On behalf of United Spirits Ltd
Dismantling of Factory and Sale of factory used items; Re-distillation Plant, Machinery, Boilers and Scrap
Through E-auction on www.quippoauctions.com
Asset Locations: Kombulgodu - Bangalore, Karnataka
Earnest Money Deposit (EMD) for Participating in E- Auction
Rs 1,300,000/- (Rupees Thirteen Lacs for all lots) by Demand Draft favoring “UNITED SPRITS LTD’’ payable at Bangalore
Auction Schedule Auction Start Date
13.04.16 Auction Start Time 02:00 PM
Auction Closing Date
13.04.16 Auction Closing Time 04:00 PM
Inspection Start Date
01.04.16 Inspection Start Time 10:00 AM
Inspection Closing Date
12.04.16 Inspection Closing Time 05:30 PM
Note - Material Inspection strictly on Prior Permission and on Working days only. Please Contact Quippo Auction for Gate pass. No request of inspection will be entertained without Gate Pass.
E- Auction Support Services provided by Quippo Valuers & Auctioneers Pvt. Ltd.
D-2, 5th Floor, Southern Park, Saket Place, Saket, New Delhi – 110017 Phone No. 011-66025822, Fax No. – 011-42658101
[email protected] www.quippoauctions.com
Online Auction Sale Catalogue
Annexure 1 - List of Material Available for Sale
On behalf of United Spirits Limited
Lot No
Lot Description UOM Approximate Quantity Bid Basis
% Vat EMD Amount
1
1. Re- Distillation Plant(Rectifier Spirit to ENA)
a. FOC Column (MOC—Copper) b. Re boiler (MOC- Copper) c. ENA Cooler (MOC- Copper) d. HCC& FOC Condensers
(MOC-Copper) e. Simmering Column(MOC—Copper) f. Purifier Column (MOC—Copper) g. Rectifier Condenser (MOC-Copper) h. Head Concentration
Column(MOC-Copper) i. MS Structural (ISMB, Channels,
plates etc.) j. Misc (Pipes, Bends, motors etc)
2. Storage Tanks a. MS Tanks (22.5 KL) b. MS Tanks (7.4 KL) c. MS Tanks (8.4 KL) 3. Cooling Tower a. Cooling Towers b. Components for cooling tower
Lot
1 No. 1 No. 1 No. 2 No.
1 No. 8 No. 8 No.
8 No.
2 No. 1 No. 1 No.
1 No. 1 No.
Lot As
applicable
1000000
2
Husk Fire Boiler(Capacity: 4 TPH, Packaged Type, working pressure 17.50 Kg/cm2, husk fired FBC type, Heating surface area- 95.80 SQM, with Air preheater, ID, FD, Booster MDC bag filter and chimney, Boiler automation system for automatic operation supplied by Thermax. ( Complete set in operating condition without feed water tank ) Boiler No KTK-3330 with certified boiler license up to 16/01/2016.
Lot
Lot As
applicable
300000
3
b) Capacity: 6 TPH, Oil Fired, Packaged Type, working pressure 10.5 Kg/cm2, Heating surface area- 129 SQM with burner and FD fan, Panel Board. (without feed pump, chimney, oil pump, day tank, feed water tank.)
Lot
Lot As
applicable
Summary of Important Points
EMD (Earnest Money Deposit) Buyer has to deposit an initial payment of Rs 13 Lacs as EMD to participate in all the lots . If Buyer wants to Participate in Lot 1 he has to deposit Rs 10 L as EMD and Rs 3 lakhs as EMD for lot No.2 &3 in the form of Bank Draft.
Security Deposit : The winner bidder, after getting LOA will be required to deposit the 20% of his final bid value within 7 days as security deposit ( Example : H1 Buyer deposited Rs 13 L as EMD . 20% of his final bid amount comes Rs 30 L . So Buyer will deposit Rs 30 - Rs 13 = Rs 17 L within 7 days from the date of receipt of the Letter of Award)
Refundable Security Deposit: This security deposit will be returned to the Buyer after final lifting of material provided there is no damage found during joint site inspection by the plant management and buyer. Any damage will result deduction of the amount from the security deposit. In case buyer opts for ‘C’ form transaction, the said security deposit will be returned after submission of the form.
Payment : 20% of the final bid amount to be paid along with the taxes within 07 days from the date of receipt of LOA along with the security deposit . 80% of the final bid amount to be paid along with the taxes within 15 days from the date of first payment given.
All sales are on “As is where is & Ground Clearance Basis”. Buyer has to lift the entire material and clear the site including debris, scraps etc.
Bid Price is the Basic Price Only. Taxes as applicable are extra.
Tax Structure - 5.5% VAT for within State Sale and 2% CST (Form C to be furnished within 3 months) or else full CST for inter-state sale. 1% TCS also will be there.
‘ C ‘ Form is acceptable, provided bidder produces necessary documents (LR, Road challan/Builty, good receipt in other state etc) as a proof of interstate movement of materials.
Buyer has to adhere EHS requirements during execution of work as per Annexure attached.
Buyer should be registered with ESI and PF
After sale of boiler to the winner bidder, as he will take all the boiler and boiler accessories out of factory, he need to furnish one letter stating “the particular boiler (with boiler registration no. mentioned) is sold to him and USL do not have any obligation on it anymore” on his letter head. This letter we will be submitting to Boiler Inspectorate Dept.
Buyer shall sign & stamp each page of catalogue including EHS guideline, Contractor Safety Assessment form
and submit the same along with EMD and Bidder’s Undertaking at the nearest Quippo office or other office recommended by Quippo Executive.
GAS CUTTING is allowed with Di-Acetylene only not with LPG.
Inspection Venue and Location Details
Sr. No. Location Company Plant Address Contact Person Contact Mobile
1 Bangalore United Spirits Ltd , Kombalgodu Near Raj Rajeshwari
College, Mysore Road, Kombalgodu-Banglore
Mr. Sanjay Yadav +919986597375
Mr. Arun Kumar +919886656277
For More Information about Inspection, Participation, Please Contact
Quippo Valuers & Auctioneers Pvt. Ltd
Bangalore
Mr. Jalapathi Reddy +91 9160004777 Mr. Suresh Reddy +91 9704494040
Hyderabad Chennai
Mr Eshwar Reddy + 91 9160003777 Mr. Hari Kumar +91 9944366165
Detail List of Materials
Area Asset description QTY
Cooling Tower
2 NOS COOLING TOWER PUMP-JANSON MAKE MADEL CN -65- 2
COOLING TOWER 15 HP MOTOR QTY 1 PAHARPUR TOWERS 1
COOLING TOWERS QTY 1 1
COMPONETS FOR COOLING-TOWERS QTY 1 1
COMPONETS FOR COOLING-TOWERS MODLE - QTY1 1
Boiler and assesories
CONDENSATE RECOVERY SYSTEMS(NEAR BOILER SEC) 1
STEAM BOILER OILFIED IAEC QTY 1 1
HUSK FIRED THERMAX BOILER CPFD 40 AND ACCESSORIES 1
HUSK FIRED THERMAX BOILER CPFD 40-ADDN ACCESSORIES 1
AUTOMATION SYSTEM FOR CPFD BOILER 1
PANEL BOARD FOR BOILER QTY 1 1
FABRICATION & ERECTION OF-IBR&NONIBR PIPES FOR STE 0
50 NB STEAM FLOW METER VFM 8700 GS 1
INSULATION OF STEAM PIPE LINES WITH-MINERAL WOOL O 1
HEAT EXCHANGE QTY 1 1
INSULATION OF TURBINE PIPELINE 1
Re- Distillation Plant
M.S.CHANNEL 100*50 QTY 1-MSANGLE50*50*6 andMSBOLT 1
CDR-PLATE HEAT EXCHANGER IND WATER HEATER QTY 2 2
STEAM CONTROL FOR ENA PLANT (STILL HOUSE) 1
SPIRAX DE AERATOR HEAD,DIFUSSER,BALL FLOAT 1
PURIFIRE COLUM EACH WITH 28000 LTRS BACKUPAND RECT 4 4
RECTIFIER CONDENSERS DIA 450 - 4 NOS&DIA 350 – 4 8
HEAD CONCENTRATION COLUMN DILUTION BOTLES/DISTILLA 1
SIMMERING COLUMN WITH ENA COOLER CONDENSER 2 NOS/D 1 1
INTER CONNECTING PIPES FUSEL OIL CONC COL & HEAD C 1
MICRO FINISH PUMP - ENA WITH FLAME PROOF MOTOR QT 1
PUMP FOR H - C COLUMN WITH FLAME PROFF MOTOR QTY 2 1
HOTWATER PUMP WITH FLAME PROFF MOTOR - FR LF 90 Q 1
FUSEL OIL PUMP WITH FLAME PROFF MOTOR QTY 1 1
SPENTLEASE PUMP WITH FLAME PROFF MOTOR QTY 1 1
CENTRIFUGAL PUMP WITH FLAME PROFF MOTOR QTY 1 1
CENTRIFUGAL PUMP WITH FLAME PROOF MPTOR QTY 1 1
RECT - SPIRIT - M S TANK OVERHEAD 7400 LTS QTY 1 1
RECT - SPIRIT M S TANK OVERHEAD 8400 LTS QTY 1 1
New Delhi Mumbai
Mr. Manoj Singh +91 9899049635 Mr. Rajendra Sapkale +91 9167995092
Ahmedabad Nagpur
Mr Shailendra Tiwari : +91 9909928744 Mr Dinesh Thakre : +91 9764007759
Kolkata
Mr Sumanta Gupta : +91 9830110917 Mr Sudip Sengupta +919836272244
Area Asset description QTY
M.S.TANKS FOR FILTER WATER 22500 LTS QTY 1 1
M.S.TANKS FOR SOFT WATER 22500 LTS QTY 1 1
RS ENA PLANT QTY 1 Annexure-1
80 WB STEAM FLOW QTY 1 -RS ENA PLANT 1
CAST STEEL GLOBE QTY 1 BRONZE FLANGE FOR STILL 1
WT CAST STEEL GLOBE QTY 1-VLVEF/E 150NB/40NBFOR E 1
SIMMERING COLUME R.S.ENA PLANT 1
SEAMLESS PIPE/BEND LR QTY 1 & ENA PLANT 1
H.C.C. PUMP FROM HATHIDAH DISTILLERY 1
CENTRIFUGAL PUMP (SS-304M3/HR10M HEAD -2 NOS –GOA 2
Terms Conditions
EMD DEPOSIT Date 12.04.16 before 06:00 PM
Validity of Bids All the highest bids remain valid for 20 Working Days only.
Payment Terms
20% of the final bid amount to be paid along with the taxes within 07 days from the date of receipt of LOA along with the security deposit. Rest 80% of the final bid amount to be paid along with the taxes within 15 days from the date of first payment given. Buyer has to deposit payment with applicable taxes. After realization of full sale consideration, Seller will issue Delivery order..
Dismantling and Lifting Period
Time period for dismantling will be mentioned in the Letter of Award. In general it is 45 days from the date of issuance of LOA. Winning bidder strictly have to follow demolition process as per USL Guidelines.
Tax All offered bids are basic price only and applicable taxes & duties as per Law of the States will be in addition to the basic price.
EMD Return EMD of All Unsuccessful bidders will be returned within 2 working days & it will not carry any interest.
EMD forfeiture
On Refusal of Lifting / Acceptance of Letter of Award (LOA) or Non-Payment within 10 working days by the H1 Bidder, the seller, would reserve its Right of disposal to whomsoever as per their discretion and EMD amount so deposited shall be forfeited without any intimation
Note : Working days means excluding Saturday and Sundays. 1) Seller - United Spirits Limited
2) Auto extension of bid closing time is 10 minutes. If any bid placed in last 8 minutes of closing time of respective lot will
extended for next 10 minutes. Each lot will be closed on interval of 3 minutes.
3) It is post approval auction. The highest bid received will be sent for approval to seller. The approvals for the same would be
given within 20 working days of Bid closing. Acceptability of BID price is solely Sellers discretion.
4) Interested Bidders shall be given to have a free access at the Seller’s Premises for inspection of the Materials under disposal. , before participating in the “Online Auction” and placing the Bid.
5) All Sales are strictly on “As is, Where is basis”, and No Exceptions, thereof. Buyers are advised to obtain all relevant
information during inspection of the assets before Bidding. Seller Company or Quippo Valuers & Auctioneers Pvt Ltd will not entertain any grievances post Auction and also Tax Liability, Warranty or Guarantee of the quality, quantity, measurement, condition, defects in any item/s or lot/s from the Bidder’s end.
6) Please Inspect the assets as there may be missing parts / equipment in the Set. Please satisfy yourselves with the condition of
the equipment to be auctioned. No complaints at any cost will be entertained after the auction. BUYER SHALL BE LIABLE TO PAY THE WINNING SALE AMOUNT along with TAXES without any EXCEPTIONS.
7) Lot details given are indicative and buyers are strongly advised to inspect the assets in the Seller’s Warehouses before
bidding.
Registration & Participation Procedure:-
8) To participate in the auction buyer must register himself online on www.quippoauctions.com.
9) Bidder/s would need to pay an E.M.D. (Refundable/Adjustable) in the form of DD / Pay Order / Banker’s Cheque .
10) Buyer has to submit Completely Filled and Signed Bidder Undertaking Form, Contractor Safety Assessment form and Signed Catalogue along with the DD of EMD .
11) PAN & VAT/CST Registration No. / TIN is mandatory for participating in the Auction. Proof of ESI and PF registration is
mandatory. Buyer has to submit Copy of PAN Card and VAT / TIN Certificate. 12) Any communication with Company’s staff members excepting during the time of filing Bidder Undertaking with EMD OR
any CARTEL among the Bidder, if reported, Auctioneer has the right to disqualify the Bidder/s and will refrain the Bidder from taking participation in the Auction.
13) Bidder has to give acceptance to follow EHS guideline attached with this document. Refer the addendum for EHS section.
14) No proxy bid allowed.
15) Do not disclose password to anyone.
Payment:-
16) No Cheque / Cash Payment will be entertained. Buyers need to deposit the payment by Demand Draft / Pay Order / Banker’s Cheque / RTGS to the Seller and the Delivery Orders will be issued by the Seller itself.
17) Successful bidder has to deposit payment in two installments. After Receipt of total Sale Amount from the successful bidder,
Seller shall release the Delivery Order (DO) of the material in the name of Highest Bidder only. 18) E.M.D Amount of H1 Bidder is taken as Security. In case buyer retracts his bids once the sale is finalized, deposited EMD
will be forfeited without recourse. Please bid only if you are agreeable to this clause.
19) No Lots can be removed without full payment being realized and presentation of original Delivery Order obtained from
Seller.
Taxes and Duties:-
20) Buyer has to deposit Full Taxes and Duties if any before Lifting of sold Asset / Material. 21) VAT, CST and TCS rates are applicable at the time of lifting. If there is any change in tax rate, buyer has to pay tax accordingly.
Lifting:-
22) All Assets must be removed from the Seller’s Premises at own Cost of the Buyer as per EHS guideline attached with this document within specified time period .
23) On Refusal of Lifting / Acceptance of Sale order or Non-Payment within given time period by the H1 Bidder, Seller would
reserve its Right of disposal to whomsoever as per their discretion. EMD amount so deposited as Security Money shall be forfeited without any intimation.
24) Delivery order will be issued in the name of Successful bidder once full Payment is cleared. Resale will not be allowed
before receipt of full and final payment by seller. 25) Packing and lifting of material will be the buyer(s) responsibility at their own Cost. Any mis-happening at the time of
dismantling, packing, pickup, loading of machines / Materials will not constitute any liability on the Seller’s end. The buyer is responsible to keep the warehouse & stockyard in order after removal of sold lots. In case of non-adherence, seller may reserve the right to impose penalties or forfeiture of payment deposited.
26) For the lifting of sold material, successful bidder shall employ or engage their own personnel at their own cost, and shall keep
seller fully indemnified against any claim whatsoever, for claim, injuries, death etc.
27) The authorized personnel of the successful bidder visiting the warehouse for lifting the goods should necessarily carry due authorization letter and proper photo identity.
28) The materials will be delivered ‘in situ’ on “As is where is” and “ground clearance basis” by Seller. Buyer has to dismantle the
equipment in safe manner in the plant premises only at his own cost. 29) Successful Bidder has to make his own arrangements for shifting, loading, unloading, weighing and transportation of sold
material at their own cost.
Other Terms and Conditions:
30) The highest bidder does not get any right to demand acceptance of his offer. Seller reserves the right to accept/ reject/ cancel any bid, withdraw any portion of the assets at any stage from Auction even after acceptance of bid/ issue of delivery order or release order/ deposit of full value by successful bidder without assigning any reason thereof. In the event of such rejection/cancellation/ withdrawal, Seller shall refund the value of assets, if paid for, to the successful bidder. Discretion lies solely on Seller/s regarding this.
31) Any Disputes related to the Assets / Documents, Post Sale, would be dealt by Seller only and the Quippo Valuers &
Auctioneers Pvt Ltd does not have any involvement or does not have any role to play in the same.
32) The Auction Company, Quippo Valuers & Auctioneers Pvt Ltd & / or the Seller Company, during the period of AUCTION
will not be held responsible for any power failures / Internet Connection failures / Bandwidth problem / erroneous Bids etc at the bidders end. Bidders themselves need to check it at their end and bid in advance and monitor their lots.
33) The Terms & Conditions as laid down shall be the binding part at the Bidder/s’ end and should be signed off before
participation in “Online Auction “.
Dismantling and demolishing: 1. EHS (Environment, Health and Safety) requirements:
a) As part of USL EHS Contractor Management System every new contractor has to submit following documents as a part of evaluation and selection of contractor.
- Contractor Health and Safety Assessment Form (Refer Annexure 1) b) In order to help the contractor to understand USL EHS requirements, following documents are attached for the
reference and acceptance by the contractor. (Signing of this catalogue will be considered as the acceptance of the EHS requirements by the contractor). Please refer the following documents;
- “Methodology of Dismantling”, to be followed during dismantling (Refer Annexure 2). Note: This methodology for dismantling the RD asset equipment and structural is prepared based on the preliminary assessment to set the safe and agreed process between vendor and USL. There will be a detailed Assessment for Method Statement in USL format prior to execution of dismantling at every stage and these methodologies may defer with the best suitable and safe assessment arrived. The attached methodology is an indicative approach on preliminary assessment for reference purpose only.
- Site Safety Setup (Refer Annexure 3) - Hydra Check List (Refer Annexure 4) - Crane Inspection Checklist (Refer Annexure 5) - Gas Cutting Checklist (Refer Annexure 6) - Welding Set Checklist (Refer Annexure 7) - Construction Safety Guidelines (Refer Annexure 8)
c) The Contractor will be assessed weekly during the execution activities at the site for Contractor Evaluation for
performance and Work Inspection. Attached herewith are the formats for evaluation; - Contractor Evaluation Checklist (Refer Annexure 9) - Work Inspection Checklist (Refer Annexure 10)
d) Contractor need to appoint his Contractor Supervisor and Safety Officer duly interviewed and approved by USL EHS
team. Contractor Safety officer will be responsible for all the safeties at the site during the work as per USL EHS requirements as per documents provided in above annexures (from Annexure 2 to 10). Contractor Supervisor will work in coordination with unit team and PMC to plan to execute the activities in well planned and safe manner.
e) In case of any EHS violation USL units has all right to put Disciplinary actions as per USL policy.
2. Contractor who is going to work on dismantling and disposal of the Assets in the USL units have to follow all the Safety and work related standards and procedures as provided or communicated to him by the USL team. All the works performed on the site will be performed under supervision of PMC or Unit Engineering Head. Contractor is responsible for delivery of all the work related safeties/activities communicated to him by PMC or Unit Engineering Head.
3. Contractor will follow all the Rules and Regulations followed in the Units for any transaction related to entire dismantling & disposal activity. He will comply with all the required policies laid and documents required by the unit as part of Contractor Management and dismantling & disposal activities of identified assets. It covers all the Legal & Regulatory compliances and documents w.r.t. contractor and contract workmen applicable at the Sites.
1st time to fill in
No. Question
Follow instructions for
Existing or New
Contractors
Select if
compliant?
Yes/No/N/A
AnswerSupporting
Docs Yes/No
Contractor
RatingGOOD OK POOR
Comments on
rating selection
1
Does your company have an up-to-date Safety Policy signed by a Managing
Director/Owner outlining the company's commitment to ensuring the safe welfare of
its employees?
2Does your company have an up-to-date Safety Statement relevant to the activities
proposed to be carried out at the USL site? (attachment mandatory).
3Does your company have up-to-date and relevant process for undertaking site
specific Risk Assessments? (attachment mandatory)
4
Does your company have a management organisation chart with defined roles and
responsibilities, relevant to their activities? In particular, please detail the Project
Manager/Job Foreman, Site Safety Supervisor, and First Aiders
Detailed and up to date
Mgt Org Chart available
Basic Mgt Org Chart
available
Poor or no Mgt Org Chart
available
5
Can you confirm that USL is or shall be named as an insured company on the
Public Liability certificate of insurance or be covered under an 'all client' basis
statement on the certificate?
Named on Public Liability
Certificate of Insurance
Covered under an 'all
client' basis statement on
the Public Liability
Certificate of Insurance
Not named specifically or
as part of an 'all client'
basis
United Spirits Limited
Form
CONTRACTOR HEALTH AND SAFETY
ASSESSMENT FORM
INSTRUCTIONS FOR CONTRACTORS INSTRUCTIONS FOR USL CONTRACTOR MANAGERS
MINIMUM REQUIREMENT: All contractors must complete Sections A & B
Date:
Name of the Company:
Address:
Contact Numbers:
Email:
Representative Name:
USL EVALUATIONCONTRACTOR QUESTIONNAIRE
Document No.
Date of Issue
Rev. No.
Page No. 1
0
DD/MM/YYYY
USL/HS/P/XX
Answers should be current, concise and accurate. For SECTIONS B to C, based on criteria listed select score 1, 3 or 5 from drop down selection
You are asked to include where appropriate, supporting documents marking clearly on enclosures or for electronic documents saving & naming it as the the name of your company and the number of the Use the comment boxes to explain rating if possible.
question to which they refer (e.g. Question 1.1.1); if necessary, include an index. Do not include general marketing or promotional material unless it specifically provides a reply to a question. The relevant All companies must score an amber or green in SECTION A (CRITICAL) . Scores from Section B and C will
Companies that subcontract at the USL <SITE NAME> should complete Section C also Check answers for all sections referring first to Question 2.2.1 & 2.1.2.
Please answer the questions specifically for your Company, not for the Group if you are part of a Group of Companies. Where, however, Group Policies, Statements, etc. are normally used in your Company please answer accordingly. In SECTION A (CRITICAL), based on criteria listed under GOOD (Green), OK (Amber) and POOR (Red) headers,
select the contractor rating using the drop down selection. All questions must be answered; any application partially completed may not be considered for assessment. Please ensure you have answered all question in Columns D & E . select the contractor rating using the drop down selection.
<SITE ADDRESS>
section of the material must be clearly indicated, (e.g. with highlighter tool). This applies to electronic versions of documents, as well as hard copies. be totalled and performance targets agreed with the USL Contractor Manager as appropriate.
Completed questionnaires with all supporting documents should be returned so as to arrive at the address below by (TIME) on (DATE)
CONTRACTOR TO FILL ONLY THE CELLS "F" G" and "H" BELOW.FOR USL OFFICIAL USE ONLY. ANY OF THE CELLS BELOW SHOULD NOT BE FILLED BY
CONTRACTORS
Guidance & Information Requirements Contractor Evaluation
SECTION A
1. GENERAL MANAGEMENT (CRITICAL) (Note: N/A not to be used for this section)
1.1
Is the company
compliant with
minimum USL
criteria?
Existing & New
Contractors Answer
Comprehensive Safety
Policy, Statement & Risk
Assessments
Basic Safety Policy,
Statement & Risk
Assessments
Some or all of Safety
Policy, Statement & Risk
Assessments not
developed or poorly
developed
FIRST TIME TO COMPLETE OR REAPPROVAL? PLEASE SELECT FROM DROP-DOWN → (Note: Annual Reviews can refer to previous questionnaire. )
6
Please provide limit and expiry date of your public liability insurance?
Please provide limit and expiry date of your contractor all risk insurance?
Please provide limit and expiry date of your professional indemnity insurance?
Please provide limit and expiry date of your employer's liability insurance? [Note:
USL does not accept any liability with regard to Employers Liability but expect the
contractor to have the appropriate level for their employees]
Adequate insurances in
place and current
Insurance in place but
inadequate /not
appropriate
Some or all required
insurances not in place,
or expired
7
Please provide details of any claims made under any insurance or professional
indemnity policy made within the last five years? If yes, it is mandatory to attach
details of the circumstances and the action that was taken to prevent a recurrence.
No claims made within
last five years
1 minor claim made
within last five years
Multiple claims made in
varying sizes over last
five years
8
Has your company ever been prosecuted or undergoing legal proceedings
(including any notices from Department of Labour, Directorate of Factories, or any
other Statutory Authority)
No prosecutions
Current legal
proceedings for minor
issue
One or more
prosecutions or current
legal proceeding
Contractor
RatingGOOD OK POOR
Comments on
rating selection
1Provide outline of agreed scope of works for all activities planned to be undertaken
at this site
2
Please state if and which of any of the following activities will be undertaken at the
USL site:
1. Handling hazardous materials including waste
2. Hot work including welding, cutting or burning
3. Confined space entry including vessels, tanks and drains
4. Break into services including electricity and other utilities
5. Work in substations or low & high voltage equipment
6. Working at height including erecting scaffolding
7. Digging or working in excavations
8. Work that creates very loud noise
3Provide evidence of technical expertise, qualifications and experience of staff
relative to the above scope of works.
All provided. Suitable for
scope of works.
Basic information only
available. Detail not
suitable for scope of
works.
No information available
or detail not suitable in
any way for scope of
works.
4
Provide certificates of training or equivalent for operatives e.g. scaffolding, welding,
electrical works, pressurised systems, chemical handling, abrasive wheel use,
manual handling, crane operation, working at height etc.
Appropriate evidence
which addresses all
required competencies
Appropriate evidence
which addresses some
required competencies
Evidence not provided or
is not deemed to be
appropriate
6
Please confirm that statutory checks on plant and equipment used are maintained
e.g. access equipment, fall restraint/arrest, lifting equipment etc and that there is a
process in place for maintaining frequency of checks.
All staff have current Safe
Pass cards
Only some staff have
current Safe Pass cardsNo information available
2.2
If the Organisation
works on projects
that come under
BOCW Act /Rules,
what mechanism is in
place to ensure
compliance?
Existing & New
Contractors Answer.
Note: The option of
selecting N/A is
provided if applicable.
Red/Amber/Green
scoring in this case
does not apply.
1
Please provide evidence that persons proposed to supervise works on site have
the necessary qualifications and experience to manage EHS for site activities and
ensure compliance with legislation
Appropriate evidence
which addresses all
required competencies
Confirmation only
providedNo information available
Contractor
RatingScore Value = 5 Score Value = 3 Score Value = 1
Comments on
rating selection
1Can you provide evidence that all staff are aware of their responsibilities with
regards safety?
Documented evidence
demonstrates awareness
and ongoing
communications
Evidence demonstrates
awareness
Evidence is informal, out
dated not, relevant to
scope or non existent
2 The deputies or alternative arrangements are in place.
Full details provided
including identification of
deputies
Confirmation only
providedNo information available
3 Has your company ownership structure changed over the past 12 months? Explanation of changes
with supporting evidence
Confirmation only
providedNo information available
1Does your company have a recognized and accredited Safety Management
System in place. e.g. OHSAS 18001
OSHAS 18001 or
equivalent in place
Working towards OSHAS
18001 or equivalent in
next 12 months
No EHS Mgt System in
place
2 Can you confirm that safety documentation is controlled appropriately? OSHAS 18001 or
equivalent in place
Working towards OSHAS
18001 or equivalent in
next 6 months
No EHS Mgt System in
place
3Is your management system assessed internally and working areas are inspected
on a regular basis by competent personnel?
Yes - Management
Review Schedule in place
Informal reviews
undertaken at irregular
frequencies
No reviews undertaken
4
Can you confirm that any findings from assessing the EHS System are reviewed by
management and that the company has a managed process for the control of
corrective actions.
Considered and
documented
Basic information only
availableNo information available
2. COMPANY INFORMATION (CRITICAL) (Note: N/A not to be used for this section)
2.1
Evidence of
competency specific
to scope of works
Existing & New
Contractors Answer
1.1
Is the company
compliant with
minimum USL
criteria?
Existing & New
Contractors Answer
SECTION B
3. HEALTH AND SAFETY MANAGEMENT
3.1
How is the EHS
Management
structure defined?
Existing & New
Contractors Answer
3.2
How does the
organisation ensure
that their Health &
Safety Management
Systems are
assured?
Existing & New
Contractors Answer
Full break down of
proposed works, covers
all aspects and details
specific hazards
Basic information only
availableNo information available
3.3
How does the
organisation ensure
that they have
adequate Health &
Safety support to
manage the work
activities identified
for their profile?
Existing & New
Contractors Answer1
Can you confirm that the competent personnel (this can be an external hired safety
consultant) is a Qualified Safety Officer holding a certificate recognised by the
Government or can demonstrate competency in another way e.g. minimum of
three years construction specific experience.
Responsible EHS person
is Qualified Safety Officer
and has minimum three
years constuction specific
experience.
Responsible EHS person
aiming towards becoming
a Qualified Safety Officer
in next 6 months
No qualifications or
adequate experience
1How does your company access and review Health & Safety legislation and
regulations.
Subscription in place to
have online access or
regular updates provided
of relevant EHS
legislation
Access to relevant EHS
legislation via WWW
demonstrated
No information available
2Does your company have a mechanism to maintain a Register of Health & Safety
Legislation?
Considered and
documented
Basic information only
availableNo information available
3 How does your company evaluate compliance to legislation? Current Register of EHS
Legislation available
List of relevant legislation
availableNo information available
1 Can you demonstrate knowledge of site Safety Management Systems?Good knowledge of USL
EHS Mgt System
Basic knowledge of USL
EHS Mgt System
No or little knowledge of
USL EHS Mgt System
2Has your company prepared site specific procedures for interaction with USL
standards?
Detailed procedure
providedYes, but of limited detail No information available
3 Does your company access Contractor EQMS?
Yes, link provided in
responses and available
to all relevant staff
Yes, but only for one
person
No access or knowledge
of presented
1
Can you confirm that the production of Health & Safety Risk Assessments is
formally documented within the organisation’s Management Systems? Attach an
Standard Operating Procedure (SOP) for carrying out risk assessment.
Embedded into OSHAS
18001
Incorporated into EHS
SystemNo information available
2Are risk assessments generic to the Organisation’s scope of operations or unique
to each particular contract?
Risk Assessments
specific to USL facility
and site
Some elements of Risk
Assessments specific to
USL facility and site
Generic or no Risk
Assessment available.
3How are risk assessments communicated to relevant staff, USL and
subcontractors?
Comprehensive
communication strategy
incorporating multiple
modes in place
Email updates onlyNo updates provided to
staff
4 Is there a formal sign-off on risk assessments? Records held for >10
years
Records held for 5 years
minimum
No retention period
defined or followed for
records
5 Is there a formal review of effectiveness of risk assessments?
Comprehensive
procedure in place to
ensure reviews happen
periodically or when
changes occur
Informal process to
review Risk Assessments
No procedure, formal or
informal, in place.
6
What specialist risk assessments are carried out e.g. occupational health
screening including health risk assessment, chemical risk assessment, vaccination
screening etc.?
Full explanation detailing
a range of assessments
supported by evidence
Response demonstrates
understanding of
requirements
Limited understanding of
requirements, general
assessments only, no
information available
1
Client and Contractor Names & Addresses, Site Location, Total Number of People
on Site & Duration, Responsible Persons (Project Manager/Foreman, Safety
Specialist, First Aiders)
Worked examples which
clearly meet the desired
criteria
Blank templates or
examples which cover
some of the criteria
No information available
or does not meet criteria
2 Details of Work and How It Will be undertaken including: Provided in detailBasic information only
availableNo information available
a Sequence of Operations
Step by step method e.g.
covers who, what, where,
when and specific hazard
control
Basic information only
availableNo information available
b Risk Assessments
Method is directly related
to assessments & details
all control measures
Method statement
reflects risk assessments
Method statement does
not reflect risk
assessments or not
available
c Resources and Specialist equipment to be used:
Method details all
resources and specialist
equip. including
competencies
Method discusses
resources and specialist
equip.
Method does not
consider resources and
specialist equip., or not
available
d Arrangements for the Protection of Personnel
Method details issue of
PPE (in keeping with risk
assessments), selection,
fitting and storage, for
each stage of works
General PPE
requirements are
discussed
No consideration of
required PPE, or no
information available
e Services
Full and specific details of
method for dealing with
services, in keeping with
risk assessments
A reasonable
consideration of services
No consideration given,
no information available
f Storage of Hazardous MaterialsFull and specific details of
storage arrangements
A reasonable
consideration of storage
arrangements
No consideration given,
no information available
3.6
Does the organisation
incorporate Health &
Safety controls into
its Risk Management
process?
Existing & New
Contractors Answer
3.7
Can you confirm the
following are
incorporated into all
Method Statements?
Existing & New
Contractors Answer
3.4
How does the
organisation ensure
that they are aware of
the requirements of
and changes to
Health & Safety
Legislation and
Regulations?
Existing & New
Contractors Answer
3.5
How does the
organisation
demonstrate
knowledge of the USL
Site Health & Safety
systems?
Existing Contractors
Answer
g Lifting Tackle
Method details selection
of tackle for each stage of
works
A reasonable explanation
of requirements given
No consideration given,
no information available
h Entry into Confined Spaces
Specific, detailed, stand
alone risk assessment &
method for confined
space entry
Specific, detailed, stand
alone risk assessment &
method for confined
space entry
Generic method or no
information available
i Work on Pressure System
Full and specific details of
personnel, competencies,
and work methods
A reasonable outline of
procedures given
No consideration given,
no information available
j Training / Competence
Full and specific details
given for each step of the
works
General or overall outline
given
No consideration given,
no information available
k Disposal of Waste
Full and specific details,
considers relevant
aspects and impacts,
from producer to disposal
site
An outline of the waste
disposal process
No consideration given,
no information available
l Accident / Emergency Response
Full details, includes site
specific procedures,
arrangements with local
emergency services and
considers all aspects of
works
Demonstrates
consideration of
emergency response
procedures
No consideration given,
no information available
m Permit to work
Permit to work system
and specific permit
requirements are detailed
in method
Permit requirements are
noted at each stage of
works
Little or no consideration
given, no information
available
n Control of Sub-contractors
Method details personnel,
competencies,
communications and
supervision in keeping
with risk assessments
Control of sub con's
accounted for within
method
Little or no consideration
given, no information
available
o Monitoring and Compliance
System for monitoring &
compliance is provided in
detail
Monitoring & compliance
accounted for within
method
No consideration given,
no information available
3 Are all method statements signed with dates? All signed and dated All signed and datedSome or none signed
and dated
4 What is the method for communicating method statement requirements?
System for
communication is
provided in detail
A reasonable outline of
procedures given
No consideration given,
no information available
1 Number of work related fatalities? (Please provide last 3 years data) Zero Zero One or more
2Number of reportable accidents (absence from work for 48 hours or more and
reporteable to Statutory Authorities)? (Please provide last 3 years data)Zero
<3 per 1,000 employees
in past year
>3 per 1,000 employees
in past year
3Number of lost time accidents (LTA) (absence from work for 24 hours more)?
(Please provide last 3 years data)Zero One in past year
Greater than one in past
year
4 Number of first aids (treatment by first aider)? (Please provide last 3 years data)<3 per 1,000 employees
in past year
3-5 per 1,000 employees
in past year
>5 per 1,000 employees
in past year
5 Total Annual Hours worked (Please provide last 3 years data) Yes Informal records kept No records kept
6What is the mechanism for accident reporting and the process for
communications? Please also detail timeframe for reporting to USL?Zero Less than 10 in past year
Greater than 10 in past
year
7 What is the process for managing hazard and near misses? Yes Informal records kept No records kept
1 Do you conduct pre-employment medical checks Yes Informal records kept No records kept
2 Do you conduct medical examination for replacement job capability ? Yes Informal records kept No records kept
3 Do you conduct annual medical examination of your employees ? Yes Informal records kept No records kept
1 What is your own induction process for all new employees? Formally documented
arrangementsExplanation of process
Unsubstantiated, informal
response or no
information available
2 Can you confirm that records of induction and training are held?
Confirmation and
comprehensive
supporting evidence
Confirmation only
providedNo information available
3Can you confirm that tool box talks or team briefs completed and records
maintained?
Confirmation and
comprehensive
supporting evidence
Confirmation only
providedNo information available
4Are emergency response procedures communicated to all staff? Records
maintained?
Confirmation and
comprehensive
supporting evidence
Confirmation only
providedNo information available
3.7
Can you confirm the
following are
incorporated into all
Method Statements?
Existing & New
Contractors Answer
What is the
Organisation's Health
& Safety Performance
Existing & New
Contractors Answer
3.9
What is the
Organisation’s policy
on and arrangements
for the
induction/training/em
ergency response of
employees (This
should include
employees, sub-
contractors & self
employed)?
Existing & New
Contractors Answer
Medical ExaminationExisting & News
Contractors Answer
3.8
5 Are Material Safety Data Sheets up to date and available for all chemicals on site?
Confirmation and
comprehensive
supporting evidence
Confirmation only
providedNo information available
Contractor
RatingScore Value = 5 Score Value = 3 Score Value = 1
Comments on
rating selection
1Can you provide evidence that all staff are aware of their responsibilities with
regards environmental protection?
Detailed and up to date
Mgt Org Chart available -
Env roles detailed
Basic Mgt Org Chart
available - No Env roles
detailed
Poor or no Mgt Org Chart
available
2 Can you confirm that deputies or alternative arrangements are in place? Provided in detailBasic information only
availableNo information available
1Can you confirm that the Organisation has an accredited Environmental
Management System in place? e.g. ISO 14001
ISO 14001 or equivalent
in place
Working towards ISO
14001 or equivalent in
next 6 months
No Env Mgt System in
place
2 Can you confirm that environmental documentation are controlled appropriately?
Confirmation and
comprehensive
supporting evidence
Confirmation only
providedNo information available
3Can you confirm that the management systems are assessed internally on a
regular basis by competent personnel?
Confirmation and
comprehensive
supporting evidence
Confirmation only
providedNo information available
4
Can you confirm that any findings from assessing the Environmental Management
System are reviewed by management and that the company has a managed
process for the control of corrective actions?
ISO 14001 or equivalent
in place
Working towards ISO
14001 or equivalent in
next 12 months
No Env Mgt System in
place
1Can you confirm that your company is familiar with the USL site Environmental
Management Team?
Yes, good knowledge of
Site Environmental
Manager and Site
Systems Manager
Knowledge of Site
Environmental Manager
only - first name only
No knowledge
demonstrated
2
Can you confirm that your company is familiar with USL site Pollution Control Board
consents including conditions relating to waste management, noise control,
chemical storage, air emissions etc?
Details of the process for
accessing detailed in
responses
Basic understanding No knowledge
demonstrated
3Can you confirm that your company can demonstrate knowledge of the PCB
consent conditions as relevant to their activity?Multiple sites At least one site No sites
4.4
Does the company
produce
Environmental
Incident Response
Plans?
Existing & New
Contractors Answer1
Can you confirm that your company has an appropriate mechanism for managing,
reporting and monitoring environmental incidents?Answered in detail
Basic information only
availableNo information available
Contractor
RatingScore Value = 5 Score Value = 3 Score Value = 1
Comments on
rating selection
1What is the procedure for assessing the safety performance and competency of
your subcontractors?
Answered in detail.
Detailed understanding of
requirements
demonstrated.
Basic information only
availableNo information available
2Do you use health and safety performance criteria in the selection of
subcontractors?
Answered in detail.
Detailed understanding of
requirements
demonstrated.
Basic information only
availableNo information available
3Do you evaluate the ability of subcontractors to comply with applicable health and
safety requirements as part of the selection process?
Answered in detail.
Detailed understanding of
requirements
demonstrated.
Basic information only
availableNo information available
4 Are subcontractors detailed on method statements where relevant?
Answered in detail.
Detailed understanding of
requirements
demonstrated.
Basic information only
availableNo information available
5 What is your process to ensure subcontractors are approved by USL?
Answered in detail.
Detailed understanding of
requirements
demonstrated.
Basic information only
availableNo information available
SIGNED:
POSITION:
DATE:
Existing & New
Contractors Answer
4.2
Has the Organisation
produced an
Environmental
Management System?
Existing & New
Contractors Answer
3.9
What is the
Organisation’s policy
on and arrangements
for the
induction/training/em
ergency response of
employees (This
should include
employees, sub-
contractors & self
employed)?
Existing & New
Contractors Answer
4.3
How does the
organisation
demonstrate
knowledge of the USL
Site Environmental
systems?
Existing Contractors
Answer
SECTION C
5. SUBCONTRACTOR MANAGEMENT
5.1
How does the
organisation ensure
safe and effective
subcontractor
management?
Existing & New
Contractors Answer
4. ENVIRONMENTAL MANAGEMENT
4.1
How is the
environmental
Management
structure defined?
Note (a):
Note (b):
Note (c):
Note (d):
USL reserves the right to verify the information provided by the Contractor
All information is treated as confidential and will not be shared with third parties.
◄ END OF QUESTIONNAIRE ►
Submission of this questionnaire is not an automatic approval
This questionnaire MUST be signed by an authorised officer of the Company
S.noArea of
dismantling
Major items to be
dismantledBasic Details Major Risks Involved Control Measures for safe Dismantling Brief of Activity how the dismantling is done Equipment used Other informations if any
A.Asbestos sheets
1. Area or no of sheet to remove:
100 Sqmeter
2. Location: Building Top
3. Height involved: From floor- 5
Mtr, From ground- 30 mtr
4. No anchor point
5. No access & frazile work
1. Fall from height
2. asbestos Fibre /Dust
3. Cancer (Chronic Effect)
4.Itching
1. Provision of scaffolding as per standard
2. If work can not be done by scaffolding,
provision of roof life line and anchor point
3. Safety net as per standard
4. Rescue arrangement
5. Unloading arrangement for asbestos
6. Barrication at ground floor
7. 3M Nose Mask, coverall, job specific Hand
gloves, Safety Shoes,Safety Helmet, Full Body
Harness with shock absorber and double layn
yard, PFAS, Life Line etc.
1. Placing of sheet barrication over the spirit
storage building
2. With the help of mobile elevator sheets will
be broken by a person sitting in the mobile crane
with the use of hammer.
3. The broken pieces will fall inside the building
and will be collected for disposal
4. Top sheets will be removed by erecting
scaffolding on top floor.
1. Mobile crane - appropriate capacity of
crane size
2. scaffolding
3. Proper PPEs
Whenever Crane is used, the
approved lifting plan is
required.
Whenever Man Basket used
with the crane, then it should
have valid third party
certificate and SWL should be
clearly marked on it with no
of person allowed in it and
users shall use fullbody
harness for its use.
B. Distillation
columns
Heights : 25, 20, 15, 10 mtr
Size/shape : cylindrical
Weight : 1 T approx if dismantled in
part
1) Fire as ENA storage tanks room is
adjucent to RD plant
2) Fall from height
3) Fall of material from height
4) Difficult crane access
5) Crane toppling
6) Equipment isolation & neutralisation
7) Structural stability
1) PPE
2) Good lifting tools & tackles
3) Safe access for material unloading
4) Area barrigation
5) Physical hard barrigation between spirit
storage area & RD plant
6) Continuous sprinkler / water provision
7) Equipment neutralization
1. Flush the column with water and open all the
manholes and opening and keep it open for 2
days
2. removal of all insualtion and proper disposal
2. dismantling of column after holding it by
crane
3. removal of column by crane
4. Gas cutting wherever required
1. Appropriate Capacity of Crane size
2. Gas cutting sets
3. Welding Curtains
4. Wall breaking equipments
5. Solid Barrication
Whenever Crane is used, the
approved lifting plan is
required.
C.
Condensors/Receiv
ers
Heights : 25, 20, 15, 10 mtr
Size/shape : cylindrical
Weight : 1 T approx if dismantled in
part
1) Fire as ENA storage tanks room is
adjucent to RD plant
2) Fall from height
3) Fall of material from height
4) Difficult crane access
5) Crane toppling
6) Equipment isolation & neutralisation
1) PPE
2) Good lifting tools & tackles
3) Safe access for material unloading
4) Area barrigation
5) Physical hard barrigation between spirit
storage area & RD plant
6) Continuous sprinkler / water provision
7) Equipment neutralization
1. Flush the column with waterand open all the
manholes and opening and keep it open for 2
days
2. removal of all insualtion
2. dismantling of column after holding it by
crane
3. removal of column by crane
4. Gas cutting wherever required
1. Appropriate Capacity of Crane size
2. Gas cutting sets
3. Welding Curtains
4. Wall breaking equipments
5. Solid Barrication
Whenever Crane is used, the
approved lifting plan is
required.
D. MS Pipe linesHeights : 25, 20, 15, 10 mtr
1) Fire as ENA storage tanks room is
adjucent to RD plant
2) Fall from height
3) Fall of material from height
4) Difficult crane access
6) Equipment isolation & neutralisation
1) PPE
2) Good lifting tools & tackles
3) Safe access for material unloading
4) Area barrication
5) Physical hard barrication between spirit
storage area & RD plant
6) Continuous sprinkler / water provision
7) Equipment neutralization
Cutting and taking it down into pieces. Wherever
flammable liquid lines are there need to be
dismantled by spanners. Use of solid barrication
and welding curtain along side the walls beside
the ENA storag building. Isolation of ENA storage
area by fixed barrication inside the ENA storgae
area if required.
1. Appropriate Gas cutting, welding set
2. Ropes, Slings for holding the pipes
3. Barrication
4. Appropriate chain block pulley
E. MS Water/Spirit
tanks (inside RD
plant)
Heights : 20 mtr
Size/shape : cylindrical
Weight : 2 T approx if dismantled in
part
1) Fire as ENA storage tanks room is
adjucent to RD plant
2) Fall from height
3) Fall of material from height
4) Difficult crane access
6) Equipment isolation & neutralisation
1) PPE
2) Good lifting tools & tackles
3) Safe access for material unloading
4) Area barrigation
5) Physical hard barrigation between spirit
storage area & RD plant
6) Continuous sprinkler / water provision
7) Equipment neutralization
Emptying out the tanks and flushing with water.
Open all manholes and opening and keep it open
for 2 days. Physical barrication inside ENA
storage room. Breakingof wall to take the tanks
out with the help of crane.
1. Appropriate Capacity of Crane size
2. Wall breaking equipments
3. Solid Barrication
Whenever Crane is used, the
approved lifting plan is
required.
F. Structurals
Heights : Ground to 20 mtr
Size/shape : MS Structurals
Weight : 2 T max structural wt
1) Fire as ENA storage tanks room is
adjucent to RD plant
2) Fall from height
3) Fall of material from height
4) Difficult crane access
6) Collapse
1) PPE
2) Good lifting tools & tackles
3) Safe access for material unloading
4) Area barrication
5) Physical hard barrication between spirit
storage area & RD plant
6) Continuous sprinkler / water provision
7) Structural stability
Barricate spirit storage top and adjecent wall
side with the help of hard barrication & fire
blanket. Partial emptying out the spirit storgae
adjecent to the RD plant. Continuous sprinkling
of water during hot work.
1. Appropriate Capacity of Crane size
2. Gas cutting sets
3. Welding Curtains
4. Wall breaking equipments
5. Solid Barrication and fire blanket
provision
Whenever Crane is used, the
approved lifting plan is
required.
RD Plant1
S.noArea of
dismantling
Major items to be
dismantledBasic Details Major Risks Involved Control Measures for safe Dismantling Brief of Activity how the dismantling is done Equipment used Other informations if any
G. Electrical
cabels/DBs
Heights : Ground to 20 mtr
Size/shape : MS Structurals
Weight : 1
Electrocution
Fall from height
Isolation
LOTO
CPR Training to Workmen
Scaffolding
Electrical supply isolation.1. Proper Scaffolding
A. Steam Pipe linesHeights : Groumd to 8 mtr
1) Fall from height
2) Fall of material from height
3) Bulky Material
1) PPE
2) Good lifting tools & tackles
3) Safe access for material unloading
4) Area barrigation
Barricate the Complete area and Crane to be
used .
B. Boiler
Heights : 15 metre
Weight: 20 ton
1) Fall from height
2) Fall of material from height
3) Bulky Material
1) PPE
2) Good lifting tools & tackles
3) Safe access for material unloading
4) Area barrigation
Barricate the Complete area and Crane to be
used .
Electrical ssupply Isolation
Scafolding
1. Appropriate Capacity of Crane size
2. Gas cutting sets
3. Welding Curtains
4. Wall breaking equipments
5. Solid Barrication and fire blanket
provision
Whenever Crane is used, the
approved lifting plan is
required.
C. Boiler Chimney
Heights : 30 metre
Weight: 5 ton
1) Fall from height
2) Fall of material from height
3) Bulky Material
1) PPE
2) Good lifting tools & tackles
3) Safe access for material unloading
4) Area barrigation
Barricate the Complete area and Crane to be
used .
1. Appropriate Capacity of Crane size
2. Gas cutting sets
3. Welding Curtains
Whenever Crane is used, the
approved lifting plan is
required.
RD Plant1
Boiler & steam
Pipe lines2
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
1.0. Site Safety Setup
1.1. Contractor should appoint qualified, experienced (minimum 5 Years) and knowledgeable
Safety Officer/s who will communicate, implement and drive the procedures throughout
the work force. Based on the labour force at site and risk associated with activities
contractor should appoint sufficient number of skilled & qualified safety Stewards
(Experience minimum 3 Years) at site. If USL Representative instruct contractor to
deploy more safety staff or change in existing staff, contractor should provide/change the
same immediately.
1.2. The Project Manager or Construction Manager or site engineer, appointed by the main
Contractor, must be totally responsible for compliance with this health and safety code.
1.3. Safety Officer should ensure continuous vigilance and enforcement of safety practices at
construction site and continuously observe employees work practices and guide/ coach
them to follow safe practices. This process must be in place till the project completion.
2.0. Fall Protection Requirement
2.1. History of accidents in industry reveals that maximum fatalities at project site are due to
falls from height. Considering high risk associated with the activities, USL has very serious
expectations from the contractor for 100% compliance for zero accident at project /
construction site.
2.2. Falls may result from a number of factors, including unstable working platforms,
inadequate engineering controls like guardrails, non-standard ladders, etc., and improper
use of fall protection equipment.
2.3. At USL, all activities involving working above 6 feet height are covered under the fall
protection requirement in case of construction project.
2.4. Following steps must be followed for all high-risk activities while working at height:
2.4.1. Make fall protection part of your workplace safety and health program
2.4.2. Identify/recognize and evaluate fall hazards before allowing worker to work
2.4.3. Eliminate fall hazards, if possible.
2.4.4. USL preference for fall protection system is as follows
a. Cherry Pickers
b. Scissor lifters
c. Scaffolding (With access equipment)
d. Life line systems
e. Safety Nets
2.4.5. All such equipment shall be complied with international standards like ANSI, EN
and their load carrying capacity shall be at least 2 times of expected live load.
2.4.6. Load carrying capacity of all such equipment shall be certified by a competent
person.
2.4.7. Cherry picker/scissor lift shall have following arrangements.
a. Maximum Height interlock
b. Gate interlock
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
c. Load indicators
d. High load alarm
e. Low pressure alarm
f. Out rigger interlock
g. Ground & emergency control
2.4.8. Only new generation hydra e.g. Model - FX 120, Escort 15, TRX 1250 etc shall be
allowed and checked as per Annexure-4
2.4.9. Crane those comply with checklist given in Annexure-5 shall allowed.
2.4.10. Proper use of appropriate equipment like scaffolds or elevated working platform
with guardrail, to prevent falls and to protect workers by encouraging use of
approved safety harness with double lanyards, safety net system, etc.
2.4.11. Inspect and maintain fall-protection equipment before and after using it.
3.0. Scaffolding
3.1. Minimum safety requirements:
3.1.1. Scaffolds must always be erected, maintained and dismantled by competent and
trained workmen.
3.1.2. After completion of the scaffold erection, competent person should check its
integrity and stability, using an approved checklist, affix a ‘Scaffold Safety Tag’ to
inform if the scaffold is safe or unsafe to use.
3.1.3. Personnel to use only those scaffolds which have a safe to use tag.
3.1.4. All platforms or scaffolds shall have guardrails & access arrangement. Scaffold
without working platform and guardrail system will not be permitted.
3.1.5. Horizontal and cross bracings must be installed across the scaffold levels.
3.1.6. Scaffolds must be properly braced and when necessary tied into building or the
structure. Platforms must be properly supported and span of planks should not
extend farther from scaffold. They should not be overloaded.
3.1.7. Ledgers should be horizontal and always be connected to the standards by load
bearing lashings, if of timber or by right angle load bearing couplers, if of metal.
3.1.8. Transoms and putlog should be horizontal and at right angle to the ledgers, to
which they should be secured by right angle couplers or putlog couplers.
3.1.9. Platforms should be close boarded; overlapping of boards and excessive
overhangs should be avoided.
3.1.10. Diagonal bracing parallel to the face of the building and full height of the scaffold
should be provided at 30 m intervals.
3.1.11. Vertical supports shall be adequately braced.
3.1.12. Tubular steel centering should be used in accordance with the manufacturer’s
instructions.
3.1.13. Sills under the support should be set on firm soil or other suitable material in a
pattern which assure adequate stability for all props.
3.2. Working Platform:
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
3.2.1. The working platform should be designed as per the anticipated load.
Type of Scaffold Maximum Load Bearing Capacity
Light duty scaffold Less than or equal to 122 kg/M2 (25 psf)
Medium duty scaffold Less than or equal to 244 kg/M2 (50 psf)
Heavy duty scaffold Less than or equal to 366 kg/M2 (75 psf)
3.2.2. Platform should be made in such a way that there should not be any opening,
which allow material to fall.
3.2.3. Proper approach ladder should be provided for scaffolds from the base level to top
working platform. Ladder shall be used for climbing up and down.
3.3. Guardrail System:
3.3.1. It should be capable of withstanding a force of at least 200 pounds (890 Newton’s)
applied in any outward or downward direction.
3.3.2. In the guardrail system, the edge height of top rails should be 1.0 meter and
midrails should be 0.5 meter above the walking / working platform.
3.3.3. Toe boards should be used as protection from falling objects; they must be erected
along the edges of the overhead walking or working surface to protect persons
working below. Toe boards shall be a minimum of 4.0 inches (10 centimeters) tall
from their top edge to the level of the walking/ working surface.
3.4. Stability & Integrity of Scaffolds.
3.4.1. Scaffolds erected on any type of soil should have a mudsill of 2-inch x 10-inch
plant (full size) and should be continuous under at least two consecutive supports.
Do not use blocking or packing such as bricks, short pieces of lumber under
scaffold feet.
3.4.2. The ratio of height to least lateral dimension should not exceed 3 to 1 (three to one
rule) unless the scaffold is (1) Tied to a structure that should be capable of
sustaining lateral loads in both tension and compression, (2) Equipped with
outrigger stabilizer or (3) Equipped with suitable guy wires.
3.5. Rolling Scaffolds
3.5.1. Height of the tower must not exceed four (4) times the minimum base dimension.
Outrigger frames or outrigger units may be used to increase base width dimension
when necessary.
3.5.2. All castors must be secured to frame legs or screw jacks with a nut and bolt or
other secure means. Weight of tower should not exceed the capacity of the
castors.
3.5.3. Screw jacks must not be extended more than 12 inches above castor base. Tower
must be kept level and plumb at all times.
3.5.4. Horizontal/diagonal bracing must be used at the bottom and top of tower and at
intermediate levels of 20 feet. Fabricated planks with hooks can be used to replace
the top diagonal brace.
3.5.5. All frames must be fully cross-braced.
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
3.5.6. Castors must be locked at all times, except when the scaffold is in motion.
3.5.7. Every rolling scaffold in use with workers, working on a height platform to be
closely monitored by 2 no’s trained attendants stationed at the base.
3.5.8. At no point of time rolling scaffolds be moved from one place to another without
getting the workers working at a height to be brought down safely.
3.6. Personal Fall Protection Systems
a) Full body harness and personal fall arrest system
3.6.1. All persons working at height of 6 feet or more should wear safety harness and
lifeline should be anchored properly. Anchorages used to attach personal fall
arrest systems shall be independent of any anchorage being used to support or
suspend platforms and must be capable of supporting at least 5,000 pounds
(22.2 kilo Newton’s) per person attached. Lanyards and vertical lifelines must
have a minimum breaking strength of 5,000 pounds (22.2 kilo Newton’s).
3.6.2. These consist of an anchorage, lifeline, and a full body harness and may include
a deceleration device, or suitable combinations.
3.6.3. While working at height where there is possibility of freefall person should use
fall arrest system. If a personal fall arrest system is used for fall protection, it
must do the following:
3.6.4. Limit maximum arresting force on an employee to 900 pounds (4 kilo Newton’s)
when used with a safety belt and limit maximum arresting force on an employee
to 1,800 pounds (8 kilo Newton’s) when used with a body harness;
3.6.5. Be rigged so that an employee can neither free fall more than 6 feet (1.8 meters)
nor contact any lower level;
3.6.6. Bring an employee to a complete stop and limit maximum deceleration distance
an employee travels to 3.5 feet (1.07 meters); and
3.6.7. Have sufficient strength to withstand twice the potential impact energy of an
employee free falling a distance of 6 feet (1.8 meters) or the free fall distance
permitted by the system, whichever is less.
b) Safety Net Systems:
3.6.8. Safety nets should be installed as close as practicable under the walking/working
surface on which employees are working and never more than 30 feet (9.1
meters) below such levels.
3.6.9. Defective nets shall not be used. Safety nets shall be inspected at least once a
week for wear, damage, and other deterioration.
3.6.10. The maximum size of each safety net mesh opening shall not exceed 36 square
inches (230 square centimeters) nor be longer than 6 inches (15 centimeters) on
any side, and the openings, measured center-to-center, of mesh ropes or
webbing, shall not exceed 6 inches (15 centimeters). All mesh crossings shall be
secured to prevent enlargement of the mesh opening.
3.6.11. Each safety net or section shall have a border rope for webbing with a minimum
breaking strength of 5,000 pounds (22.2 kilo Newton’s). Connections between
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
safety net panels shall be as strong as integral net components and be spaced
no more than 6 inches (15 centimeters) apart. Safety nets shall be installed with
sufficient clearance underneath to prevent contact with the surface or structure
below. When nets are used on bridges, the potential fall area from the
walking/working surface to the net shall be unobstructed.
4.0. Fencing / Guarding of moving parts
4.1. Every contractor should obtain formal approval from USL -Project authorities before
bringing any equipment having moving parts into the site. These equipment should have
clear specification, name plate and operation manual furnished by the manufacturer.
Standard operating procedures for these machines should be submitted to USL -project
authorities and formal clearance obtained before installing and trail run.
4.2. All motors, , chains, and friction gearing, flywheels, shafting, dangerous and moving parts
of machinery (whether or not driven by mechanical power) should be securely fenced or
lagged
4.3. Fencing of dangerous parts of machinery should not be removed while machinery is in
motion or in use
4.4. Contractor should develop equipment specific LOTO procedure for all critical equipment,
electrical distribution boxes, junction boxes etc.,
5.0. Slipping, tripping, cutting, drowning and falling hazard control
5.1. All passageways, platforms and other places of construction work at the building or other
construction work should be kept free from accumulations of dust, debris or similar
materials and other obstructions that may cause tripping.
5.2. Any sharp projections or protruding nails or similar projections which may cause cutting
hazard to a worker should be removed or otherwise made safe by taking suitable
measures by the contractor. Additional precaution has to be exercised by the contractor in
handling and laying the reinforcement bars. There should not be any protruding
reinforcement bars without adequate measures to make it safe.
6.0. Electrical Hazards Control
6.1. Electricity is extensively used in the construction site for various purposes such as driving
machinery, lifting machines; motors providing general lighting, operating hand tools etc.,
Electricity is not dangerous, if used properly. However, if used unwisely, serious accidents
can occur.
6.2. LOTO (Lock Out Tag Out) processes should be strictly followed as per USL LOTO
procedures.
6.3. All electrical distribution boards should be equipped with MCB, ELCB / RCC. All temporary
installations at a building or other construction work should be provided with earth –
leakage circuit breakers (ELCB).
6.4. All portable electrical tools shall have double insulation and shall have upstream protection
by earth leakage circuit breaker (ELCB) of less than or equal to 30 Mille Ampere rating and
miniature circuit breaker (MCB).
6.5. Any electrical connection should be taken, maintained and repaired by a qualified
electrician with use of appropriate insulated tools and necessary PPEs.
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
6.6. Temporary electrical wiring used for lights and power shall comply with the Indian
electricity rules. All temporary electrical wiring installations, tie-ins and pick-ups shall be
approved by the USL Project Coordinator. All temporary electrical cables should be
amour/metal sheathed cable to protect it from the cut due/mechanical damage.
6.7. All portable lights for use in confined areas like manholes, or damp areas shall be operated
at a maximum of 24 volts or protected by earth leakage circuit breaker (ELCB) and
miniature circuit breaker (MCB).
6.8. The contractor should ensure that all electrical appliances and current carrying equipment
used at a building or other construction work are made of sound material and are properly
and adequately earthed. All electrical appliances should be provided with a local isolation
switch close to the appliance.
6.9. The contractor should ensure that all electrical installations are protected from rain.
6.10. All current carrying parts should be enclosed and enclosure should be earthed properly.
6.11. All electrical tools and equipment must have industrial type plugtop and should be connected to plug sockets. No electrical tool or equipment must be connected to a socket or live wire using open leads of the power cable.
6.12. Any work on electrical installations like panels, wiring, generators etc including installation, repair, checks, maintenance etc must be carried out by a trained electrician with wireman license /supervisory license as applicable.
7.0. Tools & Equipment
7.1. All power tools equipment like portable grinder, drilling machine, saw, welding machine are
to be checked at USL security gate by competent person for its conditions as per the
checklist approved by USL . Only those tools, which are found safe and having LOTO
capability are allowed inside the USL Site.
7.2. Hand and power tools must be maintained in a safe condition. When power-operated tools
are designed to accommodate guards, they must be equipped with appropriate guards
when in use. All moving / rotating parts must be provided with 360 degree guarding.
7.3. All hand-held pneumatic power tools must be equipped with a constant pressure switch
that shuts off when the pressure is released. Pneumatic power tools must be secured to
the hose or whip by positive means. Safety clips or retainers must be maintained on
pneumatic impact (percussion) tools to prevent attachments from being accidentally
expelled. Hoses should not be used for hoisting or lowering tools and hoses exceeding ½”
in inside diameter must have a safety shutoff at the source of supply to reduce pressure in
case of a hose failure.
7.4. Abrasive wheel machine should not be operated more than the manufacturer’s
recommended speed. All employees using abrasive wheels must have eye protection and
other tools must be operated using appropriate personal safety equipment.
7.5. Electric power-operated tools should be of the approved double insulated type, or
grounded in accordance with good electrical practice. It should have upstream protection
through ELCB having rating not more than 30 mA. Electric power operated tools should not
be lowered by holding its power chord. Use only BIS standard hand power tools
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
7.6. All electrical tools and fixtures to be used in a confined space or in a hazardous area must to be approved by USL prior to bringing inside the site and its installation should be verified and approved by USL.
8.0. Gases / Gas Cylinder management
8.1. All compressed gas cylinder should be handled in an approved cylinder trolley. No free
rolling of cylinders is allowed at USL site.
8.2. Compressed gas cylinders shall be properly and legibly marked with the trade name of the
gas content and also colour coded as per Bureau of Indian Standard. When transporting,
moving and storing compressed gas cylinders, valves shall be closed, and protection caps
shall be in place and secured. For transportation of gas cylinder specifically designed
trolleys must be used.
8.3. Oxygen cylinders shall be stored separately from fuel gas cylinders. No compressed gas
cylinders shall be taken into confined spaces.
8.4. Gas cylinders shall be stored in an area assigned by the USL Project Coordinator. This area shall be well ventilated and away from sources of ignition or heat.
8.5. Use of LPG Gas cylinder not allowed at USL Plant site.
8.6. Gas cylinders & cutting apparatus shall comply Annexure-6
8.7. Welding Operation:-
8.7.1. Any welding machine prior to use first time should be inspected and certified for its
safe use by a competent person. All welding machine should be inspected for its
condition once in a week and proper inspection tag should be placed on the
machine.
8.7.2. Appropriate work permit must be obtained before starting any welding activity.
8.7.3. Only qualified welder is allowed to do welding with appropriate insulating hand
gloves, appropriate welding shield and tools.
8.7.4. Power to welding machine should be taken through ELCB. Welding machine
should be earthed properly. Before shifting welding machine from one place to
another power supply should be switched off.
8.7.5. Body/frames of arc-welding machines should be double earthed.
8.7.6. Electrode holders should have adequate current carrying capacity and be
adequately insulated to prevent shock, short-circuiting or flash overs.
8.7.7. Circuit connections should be waterproof and plugs/sockets used should of
industrial type. Direct plugging in of cable leads is not allowed.
8.7.8. Connections to welding terminals should be made at distribution boxes and should
have upstream ELCB protection
8.8. Grinding Operations-
8.8.1. Grinding wheels are fragile and sensitive to impacts and shocks. Be aware of this
when you handle them.
8.8.2. The grinding wheels must be handled with care during transportation.
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
8.8.3. Store in dry, frost free conditions in special racks or containers.
8.8.4. Store in moderate and constant temperature.
8.8.5. Use the wheels held in stock longest first.
8.8.6. Never exceed the maximum operating speed of the wheel in RPM or /min.
8.8.7. Make sure that the instructions on the wheel and on the machine are compatible.
8.8.8. Carefully inspect the abrasive wheels: if they are damaged in any way do not use
them.
8.8.9. Before starting the cutting-off or grinding operation, the wheel guard must be in
position and fixed securely.
8.8.10. Grind and cut only materials for which the grinding wheel is suitable.
8.8.11. Cutting off: Keep the wheel straight in the cut.
8.8.12. Grinding: Keep the wheel at an angle of 20-30 degrees with the piece.
8.8.13. Switch off the machine and allows the wheel to stop completely before placing it on
a bench or on the floor.
8.8.14. The following safety Personal Protective Equipment’s are used at grinding
operations
Full Face Shield
Ear muffs or plugs
Gloves
Dust mask
Leather apron or safety clothes
Head cover
Safety shoes etc.
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
8.9 Crane Operator-
8.9.1 Operator of valid license shall be permitted to operate the crane.
8.9.2 Operator shall always have his valid license and the certificate of the equipment he
operates.
8.9.3 Certified crane shall only be deployed for the job.
8.9.4 Assembling, maintenance and disassembling on the equipment shall be done as per
the manufacturer’s manual.
8.9.5 Overloading shall never be allowed at site.
8.9.6 The operator shall ensure the area is good enough for the crane before marching or
parking it.
8.9.7 Crane shall be stationed on a firm level ground.
8.9.8 Proper boom angle and radius shall be followed to lift the load. Refer the load chart
given in the crane manual or fixed inside the crane cabin.
8.9.9 Cranes shall not be parked near the edges of pit or excavations.
8.9.10 The swinging area of the crane shall be cordoned. The Crane helper shall ensure no
trespasser enters in this vicinity.
8.9.11 The operator shall have a clear view of the operation throughout the hoisting period.
8.9.12 A trained signalman shall give the signal for crane operation.
8.9.13 A competent rigging gang shall do material handling.
8.9.14 Clear passages shall be left for easy handling and transportation structures.
8.9.15 All persons shall stand clear when a crane is sorting or shifting materials.
8.9.16 Monthly safety inspection shall be carried out and recorded
8.9 Rigging- 8.9.1 Know the safe working load of the equipment and the tackle being used. Never
exceed this limit. 8.9.2 Examine all hardware, equipment, tackle and slings before using it and destroy
defective components. 8.9.3 Caution must be exercised when working near overhead power lines. Minimum
safe distance should be maintained. 8.9.4 Hoist lines shall be in plumb at all times. 8.9.5 Rapid swinging of suspended loads also subjects the equipment to additional
stresses, which can cause collapse. Load must always be kept directly below the boom point or upper load block
8.9.6 The rated loads of most hoisting equipment do not generally account for the weight of hook blocks, hooks, slings, equalizer beams, material handling equipment and other elements of lifting tackle. Their combined weight must be subtracted form the load capacity of the equipment to determine the maximum allowable load to be lifted.
8.9.7 Never use damaged slings or hoist ropes. 8.9.8 Sharp bends, pinching and crushing must be avoided. 8.9.9 Never allow wire rope to lie on ground for any length of time or on damp or wet
surfaces, rusty steel or near corrosive substances.
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
8.9.10 Avoid dragging rope slings from beneath loads. 8.9.11 Keep all ropes away from flame cutting and electric welding operations. 8.9.12 Never wrap a wire rope completely around a hook. The sharp radius will damage
the sling. 8.9.13 Ensure that the sling angle is always greater than 450. If horizontal distance
between the attachment points on the load is less than the weight of the shortest sling leg, then the angle is adequate one. In this case angle is greater than 600.
8.9.14 When using choker hitches, do not force the eye down towards the load once tension is applied. Rope damage is inevitable.
8.9.15 All loads must be rigged properly to prevent the dislodgement of any part. 8.9.16 The load must be kept under control at all times. 8.9.17 Loads must be safely landed and properly blocked before being unhooked and
unsung. 8.9.18 Lifting beams should be plainly marked with their weight and designed working
loads and should only be used for the purpose for this they were designed. 8.9.19 Hoist rope must never be wrapped around the load. 8.9.20 Keep hands away from pinch points as the slack is being taken up. 8.9.21 Wear gloves when handling wire rope. 8.9.22 Avoid impact loading. Lift the sling gradually until the slack is eliminated. 8.9.23 Never ride on a load that is being lifted.
8.10 Signalling
8.10.1 The signalman must 8.10.2 Be qualified by experience with the operations. 8.10.3 Wear high visibility clothing. 8.10.4 Use hand signals only when his signals are clearly visible to the operator. 8.10.5 Signalman should be in constant communication with the crane operator, either
visually with hand signals or audibly by radio throughout the operation. If the operator loses contact with the signalman for any reason, he must stop the movement of the crane until communication is restored.
8.10.6 Hand signals can be used effectively when the distance between the operator and the signalman is not great, but 2-way radios should be used when the distance or atmospheric conditions prevent clear visibility. Adequate lighting and signaling arrangements must be available during night work and equipment must not be operated when either one is inadequate.
8.10.7 When two or more cranes or hoist are used to lift one load, one qualified person should be responsible for the operation. He should analyze the operation and instruct all personnel involved in the proper positioning, rigging of the load, and the movement to be made.
9.0. Lifting appliances
9.1. All lifting appliances, including their parts and working gear, whether fixed or moveable and
any plant or gear used in anchoring or fixing of appliances, should confirm appropriate
Bureau of Indian Standards and be of sound construction, sound material, and of adequate
strength and maintained in good working condition.
9.2. Every lifting appliance should be provided with adequate and efficient brakes / control
measures. Test and periodical examination of lifting appliances.
9.3. All lifting appliances including all tackles & parts, whether fixed or moveable, should be
tested and examined by a competent person in the following circumstances and certificate
to be maintained on record at site:
1 Before being taken into use for the first time
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
2 After it has undergone any alterations or repairs liable to affect its strength or
stability
3 Or after erection on a construction site
9.4. All lifting appliances should be thoroughly examined by a competent person once at least
in every twelve months and the record of examination should be maintained as per State
Factory Rules.
9.5. Automatic safe load indicators:-
a. Every crane, if so constructed that the safe working load may be varied by raising or
lowering of the jib, should be attached with an automatic indicator of safe working
loads which give a warning to the operator wherever the load exceeds the safe
working load
b. Cut-out should be provided which automatically arrests the movements of the lifting
parts of every crane if the load exceeds the safe working load, wherever possible.
c. In case it is not possible to install an automatic safe load indicator, in which case,
provision of a table showing the safe working loads at the corresponding inclinations
or radii of the jib on the crane will be considered sufficient.
9.6. Identification and marking of safe working load:-
a. Every lifting appliance and loose gear should be clearly marked for its safe working
load and identification by stamping or other suitable means;
b. Every lifting appliance having more than one working load should be fitted with
effective means to enable the operator to determine safe working load at each point
under all condition of use.
c. No lifting appliances or lifting gear should be used unless marked as per BIS
provisions.
9.7. Operation of lifting appliance:-
a. Every crane driver or lifting operator should possess adequate skill and training in the
operation of the particular lifting appliance;
b. Person above eighteen years of age should be in control of any lifting appliance,
scaffold winch, or to give signals to the operator;
c. Precaution should be taken by the trained operator to prevent lifting appliance from
being set in motion;
d. The operation of lifting appliance should be governed by signals, in conformity with
the BIS standards;
e. There should not be sudden jerk to any lifting appliances while the material is being
raised, lowered or slowed.
10.0. STACKING & UNSTACKING OF MATERIALS
10.1. Planned layout of storage area and periodic inspection of storage condition at each site.
10.2. Consideration for shape of stack and size according to nature, shape & size of materials or
articles to be stored. Do not stack goods with different shapes/ length together and
separate from the beginning items.
10.3. Proper access to site storage areas through clear approach road, pathways etc.
10.4. Identification of material by tagging, labeling etc.
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
10.5. Proper illumination & ventilation
10.6. Safe distance of storages from overhead traction lines, edge of excavation etc.
10.7. Consideration of climatic conditions i.e. excessive heat or cold, rain etc.
10.8. No overloading floors and platforms
10.9. Use of lifting attachments like special clamps etc while handling materials.
10.10. Firmly secure Oxygen & Acetylene cylinders or other articles that can easily topple over.
10.11. To prevent stacks of goods from collapsing while climbing on them or removing them.
Remove each item to the side with hooks to prevent pinching of fingers before being lifted
finally.
10.12. Provide fire protection means.
NOTE : Thumb Rule : - Height should not exceed 3 times the length of the shorter side of the
base in any self-sustaining stack.
11.0. MANUAL HANDLING OF MATERIALS
11.1. Ensure good co-ordination when a team of two or more workmen carries out a joint
operation.
11.2. For physical lifting by workmen, arrangement shall be such that a workman is not required
to pull / lift stores at heights greater than 1.5 m.
11.3. Stop at corner to confirm safety in surrounding areas when carrying rods or similar long
articles.
11.4. When two persons carry out long rods, use the same shoulder and signal their movements.
Use only the prescribed passageways.
11.5. Lift heavy goods by squatting on heels and keeping the back straight. Do not through / toss
/ drop stores casually and move / stack them slowly & deliberately.
11.6. Remove each item to the sides with hooks to prevent stacks of goods from collapsing or
pinching of fingers while climbing on them or removing them before being lifted finally.
11.7. Ensure use of helmets, safety footwear, filter / protective glass, dust-mask goggles and any
other PPE in accordance with specific operational requirement.
12.0. MECHANICAL HANDLING OF MATERIALS BY USING LIFTING APPLIANCES & GEARS
a) Testing & Examination
Certificates of test and examinations shall be obtained for the lifting appliances & gears such as
Winches, Derricks and accessory gear
Cranes / Hoists and their accessory gear
Loose gear
Wire Rope
b) Periodicity
All lifting appliances shall be tested, examined & certified by a competent person before
being used for the first time and subsequently examined by him once in every 12 (twelve)
months.
All lifting gears shall be tested initially (before being used) and also after undergoing any
major alterations – tested on behalf of the manufacturer. Subsequently re-tested every 5
(Five) years by a competent person.
The lifting gear should also be thoroughly examined by a competent person in every 12
(Twelve) months whereas a chain is to be examined at least once in every month by a
responsible person.
Ropes shall be tested & examined by a competent person. A responsible person inspects
every wire rope once in every day prior to usages.
c) Controlling Hazards
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
Make sure (before use) that all the lifting appliances & gear are tested, examined &
certified by a competent person and they are in sound condition.
Every lifting appliances and loose gear shall be marked (in plain figures or letters) with it’s
Safe Working Load and identified clearly by means of stamping or other suitable means.
Lifting appliances & gears shall not be loaded beyond it’s Safe Working Load while in
use.
Care should be taken not to dragging or pulling under the load.
Deployment of trained operator & signaler and their safe method of work.
All the operators, riggers, signalers of lifting appliances shall be above 18 (Eighteen)
years of age, sufficiently competent & reliable, possess the knowledge of the inherent
risks involved in the operation of lifting appliances.
Ensure precaution to prevent persons passing under suspended load. Preferably
barricade the working place and also instruct the gang to move to a safe distance away
from the place where operations are carried out before the loading sling is hoisted.
All slings should have a thimble for increasing their life.
Use guide rope or tag line for handling long objects.
Specify area of providing safe means of access to every part of lifting appliances.
Lift the load when in plumb and bring it to the plumb of the hook. Make sure that the
horizontal movement does not take place simultaneously with the vertical movement.
Sling the load properly and signal only when loading of the sling is completed.
d) Colour Coding for Slings
Colour Coding of Slings shall be done periodically to ensure that only safe slings are
being used at site. (Where applicable as per contract requirements)
All slings in use will be checked by the mechanical Engineer & Safety Officer.
All damaged slings (10% wires broken in one lay, 4 wires broken in one strand) shall be
segregated and removed from site. Visually damaged slings having thinned diameter,
bird caging, flattening will be rejected.
Serviceable slings will be marked with a particular colour (on the sleeve). During the
subsequent month slings marked with only that particular colour will be used till
they are once again checked on the fixed day of the month.
13.0. Personal Protective Equipment (PPE)
13.1. Personal Protective equipment are barrier between the person and the hazard. These
provide adequate protection, when selected properly and used and maintained in
accordance with the manufacturers guidelines. A proper hazard assessment therefore is a
must before selecting/stipulating a PPE.
13.2. Personal protective equipment are not a fool proof safety system and therefore, more
emphasis should be given on engineering & administrative controls to eliminate or
minimize the hazards. All efforts must be made to free from trip hazards.
13.3. Effort to minimize the hazard must be adequate & appropriate. All necessary personal
protective equipment must be Indian standard as a minimum & approved by USL EHS
Staff should be available for use of persons employed on the site and maintained in a
condition suitable for immediate use, and the contractor should take adequate steps to
ensure proper use of equipment.
13.4. All contractor workers (all persons hired by contractor/subcontractor) should wear minimum
PPE that are Safety Helmet, Safety Shoes and Safety glasses without fail while working at
construction site.
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
13.5. Workers should be trained in proper use of PPEs. They should be taught pre-use
inspection, storage & maintenance of PPEs.
13.6. Contactor should maintain PPE store at construction site. Sufficient stock of PPE should
always be maintained at site. Safety Steward should ensure that right type PPE issued to
worker according the need of protection against the hazard.
13.7. Head Protection:-
13.7.1. Contractor should ensure that all workers entering in USL construction site wear
safety helmet with its strap worn under the chin without fail.
13.8. Eye and face protection:-
13.8.1. All persons working at site should wear safety glasses for eye protection.
13.8.2. Suitable goggles or effective protective screen should be provided for the
protection of eyes of persons employed in the process, which involves the
following activities:-
Dry grinding of metals by a revolving wheel or disc driven by mechanical
power
External or internal turning of non-ferrous metals.
Welding or cutting of metal by means of an electrical, oxy-acetylene or similar
process
Breaking or dressing of stone, concrete.
Handling and working with substances of a corrosive nature such as acids,
alkalis, chemicals and removing agents
Note: Any person assisting or in the vicinity of the above-said processes, are also
required to wear eye and face protection.
13.9. Hand and arm protection
13.9.1. Accident statistics reveal that the fingers and hands are the most frequently injured
parts of the body. In order to avoid accidents to fingers and hands, every building
worker engaged in handling sharp objects or materials which may cause hand
injury should be provided with suitable hand-gloves by the contractor, in
accordance with the BIS standards. The employees should wear protective
equipment like gloves, gauntlets, hand pads, etc. The selection of gloves should
depend on the nature of work and the risk involved.
Foot protection
13.9.2. Injuries to the foot are mainly caused by the falling of materials while handling or
by the foot striking against materials or objects. Safety shoes with steel toecaps
protect the toes from falling objects and striking against objects. The steel inner
sole affords protection against protruding nails or sharp objects. In addition to the
use of safety shoes, foot gaiters should be worn while carrying out welding and
cutting operations.
13.9.3. Every building worker required to work in water or in wet concrete or in other
similar work at a building or other construction work, should be provided with
suitable waterproof boots by the contractor.
13.10. Hearing Protection
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
13.10.1. To protect the ear (hearing ability) from industrial noise, the following types
of protective devices should be used:-
13.10.2. Earplug: The earplugs are usually made of soft rubber or PVC materials.
The noise reduction obtainable by the use of ear plugs ranges from 15 dB (A) to
20 dB (A), provided it is used as per manufacturer’s recommendation.
13.10.3. Ear Muff: The effectiveness of the earmuff depends upon the size,
shape, seal materials and the type of suspension used. Earmuff gives a better
protection than earplug. The noise reduction obtainable by the use of earmuffs
ranges from 30dB (A) to 40dB (A), provided it is used as per manufacturer’s
recommendation.
13.11. Respiratory Personal Protective Equipment
13.11.1. Dust Respirator: Dust respirator should be used for protection against dust
particles in the air. It is usually attached to half-face mask, containing filter paper or
cotton, which screens fine particles of dust from the inhaled air. These dust
respirators should not be used in an area where oxygen deficiency is noticed, or
toxic gas or vapor present.
14.0. ROOF WORK
15.0. Work On Steep Roofs
15.1. All practicable measures should be provided to protect the building workers against sliding
when carrying out work on steep roofs. Such as:
15.1.1. Roof Life line system as per EN 954 part D
15.1.2. All crawling boards used for work on steep roofs should be of adequate
strength, made of sound material and of the type approved for the purpose
of their use as per BIS standards;
15.1.3. Crawling board should be kept in good condition and inspected by a
responsible person before being taken into use;
15.1.4. Crawling board should be secured to a steep roof on which it is used by
ridge hooks or other effective & safe means;
15.1.5. A firmly fastened life line of adequate strength should be strung beside
each crawling board throughout its length while using crawling boards.
15.1.6. Person working on steep roofs must be physically fit and wear fall
protection devices.
15.1.7. A safety net or catch platform should be installed under the roof.
15.1.8. Evacuate all workers under the roof where working is in progress.
15.1.9. Suitable precautionary board should be displayed on working spot.
15.1.10. Guardrails to be installed around the roof edge and roof openings along
with toe guard and middle rail.
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
15.1.11. Proper access and egress to be provided to reach the work spot.
15.1.12. All roof materials should be stored at ground level and shifted as per
requirement and do not be stored at elevated work spot.
15.1.13. Care must be taken while transporting the fragile material from store to
work spot.
15.1.14. Proper PPEs like suitable clothing, footwear with non-slip soles safety belt,
fall arresting system etc. made preferably from rope to be ensure.
15.1.15. The electrical supply to adjacent overhead wires should be interrupted or
the wires should be rendered harmless by so other means.
15.1.16. Proper lighting arrangement should be made.
15.1.17. Medical examination would be done to detect any occupational diseases
before engagement at work.
15.1.18. Over weight person or fatty person should not be allowed to work with
fragile roof.
15.1.19. Emergency vehicle should be parked at site for round the clock.
15.1.20. First aid / hospital shall be identified and phone number would be
displayed at all visible locality.
All jobs at site shall be with a permit. Initiator to select appropriate PTW form for Hazardous
tasks based on PTW decision tree and document the Hazardous task in the relevant PTW form
as given below.
Hot Work Permit (USL/HS/F/12)
Electrical Work Permit (USL/HS/F/13)
General Permit (USL/HS/F/14)
Confined Space Entry Permit (USL/HS/F/15)
Excavation work Permit (USL/HS/F/16)
16.0. Work On Steep Roofs
16.1. All practicable measures should be provided to protect the building workers against sliding
when carrying out work on steep roofs. Such as:
16.1.1. Roof Life line system as per EN 795 part D
16.1.2. All crawling boards used for work on steep roofs should be of adequate strength,
made of sound material and of the type approved for the purpose of their use as
per BIS standards;
16.1.3. Crawling board should be kept in good condition and inspected by a responsible
person before being taken into use;
16.1.4. Crawling board should be secured to a steep roof on which it is used by ridge
hooks or other effective & safe means;
SPECIFIC EHS REQUIREMENTS FOR ASSET DISPOSAL
16.1.5. A firmly fastened life line of adequate strength should be strung beside each
crawling board throughout its length while using crawling boards.
16.1.6. Person working on steep roofs must be physically fit and wear fall protection
devices. All Height worker should have gone through Doctor Fitness certificate as
per the norms. All Contractor must have obtain the fitness certificate from the
doctor for those height workers.
Agency / Company Name :
Date : Hydra No:
S.No. O.K Not O.K N.A Remarks
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23 Fire Extinguisher
24
25
26
27
28
29
Side Signal / indicators - Left / Right
Parking Light
Driver / Operator Fitness
Driver/Operator Name :
HYDRA INSPECTION CHECKLIST
Checked by
SignatureDesignationName
Description
Driver seat belt condition
Safety latch with spring return available on all hook
Usages of Tag Line to be ensure during the material
handling with Hydra
UNITED SPIRITS LIMITED
Driver's License ( Ex - OTH Cranes)
Boom Light
Head Light
Hand Brake is in working condition
Weight Block Arrangement
Boom Limit Switch/Over load limit switch / indicator
Valid USL Gate Pass for the Driver / Operator
Front glass clarity
Reverse Horn / Light
Horn
Rear view mirror on both side
Note- Attached all necessary xerox verified from original with this check sheet after during hydra inspection.
Oil Leakage if any.
Wind Shield Condition
Any Other -
Gauges (Fuel / Speed / Heat )
Tire pressure & its condition
Brake Light
SAFE LOAD INDICATOR available & its working condition
Hydra - Valid Third Party Certification from competent
person & Insurance of Hydra
Wire Rope Condition
I undersigned checked/inspected the overall condition thoroughly of New Generation Hydra.
It is found Fit / Unfit for the work at USL Plant.
All Slings/Web Slings/D-shackle Condition & its valid Third
Party Certification from competent person
Condition of Tire & Spare Tire
UNITED SPIRITS LIMITED
CRANE INSPECTION CHECKLIST
Project Name: Agency / Company Name: Make Of Crane: Capacity: Crane No:
Third Party Certificate Validity: Insurance Certificate Validity:
LOCATION: Date: Time: Crane Operator Name: Operator license No: Driving License Validity:
Sr. Description
OK NOT OK NA Remarks
No.
1 Valid driving license
2 Valid Gate Pass for the Driver / Operator/Gate Pass No Gate Pass No:
3 Hook and Hook latch
4 Automatic Safe Load Indicator - Electronic Device
5 Over hoist limit switch
6 Boom limit switch
7 Boom angle indicator
8 Boom limit cut off switch
9 Condition of boom
10 Condition of ropes
11 Number of load lines
12 Size and condition of the slings
13 Stability of crane
14 Soil condition at location
15 Swing break and lock
16 Propel break and lock
17 Hoist break and lock
18 Boom break and lock
19 Main clutch
20 Leakage in hydraulic cylinders (if Any)
21 Out riggers fully extendable
22 Tyre pressure /crawler belt condition
23 Condition of battery and lamps
24 Guards of moving and rotating parts
25 Load chart provided
26 Number and position of pedant ropes
27 Reverse horn
28 Load test details
29 Operators fitness
30 Pollution Under Control Certificate
31 Fire Extinguisher of appropriate type
32 Training to the operator, Helper, Rigger, Signal man
33 Flame Arrestor (Muffler)
34 Crane Helper/Rigger/Signal Man
The above mentioned points are thoroughly examined by the undersigned.
Checked by Contractor's Name Designation Signature
Contractor Safety Officer
USL Representative / EHS Coordinator
Note: - Attached a clean Xerox copy of Crane Documents with Operator experience certificate & License
(Min Experience of Operator should be 5 Years)
SL
NOY/N/NA
SL
NOY/N/NA
10 11
11 12
Checked by permit authoriser
NAME
CHECK LIST FOR GAS CUTTING SET
CHECK ITEM PHOTOS
9
CHECK ITEM PHOTOS
4
Cylinder secured by
chain to the trolley.
Availability of
industrial type
lighter(no match
box / commercial
lighters).
3
5
Flash back arrestor
(FBAs) i.e. Non
return valves
(NRVs) is provided
for acetylene &
oxygen cylinders
Tight Crimping of
hoses with jubilee
clamps.
1
Protective valve cap
firmly fixed for both
cylinder(Check for
damage/crack in the
valve cap)
2
Checked by contractor
NAME
7 8Trolley tire shall be free
from damages.
DATE
DATE
SIGNATURE
SIGNATURE
CHECK ITEM
NO Flammable material present nearby or
below the working areaFire Blanket to be use to cover the working area
Gas CuttingSafety Training Given to Gas
Cutter, Helper and subordinates / Tool Box
Talk given before starting work. Attached
Tool Box Talk sheet.
Soap Solution test caried out for leakage
Pressure gauges two
for each cylinder(inlet &
out)are in working
condition(both Oxygen
& Acetylene gas)
Hose free from
damage(cut and cracks
)
Flash back arrestor
(FBAs) i.e Non return
valves (NRVs) is
provided for both
acetylene & oxygen
cylinders at both end of
hose.
6
1
2
4 5
6
3
7
8
DATE OF CHECK- CONTR NAME-
YES(Y)
NO(N) X
LEGENG
LOCATION OF USE-
1
2
3
4
5
6
7
8
9
10
11
12
13
Machine No.:-
Working Location:-
Are return lead connected properly
(Rod, Angle, Channels shall not be used.)
W-6
Equipment Inspection Sticker -
Green Sticker (Fit For Use) / Red Sticker (Unfit
For Use)
No damage in the insulation of welding cables
Trolley without damaged wheels
CHECK LIST FOR ARC WELDING MACHINE (only 3 phase machines allowed)
Regulator with indicator is provided
ON / OFF knob is provided(Check for damage and
uninsulated knob)
Month………………….
CHECK ITEMS (to be checked daily)
No internal live electrical parts of welding machine
is exposed
Is earthing given to body of m/c. - GI Rod for the
Welding Machine
Fire extinguisher and fire bucket with sand
availability
Industrial type Plug for power tapping cable of
welding machine
Welding Machine Calibration Certificate. Attached
the certificate.
Sl No DescriptionWeek
Date
Welding cables connected to the welding machine
with lugs at the joints
W-1
Electrode rod holder and earthing holder are
without damage
W-2 W-3 W-4 W-5
1
2
3 4
5
6
7
8
2
14
15
16
NO Flammable material present nearby or below
the working area
Fire Blanket to be use to cover the working area
Chk by Supervisor
Chk by Permit authoriser
I undersigned checked/inspected the overall condition thoroughly for the above checklist.
It is found Fit / Unfit for the work at USL Plant.
Welding Safety Training Given to Welder, Helper
and subordinates / Tool Box Talk given before
starting work. Attached Tool Box Talk sheet.
USL/EHS/Guideline/R0
Environment Health & Safety
Construction Safety Guidelines
USL/EHS/Guideline/R0
Guidelines
1. Contractor will be fully responsible for the safety of the persons working for him & shall comply with all statutory requirements as applicable.
2. Where one hundred and fifty or more workers are ordinarily employed at a project site,
contractor must appoint a full time safety officer. Qualifications and experience of
safety officers must be as per Building and other construction workers (regulation of
employment and conditions of service) Act, 1996 and Rules made there under. For each
additional 300 or a part thereof one additional Safety officer with the qualifications as
mentioned above, shall be appointed by the Contractor.
3. Wherever the number of workers employed by a single employer is less than one
hundred and fifty, such employers may form a group and appoint common Safety
Officer who may be assisted by suitable and adequate staff, with prior approval of the
Engineer-in-charge.
4. Individual contractors are responsible for the security of their store/office/materials/work on
the site and adequate measures must be taken on security.
5. Contractor must provide identity cards / badges for every person entering the site & these cards
must be signed by safety officer & security personnel.
6. Every person entering the site must be provided with induction & safety training by safety
officer prior to start of work and training records to be maintained.
7. Prior to start of any work a proper risk assessment will be carried out jointly by contractor and
USL representative and adequate precautions shall be taken to eliminate / reduce the risk
associate with the work.
8. Contractor must provide Personnel Protective Equipment (PPE) to the persons
a. Safety shoes, hard hat (helmets) & high visibility clothing / jackets to all the persons working in the site.
b. Job specific PPE’s such as safety belt / safety net for height work, hand gloves while carrying out activities involving lifting/shifting of sharp objects or handling corrosive chemicals, nose mask to protect against dust etc., to all the persons involved for that activity.
c. Ear plugs / Muff shall be provided where noise level is more than 90 dBA.
d. Face & Eye protection shield shall be provided while carrying out grinding, cutting, welding & chipping activities and hazardous chemicals handling are being carried out.
USL/EHS/Guideline/R0
9. Contractor shall ensure that activities requiring special precautions are carried out with a valid Work Permit prior to start of the activity. Work permits are needed for carrying out Height work, Hot work, Electrical work, Fragile roof work, Confined space work, demolition work, excavation work etc. A dedicated supervisor must supervise the activities carried under work permit system.
10. Proper drinking water facility shall be provided by the contractor on site.
11. First aid box consisting of items as specified in factory rules must be provided in office/work area and have trained first aiders.
12. Housekeeping in the work area must be maintained at all time and following points must be taken care for maintaining good housekeeping
a. Clean up the work area before and after work.
b. Do not leave rubbish & scrap for the next person to clear.
c. Keep gangways, work platforms and stairways clear of equipment and materials not in
immediate use. Clean up spilled oil and grease.
d. Deposit waste material at a recognized disposal point.
e. Remove or hammer down any nails you see projecting from timber. f. Gas cylinders in designated place after use. g. No parking of vehicles/ truck/trolleys, cranes and trailers etc., will be allowed on roads. h. Trucks carrying sand, earth and other pulverized material shall be covered while moving
within the plant area/ or will be transported with top surface wet. i. The contractor shall ensure that atmosphere in plant area and on roads is free from
particulate matter like dust, sand etc., by keeping the top surface wet for ease in respiration.
13. Contractor must ensure all Accident / Incident including near miss happening at the site are communicated to USL representative immediately and necessary corrective / preventive measures taken to prevent recurrence.
14. Contractor must ensure that all persons working on the site are following safety rules / requirements and any violation of it shall be taken up serious and suitable penalty shall be imposed.
15. Contractor must conduct tool box talk on a daily basis and a safety meeting with USL representative once in a week.
16. Contractor must ensure that all tools, tackles & equipment’s brought on the site are safe, are fit for use and shall have valid test certificate issued by competency agency where ever it is applicable.
USL/EHS/Guideline/R0
17. Work at Height
a. All work performed six feet or more in elevation or within four feet of an unprotected floor opening, wall opening, or roof edge with a potential six-foot fall requires optimum fall protection & Work at Height work permit.
b. Approved techniques for providing optimum fall protection include: i. A properly manufactured/constructed, erected, secured and maintained ladder.
ii. A properly manufactured, erected and maintained metallic scaffold with complete handrail system (top rail, mid-rail, toe-guards) & having two accesses to it as per IS specifications.
iii. A properly inspected, operated and maintained mobile bucket or scissors lift. Contractors working with mobile buckets or scissors lifts must work within the confines of the railing and be tied off utilizing a safety belt.
iv. Maintain guarding at all openings along roof edges, building edges, and floor openings with guard rails, barricades and/or covers.
v. Bamboo ladders, bamboo scaffolding, A type ladders are not permitted. vi. Every employee to whom the Contractor or its subcontractor issues a safety belt
shall be instructed by a Qualified Person in the proper method of wearing, using, and securing it.
vii. Appropriate safety net shall be installed to protect person from fall while carrying out height work.
18. Fire Protection
a. Contractor must provide adequate no of fire extinguishers at the work place. b. Contractor must have trained fire fighters among the work force.
19. Electrical Safety
a. All electrical work should be done by qualified personnel’s only. Engineer/Supervisor to possess supervisor license and workmen to possess wiremen license. Appropriate personal protective equipment should be used as necessary.
b. Contractor shall provide electrical distribution board to which supply will provided. This distribution board shall be made of metal and it shall be fitted with ELCB. Power to different equipment’s / sub-distribution boards shall be drawn from this main DB.
c. Double earthing must be provided to all the distribution boards and electrical equipment.
d. Power to all electrical devices / equipment’s shall be through 3 core cables for single phase equipment’s & 4 core cables for 3 phase equipment’s. No wires will be permitted to supply power to any of the electrical equipment’s.
e. Power shall be supplied by providing proper plug tops or direct termination in the DB & bare wire power tapping shall not be allowed.
f. Damage insulation & tapped joints cables shall not be allowed.
g. Two pin plug sockets / top shall not be allowed.
h. All temporary power panels and live parts of wiring or equipment shall be fully guarded to protect all persons or objects from harm. In addition, switches, fuses, and automatic circuit breakers should be marked, labeled, or arranged for ready identification of circuits or equipment supplied through them.
i. All circuits should be protected against overload.
USL/EHS/Guideline/R0
j. Earth fault circuit interrupters (ELCBs) are required in all circuits used for portable electric tools and equipment.
k. Electrical wire or flexible cord passing through work areas should be covered or elevated to protect it from damage by foot traffic, vehicles, sharp corners, projections, doorways or pinching. In addition, patched, oil-soaked, worn, or frayed electric cords or cables should not be used.
l. Flexible cords should be used only in continuous lengths without splices
20. Hand Tools
a. Contractors’ tools and equipment brought into the plant must be maintained in a safe operating condition. Company representative will inspect each and every tool/equipment and affix a sticker fit for use. Only fit for use tools/equipment will be allowed for usage.
b. 110 v Double Insulated Hand tools recommended.
c. The supply arrangement shall be from a 240 v / 110 v double wound transformer with
the secondary winding center point connected to earth.
d. Alternately 230V hand tools with double insulation symbol on the name plate can be used connected to a socket outlet protected by 30mA ELCB.
21. Warning Sign’s
a. Contractor must ensure that appropriate warning signs are displayed at relevant places where ever it is needed.
b. Contractor must ensure proper barricading with tapes or by physical means is carried out where ever it is needed.
22. Gas Cylinders
a. Use of LPG for gas cutting activities is not allowed. b. All gas cylinders used on the site must be stored in a well-ventilated, cover area free from
direct sun light, stored in vertical position and properly secured with chain. c. All cylinders must be provided with safety cap’s d. Proper Cylinder trolley must be provided for transportation of cylinders.
23. Contractor must dispose of debris & excavated earth material in an approved manner.
24. All potentially dangerous parts of any machinery used for construction works must be adequately guarded. It should not be possible for an extended hand to touch or reach any moving parts of the construction machinery.
25. Contractor must ensure that adequate illumination is available while carrying out the work.
26. Contractor must maintain inspection records of wire ropes, lifting tools & tackles, ladders, scaffolds, training records, statutory records, work permits, accident/incident reports, gate entry records etc.
CONTRACTOR
EVALUATION
Document
No. USL/HS/F/106
Date of
Issue 29/07/2015
United Spirits Limited Rev. No. 00
Form Page No. 1 of 1
CLASS-I Paper copies of this document are for REFERENCE ONLY - The current LIVE version is available on the EHQS System
Contractor: Location of Work:
Scope of Work
Assessed by:
Date of Evaluation:
Safety Performance
Scoring Legend: 1=Poor 2=Good 3=Excellent
Score
Rate the contractors ability to prevent injuries & achieve a goal of zero injuries & incidents
Rate the adequacy of the contractor’s safety management system
Rate the adequacy of the contractor’s safety auditing and inspections
Rate the contractor’s safety performance
How good was the housekeeping and orderliness?
Rate the safety attitude and cooperation of the contractor’s supervisors.
Rate the safety attitude and cooperation of the contractor’s employees e.g. wearing PPE, barricading
Rate the planning of safety during the contract. Was it positive and proactive?
Rate the quality of the contractor method statements and risk assessments
How was the adherence to Permit to Work requirements?
Comments on overall safety performance:
Recommend: a) Stay on Approved Contractors List (score >15) or
b) Remove from Approved Contractors List (score<15)
Site EHS Coordinator signature USL Nominated person signature
CONTRACTOR
WORK INSPECTION
CHECKLIST
Document No. USL/HS/F/104
Date of Issue 29/07/2015
United Spirits Limited Rev. No. 00
Form Page No. 1 of 1
CLASS-I Paper copies of this document are for REFERENCE ONLY - The current LIVE version is available on the EHQS System
Contractor Name: __________________________________________________________________
Nature of Work: ____________________________________________________________________
Location: _________________________________________________ Date: ___________________
Sl No Checkpoint YES NO NA
1 All necessary work permits are obtained and displayed at job location? **
2 Activities are carried out in adherence to permit requirements **
3 Safety Officer present at site? **
4 Supervisor present at location?
5 Good housekeeping is maintained at work location?
6 Appropriate barricades are provided around the work location? **
7 Appropriate caution signage are displayed at the work location? **
8 Adequate fire extinguishers are available in the work location? **
9 Debris is stored in a dedicated location, barricaded & signposted
10 Safety Helmet and Safety Shoes are worn by all workers at the location**
11 All other required PPE are worn (safety glasses, face shield, gloves, masks,
ear plugs, full body harness etc) **
12 All temporary electrical panels are adequately protected from rain, moisture,
pests etc**
13 Electrical panels are clearly marked and danger signs are labelled**
14 All portable electrical equipment are properly earthed and double insulated**
15 All portable electrical equipment are connected to power source with proper
plugtop**
16 All rotating parts have appropriate machine guarding**
17 Electrical extension cords/junction boxes are in good condition with upstream
ELCB protection of 30 mA. **
18 Electrical cables are routed on the ground with adequate protection or routed over head
19 Lock Out – Tag Out procedures are followed where applicable**
20 Cranes , Lifts, Mobile Lifting equipment are **
Certified by a Competent Person
Operated by qualified, trained persons with applicable permits and licenses
Corrective Action
Sl No Action Plan Responsibility Timeline
Note: For any non-conformance to checkpoints marked **, “Contactor Discipline Form” to be issued.