Town or City

PSC NO~

FIRST REVISED SHEET NO. 33D

GREEN RIVER ELECTRIC CORPORATION NAME OF ISSUING CORPORATION

CANCELLING PSC NO. --~6~---------------

ORIGINAL SHEET NO.

CLASSIFICATION OF SERVICE

Three-Phase Demand - Large Power 1,000 KW and Above (Cont.)

SERVICE VOLTAGE

The above rates are based on service provided at the seller ' s primary distribution voltage. If service is furnished at the seller's secondary distribution voltage, the demand and energy charges spec­ified in the above rate schedules, excluding the customer charge and the amount calculated in accordance with the fuel adjustment provision, shall be increased by five percent (5 %). If the seller, at its option, meters the service at the secondary distribution voltage, metered demand and energy will be adjusted for billing purposes to the primary voltage by adding estimated transformer losses to the amounts metered.

MINIMUM MONTHLY CHARGE

The minimum monthly charge shall be in accordance with investment to

33D

RATE PER UNIT

serve and as mutually agreed to by both parties.

FUEL ADJUSTMENT CHARGE PUBliC SER ~ICE COMMISSION

OftENTUCKY EfFECTIVE

The energy charge in any month shall be increased or decreased by a fuel adjustment charge according to the following formula : JAN 1 1991

F1 = rate applicable to each KWH sold P PUaSUANT TC 807 KAR 5:01 1•

· 1 · SECT ON 9 (1) Where F is the aggregate charge from the Company's wholesale po~'f'r ~"~"2//,, supplier for fuel adjustment less any credit for intersystem pow~~UC~~itwc~E~- ~~~iu~~~~~ sales, in the Corporation's wholesale power contract; where P is the total KWH purchased, less line losses equal to a twelve-month moving average not to exceed ten percent (10 %). The rate resulting from this formula shall be applied to each kilowatt hour sold in the current month and each KWH attributable to company use in the current month.

TAXES

There shall be added to each applicable customer's bill the Kentucky Sales Tax (KRS 139.210). There shall also be added to each applicable customer ' bill the Util itv Gross Receipts License Tax for Schools (KRS 160.617).

Janua r:y , 1, 1991

ISSUED BY TITLE President & General Manager ~

}~ ISSUED BY AUTHORITY OF AN RDER OF THE PUBLIC SERVICE COMMISSION IN CASE NO. 90-152 DATED DECEMBER 21, 1990. ~~

Page 13: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

FOR ALL TERRITORY SERVED Community, Town or City

PSC NO. -~6 __________ _ GREEN RIVER ELECTRIC CORPORATION

-OWENSBORO, KENTUCKY Thirteenth Revised SHEET NO. 34

CANCELLING PSC NO. _ ___:6 ____ _

_ T_:___:_:w-=e..:....:l f~t.:....:h_.:.::R..::e.:..v.:.:i s:.::e:..::d:....__ SHEET N 0. 34

CLASSIFICATION OF SERVICE

Street and Individual Consumer Lighting

APPLICABLE Service area in Daviess, Hancock, Hopkins, McLean, Henderson, Ohio, Webster, Breckinridge, and Muhlenberg Counties.

AVAILABILITY OF SERVICE To any consumer within the service area and subject to established Rules and Regulations of the Corporation.

Type Light Approximate Lumens Mercury Vapor per lamp per month 7,000

Mercury Vapor per lamp per month 12,000

High Pressure Sodium per lamp per month 9,500

High Pressure Sodium per lamp per month 27,000

SERVICE LIMITED TO EXISTING INSTALLATIONS

(C) Mercury Vapor Per lamp per month 20,000

UNDERGROUND SERVICE WITH NON-STANDARD POLE

FEB 2 0 1995

PURSUANT TO 807 KAR S~ll SECTION 9 (1) '

BY: e. )t.al_ FOR

For service to governmental entities and street lighting districts with underground service on aluminum or fiberglass poles, an additional charge of $4.45 per month per pole will be added to the standard charges for street lighting.

OVERHEAD SERVICE TO STREET LIGHTING DISTRICTS SERVED PURSUANT TO KRS 179.470

For service to street lighting districts utilizing standard overhead facilities, an additional charge of $1 . 85 per month per pole will be added to the standard charges for street lighting .

RATE PER

$8 . 20

$9.52

$8.20

$11.30

$11.30

DATE OF ISSUE February 20, 1995

ISSUEDBY ~·~~ DATE EFFECTIVE _....:..F...!:e::::b.:..r~u~a r:....vl-..!:2~0..L, _1!...:9~9~5 __ _

TITLE President and General Manager

Page 14: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

FORM FOR FILING RATE SCHEDULES FOR ALL TERRITORY SERVED Community, Town or City

PSC NO. 6 . --~~----~--~---------

FIRST REVISED SHEET NO.

GREEN RIVER ELECTRIC CORPORATION CANCELLING PSC NO. 6

NAME OF ISSUING CORPORATION

(R)

(R)

(R)

ORIGINAL SHEET NO.

CLASSIFICATION OF SERVICE

DECORATIVE AREA LIGHTING

APPLICABLE

Service area in Daviess, Hancock, Hopkins, McLean, Henderson, Ohio , Webster, Breckinridge, and Muhlenberg counties.

AVAILABILITY OF SERVICE

To governmental units, lighting districts, or similar entities organized under KRS 179.470 within the service area and subject to established Rules and Regulations of the Corporation.

CONDITIONS OF SERVICE

Area lighting will be installed using underground service, with lights in each individual subdivision or lighting district having an average accessible service circuit of seventy-five feet (i.e., distance from existing source of secondary electric service to light= 75 ft. average). For light locations in excess of seventy-five feet average, or services requiring conductor sizes greater than the standard #12-2 AZ conductor, customer shall be required to pay these costs in advance of receiving service .

RATE PER MONTH APPROXIMATE LUMENS

High pressure sodium fixture, with white acorn style globe installed on decorative pole.

-High pressure sodium fixture, with lantern style globe installed on decorative pole.

Two high pressure sodium fixtures, with either acorn or lantern style globes installed on a decorative pole with scroll crossarm.

6,300

6,300

6,300 per lamp

PUBLIC SERVICE COMMISSION OF KENTUCKY

EFFECTIVE

AUG 0 1 1994

PURSUANT TO 807 KAR 5:011 SECTION 9 (1) '

BY: ~~~lf., >tu.l, FOR rkf PiJiic S..:IW!CZ COMl~iSsfoN-

35A

35A

RATE PER UNIT

$11.14

$11.14

$19 . 61

-DATE OF ISSUE August 3, 1994

' ~~ DATE EFFECTIVE August 1 1994

--~~~~~~----------

ISSUED BY NAMEOF OFFICER

ISSUED BY AUTHORITY OF AN ORDER OF THE PUBLIC DATED JULY 22, 1994 .

TITLE President and General Manager

SERVICE COMMISSION IN CASE NO. 92-504

Page 15: OWENSBORO, KENTUCKY RULES AND REGULATIONSpsc.ky.gov/tariffs/xtra info/Inactive or Non-Jurisdictional Utilities... · OWENSBORO, KENTUCKY CANCELLING PSC NO.-----SHEET NO. _____ __

FORM FOR FILING RATE SCHEDULES FOR ALL TERRITORY SERVED Community, Town or City

PSC NO. 6

~GREEN RIVER ELECTRIC CORPORATION

TWELFTH REVISED SHEET NO.

CANCELLING PSC NO. 6 NAME OF ISSUING CORPORATION

ELEVENTH REVISED SHEET NO.

CLASSIFICATION OF SERVICE

Industrial Consumers Served Under Special Contracts

The Rates to Commonwealth Aluminum, Inc., and Willamette Industries, Inc., (Western Kraft Paper Group/Kentucky Mills Division), shall be as follows:

Demand Charge of: per KW of billing demand*

Plus Energy Charge of: (R) per KWH consumed

(T)

(R)

(T)

(R)

The Rates to Southwire Co. and WorldSource shall be as follows:

Demand Charge of: per KW of billing demand*

Plus Energy Charge of per KWH consumed

The Rates to Scott Paper co. shall be as follows: Demand Charge of: per KW of billing demand*

Plus Energy Charge of per KWH consumed

*Billing demand for purposes of this tariff shall be the contractual billing demand in the current billing month or the highest contractual billing demand in any of the previous eleven (11) billing months, whichever is greater.

National-Southwire Aluminum: The rates to National-Southwire Aluminum Company shall be the NSA Smelter Rate contained in the tariff of Big Rivers Electric Corp­oration, attached herein, plus $.00008 per kilowatt hour per month.

36

36

RATE PER UNIT

$10.15

1.84006¢

$10.40

2.06006¢

$10.20

1.86006¢

TE OF ISSUE August 3, 1994

ISSUEDBY ~~ NAME OF 0 FICER

DATE EFFECTIVE August 1, 1994 ----~~--~------------

TITLE ___ P_r_e_s_i_d_e_n_t __ a_n_d __ G_e_n_e_r_a_l __ M_a_n_a_g_e_r __ ~'-'1~r-YI~

C;~ ISSUED BY AUTHORITY OF AN ORDER OF THE PUB1I6 SERVICE COMMISSION IN CASE NO. 92-504 DATED JULY 22, 1994.