PASIG RIVERPASIG RIVER REHABILITATION
COMMISSION
OUTLINE OF THE PRESENTATION
I. SITUATIONERA. BIOPHYSICAL B. GEOPOLITICALC. CHALLENGESC. CHALLENGES
II. HISTORICAL BACKGROUNDA. INSTITUTIONALB. ACTIVITIES AND PROGRAMSC. MASTERPLAN
III. PRRCA. MANDATE B. POWER/FUNCTIONSC. PARTNER AGENCIESD. PROGRAMS/PROJECTS
1. COMPLETED2 ONGOING2. ONGOING
IV. PROPOSED PROJECTA. TROMMET
I. SITUATIONER
The Pasig River System
BoundariesE t L g d B
Length: 27 Kms
East Laguna de Bay
West Manila Bay
North Manila, Mandaluyong, Pasig
South Manila, Makati, Pateros
Average Width 91 m
Average Depth 4 mAverage Depth 4 m
Water Volume 6.548 million m3
Low Flow, March to May 12 m3 /sec
High Flow, October to November 275 m3/sec
Depth Deepest: 6 m
Shallowest: 2 m
I. SITUATIONER
Cities and Municipalities in the Project Area:
•Makati•Mandaluyong
•Pateros•Quezon City
•Manila•Marikina•Pasig
•Taguig•San Juan
CURRENT CONDITIONS
Existing informal settlers along i b k t b l t d
I. SITUATIONER
river banks to be relocated.
Floating Garbage from Minor and Major Tributaries
CURRENT CONDITIONS
I. SITUATIONER
Minor and Major Tributaries draining in Main River
Domestic and Industrial Wastewater
CURRENT CONDITIONS
I. SITUATIONER
I. SITUATIONER
SOURCES OF POLLUTION
5% Solid Waste
65% Domestic Waste
30% Industrial Waste
I. SITUATIONER
WATER QUALITY OF PASIG RIVERPasig River Annual Average DO Level
8
0
2
4
6
mg/
L
1999 2000 2001 2002 2003 2004 2005 20062007 as of 2nd
Qtr
Passed
Failed
M arikina 5 4.2 5.36 6.34 5.26 4.71 2.85 2.74 3.7
Bambang 4.59 5.97 6.43 5.60 4.32 4.45 5.24 4.58 6.13
Lambingan 3.41 4.84 4.42 4.93 2.90 2.57 2.31 2.76 3.93
Sanchez 0.65 0.04 0.91 1.20 1.49 0.55 0.62 0.28 1.45
Jones 2.47 3.56 3.37 4.79 2.77 1.29 1.76 1.37 3.60
DENR Standard: > mg/l= passed; <5mg/l= failed
I. SITUATIONER
WATER QUALITY OF PASIG RIVERPasig River Average BOD Level
05
10152025303540
mg/
L
1999 2000 2001 2002 2003 2004 2005 20062007 as of 2nd
Qtr
Passed
Failed
DENR Standard:<7mg/l= passed; >7mg/l=failed
Marikina 8 5.43 4.83 4 8 8.56 5 6.58 10.17
Bambang 2.93 2.93 3.92 2.40 7.92 7.11 4.46 6.42 5.17
Lambingan 3.75 4.14 3.45 4.11 7.83 6.33 7.54 6.33 10.33
Sanchez 25.42 32.33 23.60 20.00 21.00 33.56 32.67 32.37 37.00
Jones 5.54 6.21 7.75 7.10 7.92 7.22 5.98 8.42 6.67
Qtr
I. SITUATIONER
6 TRIBUTARIES WITH BASELINE STUDY
1. Estero de Valencia2 E t d P d2. Estero de Pandacan3. San Francisco River4. San Juan River5. Estero de Binondo6. Estero de Guadalupe Nuevo
I. SITUATIONER
WATER QUALITY OF 6 TRIBUTARIES
90 BOD LEVEL (mg/L)
2030
40
50
6070
80
DENR Standard: <7 mg/L= passed; >7 mg/L=failed
0
10
Binond
o
Valenc
ia
Panda
can
Francisc
o
San Ju
an
Guada
lupe
Class C
I. SITUATIONER
WATER QUALITY OF 6 TRIBUTARIES
6 DO LEVEL (mg/L)
1
2
3
4
5
DENR Standard:>5 mg/l: passed; <5 mg/l: failed
0
Binond
o
Valenc
ia
Panda
can
Francisc
o
San Ju
an
Guada
lupe
Class C
•• 1973 The Pasig River 1973 The Pasig River
II. HISTORICAL BACKGROUND
INSTITUTIONAL
ggDevelopment Council (PRDC)Development Council (PRDC)
•• 1993 River Rehabilitation 1993 River Rehabilitation Secretariat (RRS)Secretariat (RRS)
•• 1993 Presidential Task Force 1993 Presidential Task Force on the Rehabilitation of the on the Rehabilitation of the Pasig River (PTFRPRPasig River (PTFRPR--PRRP)PRRP)
•• 1999 Pasig River 1999 Pasig River Rehabilitation Commission Rehabilitation Commission Rehabilitation Commission Rehabilitation Commission (PRRC)(PRRC)
• 2006 PRRC Chairmanship transferred to the DENR Secretary and Co-chaired by MMDA Chairman
•• “MULING AAWIT ANG PASIG” “MULING AAWIT ANG PASIG” Concert SeriesConcert Series
II. HISTORICAL BACKGROUND
ACTIVITIES 1999-2006
•• PLDT-DPC National Virtual Arts Competition with the Theme “Ilog PASIGlahin”
• PRRC Theme Song Writing Contest• Clean-Up the World• Annual Pasig River Symposium (A Report to the Nation on the State of the Pasig River)P i Ri i Ch l • Pasig River Heritage Chorale Competition
•• Annual International Marathon Annual International Marathon for the Pasig Riverfor the Pasig River
•• Annual Earthday ActivitiesAnnual Earthday Activities•• Fluvial ParadeFluvial Parade
LEGAL BASIS
III. PASIG RIVER REHABILITATION COMMISSION
•Executive Order No. 54, January 6, 1999E ec ti e Order No 65 Jan ar 19 1999•Executive Order No. 65, January 19, 1999
•Implementing Rules and Regulations•Executive Order No. 510, March 5, 2006
MANDATEVISION
“A Pasig River, Clean and Alive, reflecting the country’s noble history and socio-economic
MISSION“To restore the Pasig River to its historically
pristine condition by applying bio-eco engineering and attain a sustainable
III. PASIG RIVER REHABILITATION COMMISSION
history and socio-economic progress”
engineering and attain a sustainable socio-economic development”
1. Formulation of a master plan
III. PASIG RIVER REHABILITATION COMMISSION
POWERS AND FUNCTIONS
2. Regulate easement3. Integrate and
coordinate development programs
4. Abate industrial wastewater and sewerage dumping and sewerage dumping and enforce environmental laws
5. Relocation of formal and informal settlers
6. Undertake civil works such as dredging
III. PASIG RIVER REHABILITATION COMMISSION
POWERS AND FUNCTIONS
such as dredging, clearing of structures, cleaning of the river and its tributaries/esteros
7. Status Report to the President
8. Coordinate with national and local government and local government agencies/units
9. Formulate implementing rules and regulations
•• 13 13 NGAs: DENR,NGAs: DENR, MMDA, MMDA,
PARTNER AGENCIES
III. PASIG RIVER REHABILITATION COMMISSION
DBM,DBM, DOF, DPWH, DOF, DPWH, HUDCC, DOTC, OES, DOT, HUDCC, DOTC, OES, DOT, DILG, DTI, DNDDILG, DTI, DND
•• Metro Manila Mayors Metro Manila Mayors LeagueLeague
•• 3 3 private sector private sector pprepresentatives: representatives: Unilever Phils., Clean & Unilever Phils., Clean & Green Foundation Green Foundation Foundation, Inc. (C&GFI) Foundation, Inc. (C&GFI) GMAGMA--7 7 Network Inc. Network Inc.
Completed Projects•18 Linear Parks •4 Ferry Stations
Manila
III. PASIG RIVER REHABILITATION COMMISSION
•2424 Families were relocated
On-Going Projects•5 Linear Parks •2 Ferry Stations•2,574 Families still to be relocated•728 Housing Units
Completed Projects7 Li P k
Mandaluyong
III. PASIG RIVER REHABILITATION COMMISSION
•7 Linear Parks •1 Ferry Station•2 Housing Project (URA)•432 Families were relocated
On-Going Projects•1 Linear Parks •247 Families still to be relocated
Completed Projects4 Li P k
Makati
III. PASIG RIVER REHABILITATION COMMISSION
•4 Linear Parks •1 Ferry Station•1171 Families were relocated
On Going ProjectsOn-Going Projects•5 Linear Parks •64 Families still to be relocated
Completed Projects
Pasig
III. PASIG RIVER REHABILITATION COMMISSION
•2 Linear Parks (Pineda & Buting)•1373 Families were relocated
On Going ProjectsOn-Going Projects•San Joaquin Ferry Station•Unisphere Holdings Inc. to fund and construct a ferry station in Bo. Ugong, Pasig City. •Buting 2 Linear Park •535 Families still to be relocated
On-Going Projects2 O G i Ri i F t
Taguig
III. PASIG RIVER REHABILITATION COMMISSION
•2 On-Going Riparian Forest
MarikinaOn Going ProjectsOn-Going Projects•2 Ferry Stations
Rodriguez Rizal
•6 – Day Care Center•2 Multi Purpose Hall
Completed
III. PASIG RIVER REHABILITATION COMMISSION
•2 – Multi-Purpose Hall•2 – Health Center
•1 – Public Market•1000 Housing Units
On-Going
1000 Housing Units•School Building
COMMUNITY FACILITIES
Completed
Cavite
III. PASIG RIVER REHABILITATION COMMISSION
•Health Center •Multi Purpose Hall•Public Markets (SB-1, SB-2 and CM)•2 Storey Elementary School Building•Public Market
On GoingOn-Going
• 2 Health Centers• 2 Multi Purpose Halls• 2-Units of 2 Storey School Building
V. PROPOSED PROJECTS
Treatment and Rehabilitation of Major and Minor Esteros and Tributaries –
Riverfront Development Project
(TROMMET-RDP)
PROPOSED PROGRAM OF WORKS
TROMMET-RDP
•Garbage Free
•Class C Water Quality
•Urban Renewal Projects
29 Major and Minor Tributaries and EsterosMAJOR TRIBUTARIES
San Juan River
Marikina River
Napindan River
MANILA AREA
Estero de VitasEstero Tripa de GallinaEstero de MagdaleneEstero de San Sebastian
d
MAKATI AREA
Guadalupe Nuevo Creek
Balisan Creek
MANDALUYONG AREA
Buayang Bato Creek
MINOR ESTEROS AND TRIBUTARIESEstero de San LazaroEstero de AvilesEstero de QuiapoEstero de ConcordiaEstero de ProvisorEstero de Santa ClaraEstero de PandacanEstero de ValenciaEstero de Uli-uliEstero de SampalocBuayang Bato Creek
TAGUIG AREA
Taguig-Pateros Creek
PASIG AREA
Pineda Creek
Estero de SampalocEstero de SantibanezEstero de PacoEstero de TanqueEstero de Balete Estero de San MiguelEstero dela ReinaEstero de Binondo
GARBAGE FREE
Information and Advocacy
TROMMET-RDP
System and Infrastructure
Monitoring and Enforcement
Information and Advocacy
1. A Updating of Development C i i M i l
TROMMET-RDP
Communication Materials
2. Sequel of Pasig River book: “A Dying Ecosystem”
3. Advocacy Advertisements
4. Maximum Media Mileage
5. Enhance Development Communication Program Communication Program
6. Linkage/Networking
SYSTEM AND INFRASTRUCTURE
1. Boomtraps
2 B t f i b d
TROMMET-RDP
2. Boats for river-based garbage collection
3. Roadside/door to door collection system
4. “May Pera sa Basura” Programs
5. Alternative Technology (i.e. Plastic Melter)
6. Materials Recovery Facilities (MRF)
MONITORING AND ENFORCEMENT
1. Deputization of Environmental Police
TROMMET-RDP
2. Policy/Ordinance Development/Updating
CLASS C WATER QUALITY
Domestic Wastewater Industrial Wastewater
TROMMET-RDP
Information and Advocacy
System and Infrastructure
Monitoring and Enforcement
INFORMATION AND ADVOCACY
1. Advocacy Advertisements
TROMMET-RDP
2. Maximum Media Mileage
3. Enhance Development Communication Program
4. Water Quality Monitoring Billboard
SYSTEM AND INFRASTRUCTURE
1. Construction of Artificial Wetlands
TROMMET-RDP
Wetlands
2. Sewerage Treatment Plant (STPs)
3. Wastewater Treatment Plant
MONITORING AND ENFORCEMENT
1. Ambient Water Quality Monitoring in 29 tributariesPolicy/Ordinance 29 tributariesPolicy/Ordinance Development/Updating
2. Ecowatch / Support public disclosure program
3. Strengthening implementation of Environmental Users Fee
URBAN RENEWAL PROJECTS•Environmental Preservation Areas (EPAs-3,10,500 meter radius)
•Dredging
TROMMET-RDP
g g
•Ferry Stations
•Relocation
•River Highway
URBAN RENEWAL PROJECTTransportation
TROMMET-RDP
Three Ferry Stations are in various stages:• Marcos Bridge Ferry Station in Marikina City expected to start construction in January 2008 • Eastwood Ferry Station in Libis area, in preliminary survey and reconnaissance is being done by the Design Team, if found viable to start construction by Mid-2008.
URBAN RENEWAL PROJECTBASECO Phase 2 URA Project :Multi-Modal/ CommonD ki A
TROMMET-RDP
Docking Area
•Maximize the benefits fromPhase I by providing an area sothat barges and other seavessels need not enter PasigRiver and can unload directlyinto trucks their cargo at theproposed common docking area.
•Construction of a 400 linearmeters of EPA with revetmentwall.•Projected Cost is 120 Million.
Buting 3 Linear Park Project
•Construction of a 800 linear meters ofEPA with revetment wall.•Projected Cost is 250 Million.
Sumilang Linear Park cum Revetment wall
Top Related