construction underwayONGOINGProjects(Projects added for the current month are highlighted and in bold face type)
GAS – The AmericasU.S.3BEAR ENERGY LLC – (10/17) Project: 3Bear SystemType: Project includes the development,
ownership and operation of a gathering and processing system
Length: 100 milesLocation: Lea and Eddy counties, NM Completion: 1Q 2018Comments: Project is designed for expansion and
will accommodate the rapid production growth in the Delaware Basin
AMERICAN MIDSTREAM – (8/17)Operator: High Point Gas Transmission LLCProject: Venice to Toca Pipeline Abandonment
ProjectType: Project includes pipeline abandonment
and valve modifi cationsLength: 62 milesDiameter: 12 to 22 inchesLocation: Plaquemines and St. Bernard parishes, LADocket: CP16-474
ATMOS ENERGY – (9/17)Operator: Atmos Pipeline TexasProject: Atmos Pipeline Texas ReplacementType: Project includes pipeline replacement
Length: 29 milesDiameter: 10 inchesLocation: Hopkins, Delta and Lamar, TX
Operator: Atmos Pipeline TexasProject: Atmos Pipeline Texas ReplacementSegment: Line M Pipeline ReplacementType: Project includes pipeline replacementLength: 19 milesDiameter: 11 inchesLocation: Ellis and Navarro, TX
Operator: Atmos Pipeline TexasProject: Atmos Pipeline Texas ReplacementSegment: WL 201 Pipeline ReplacementType: Project includes pipeline replacementLength: 5 milesDiameter: 11 inchesLocation: Clay, TX
BLACK HILLS ENERGY – (6/17)Project: Northeast Nebraska LineType: Line will run from Bancroft to NorfolkLength: 50 milesLocation: Bancroft, NE - Norfolk, NECompletion: Project completion date has been
extended
BLUE FLAME PIPELINE – (3/17)Owner: Antero MidstreamProject: Marcellus Gathering System Pipeline
Type: Project includes the construction of 24-inch and 20-inch pipeline
Length: 8 milesLocation: Doddridge, Tyler and Ritchie counties, WV
BRAZOS MIDSTREAM – (6/17)Project: Comanche II PlantType: Project includes the construction of a
second gas processing plantLocation: Reeves County, TXCompletion: 1Q 2018Comments: Project will add 200 MMcf/d of
incremental processing capacity and will increase Brazos’ total operated processing capacity in the Delaware Basin to 260 MMcf/d
BRUCE ALLEN INC. – (6/17)Owner: Dominion TransmissionProject: Transco to Charleston ProjectType: Project will include the construction of
new pipeline including the following: two new natural gas transmission pipelines, upgrades to an existing compressor station and the addition of a new compressor station
Length: 60 milesDiameter: 4 and 12 inchesLocation: Charleston, Dillon, Lexington and
Marlboro counties, SCCompletion: November 2017
30 Pipeline News November 2017 • www.pipeline-news.com
ONGOINGProjects construction underway
Comments: Project has been approved by FERC. Project will consist of the following facilities: Moore to Chappells Pipeline; Dillon Pipeline; Moore Compressor Station; and Dor Compressor Stations
CANYON MIDSTREAM PARTNERS II LLC – (5/17)Project: Redcliff PlantType: Project includes the construction of a
new natural gas processing facility (the Redcliff Plant) and a gas gathering system, including of 20-inch steel trunkline, multiple field compression stations and low-pressure gathering pipelines
Length: 70 milesLocation: Woodward County, OKCompletion: 2018Comments: Once completed, the project will provide
its customers with 200 MMcf/d of cryogenic gas processing capacity and access to premium residue gas markets on ANR and Southern Star Central
CENTRAL NEW YORK OIL & GAS CO. LLC – (12/16)Project: MARC II Pipeline Type: Project includes the construction of a new
natural gas pipeline gathering headerLength: 30 milesLocation: Luzerne County, PACompletion: 4Q 2017Comments: Crestwood has received non-binding
indications of interest for firm transportation on the proposed MARC II Pipeline in excess of 700 MMcf/d
CFE– (REV 7/17)Project: Encino-La Laguna PipelineType: Pipeline will transport gas from southern
Texas and supply northern Chihuahua and Durango states
Length: 263 milesLocation: Texas - Chihuahua and DurangoCapacity: 1.5 MMcf/dCompletion: 3Q 2018
Contractor: GDI SICIM Pipelines SA De c.vType: Project includes engineering,
procurement and construction of pipelineCost: $372 million
CHENIERE CORPUS CHRISTI PIPELINE LP –(5/17)Project: Corpus Christi PipelineType: Project includes pipeline constructionLength: 23 milesDiameter: 48 inchesLocation: Sinton, TX – Corpus Christi, TXDocket: CP12-508Completion: 2019 Comments: Pipeline will allow for the interconnection
points with interstate and intrastate natural gas transmission pipelines in South Texas, including Tennessee Gas Pipeline, Southcross, Kinder Morgan Tejas Pipeline and Transcontinental Gas Pipeline. The line will terminate at the proposed Corpus Christi Liquefaction Plant
Contractor: Associated Pipe LineType: Project includes pipeline construction
COLUMBIA GAS TRANSMISSION LLC – (5/17)Project: Line SM-80 MAOP ProjectType: Project includes the abandonment
of a segment of existing pipeline and the replacement of the segment by constructing and operating a 30-inch-diameter pipeline
Length: 3.8 milesLocation: Wayne County, WVComments: The replacement pipeline would allow
that segment of Line SM-80 to operate at its original maximum allowable operating pressure
COLUMBIA MIDSTREAM – (7/17)Contractor: InterCon Construction Inc.Sub: Lone Star Directional DrillingProject: Big Pine System ExtensionType: Project includes the installation of 3,300
feet of pipeline via HDDDiameter: 20 inches Location: Westmoreland and Indiana counties, PASupt: David Chesney
COLUMBIA PIPELINE GROUP – (7/17)Project: Leach XPress ProjectType: Project includes the construction of
natural gas pipeline and compression facilities
Length: 160 milesDiameter: 30 and 36 inchesLocation: Fairfield, Perry, Noble and Monroe
counties, OH; Marshall County, WV; and Greene County, PA
Capacity: 1.5 Bcf/d
Contractor: Associated Pipe Line Contractors Inc.Sub: Pedero Pipe Support Systems USAtType: Project includes providing spray breakers
and pillows on pipelineHQ: Lancaster, OHSupt: Mark Nail and James Silva
Contractor: Associated Pipe Line Contractors Inc.Type: Project includes the installation of pipelineLength: 44.3 milesDiameter: 36 inchesLocation: Noble, Muskingum, Morgan and Perry
counties, OHForemen: Charles Beddingfield and Michael Steward
Contractor: Apex Pipeline Services Inc.Type: Project includes anomaly digs and
pipeline modificationsDiameter: 4 to 36 inchesLocation: Edinburg, VAForemen: Brandon Sampson and Matthew Steward
Contractor: Price Gregory InternationalType: Project includes the installation of pipelineLength: 28 milesDiameter: 36 inchesLocation: Monroe and Noble counties, OH Foremen: Stan Campbell and Colby Steward
Project: Rayne XPress ProjectType: Project involves the construction of
two new compressor stations along the existing Columbia Gulf System
Location: Marshall County, WV - Pennsylvania - Ohio - Wayne County, WV
Completion: 2017Comments: Project will increase capacity up to 1.0
Bcf/d of natural gas to efficiently transport Marcellus and Utica production to markets in the Gulf Coast region and beyond
Contractor: Minnesota Ltd. Project: Tri-County Bare Steel Project, Phase IIType: Project includes the construction of
20-inch pipelineLength: 8.3 milesLocation: Washington County, PACost: $138 million
CONSUMERS ENERGY – (10/17)Project: Saginaw Trail PipelineType: Project will be executed in five phases
and includes take up and relay of existing pipeline
Length: 94 milesDiameter: 24 inchesLocation: Saginaw, Genesee and Oakland counties,
MICost: $610 millionCompletion: 2022Comments: Project is part of the Transmission
Enhancements for Deliverability & Inrity (TED-I) and will be built in five stages
Contractor: Welded ConstructionType: Project includes construction of Phase 1
of the pipeline
CRESTWOOD EQUITY PARTNERS LP – (9/17)Project: Orla Expansion ProjectType: Project includes the construction of a
cryogenic gas processing plant, multiple third-party pipelines and a high-pressure pipeline (Orla Express Pipeline)
Length: 33 milesDiameter: 20 inchesLocation: Eddy County, NM - Orla, TXCapacity: 200 MMcf/d Cost: $170 millionCompletion: 2Q 2018
Contractor: T.G. Mercer Consulting Services Inc. Type: Project includes offloading and racking of
pipelineContact: Michael Magee Supt
Project: Bear Den Plant / Bear Den West PipelineType: Project includes the construction of a
new processing plant and an associated pipeline
Location: McKenzie County, NDCompletion:4Q 2017Comments: Project will have a capacity of 30 MMcf/d
of gas and will meet increasing production volumes from producers on the Arrow system and acreage surrounding the Fort Berthold Indian Reservation
DCP MIDSTREAM LP – (7/17)Project: Sand Hills Pipeline Extension (Phase II)Type: Project includes the partial looping of the
pipeline and the addition of seven new pump stations in the initial phase of the extension
Capacity: 85 MbpdCost: $500 millionLocation: Mont Belvieu, TXCompletion: 2Q 2018
www.pipeline-news.com • November 2017 • Pipeline News 31
ONGOINGProjects construction underway
Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity by over 100 Mbpd to a minimum of 550 Mbpd
Project: Sand Hills Pipeline Extension (Phase I)Type: Project includes the expansion of existing
pipeline through the addition of four pump stations and a pipeline loop
Location: Mont Belvieu, TXCompletion: 4 Q2017Comments: Project will increase pipeline capacity by
30 percent to 365 Mbpd
DOMINION TRANSMISSION — (10/17)Project: New Market ProjectType: Project includes the installation of two
new compressor stations and additional compression at an existing station
Location: Madison and Chemung counties, NYCapacity: 112 MDth/dCost: $159 millionDocket: CP14-497Comments: Project will provide extra natural gas
capacity along 200 miles of existing Dominion pipeline across upstate New York with no new pipeline is being laid
Project: Eastern Market Access ProjectType: Project includes adding compression
and auxiliary facilities along Dominion’s existing interstate natural gas transmission pipeline
Location: Charles County, MD, Loudoun and Fairfax counties, VA
Capacity: 294 MDth/dDocket: CP17-24Completion: 4Q 2018
Contractor: Minnesota Ltd. LLC Type: Project includes the installation of 1,400
feet of pipelineDiameter: 30 inchesLocation: Loudoun County, VAHQ: Leesburg, VASupt: Roman McKown
DOMINION EOG – (7/17)Contractor: Minnesota Ltd. LLCProject: Pipeline Infrastructure Replacement
ProgramType: Project includes pipeline installationLength: 30 milesLocation: Cuyahoga County, OHHQ: Dover, OHSupt: Gary Hawk
EASTERN SHORE NATURAL GAS – (REV 6/17)Owner: Eastern Shore Natural Gas Project:
Reliability Expansion ProjectType: Project involves the construction of 15
miles of 16-inch pipeline and two loops (Dover and Porter)
Length: 15 milesLocation: New Castle, Kent and Sussex counties, DEDocket: CP15-498
EM ENERGY PIPELINE PENNSYLVANIA LLC –(7/17)Contractor: MG DyessProject: Constellation Pipeline Extension ProjectType: Project includes the installation of welded
steel natural gas pipelineLength: 21 milesDiameter: 8, 20 and 24 inchesLocation: Butler County, PA
ENABLE MIDSTREAM PARTNERS LP – (6/17)Project: Wildcat PipelineType: Project includes pipeline constructionLength: 140 milesDiameter: 20, 24 and 30 inchesLocation: Johnson County, TXCompletion: 2Q 2018Comments: Project will move up to 400 MMcf/d of
natural gas to a processing plant and pipeline hub in north Texas
Project: Kingfi sher ExtensionType: Project includes the construction of
a new transmission line to connect southeast Kingfi sher County with EOIT’s existing mainline facilities that deliver to Bennington, OK
Location: Kingfi sher County, OK – Bennington, OKComments: Project is currently in the evaluation
stage and will provide access to Enable Oklahoma Intrastate Transmission’s on-system power, LDC and industrial end users and EOIT’s East Pool
USA: +1-713-939-0007Canada: +1-780-377-0336
www.plmcat.com
Your Global Partner for Pipeline Solutions
©2017 Caterpillar. All rights reserved. CAT, CATERPILLAR, BUILT FOR IT, their perspective logos, “Caterpillar Yellow”, the “Power Edge” trade dress as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission.
PipeLine Machinery International (PLM) delivers maximum performance through quality machinery, solutions and people - and we’re ready to go to work for you. Cat® Pipelayers are purpose-built to provide increased lift-capacity, ease of operation and maximum performance. The Cat ACERTTM engines meet global emission standards and like all Cat machines, are designed for long life and serviceability to help keep your operating costs low. Let’s work together.
PERFORMANCE AT WORK.
PL87 PL83 PL72
Lift Capacity Net Power Max216, 000 lb. 345 hp
Lift Capacity Net Power Max170, 000 lb. 345 hp
Lift Capacity Net Power Max90, 000 lb. 245 hp
PL61
Lift Capacity Net Power Max40, 000 lb. 125 hp
PipelineNews_Jan2017_HalfPage.indd 1 10/16/17 11:09 AM
32 Pipeline News November 2017 • www.pipeline-news.com
ONGOINGProjects construction underway
Project: Enable Gas Transmission Expansion/Enable Oklahoma Intrastate Transmission Expansion
Type: Project includes the expansion of two existing pipelines
Location: Oklahoma (SCOOP/STACK)Comments: The expansions will utilize existing
capacity on EGT and EOIT along with the installation of certain new facilities to provide over 600 MDth/d of new, firm natural gas transportation service
Project: Cana and STACK Expansion (CaSE) ProjectType: Project includes the expansion of existing
pipelineLocation: Oklahoma (SCOOP/STACK)Completion: 2018Comments: Project is expected to launch at an initial
capacity of 45 MDth/d, growing to the full 205 MDth/d of contracted capacity by 4Q 2018
ENERGY TRANSFER PARTNERS — (10/17)Project: Red Bluff PipelineType: Project includes pipeline constructionLength: 93 milesDiameter: 30 and 42 inchesLocation: Orla, TX - Waha, TXCapacity: 1.4 Bcf/dCompletion: 2Q 2018Comments: Project will connect the Orla Plant to
the Waha Plant to provide residue gas takeaway and has guaranteed fee based long-term commitments
Owner: Energy TransferProject: Revolution PipelineType: Project includes the construction of
pipeline and a fractionation facilityLength: 86 milesDiameter: 24 and 30 inchesLocation: Butler County, PA – Revolution PlantComments: Project will have a capacity in excess of
440 MMcf/d
Contractor: Capstone EnergyType: Project includes pipeline construction
Contractor: WillbrosType: Project includes pipeline construction
Contractor: PumpcoType: Project includes pipeline construction
EQT & RANGE RESOURCES – (5/17)Project: Mako Pipeline – Phase IIType: Project includes the construction of
24-inch pipelineLength: 20 milesLocation: PennsylvaniaComments: Pipeline will provide more than .5 Bcf/d of
firm capacity and is backed by a long-term firm capacity reservation commitment
EQUITRANS LP – (6/17)Project: Plasma InterconnectType: Project includes the construction of a
30-inch diameter pipeline (H-310 line), the Plasma Compressor Station and two header pipelines
Length: 35 milesLocation: Monroe County, OH
Comments: Project is part of the Ohio Valley Connector Project and will create 850 MDth/d of new firm transportation service
EXCEL ENERGY – (7/17)Contractor: Snelson Cos. Inc./KR Swerdfeger
Construction/SiteWise Corp./Q3 Contracting
Project: Residential Gas Service Replacement Program
Type: Project includes integrity management and maintenance work on existing pipeline
Location: Henderson, COComments: The program will result in the replacement
of 600 miles of natural gas pipeline throughout Colorado, with nearly 100 miles residing in the Denver metro area
GEOSOUTHERN OPERATING II LLC – (9/17)Project: DC PipelineType: Project includes gathering system
constructionLength: 9.2 milesDiameter: 10 inchesLocation: Martin County, TXDocket: T-4 01234
HARVEST PIPELINE CO. – (9/17)Project: St. Charles Ranch PipelineType: Project includes pipeline constructionLength: 9.8 milesDiameter: 10 inchesLocation: Aransas County, TXDocket: T-4 01234
HENKELS & MCCOY – (2/17)Owner: Spectra EnergyProject: Atlantic BridgeType: Project includes the take up, relay and
new lays of 12-inch to 42-inch pipeline and compressor station work
Length: 35 milesLocation: Westchester County, NY; Fairfield, New
Haven and New London counties, CT; Norfolk County, MA
Completion: 2017Comments: Project will have a peak capacity of
132,700 Dth/d
HOWARD MIDSTREAM ENERGY PARTNERS LLC – (1/17)Operator: Nueva Era Pipeline LLCProject: Nueva Era PipelineType: Project includes the construction of two
30-inch pipeline laterals— 17 miles in Webb County, TX (Impulsora Pipeline) and 171 miles in Mexico (Midstream de Mexico)
Length: 190 milesLocation: Webb County, TX - Escobedo, Nuevo LeónCompletion: 2018Comments: Project will provide seamless
transportation service for 600 MMcf/d of natural gas (expandable to 900 MMcf/d), connecting producers in South Texas directly with end-users in northern Mexico
Operator: Impulsora Pipeline LLCProject: Impulsora PipelineType: Project includes the construction and
operation of new border crossing pipeline facilities station
Length: 17 miles
Diameter: 30 inchesLocation: Webb County, TXDocket: CP16-70
INFRASOURCE CONSTRUCTION LLC – (5/17)Owner: Dominion East OhioType: Project includes the construction of
24-inch and 16-inch pipelineLength: 10 milesLocation: Mehoning and Trumball counties, OH
INTERSTATE POWER AND LIGHT CO. PIPELINE – (9/17)
Project: Clinton #3 LateralType: Project includes pipeline constructionLength: 12.3 milesDiameter: 16 inchesLocation: Clinton and Scott counties, IADocket: P-0893Completion: 1Q 2018
IROQUOIS GAS TRANSMISSION SYSTEM LP – (REV 2/16)Owner: Tennessee Gas Pipeline Co. LLCProject: South-to-NorthType: Project includes the reverse flow on
existing pipelineLocation: Canajoharie, NY; Brookfield, CT; and
Wright, NY Completion: 2017Comments: Project would transport up to 300 MDth/d
of natural gas
KINDER MORGAN INC. – (REV 8/17)Project: Mier-Monterrey PipelineType: Project includes the looping of the
existing system and construction a new lateral
Location: Pesquería, Nuevo León, MexicoCompletion: 1Q 2018Comments: Pipeline connects to a 1,000-megawatt
power plant complex and to the Pemex natural gas transportation system
Contractor: Gulf Interstate EngineeringType: Project includes engineering,
procurement and construction support for pipeline
Contractor: ARB Inc.Type: Project includes pipeline construction
Operator: Tennessee Gas Pipeline Co. LLC Contractor: Henkels & McCoy Inc. Project: Orion ProjectType: Project includes the construction
of pipeline looping (i.e., installation of additional pipe adjacent to and connecting with the existing pipeline) and minor modifications to one existing compressor station
Length: 13 miles Diameter: 36 inchesLocation: Pike and Wayne counties, PACapacity: 135 MDth/dCost: $143 millionHQ: Honesdale, PASupt: Chad SimmonsForemen: Jason Steed and Mark StewardCompletion: 3Q 2018
www.pipeline-news.com • November 2017 • Pipeline News 33
ONGOINGProjects construction underway
Project: UTOPIA East ProjectType: Project includes construction of the first
two spreads of the 12-inch pipelineLength: 215 milesLocation: Harrison County, OH - Fulton County, OHCompletion: 2018Comments: UTOPIA will transport previously refined
or fractionated natural gas liquids, including ethane and propane, with an initial 50 Mbpd of capacity, which is expandable to more than 75 Mbpd
Contractor: Minnesota Ltd. LLCType: Project includes metering station
upgrades and pipe fabricationDiameter: 2 to 12 inchesLocation: Tuscarawas County, OHHQ: Dover, OHSupt: Gary Hawk
Contractor: Letourneau Enterprises LLCType: Project includes the clearing, grubbing
and matting of pipeline right-of -wayLength: 4 milesDiameter: 12 inchesLocation: Harrison County, OHHQ: Cadiz, OHSupt: Tyson L. Shook
Contractor: Henkels & McCoy Inc.Project: Connecticut ExpansionType: Project includes the fabrication and
installation of pipeline loopingLength: 13.4 milesDiameter: 24 and 36 inches
Location: Albany County, NY, Berkshire and Hampden counties, MA and Hartford County, CT
Capacity: 72.1 MDth/dCost: $93 millionForemen: Timothy Hathaway and Mark StewardCompletion: 4Q 2017
Project: Gulf Coast Southbound Expansion Phase IType: Project includes the construction of
a new compressor station, modifying existing valve sites and replacement of a minimal length of pipeline facilities, as well as modifications to NGPL’s existing compressor station facilities
Location: Cass, Victoria, Wharton and Angelina counties, TX; White County, AR
Capacity: 460 MDth/dCompletion: 4Q 2018
Project: Gulf Coast Southbound Expansion Phase II
Type: Project includes construction of additional compression facilities at NGPL’s new compressor station
Location: Chicago Market, IL - Agua Dulce Hub, LACapacity: 250 MDth/dCompletion: 4Q 2019
LATEX CONSTRUCTION – (5/17)Owner: PSNC Energy Project: T-001A Gas PipelineType: Project involves the construction of
24-inch and 8-inch pipeline Length: 50 miles
Location: Cleveland, Rutherford and Polk counties, NC
MARKWEST – (7/17)Contractor: Apex Pipeline Services Inc.Project: Sherwood ExpansionType: Project includes the installation of
pipelineLength: 3 milesDiameter: 30 inchesLocation: Doddridge County, WVCapacity: 600 MMcf/dHQ: Sherwood, WVSupt: Roman McKown
MEADE – (6/17)Owner: NIPSCOProject: LaPorte to Gary Aetna Natural Gas Line
UpgradeType: Project includes the replacement of
existing 22-inch natural gas transmission line with a 24-inch lineLength: 30 milesLocation: LaPorte County, INComments: Work will be conducted in existing
NIPSCO easements and construction will begin on the La Porte side of the route and move west toward Gary
MICHELS – (5/17)Owner: Northern Natural GasProject: Northern Lights 2017 ExpansionType: Project includes the construction of
5.3 miles of 16-inch pipeline (Chisago
34 Pipeline News November 2017 • www.pipeline-news.com
ONGOINGProjects construction underway
Interconnect Loop), the construction of 1.3 miles of 6-inch pipeline (Belle Plaine Loop Extension) and the construction of 2.8 miles of 12-inch pipeline (St. Cloud Loop Extension)
Length: 10 milesLocation: Chisago, LeSueur, Scott and counties, MNComments: Project will transport an incremental
peak day firm service load of 76 MDth/d through the addition of the pipeline and compression facilities on Northern’s existing system
Owner: Spectra EnergyProject: Lebanon ExtensionType: Project includes the construction of
36-inch pipelineLength: 2.1 milesLocation: Monroe County, OH
MIDAMERICAN ENERGY HOLDINGS CO. –(9/17)Operator: Northern Natural Gas Co.Project: Des Moines B-line Loop ProjectType: Project includes pipeline looping and
pipeline abandonmentLength: 14 milesDiameter: 20 inchesLocation: Boone and Polk counties, IACost: $32.5 millionDocket: CP17-434Status: Project is in the bidding phase
Contractor: Appalachian Pipeline Contractors LP Type: Project includes pipeline installationContact: Bobby Rose Supt
MOGAS PIPELINE LLC – (5/17)Project: MoGas PipelineType: Project includes looping the MoGas
natural gas pipeline to add incremental firm capacity
Location: MissouriComments: Project is currently undergoing an open
season
NATIONAL FUEL GAS SUPPLY CORP. – (5/17)Project: Line T2KNY Install, Line TNY Replacement,
and Line KNY Abandonment Type: Project includes the installation of 1.2
miles of new 20-inch natural gas pipeline (Line T2KNY), replacement of 6.7 miles of 20-inch bare steel pipeline with 7 miles of 24-inch coated natural gas pipeline (Line TNY), abandonment of 14.9 miles of 20-inch bare steel natural gas pipeline (Line KNY), modifications at two existing meter and regulator stations (North Boston and East Eden), and modifications at the existing Zoar Compressor Station
Length: 14 milesLocation: Erie County, NYComments: Project will provide an additional
2.6 MDth/d of new firm capacity
NEW MEXICO GAS CO. – (8/17)Project: Taos Mainline Re-route ProjectType: Project includes take up and relay of
existing pipelineLength: 6 miles
Diameter: 12 inchesCost: $14 millionLocation: Pilar, NMCompletion:4Q 2017
Contractor: Crossfire LLCType: Project includes pipeline replacement
ONEOK INC. – (9/17)Operator: ONEOK WesTex Transmission LLCProject: ONEOK WesTex Transmission Pipeline
ExpansionType: Project includes pipeline constructionLength: 15 milesDiameter: 24 inchesLocation: Reeves County, TXCapacity: 100 MMcf/dCompletion: 2Q 2018
Project: STACK Gathering SystemType: Project includes pipeline constructionLength: 32 milesDiameter: 16 inchesLocation: Blaine County, OKCapacity: 200 MMcf/dCost: $40 millionCompletion: 4Q 2017
Contractor: T.G. Mercer Consulting Services Inc.Type: Project includes offloading and racking of
pipelineContact: Michael Magee Supt
ORYX MIDSTREAM SERVICES LLC – (9/17)Operator: Oryx Southern Delaware Oil Gathering
and Transport LLCProject: Oryx Trans Permian Pipeline Gathering
SystemType: Project includes pipeline gathering system
constructionLength: 15 milesDiameter: 10 inchesLocation: Reeves County, TX
Operator: Oryx Southern Delaware Oil Gathering and Transport LLC
Project: Pecos Big Tex Gathering SystemType: Project includes trunkline constructionLength: 24 milesDiameter: 12 inchesLocation: Pecos, TX
Operator: Oryx Southern Delaware Oil Gathering and Transport LLC
Project: Pecos Utah Gathering SystemType: Project includes pipeline gathering system
constructionLength: 7 milesDiameter: 12 inchesLocation: Pecos, TX
PACIFIC GAS AND ELECTRIC CO. – (8/17)Operator: Northwest Natural Gas Co.Project: North Mist Expansion ProjectType: Project includes pipeline construction, a
new reservoir and a compressor stationLength: 13 milesDiameter: 16 inchesLocation: Portland, ORCapacity: 2.5 Bcf/dCost: $125 millionCompletion: 4Q 2018
Contractor: FluorType: Project includes front-end engineering
and designCost: $125 million
Contractor: Snelson Companies Inc.Type: Project includes pipeline installationContact: David Wix Superintendent
Project: PG&E’s Pipeline Safety Enhancement PlanType: Project includes pipeline transmission
line work as part of ongoing gas-system improvements
Location: California
Contractor: InterCon Construction Inc. Type: Project includes pipeline hydrotesting,
installation of two launchers and three mainline valves
Length: 27 milesDiameter: 34 inchesLocation: Kern County, CAContact: Mary LaRue Superintendent
PASO NORTE PIPELINE GROUP – (REV 8/14)Project: Paso Norte PipelineType: Project includes the construction of
30-inch pipelineLength: 340 milesLocation: Deming, NM - Mexico/ChihuahuaComments: The pipeline will have a capacity of 366
MMcf/d of natural gas
PIPELINE SYSTEMS INC. – (4/17)Project: Tenaska Westmoreland PipelineOwner: Tenaska Pennsylvania PartnersType: Project includes mainline construction on
20-inch pipelineLength: 9.5 milesLocation: Westmoreland County, NEComments: Project will run from an existing Texas
Eastern pipeline and connect to a new electric power generator
PRICE GREGORY INC. – (4/17) Owner: Tennessee Gas Pipeline Co. LLCProject: Triad Expansion ProjectType: Project involves the expansion of 36-inch
pipeline looping along existing line right-of-way
Length: 7 milesLocation: Susquehanna County, PACompletion: 2017Comments: Project will have an additional capacity of
180 MDth/d
Owner: Energy Transfer Partners LP/Regency Energy Partners LP
Project: Roadrunner Gas Transmission PipelineType: Project includes the construction of
30-inch pipelineLength: 200 milesLocation: Coyanosa, TX – MexicoCompletion: 2019Comments: First phase of the pipeline project for 170
MMcf/d of available capacity is expected to be completed by 1Q 2016. The second phase, which will increase the pipeline’s available capacity to 570 MMcf/d, is expected to be completed by 1Q 2017. The third and final phase of the project
www.pipeline-news.com • November 2017 • Pipeline News 35
ONGOINGProjects construction underway
is expected to be completed in 2019 and will increase available capacity on the pipeline to 640 MMcf/d
QEP ENERGY CO. – (9/17)Project: Fuel Gas LateralType: Project includes gathering system
constructionLength: 5 milesDiameter: 6 inchesLocation: Martin County, TXDocket: T-4 01234
RICE ENERGY — (8/17)Contractor: InterCon Construction Inc.Project: Prometheus PipelineType: Project includes pipeline installationLength: .5 milesDiameter: 16 inchesLocation: Monroe County, OHContact: Joe Schmelzer Superintendent
Contractor: Apex Pipeline ServicesProject: Utica Gathering LineType: Project includes the construction of a
gathering pipeline and an interconnectLength: 12 milesDiameter: 16 inchesLocation: Cameron and Monroe counties, OHCapacity: 350 Mcf/dHQ: Cameron, OHSupt: Dana Keaton
SEMGROUP CORP. – (6/17)Project: Canton PipelineType: Project includes the construction of
24-inch pipelineLength: 50 milesLocation: Woods County, OK - Blaine County, OKCompletion: 4Q 2017Comments: Project will have an initial capacity of 200
MMcf/d and, with additional compression, could be expanded up to 400 MMcf/d
SHELL PIPELINE – (12/16)Project: Falcon PipelineType: Project includes the construction of new
pipelineLength: 94 milesLocation: Pennsylvania, West Virginia and OhioCompletion:2018Comments: Project will collect ethane from MarkWest
Energy Partners LP’s Houston Processing and Fractionation facility in Washington County, PA and from its Cadiz Complex in Harrison County, OH
SIERRITA GAS PIPELINE LLC – (REV 3/17)Project: Sierrita Gas PipelineType: Project includes the construction of
36-inch pipelineLength: 60 milesLocation: Tucson, AZ - Sasabe, AZCapacity: 200 MMcf/dCost: $200 millionDocket: CP13-74
SOUTH JERSEY GAS – (4/17)Project: South Jersey Gas PipelineType: Project includes the construction of an
underground 24-inch pipelineLength: 22 milesLocation: Maurice River Township, NJ – Upper
Township, NJCompletion: 2019Comments: Project has been approved by the
Pinelands Commission and will serve more than 140,000 customers
SPECTRA ENERGY – (8/16)Owner: Comisión Federal de ElectricidadProject: Nueces-to-Brownsville PipelineType: Project includes constructing and
operating a header systemLength: 168 milesLocation: Nueces County, TX – Brownsville, TXStart: 2016Completion: 2018Comments: The pipeline will connect with the Sur de
Texas – Tuxpan Pipeline, which will extend into Mexico
STAR CENTRAL GAS PIPELINE INC. – (9/17)Project: Shidler Line Abandonment ProjectType: Project includes pipeline abandonmentLength: 31.2 milesDiameter: 16 inchesLocation: Osage County, OKDocket: CP16-456
To PerformanceDual/Multiple Diameter Pigs have a slotted cup/slotted
disc design for pigging dual diameter or multiple diameter
pipelines. Minimizing by-pass, these pigs provide a
near constant seal in multiple diameter conngurations.
800-752-1628 • 918-446-1934w w w.enduropls.com • [email protected]
36 Pipeline News November 2017 • www.pipeline-news.com
ONGOINGProjects construction underway
STRIKE CONSTRUCTION – (5/17)Owner: Spectra EnergyProject: Valley CrossingType: Project includes the construction of
36-inch or 42-inch pipeline header systemLength: 168 milesLocation: Aqua Dulce Hub, Nueces County, TXCapacity: 2.6 Bcf/dCompletion: 2Q 2018Comments: Valley Crossing’s transportation services
will provide new market opportunities for Texas gas producers and help Mexico meet its growing electric generation needs as generators shift away from fuel oil and imported LNG
Owner: Spectra EnergyProject: Jackfish Lake ExpansionType: Project includes the construction of two
36-inch loops to expand to the Fort St. John mainline. Two compressor station additions will also be built to move the increased volume of gas
Length: 22 milesLocation: Taylor - ChetwyndComments: The project will add 137.5 MMcf/d of
transportation capacity to Spectra Energy’s BC Pipeline
SUNLAND CONSTRUCTION – (1/17)Operator: Gulf South Pipeline LPProject: Coastal Bend HeaderType: Project includes the construction of
36-inch pipeline, three compressor stations and seven meter stations
Length: 66 milesLocation: Wharton and Brazoria counties, TXCompletion: 3Q 2017
SUNOCO LOGISTICS – (7/17)Project: Mariner East IIType: Project includes pipeline constructionLength: 51 milesDiameter: 20 inchesLocation: Cumberland and Dauphin counties, PACapacity: 345 MbpdCompletion: 3Q 2017
Contractor: Precision Pipeline LLCSub: Northern Clearing Inc.Type: Project includes the clearing of pipeline
right-of-wayDiameter: 16 and 20 inchesLocation: Perry, York and Dauphin counties, PASupt: Duanne Kmieciak
Contractor: Welded ConstructionType: Project includes the dual lay of pipelineLength: 34 milesDiameter: 16 and 20 inchesLocation: Morgantown, PAForemen: Boyd Catching Jr., Steward Guffey and
Daniel Heath
Contractor: Welded ConstructionType: Project includes the new lay of pipelineLength: 27 milesDiameter: 12 and 20 inchesLocation: Washington, PAForemen: Anthony Loggins and Timothy Steward
Contractor: Welded ConstructionType: Project includes the new lay of pipelineLength: 25 milesDiameter: 20 inchesLocation: Smithton, PAForemen: Gary Weems and Edward Steward
TALL OAK MIDSTREAM – (10/17)Project: TOM Midcon TransportType: Project includes construction of pipelineLength: 25 milesDiameter: 16 inchesLocation: Alfalfa, OKCompletion: 1Q 2018
Contractor: ACT Pipeline ServicesType: Project includes construction of pipeline
TEXAS EASTERN TRANSMISSION LP – (5/17)Project: Marshall County Mine Panel 17W ProjectType: Project includes the excavation and
elevation of sections of Texas Eastern’s lines 10 (30-inch diameter), 15 (30-inch diameter), 25 (36-inch diameter) and 30 (36-inch diameter) to minimize and monitor potential strains on the pipelines due to anticipated longwall mining activities of Marshall Coal
Location: Marshall County, WV Comments: Once the mining-induced subsidence
and the 2017-2018 heating season have both finished, the two sections of Lines 10 and 15 located within wetlands will be removed and the four elevated pipeline sections will be re-installed below ground, hydrostatically tested, and placed back into service
Project: TEALType: Project includes the construction of
two 36-inch and 30-inch pipelines, new compressor stations and upgrades to existing compressor stations
Length: 5 milesLocation: Alabama and OhioStart: 2017Comments: One pipeline will tie into NEXUS
Project: Bayway LateralType: Project includes the construction of
24-inch pipeline, meter and regulating stations
Length: .5 milesLocation: Linden, NJStart: 2017
Project: Northern Supply AccessType: Project includes the modification of
existing facilities and construction of a new 23,877 horsepower compressor station
Location: Indiana, Ohio, Kentucky, Tennessee, and Mississippi
Completion: 2017Comments: Project will provide efficient north-to-
south natural gas transportation on Texas Gas’ existing system, while maintaining the current south-to-north flow
TEXAS GAS TRANSMISSION LLC – (9/17)Project: Calliou Bay—Dog Lake PipelineType: Project includes the abandonment of
certain pipeline assets and ancillary
facilitiesLength: 6 milesDiameter: 8 inchesLocation: Terrebonne Parish, LADocket: CP17-437
Project: Deep Saline—Peltex PipelineType: Project includes the abandonment of
certain pipeline assets and ancillary facilities
Length: 12 milesDiameter: 10 inchesLocation: Terrebonne Parish, LADocket: CP17-437
TRANSCANADA CORP. – (8/17)Operator: ANR Pipeline Co.Project: Wisconsin South Expansion ProjectType: Project includes installation of a new
compressor unit, lateral replacements and capacity enhancements at existing meter stations
Location: Kendall and Kane counties, IL; Rock County, WI
Capacity: 230 MDth/dCost: $57.7 millionDocket: CP17-9
Contractor: Minnesota Ltd. LLCType: Project includes the replacement of
pipelineDiameter: 22 and 30 inchesLocation: Lake County, INSupt: Kerry Schott Superintendent
Contractor: Henkels & McCoy Inc.Type: Project includes take-up and installation
of pipelineLength: .8 milesDiameter: 24 inchesContact: Andrew Lurkin Superintendent
TROY CONSTRUCTION – (REV 6/17)Owner: Williams PartnersProject: Virginia Southside Expansion Project IIType: Project includes the construction of new
24-inch pipeline, one delivery metering and regulator station, an additional unit at a compressor facility station and an additional electric motor for an existing Transco compressor station
Length: 4 milesLocation: Brunswick County, VA - Greensville
County, VACompletion: 4Q 2017Comments: FERC has approved Williams’ request to
use an additional 1.26 acres of temporary workspaces at six existing Transco meter and regulator stations. Once completed, project will provide 250 MDth/d of firm transportation capacity to a delivery point on a new lateral
VELOCITY CENTRAL OKLAHOMA PIPELINE LLC – (4/17)Type: Project includes the construction of
an 8-inch pipeline and four terminal expansions
Length: 41 milesLocation: Cushing, OK (SCOOP play)Completion: mid-2017
www.pipeline-news.com • November 2017 • Pipeline News 37
ONGOINGProjects construction underway
Comments: Project will allow producers to transport up to 100 Mbpd of truck injected or pipeline gathered barrels
WASHINGTON GAS LIGHT – (7/17)Contractor: InfraSource LLCProject: WGL Loop ReplacementType: Project includes the replacement of a
pipeline loop and 10,500 feet of pipelineLength: 20 milesDiameter: 20 inchesLocation: Clarke County, VAHQ: Front Royal, VASupt: Jason NashComments: Project is part of a 40-year plan to
replace gas main and service lines called PROJECTpipes, which was approved by the Public Service Commission of the District of Columbia in Order No. 17602
WBI ENERGY INC. – (REV 5/17)Project: Demicks Lake PipelineType: Project involves the construction of a
24-inch lateralLength: 22 milesLocation: North DakotaCompletion: 2017Comments: Project will have an additional capacity of
222 MMcf/d
WHC ENERGY SERVICES – (2/17)Owner: ONEOK/FermacaProject: Roadrunner Pipeline
Type: Project includes the construction of 30-inch pipeline
Length: 200 milesLocation: Coyanosa, TX – Tarahumara, MexicoComments: Pipeline will connect to the Tarahumara
Pipeline
WHITEWATER MIDSTREAM – (4/17)Project: Agua Blanca PipelineType: Project includes construction of pipelineLength: 77 milesDiameter: 36 inchesLocation: Orla, TX - Waha HubCapacity: 1.25 Bcf/dCompletion: 4Q 2018
WILLIAMS TRANSCONTINENTAL – (REV 11/17)Owner: Williams Partners LPProject: Southeast Market Pipelines ProjectSegment: Hillabee Expansion (Phases I, II and III)Type: Project includes pipeline looping and
installation of additional compression on the mainline
Length: 45 milesDiameter: 42 inchesLocation: Coosa, Chilton and Choctaw counties,
ALCapacity: 1.2 MMDth/dDocket: CP15-16Status: Phase I is in service and FERC has
prepared a Draft Supplemental Environmental Impact Statement for the remaining two phases
Comments: Southeast Market Pipelines Project includes Sabal Trail Transmission LLC’s
Sabal Trail Project and NextEra’s Florida Southeast Connection
Completion: 4Q 2021
Owner: Williams Partners LP Project: Atlantic SunriseContractor: Latex Construction – Spread 4 / Welded –
Spread 7Type: Project consists of compression and
looping of the Transco Leidy Line in Pennsylvania along with a greenfi eld pipeline segment, referred to as the Central Penn Line, connecting the northeastern Marcellus producing region to the Transco mainline near Station 195. Additional Transco facilities are also being added or modifi ed to allow gas to fl ow bi-directionally
Length: 207 miles (183 miles of greenfi eld pipeline and two pipeline loops - the Chapman Loop and Unity Loop - totaling 12 miles)
Location: Pennsylvania, Maryland, Virginia, North Carolina and South Carolina
Comments: Project has been approved by the Federal Energy Regulatory Commission (FERC) and will add 1.7 MMDth/d of pipeline capacity to the existing Transco system
Segment: Central Penn LineType: Project includes construction of pipelineLength: 177 milesDiameter: 42 inchesLocation: Susquehanna County, PA - Lancaster
County, PACapacity: 1.7 MMDth/d
New York/Pennsylvania Based Company
Mainline Pipe Construction
Hydrostatic Testing
All Sizes of Horizontal andDirectional Drilling Services
National Leaders inNational Leaders inSafety and Environment
www.meridienenergy.com716 358 2131
P.O. Box 812647 Rt. 394 Randolph-Jamestown Rd.
Randolph, NY 14772e-mail: info @ meridienenergy.com
30 Years of exclusively constructinglarge diameter natural gas pipelines
up to 42” in Northeastern United States
38 Pipeline News November 2017 • www.pipeline-news.com
ONGOINGProjects construction underway
Cost: $410 millionDocket: CP15-138
Owner: Williams Partners LPProject: Leidy Southeast ExpansionType: Project consists of construction of new
pipe within or parallel to existing pipeline and utility rights-of-way, horsepower additions at existing compressor stations and existing facility modifi cations along its mainline
Length: 30 milesLocation: Pennsylvania and New JerseyComments: Project will expand the Leidy Line’s
currently subscribed fi rm transportation capacity of 1.7 MMDth by about 30 percent
Owner: Williams Partners LPProject: Garden State ExpansionType: Project involves an expansion to deliver
180 MDth/d of additional natural gas capacity
Location: Burlington County, NJStart: 2016Completion: 2017Comments: Project is part of an expansion of the
Transco interstate natural gas pipeline
Owner: Williams Partners LPProject: Gulf Connector Expansion ProjectType: Project includes increasing compression
on the existing pipelineLocation: Texas – LouisianaCapacity: 475 MDth/dCost: $167.4 millionDocket: CP16-494Status: Project submitted an application
with FERC for a Certifi cate of Public Convenience and Necessity
Start: 4Q 2017Completion: 1Q 2019
WISCONSIN GAS – (10/17)Project: Dovre Lateral Natural Gas PipelineType: Project includes construction of pipelineLength: 9.5 milesDiameter: 12 inchesLocation: Barron County, WICompletion: 2Q 2018
WPX ENERGY – (8/17)Operator: Howard Energy PartnersProject: Stateline oil gathering and gas processing
projectsType: Project includes construction of a
gathering system and associated pipelinesLength: 50 milesDiameter: 36 inchesLocation: Lea and Eddy counties, NM; Reeves and Loving Counties, TXCapacity: 400 MMcf/d Cost: $863 millionCompletion: 2Q 2018Comments: JV plans to add a second train to double
capacity of the complex by 2Q 2019
XCEL ENERGY – (10/17)Project: Lancaster to Fort Lupton Pipeline Type: Project includes construction of pipelineLength: 4.1 milesDiameter: 24 inchesLocation: Weld County, CO
Status: Project is in the development stageStart: 3Q 2017Completion: 1Q 2018
CanadaTRANSCANADA CORP. – (9/17)Operator: Gas Transmission Northwest LLCProject: Gas Transmission Northwest PipelineType: Project is an existing pipelineLength: 1,353 milesLocation: Kingsgate, B.C. – Malin, ORCapacity: 2.9 MMcf/dComments: Pipeline transports Western Canadian
Sedimentary Basin and Rocky Mountain-sourced natural gas to third-party natural gas pipelines and markets in Washington, Oregon, and California
Contractor: United Piping Inc.Type: Project includes station modifi cations
along mainlineDiameter: 2 inches to 48 inchesLocation: Walla Walla County, WA - Morrow County,
ORContact: Mark Thomson Superintendent
Operator: NOVA Gas Transmission Ltd.Project: 2017 NGTL System Expansion ProjectType: Project includes construction of fi ve
pipeline sections and two compression facilities
Length: 143Diameter: 24, 30 and 36 inchesLocation: AlbertaCapacity: 443 MMcf/dCost: $1.3 billionFiling: 443 MMcf/dCompletion: 2Q 2018
Segment: Grande Prairie Mainline Loop 2 – McLeod River Section
Type: Project includes construction of pipeline looping
Length: 22 milesDiameter: 48 inchesLocation: Edson, AB
Section: Liege Lateral Loop 2 – Pelican Lake Section
Type: Project includes construction of pipeline looping
Length: 35 milesDiameter: 30 inchesLocation: Wabasca, AB
Segment: Kettle River Lateral Loop – Christina River Section
Type: Project includes construction of pipeline looping
Length: 12 milesDiameter: 24 inchesLocation: Fort McMurray, AB
Segment: Loop – Boundary Lake SectionType: Project includes construction of pipeline
loopingLength: 56 milesDiameter: 36 inchesLocation: Clear Hills County, AB
Segment: Northwest Mainline Loop No. 2 – Bear
Canyon SectionType: Project includes construction of pipeline
loopingLength: 18 milesDiameter: 36 inchesLocation: Saddle Hills County, AB
Segment: Alces River Compressor Station Unit Addition
Type: Project includes the addition of a compressor unit
Location: Grande Prairie, AB
Segment: Otter Lake Compressor Station Unit Addition
Type: Project includes the addition of a compressor unit
Location: Manning, AB
Operator: NOVA Gas Transmission Ltd.Project: Towerbirch Expansion ProjectType: Project includes construction of two
pipelines, two meter stations, valve sites and launcher/receiver facilities
Length: 75 milesDiameter: 30 and 36 inchesCost: $439 millionFiling: A79841Completion: 4Q 2017
Project: Vaughan Mainline Expansion ProjectType: Project includes construction of pipelineLength: 7.2 milesDiameter: 42 inchesLocation: Vaughan, OntarioFiling: A78823
Caribbean/South & Central AmericaCANACOL ENERGY LTD. – (10/17)Project: Sabanas Gas FlowlineType: Project includes pipeline constructionLength: 51 milesLocation: Cartagena - BarranquillaCapacity: 130 MMcf/dCost: $41 million Completion: 1Q 2018Comments: Project will connect the Jobo gas plant to
the connection point with the Promigas S.A. Gas Pipeline at Bremen
ENCANA – (REV 11/17)Owner: Argentine GovernmentProject: Noreste Argentino PipelineType: Project includes the construction of
a main trunk line, branch lines and compressor stations
Length: 910 milesDiameter: 30 inchesLocation: Buenos Aires - UruguayCapacity: 10 Bcm/yCost: $2 billionCompletion: 2Q 2018Comments: Project will be carried out in three
diff erent construction phases: Salta, Formosa and Santa Fe
Contractor: Siat and TubaceroType: Project includes pipeline supply
Contractor: Vertúa
www.pipeline-news.com • November 2017 • Pipeline News 39
ONGOINGProjects construction underway
Segment: SaltaType: Project includes pipeline construction
Contractor: Techint-PanedileSegment: FormosaType: Project includes pipeline construction
Contractor: Helport-CPC-Rovella Carranza and Contreras Hermanos
Segment: Santa FeType: Project includes pipeline construction
PERU – (REV 11/17)Project: Southern Peruvian GaslineType: Project includes pipeline constructionLength: 620 milesDiameter: 32 inchesLocation: Camisea fi eld - Southern PeruCapacity: 800 MMcf/dCost: $2.1 billionStatus: Peru has canceled a contract for
construction of the pipeline after the consortium hired to build it failed to meet its fi nancing deadline. Odebrecht SA, the subject of a multinational corruption investigation, led the consortium with a 55% stake, Enagas SA held 25% and Grupo Grana y Montero 20%
Comments: If built, project will improve the existing Peruvian Energy Network, contributing to the development of an Energy Node and Petrochemical Hub in Southern Peru
Contractor: Tipiel SAType: Project includes the front-end
engineering and design for the pipeline
MexicoFERMACA PIPELINE EL ENCINO, S DE R.L. DE
C.V. – (REV 6/17)Owner: FermacaProject: La Laguna–Aguascalientes Natural Gas
PipelineType: Project involves building and operating a
natural gas pipelineLength: 290 milesDiameter: 42 inchesLocation: Durango - Zacatecas - AguascalientesCapacity: 1.2 Bcf/dCost: $1 billionCompletion: 2Q 2018Comments: Pipeline will supply CFE’s power plants
in Aguascalientes and Jalico states, as well as central and western parts of the country
Contractor: Fermaca Pipeline el Encino, S de R.L. de C.V.
Type: Project includes engineering, procurement and construction for the pipeline
Cost: $372 million
GASODUCTO DE AGUAPRIETA – (REV 9/17)Owner: Infraestructura Energética Nova S.A.B. de
C.V.Type: Project includes the construction and
operation of a natural gas pipelineLength: 127 milesDiameter: 42 inchesLocation: Ojinaga - El Encino, ChihuahuaCapacity: 1.4 Bcf/dCompletion: 3Q 2017Comments: Project will have a design capacity
capable of transporting approximately 1.4 Bcf/d of natural gas
Contractor: Gasoducto de AguaprietaType: Project includes engineering,
procurement and construction for the pipeline
Cost: $298 million
TRANSCANADA CORP. – (REV 7/17)Project: Tuxpan-Tula PipelineType: Project includes the construction and
operation of a natural gas pipelineLength: 155 milesDiameter: 36 inchesLocation: Tuxpan, Veracruz - TulaCapacity: 703 MMcf/dCompletion: 2Q 2018Comments: Pipeline will transport natural gas
brought from the US (through a future South Texas-Tuxpan Maritime Pipeline) to the states of Veracruz, Puebla and Hidalgo where it will be connected to the country’s pipeline network
“SAFETY FIRST - SERVICE ALWAYS”
• Pipeline Stringing - 60’ + 80’ pipe
• Unloading/Stockpiling Pipe from rail sidings
•Ship discharge/Project Pipe
• General/Heavy Hauling (Nationwide)
•Logistics/Cost Estimates
Contact:Jimmy MontgomeryJimmy@mtilogistics
Phone: (877) 787-4644, (713) 592-6766Fax: (713) 592-6769
Website: MTILOGISTICS.COM
40 Pipeline News November 2017 • www.pipeline-news.com
ONGOINGProjects construction underway
Contractor: Jacobs Engineering GroupType: Project includes engineering,
procurement and construction for the pipeline
Project: Tula - Villa de Reyes PipelineType: Project involves pipeline constructionLength: 284 milesDiameter: 36 inchesLocation: Tula, Hidalgo - Villa de Reyes, San Luis
PotosíCapacity: 550 MMcf/dCost: $550 millionCompletion: 2Q 2018Comments: Pipeline will supply natural gas to the
CFE’s power generation plants located in the States of Hidalgo and San Luis
Potosí, as well as the Central and Western regions of the country
NGL – The AmericasU.S.DCP MIDSTREAM LP – (9/17)Project: Ramsey PipelineType: Project includes pipeline constructionLength: 10 milesDiameter: 12 inchesLocation: Reeves County, TXDocket: T-4 01234
ENTERPRISE PRODUCTS PARTNERS LP – (6/17)Project: Shin Oak NGL PipelineType: Project includes the construction of
24-inch pipelineLength: 571 milesLocation: Gaines County, TX - Mont Belvieu, TXCompletion: 2Q 2019Comments: Project will have an initial design capacity
of 250 Mbpd, expandable to 600 Mbpd
PEMBINA PIPELINE LTD. – (11/16)Project: Northeast B.C. (NEBC) ExpansionType: Project includes the expansion of existing
pipeline and construction of new pipelineLength: 100 milesDiameter: 12 inchesLocation: Wonowon to TaylorCapacity: 75 MbpdCost: $235 millionCompletion: 1Q 2018Comments: Expansion will add condensate NGLs to
the company’s system, while the Eagle Gas Pipeline is another step towards constructing B.C.’s first LNG export terminal
LNG – The AmericasU.S.FREEPORT LNG DEVELOPMENT LP – (5/17)Operator: Freeport LNG Development LLCProject: Freeport LNG Quintana Regas Terminal
ExpansionType: Project includes construction of three
liquefication trainsLocation: Quintana Island, TXCapacity: 13.4 MMtpaCost: $12.5 billionDocket: CP12-29
Completion: 2019Comments: Companies that have agreed to purchase
gas from Freeport LNG include Osaka Gas Co., a Japanese gas supplier; Chubu Electric Power Co., a Japanese electricity provider; and BP Energy Company, which provides gas and power to U.S. utilities and industries
Segment: Freeport LNG Pipeline FacilitiesType: Project includes pipeline construction and
facility modificationsLength: 11 milesDiameter: 42 inchesComments: Pipeline will connect the terminal with the
Sratton Ridge Meter Station
Contractor: Burns & McDonnellType: Project includes design of the terminal
Contractor: Zachry GroupType: Project includes construction of the
terminal
LIQUEFIED NATURAL GAS LTD. – (REV 8/17)Operator: Magnolia LNG LLCProject: Magnolia LNG Export TerminalType: Project includes the development of four
LNG production trains, two LNG tanks, and LNG ship and truck loading facilities
Location: Lake Charles, LACapacity: 8 MtpaDocket: CP14-347Completion:2Q 2018Comments: Project entered into a Precedent
Agreement for 20-year binding pipeline capacity with Kinder Morgan Louisiana Pipeline LLC to deliver gas to the site for the full capacity of the terminal
Contractor: KSJVProject: Magnolia LNG Export TerminalType: Project includes the engineering,
procurement, construction, commissioning, start-up and performance testing of the terminal
Cost: $4.3 billion
PUGET SOUND ENERGY INC. – (REV 8/17)Project: Puget Sound Energy LNG FacilityType: Project includes construction of an LNG
storage tank, infrastructure for loading marine vessels, mooring dolphins and distribution pipelines
Location: Port of Tacoma, WACapacity: 30 McmCost: $310 millionContact: Shirley Schultz Project Manager (253) 591-5121 [email protected]: 4Q 2019
Contractor: CB&IProject: Puget Sound Energy LNG FacilityType: Project includes the engineering,
procurement, fabrication and construction of a storage tank, liquefier and vaporizer
Cost: $200 million
TRANSCANADA CORP. – (5/17)Owner: Cameron LNGProject: Cameron Access ProjectType: Project includes the installation of pipelineLength: 34 milesDiameter: 34 and 36 inchesLocation: Lake Arthur, LAStart: 2016Completion: 2018
OIL - The Americas U.S.BAKKENLINK PIPELINE – (11/16)Project: Dry Creek to Beaver Lodge PipelineType: Project includes the construction of
16-inch pipelineLength: 37 milesLocation: Dry Creek, ND – Tioga, NDStart: 2016Comments: Pipeline would be designed with an initial
capacity of 100 Mbpd and will tie into the Garden Creek Pipeline
ENBRIDGE PIPELINES INC. – (10/17)Project: Line 3 Replacement ProgramType: Project includes replacement of pipeline
and construction of associated facilitiesLength: 1,031 milesDiameter: 34 and 36 inchesLocation: Hardisty, AB - Superior, WICapacity: 760 MbpdCost: $7.5 billionFiling: A81621Start: 3Q 2017Completion: 2Q 2019Comments: The existing Line 3 Pipeline will be
decommissioned
Contractor: MichelsType: Project includes replacement of a pipeline
segmentLength: 12 milesDiameter: 36 inchesLocation: Douglas County, WI
Contractor: Dun Transportation & Stringing Inc. Type: Project includes offloading and
stockpiling of pipeLength: 200 milesDiameter: 36 inchesLocation: Kittson, Polk, Red Lake and Carlton
counties, MNContact: Greg Norman Superintendent
Project: Line 78 Project Contractor: Minnesota Ltd. LLCType: Project includes the removal of pipelineDiameter: 24 inchesLocation: Will County, IL Supt: Kerry Schott
ENERGY TRANSFER PARTNERS – (REV 10/17)Operator: Rover Pipeline LLCProject: Rover PipelineType: Project includes construction of two dual
mainlines, four mainline compressor stations, eight supply laterals, eight supply lateral compressor stations and other ancillary facilities
Length: 713 miles
www.pipeline-news.com • November 2017 • Pipeline News 41
ONGOINGProjects construction underway
Diameter: 24, 30, 36 and 42 inchesLocation: Ashland, OH - Howell, MICapacity: 3.25 Bcf/dCost: $4.2 billionDocket: CP15-93Status: Phase 1A of the pipeline is in-service and
construction has started on Phase II of the project
Completion: 4Q 2017
Contractor: AECOMType: Front-end engineering and design
Contractor: Ariel Corp.Type: Compressor supplyCost: $42 million
Contractor: Berg Steel Pipe Corp. Type: Pipe supplyLength: 620 milesDiameter: 36 and 42 inches
Contractor: Sheehan Pipeline Construction Inc.Spread: 1, 2Segment: Mainline A and BType: Pipeline constructionLength: 78 milesDiameter: 42 inchesLocation: Carroll, Tuscarawas, Stark, Wayne, Ashland, Richland, Crawford, Seneca,
Hancock, Wood, Henry, and Defiance, OH
Contractor: U.S. PipelineSpread: 3Segment: Mainlines A and BType: Pipeline constructionLength: 70 milesDiameter: 42 inchesHQ: St. Clairsville and Dennison, OHSupt: Jason West, Greg Norman and Dane
Hilsabeck Contractor: MichelsSpread: 4Segment: Mainlines A and BType: Pipeline constructionLength: 101 milesDiameter: 42 inchesSupt: Rick Zavitz
Contractor: Precision Pipeline LLCSpread: 5, 6Segment: Mainlines A and BType: Pipeline constructionLength: 208 milesDiameter: 42 inchesSupt: Bobby Poteete, Tommy Haynes and JW
Morgan
Contractor: Precision Pipeline LLCSpread: 7, 8Segment: Market Segment PipelineType: Pipeline constructionLength: 99 milesDiameter: 42 inchesLocation: Defiance, Henry, and Fulton, OH;
Lenawee, Washtenaw, and Livingston, MISupt: James Junker Jr., Cory Strandlien and
Toby Prawl
Contractor: Precision Pipeline LLCSegment: Berne LateralType: Supply lateral construction
Length: 3.7 milesDiameter: 24 inchesLocation: Noble and Monroe, OHSupt: Adam Minigh
Contractor: Precision Pipeline LLCSegment: Majorsville Lateral Type: Supply lateral constructionLength: 24 milesDiameter: 24 inchesLocation: Marshall, WV and Belmont, OHSupt: Dennis Bergman
Contractor: Precision Pipeline LLCSegment: Sherwood Lateral Type: Supply lateral constructionLength: 54 milesDiameter: 36 inchesLocation: Doddridge, Tyler, and Wetzel, WV;
Monroe, OHSupt: Jim Nierenda
Contractor: Precision Pipeline LLCSegment: CGT Lateral Type: Supply lateral constructionLength: 5.7 milesDiameter: 24 inchesLocation: Doddridge, WV
Contractor: MichelsSegment: Burgettstown Lateral Type: Supply lateral constructionLength: 52 milesDiameter: 36 inchesLocation: Washington, PA; Hancock, WV; Jefferson
and Carroll, OHSupt: Rick Zavitz
Contractor: Latex ConstructionSegment: Seneca Lateral Type: Supply lateral constructionLength: 26 milesDiameter: 42 inchesLocation: Noble and Monroe, OHSupt: Adam Minigh
Contractor: U.S. PipelineSegment: Cadiz Lateral Type: Supply lateral constructionLength: 3 milesDiameter: 30 inchesLocation: Harrison, OHSupt: Jason West
Contractor: U.S. PipelineSegment: Clarington Lateral Type: Supply lateral constructionLength: 32.6 milesDiameter: 42 inchesLocation: Monroe, Belmont and Harrison, OHSupt: Wayne Fontenot
Project: Trunkline Backhaul ProjectType: Project includes upgrades and
modifications at existing compressor stations to allow for bi-directional flow of natural gas on their existing pipeline systems
Location: Wayne County, IL; Massac County, IL; Dyer County, TN; Tate County, MI
Capacity: 750 MMcf/dCost: $50.8 millionDocket: CP15-96
Comments: Project will interconnect with the Rover Pipeline
Project: Panhandle Backhaul ProjectType: Project includes upgrades and
modifications to allow for bi-directional flow of natural gas on their existing pipeline systems
Location: Allen, Hamilton, Vermillion and Parke counties, IN; Douglas County, IL; Lenawee County, MI
Capacity: 750 MMcf/dCost: $50.8 millionDocket: CP15-94Comments: Project will interconnect with the Rover
Pipeline
Contractor: BigInch Fabricators and Construction Inc.Type: Project includes the installation of pipeline Length: 24 milesDiameter: 2 and 24 inchesLocation: Hamilton County, INHQ: Montezuma, INSupt: Jim Shepler
Contractor: BigInch Fabricators and Construction Inc.Type: Project includes the installation and
station fabrication of various pipelineDiameter: 2 to 36 inchesLocation: Parke County, INHQ: Montezuma, INSupt: Frank Ayers
Contractor: Northern Indiana Public Service Co.Type: Project includes the replacement of 1,800
feet of pipeline via HDD and in-line facility modifications
Diameter: 24 inchesLocation: Cass, Miami and Wabash counties, INSupt: Tim Dunn
ENERGY TRANSFER PARTNERS/PHILLIPS 66SUNOCO LOGISTICS – (7/17)Contractor: Troy Construction (spreads one and two)/ Sunland Construction (spreads three and
four)Project: Bayou Bridge ExpansionType: Project will be built in two phases and
includes the construction of new pipelineLength: 155 milesDiameter: 12 and 16 inchesLocation: Lake Charles, LA - St. James, LACompletion: 4Q 2017
MAGELLAN MIDSTREAM PARTNERS LP —(10/17)Project: Wink PipelineType: Project includes construction of pipeline
and a terminal, which will offer broad inbound and outbound pipeline access to parties that connect to the facility
Length: 60 milesDiameter: 24 inchesLocation: Wink, TX - Crane, TXCapacity: 250 Mbpd (initial) 600 Mbpd (expandable)Cost: $150 millionStatus: Project is under construction and will
undergo an open season at a later dateCompletion: 2Q 2019Comments: Project will offer direct service from the
Delaware Basin to the Crane origin of Magellan’s Longhorn Pipeline, which
ONGOINGProjects construction underway
42 Pipeline News November 2017 • www.pipeline-news.com
provides crude oil and condensate transportation service to the Houston and Texas City refining complex and marine export facilities. In addition, the new pipeline segment will be able to provide service from the Delaware Basin to the new crude oil and condensate line to Corpus Christi, TX that has been proposed by Magellan as well as others in the industry
MEDALLION MIDSTREAM LLC – (9/17)Project: Delaware Basin Pipeline Gathering SystemType: Project includes gathering system pipeline
constructionLength: 3 milesDiameter: 11 inchesLocation: Reeves and Pecos, TXComments: Project will tie into the Delaware Basin
Pipeline
Operator: Medallion Pipeline Co. LLCProject: Wolfcamp ExpansionType: Project includes expansion of a partial
loop of the mainline Length: 47 milesDiameter: 16 inchesLocation: Howard, Glasscock, Mitchell and Scurry
counties, TXCapacity: 95 Mbpd Contact: Paige Snider Executive Assistant (972) 746-4401 [email protected]: 4Q 2017Comments: Project will be capable of providing
bi-directional services
Operator: Medallion Pipeline Co. LLCProject: Howard Lateral ExpansionType: Project includes installation of additional
pumping horsepower and construction of pipeline
Length: 15 milesLocation: Howard County, TXCapacity: 25 MbpdContact: Paige Snider Executive Assistant (972) 746-4401 [email protected]: 4Q 2017Comments: Project will be capable of providing
bi-directional services
MICHELS CORP./LOENBRO/PRECISION PIPELINE – (REV 5/16)Owner: NorthStar MidstreamProject: NST Express PipelineType: Project includes the construction of
12-inch and 30-inch pipeline, including a storage facility
Length: 1,134 milesLocation: Bakken/Three Forks area - Patoka, ILCompletion: 2018Comments: Michels will have spreads 1-3 and
Precision will have spreads 4-6. The pipeline will transport 450 Mbpd with a capacity as high as 570 Mbpd or more – which could represent approximately half of Bakken current daily crude oil production
NAVIGATOR ENERGY SERVICES – (9/17)Project: Lario Mott Gathering System ExtensionType: Project includes extension of an existing
gathering systemLength: 11 milesDiameter: 6 inchesLocation: Martin, Lario and East Willow, TXCapacity: 30 Mbpd
Project: Big Spring Gateway Pipeline ExpansionType: Project includes the construction of
a new 50-mile mainline and 25 miles of pipeline laterals to connect to new Midland destinations: Centurion Pipeline and Permian Express Terminal (formerly SunVit)
Length: 75 milesLocation: Midland, TXCapacity: 140 MbpdCompletion: 2017Comments: Upon completion of the expansion, the
system will include more than 650 miles of installed pipeline and a total system deliverability of 600 Mbpd of crude oil
NC CONTRACTORS – (5/17)Owner: Enterprise Products Pipeline LPProject: ECHO Phase IIType: Project includes the extension the 30-inch
ECHO PipelineLength: 80 milesLocation: Wilson County, TX – Gardendale, TXCompletion: 2017Comments: Project will increase capacity to
350 Mbpd
PRIMORIS/HOLLOMAN CORP./PUMPCO – (5/17)Owner: Enterprise Products Partners LPContractor: Primoris Pipeline has been awarded
spreads 1 and 2, Holloman Corp. has been awarded spreads 3 and 4, and Pumpco Inc. has been awarded spread 5
Project: Midland-to-Sealy PipelineType: Project includes the construction of
24-inch pipeline Length: 416 milesLocation: Midland, TX - Sealy, TXCompletion: 2018Comments: Pipeline will have the capability to provide
up to 540 Mbpd of take-away capacity for growing volumes of crude oil, and condensate from the Permian Basin
SANTA FE MIDSTREAM LLC – (10/17) Owner 2: Vermilion Cliffs Partners LLCProject: San Andres Gathering SystemType: Work scope includes construction of
a natural gas and crude oil gathering, treating and processing system
Diameter: 20 inchesLocation: Yoakum, Gaines and Cochran counties,
TX; Lea County, NMCapacity: 200 MMcfd (gas processing)Completion: 2Q 2018Contact: Cliff Rupnow Managing Partner and VP of Commercial (214) 308-9623 or (817) 239-5547 Comments: Residue from the natural gas processing
plant and treating facilities will be delivered to El Paso Natural Gas’ interstate pipeline with access to the WAHA hub and Western U.S. natural gas markets. NGLs
will be delivered to Enterprise Products’ Chaparral Pipeline for transportation to Mt. Belvieu, TX
SEABROOK LOGISTICS – (3/17)Owner: Magellan Midstream Partners LP/LBC Tank
Terminals LLCType: Project includes the construction of
270 Mcm of additional crude oil and condensate storage and the construction of a 24-inch bi-directional pipeline
Location: Seabrook, TXCompletion: 2018Comments: If warranted by market demand, Seabrook
Logistics could construct an additional 480 Mcm of storage, a second 24-inch diameter pipeline between the Seabrook Logistics’ facility and Magellan’s Houston crude oil distribution system and a second Aframax ship dock
SEMGROUP/NGL ENERGY PARTNERS – (3/17)Project: Glass Mountain Pipeline ExtensionType: Project includes the extension of 215
miles of existing pipelineLength: 44 milesLocation: Cushing, OKCompletion: 4Q 2017Comments: The extension will deliver crude oil from
north-central Oklahoma’s STACK resource play to Cushing, OK
SUNLAND CONSTRUCTION – (5/17)Owner: Enterprise Products Partners LPProject: RGP Pipeline and Rail Terminal Expansion Type: Project includes construction of a pipeline
lateralLength: 65 milesDiameter: 20 inchesLocation: Sorrento, LA - Breaux Bridge, LAComments: Enterprise will also upgrade rail receipt
points at Mont Belvieu to handle as many as 100 refinery grade propylene cars per day
Owner: TransCanada Corp./Magellan MidstreamProject: HoustonLinkType: Project includes the construction of a
24-inch pipelineLength: 9 milesLocation: Houston, TXStart: 2016Completion: 2017Comments: Project will provide TransCanada’s
customers access to Magellan’s Houston and Texas City crude oil distribution system
TALLGRASS ENERGY – (7/17)Contractor: Minnesota Ltd. LLCProject: REX Compressor StationType: Project includes the installation of a meter
stationDiameter: 12 inchesLocation: Hendricks County, INSupt: Kerry Schott
TALL OAK MIDSTREAM LLC – (7/15)Project: Eagle Ford JV Pipeline System ExpansionType: Project includes the construction of a
20-inch condensate gathering system and expansion on an existing pipeline system
Length: 125 miles
ONGOINGProjects construction underway
www.pipeline-news.com • November 2017 • Pipeline News 43
Location: Gardendale, TX - Corpus Christi, TXCompletion: 2017Comments: Project includes a new terminal on the
Corpus Christi ship channel to support the increased volumes to be shipped via pipeline to the region
WELSPUN TUBULAR/PUMPCO/STRIKE – (10/16)Owner: Diamond Pipeline LLCProject: Diamond PipelineType: Project includes the construction of a new
pipelineLength: 440 milesLocation: Cushing, OK - Memphis, TNComments: The pipeline will be capable of
transporting 200 Mbpd of domestic crude oil from the storage hub in Cushing to Valero’s refi nery in Memphis
WESTERN REFINING INC. – (10/17)Operator: Western Refi ning Conan Gathering LLCProject: Conan Crude Oil Gathering Pipeline
SystemType: Project includes construction of a
gathering systemLength: 130 milesLocation: Lea County, NM - Loving County, TXCapacity: 246 MbpdsCost: $225 millionCompletion: 2Q 2018
CanadaENBRIDGE ATHABASCA – (REV 6/17)Project: Athabasca Pipeline TwinningType: Project includes: a new pump station at
the existing Kirby Lake Terminal; a new pump station at the existing Bonnyville Station; and a new 36-inch pipeline
Length: 214 milesLocation: Kirby LakeComments: The in-service date of the project has
been delayed until 2017 due to changes in production estimates from oil sands operations
ENBRIDGE – (3/17)Project: Enbridge Line 10 Westover Segment
Replacement ProjectType: Project includes the replacement of
12-inch pipeline with new 20-inch pipeline and three new sections for proposed reroutes from existing right-of-way
Length: 35 milesLocation: Ontario (Westover Terminal - Nanticoke
Junction Facility)Completion: 2018Comments: The National Energy Board (NEB) has
approved the project and has imposed a total of 46 conditions covering a wide range of matters, including emergency management and environmental protection
INTER PIPELINE – (2/17)Project: Kirby North Project Type: Project includes the construction of
16-inch and 8-inch pipeline laterals, as well as a new pumping and metering facility
Length: 15 miles
Location: Conklin, ABComments: Project will produce up to 100 Mbpd of
bitumen and require bitumen blend and diluent transportation capacity over the long term
KINDER MORGAN ENERGY PARTNERS – (10/17)Operator: Trans Mountain Pipeline ULCProject: Trans Mountain ExpansionType: Project includes construction of twinned
pipeline, 12 new pump stations and 20 tanks
Length: 608 milesDiameter: 30 inchesLocation: Edmonton - VancouverCapacity: 590 MbpdCost: $7.4 billionFiling: A85729Completion: 3Q 2019
Contractor: EVRAZ North AmericaType: Project includes pipe supplyLength: 497 miles
Contractor: Midwest Pipelines Inc.Type: Project includes construction of spreads
1 & 2 of the pipeline (Edmonton/Yellowhead)
Contractor: Ledcor Sicim Limited PartnershipType: Project includes construction of spreads 3
& 4 of the pipeline (North Thompson)
Contractor: Surerus Murphy Joint VentureType: Project includes construction of spread 5A
of the pipeline (BC Interior)
Contractor: Macro Spiecapag Joint VentureType: Project includes construction of spread 5B
of the pipeline (Coquihalla – Hope)
Contractor: Somerville-Aecon Energy GroupType: Project includes construction of spread 6
(Fraser Valley)
Contractor: Kiewit Ledcor TMEP PartnershipType: Project includes construction of spread 7
of the pipeline, Burnaby Mountain tunnel and three terminals (Westridge Marine Terminal, Burnaby Terminal and the Sumas Terminal)
PEMBINA PIPELINE CORP. – (REV 11/17)Project: Phase IV ExpansionType: Project involves the expansion of the
Fox Creek and Namao Pipeline through two new pump stations
Location: Fox Creek - NamaoCapacity: 180 MbpdCompletion:4Q 2018Comments: Pembina has the ability to further
expand capacity between Fox Creek and Namao by adding additional pump stations
Project: Phase V ExpansionType: Project involves pipeline construction,
installation of a new pump station and upgrading an existing pump station
Location: Lator and Fox Creek, AB
Length: 60 milesDiameter: 20 inchesCapacity: 260 Mbpd (transmission) 40 Mbbl (storage)Cost: $385 millionStatus: Clearing of the right-of-way is almost
completeCompletion: 4Q 2018Comments: Project will address capacity constraints
between Lator and Fox Creek by adding capacity, which will support growth in the prolifi c Monteny and Deep Basin resource plays
PRODUCTS –The Americas U.S.BUCKEYE PARTNERS LP – (REV 6/17)Project: Michigan/Ohio Pipeline Expansion Project
(Phase II)Type: Project includes the reversal on a portion
of the existing Laurel Pipeline to facilitate the transportation of refi ned petroleum products
Location: Pittsburgh, PACompletion: 2018
Project: Michigan/Ohio Pipeline Expansion (Phase I)Type: Project includes the reversal of a portion
of the existing Laurel PipelineLocation: Detroit, MI, Lima, OH and Midland, PAComments: This phase of the project is in addition to
the fi rst phase, which off ered expanded transportation services from Midwestern origin points to destination points as far east as the Pittsburgh area
MAGELLAN MIDSTREAM PARTNERS LP/TRANSMONTAIGNE PARTNERS LP – (6/16)Owner: Magellan Midstream Partners LP and
TransMontaigne Partners LPType: Project involves the construction of a 150-
mile, 16-inch diameter pipeline capable of transporting 150 Mbpd
Length: 150 milesLocation: Corpus Christi, TX - Brownsville, TXCompletion: 2018
VANCOUVER AIRPORT FUEL FACILITIES CORP. – (9/17)
Project: Vancouver Airport Fuel Delivery PipelineType: Project includes pipeline constructionLength: 8 miles Diameter: 14 inchesLocation: Richmond, B.C.Completion: 3Q 2018Comments: Project will supply aviation kerosene fuel
from an upgraded marine terminal and adjacent fuel storage facility
MexicoNUSTAR ENERGY LP – (8/17)Project: New Burgos Pipeline Type: Project includes construction of pipelineLength: 34 milesDiameter: 10 inchesLocation: Reynosa, Mexico - Edinburg, TX
ONGOINGProjects construction underway
44 Pipeline News November 2017 • www.pipeline-news.com
Capacity: 108 MbpdComments: Project will parallel the existing Burgos
Pipeline
CanadaENBRIDGE INC. – (10/15)Project: Norlite SystemLocation: CheechamStart: 2017Comments: System will be capable of transporting
270 Mbpd of diluent from Edmonton into the oil sands region and has the potential to be further expanded with the addition of pump stations to an ultimate capacity of over 400 Mbpd
OFFSHORE – The Americas U.S.INFRAESTRUCTURA MARINA DEL GOLFO –(7/17)Owner 2: TransCanada Corp. (60%)Operator: Infraestructura Marina del GolfoProject: Sur de Texas-Tuxpan PipelineType: Project includes the engineering,
procurement, construction, operation and maintenance of an underwater pipeline
Length: 497 milesDiameter: 42 inchesCapacity: 2.6 MMcf/dCost: $1.3 billionLocation: Gulf of Mexico - Tuxpan, VeracruzCompletion: 4Q 2019Comments: The subsea gas pipeline will interconnect
with the Nueces-Brownsville Pipeline and the Tuxpan-Tula Pipeline
Contractor: AllseasSub: First SubseaType: Project includes the supply a Ballgrab
Pipeline Recovery Tool (PRT) for a subsea pipeline
Contractor: Nippon Steel & Sumitomo Metal Corp./Mitsui & Co. Ltd.
Type: Project includes the supply of a 600,000 ton steel order consisting of large diameter welded steel pipe and plate as raw material for the pipeline
Length: 242 milesDiameter: 42 and 48 inches
Contractor: Shawcor Ltd.Type: Project includes the coating of pipe
with the application of concrete weight coating in a variety of thicknesses (2.25, 2.75 and 3.5 inches) and the installation of 5,000 sacrificial anodes
SUBSEA 7 – (5/17)Owner: BPProject: Mad Dog 2 developmentType: Project includes the engineering,
procurement, construction and installation of the subsea umbilicals, risers and pipeline systems and associated subsea architecture for the project
Location: Offshore New Orleans
TECHNIP FMC – (5/17)Owner: Shell Offshore Inc.Project: Kaikias deep water projectType: Project includes the delivery, integration,
and installation of the subsea production system and subsea riser, jumper and flowline equipment for phase one of the project
Location: Gulf of Mexico
CanadaHUSKY ENERGY — (10/17)Owner 2: Suncor Energy (25%)Owner 3: Nalcor Energy (5%)Project: West White Rose Extension ProjectType: Project includes the construction of a new
fixed wellhead platform in the White Rose Field
Location: offshore St. JohnsCapacity: 75 MbpdCost: $2.2 billionCompletion: 1Q 2022
Contractor: TechnipFMC Type: Contract includes engineering,
procurement, construction and installation subsea equipment, including tie-in manifolds, flexible flowlines, and control umbilicals, which will connect the recently announced West White Rose platform to the existing SeaRose FPSO vessel
Caribbean/South & Central AmericaESSO EXPLORATION AND PRODUCTION
GUYANA LTD.– (7/17)Contractor: SaipemProject: Liza Project Type: Project includes the engineering,
procurement, construction and installation of the subsea umbilicals, risers and flowlines and associated structures and jumpers. Project also consists of transportation and installation of umbilicals, manifolds and associated foundations for the gas injection systems
Location: offshore GuyanaStart: 2019 Comments: Located 120 miles offshore Guyana at a
depth of 1,800 meters, the Liza field is a subsea development estimated to contain more than 1 billion BOE
BP TRINIDAD & TOBAGO LLC – (7/17)Contractor: McDermottProject: Angelin gas fieldType: Project includes the design, procurement,
fabrication, transportation, installation and commissioning of a six-slot wellhead platform and subsea pipeline
Diameter: 26 inchesLocation: offshore Trinidad and TobagoCapacity: 600 MMcf/dComments: The contract follows the successful
completion of a multi-phase engineering contract, including pre-front end engineering design, front-end engineering design, and pre-execution engineering contracts previously awarded
to McDermott for the initial design and execution planning of Angelin
Project: Lakach FieldType: Project includes the design, detailed
engineering, procurement, construction, load out, and mechanical completion of 4,300-ton topsides that can process 590 MMcf/d of gas, and a 6,100-ton jacket. Contract will also cover the design, detailed engineering, procurement, fabrication, transport, installation, and pre-commissioning of 10-inch and 8-inch inside-diameter flexible flowlines; 26-inch-outside-diameter, 6-mile concrete-coated rigid subsea pipeline; a diving campaign to support LNG train and field turnarounds; and a large number of subsea structures and tie-in spools
Location: TrinidadComments: Technip’s S-Lay pipelay vessel, the
G-1200, will install the rigid pipelines
OTHER – The Americas U.S.ENTERPRISE PRODUCTS PARTNERS LP – (6/17)Type: Project includes the construction of a
new 12-inch diameter ethylene pipeline and re-purposing of a large, high-capacity ethylene storage well expansion
Length: 24 milesLocation: Mont Belvieu, TXCompletion: 2018Comments: Upon project completion, the 5.3-million-
barrel cavern will be able to inject/withdraw ethylene at a rate of 2 Mbph expandable to 4 Mbph
TARRANT REGIONAL WATER DISTRICT –(8/17)Project: Integrated Pipeline ProjectType: Project includes construction of a water
transmission pipeline, three lake pump stations, and three booster pump stations
Length: 150 milesDiameter: 84 to 108 inchesLocation: Fort Worth, TX - Anderson, TXCapacity: 50 MMgpd Cost: $1.6 billionCompletion: 2018
XCL MIDSTREAM LLC — (8/17)Project: XCL Appalachia Connector Pipeline Phase
IType: Project includes construction of a gas
header system, wet gas system and a parallel fresh water pipeline
Length: 100 milesDiameter: 24 inchesLocation: West VirginiaCapacity: 800 MMcf/dCompletion: 2Q 2018Comments: Project will have interconnections with
TL-590, Leach Xpress, Mountaineer Xpress and TETCO M2 pipelines
Contractor: ProFoam LLCType: Project includes unloading pipeline and
pre-construction activities
ONGOINGProjects construction underway
www.pipeline-news.com • November 2017 • Pipeline News 45
Location: Marshall County, WVContact: Kevin Smith Superintendent
GAS – International Africa GALSI PIPELINE – (REV 10/16) Owners: Sonatrach/Edison/Enel/Hera GroupProject: Galsi PipelineType: Project includes the construction of
351 miles of offshore pipeline crossing the Mediterranean Sea and 161 miles of onshore pipeline, including gas compression facilities
Length: 512 milesLocation: Koudiet Draouche - PiombinoCompletion: 2018Comments: The initial transport capacity will be 8 Bcm
per year
KINGDOM OF MOROCCO/FEDERAL REPUBLIC OF NIGERIA – (1/17)Pipeline: Trans-African Pipeline Type: Project includes the construction of a new
gas pipelineLocation: Nigeria – Morocco - Europe.Comments: The Trans-African Pipeline will improve
access to energy across West Africa and establish a competitive regional market for electricity
Asia PacificARROW ENERGY – (REV 5/16)Project: Arrow Bowen PipelineType: Project includes the construction of high-
pressure steel pipelineLength: 512 milesLocation: Bowen Basin - GladstoneCompletion: 2018
ABB – (2/16)Owners: SOCAR/BOTAS/BPProject: Trans-Anatolian Natural Gas PipelineType: Project includes delivering the control
infrastructure to contribute to safe, secure and reliable operation of the pipeline throughout its lifetime
Length: 1,150 milesLocation: Sangachal – Erzurum – Eskishehir –
Greece - Albania - ItalyCompletion: 2018Comments: Pipeline will interconnect with two others:
the South Caucasus at Turkey’s border with Georgia and the Trans Adriatic at its border with Greece and the capacity of the pipeline can reach 60 Bcm/y
AZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 11/15)Project: Azeri PipelineType: Project includes the construction of new
pipelineLength: 2,175 milesLocation: Georgia, Turkey, Greece, Bulgaria, Albania
and ItalyCompletion: 2019Comments: Pipeline will have a capacity of 16 Bcm/y
ESSAR PROJECTS – (4/17)Owner: GSPL India Gasnet Ltd.Project: Mehsana–Bhatinda–Jammu–Srinagar
Pipeline (segment)Type: Project includes laying natural gas
pipelines, a segment of the 1,305-mile Mehsana–Bhatinda–Jammu–Srinagar Pipeline
Length: 62 milesLocation: Jalandhar - AmritsarCompletion: 2017Comments: The company has recently completed the
tender process for three sections of the pipeline
GUJARAT STATE PETROLEUM CORP. – (REV 12/16)Contractor: GSPL India GasnetProject: Mehsana-Bhatinda PipelineType: Project includes the construction of new
pipelineLength: 1,037 milesLocation: Mehsana-BhatindaComments: Pipeline is currently being considered
for cancellation but, if built, will have a transportation capacity of 30 MMcf/d
Contractor: GSPL India TranscoProject: Surat-Paradip PipelineType: Project includes the construction of new
pipelineLength: 1,071 milesLocation: Surat - ParadipComments: Pipeline is currently being considered
for cancellation but, if built, will have a transportation capacity of 30 MMcf/d
Contractor: GAILProject: Mallavaram-Bhilwara PipelineType: Project includes the construction of new
pipelineLength: 984 milesLocation: Mallavaram - BhilwaraComments: Pipeline is currently being considered
for cancellation but, if built, will have a transportation capacity of 30 MMcf/d
IIL&FS ENGINEERING AND CONSTRUCTION CO. LTD. – (REV 2/17)Owner: Gas Authority of India Ltd.Project: Kochi-Koottanad-Bangalore-Mangalore
PipelineType: Project includes the laying and
construction of 30-inch pipeline along with associated works
Length: 685 milesLocation: KeralaCompletion: 2019Comments: GAIL has won a second extension for
completing the project as it faces unprecedented problems in getting land in Kerala and Tamil Nadu
KBR INC. – (2/17)Owner: PT PLNType: Project includes a feasibility study to
develop a reliable, efficient and robust infrastructure and logistics ecosystem for the LNG regasification of and gas supply to the multiple gas fired power plants in Sumatera, Maluku and Papua provinces, with the potential for additional locations. With the findings and recommendations
from the feasibility study, KBR will then perform the front-end engineering design work for the proposed infrastructure schemes, developing preliminary engineering designs and technical design basis
Location: IndonesiaComments: During the course of the project, KBR will
also provide on-the-job training to PLN’s project team members
NIPPON STEEL & SUMIKIN ENGINEERING – (REV 8/16)Owner: Tokyo Gas/JAPEXType: Project includes the construction of new
pipelineLength: 870 milesLocation: Sakhalin - Ibaraki Prefecture
NORTHERN TERRITORY GOVERNMENT –(7/17)Operator: JemenaProject: Northern Gas PipelineType: Project includes pipeline construction and
two compressor stationsLength: 386 milesDiameter: 14 inchesLocation: Tennant Creek, Northern Territory, -
Mount Isa, QueenslandCapacity: 87 MMcf/dCost: $800 millionCompletion: 2018
Contractor: Spiecapag AustraliaType: Project includes pipeline constructionLength: 88 miles
Contractor: McConnell DowellType: Project includes the engineering,
construction and commissioning of a section of pipeline
Length: 262 milesDiameter: 14 inchesCost: $300 million
Contractor: GPA EngineeringType: Project includes the design of the pipeline
Contractor: KBRType: Project includes the facility design of the
project
Contractor: EcOzType: Project includes providing environmental
consultation services for the project
Contractor: Maloney Field ServicesType: Project includes providing land access and
valuation services for the project
Contractor: MRC Global CoatedType: Project includes supplying pipeline for the
projectDiameter: 14 inches
Contractor: EnscopeType: Project includes providing project
management services for the natural gas treatment and compression facilities
Contractor: IntertekType: Project includes pipeline inspection for
the project
46 Pipeline News November 2017 • www.pipeline-news.com
ONGOINGProjects construction underway
Contractor: SynertecType: Project includes the design, supply and
commissioning of the process control and safety system
PERUSAHAAN GAS NEGARA – (8/17)Operator: PertaminaProject: Duri-Dumai Pipeline SystemType: Project includes construction of
transmission and distribution pipelines Length: 75 milesDiameter: 24 inchesLocation: Dumai, RiauCapacity: 140 MMcf/d Cost: $574 million Start: 3Q 2017Completion: 4Q 2018
Contractor: P.T. Connusa EnergindoType: Project includes engineering,
procurement and design
Contractor: PertaminaType: Project includes construction of
transmission and distribution pipelines
PETROVIETNAM GAS/MOECO/PTTEP – (REV 6/16)Project: O Mon Gas PipelineType: Project includes the construction of risers,
subsea pipeline, onshore pipeline and a line break valve
Length: 248 milesLocation: Malay Basin - southern VietnamCompletion: 2023Comments: Pipeline will have a capacity of 20.3
MMcm/y
PUNJ LLOYD – (5/16)Type: Project includes the construction of a
14-inch pipeline (186 miles) and a 32-inch pipeline (187 miles) and the construction of a block valve and pigging stations
Length: 373 milesLocation: Oman New Delhi Completion: 2018
RELIANCE INDUSTRIES – (REV 11/16)Owner: China National Petroleum Corp.Project: Shahdol-Phulpur PipelineType: Project includes the construction of new
pipelineLength: 188 milesLocation: Shahdol - Jaysing Nagar - Beohari-Gurh
- PhulpurCompletion: 2023Comments: Pipeline will have a capacity of 4.3
MMcm/d
Project: Dahej Nagothane Ethane Pipeline Project Type: Project includes the construction of new
pipelineLength: 301 milesLocation: Dahej, Gujarat – Nagothane, Maharashtra Comments: Project will transport 1.25 MMtpa of liquid
ethane
SAPURAKENCANA – (3/17)Owner: Repsol Oil & Gas Malaysia Ltd.Project: Bunga Pakma Development ProjectType: Project includes the transportation and
installation of pipeline, substructure and topside
Location: MalaysiaCompletion: 2018
WOOD GROUP – (8/15)Project: HBWS gas fieldsType: Project includes the detailed design of
onshore raw gas and Mono-Ethylene Glycol pipelines from the well pad to the gas plant
Location: Victoria, Australia
Western Europe & EU CountriesFULCRUM UTILITY SERVICES LTD. – (1/17)Type: Project includes the construction of a new
gas pipeline, converting an existing fuel oil source to natural gas
Length: 7.5 milesCompletion: 2017Comments: Upon completion, Fulcrum will adopt,
own and operate the pipeline and gas meters
FSU Eastern EuropeAZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 12/16)Project: South Caucasus Pipeline ExpansionType: Project includes pipeline looping and two
new compressor stationsLength: 303 milesCompletion: 2019Location: Azerbaijan - Georgia-Turkey borderComments: Project will connect with the Trans-
Anatolian Natural Gas Pipeline
SERINUS ENERGY INC. – (7/17)Contractor: Confind S.R.L.Project: Moftinu Gas Development ProjectType: Project includes the engineering,
procurement, construction and commissioning of a gas processing facility and associated flowlines and pipelines
Location: RomaniaCompletion: 1Q 2018
GAZPROM – (2/16)Project: Power of Siberia PipelineType: Project includes the construction of
55-inch pipeline that will run through swampy, mountainous and seismically hazardous areas
Length: 1,864 milesLocation: Irkutsk Region - Republic of Sakha
(Yakutia) - Amur RegionCapacity: 38 Bcm/y of natural gas from RussiaCost: $400 billionStatus: According to Russian media, the project is
moving ahead of schedule and 448 miles of the pipeline has been completed
Completion: 2018Comments: Project is a key element in a 30-year gas
supply deal between Moscow and Beijing
Project: Yakutia-Kahbarovsk-Vladivostok PipelineType: Project includes the construction of new
56-inch pipelineLength: 2,500 milesLocation: Yakutia - VladivostokCompletion: 2019
Comments: Project will have a design capacity of 61 Bcm/y of natural gas
GAZ-SYSTEM/EUSTREAM – (4/17)Project: Poland – Slovakia Pipeline ConnectionType: Project includes the construction of
new pipeline, a measuring station, a compressor station and compressor station modifications
Length: 102 milesLocation: Poland – SlovakiaCompletion: 2019Comments: Project is part of the North-South Corridor
Project and will connect the Slovak gas compressor station and the gas interconnection point
POLAND/LITHUANIA – (REV 3/12)Type: Project includes the construction of new
pipelineLength: 445 milesLocation: Estonia - Latvia - Lithuania - PolandComments: Project is in the feasibility stage
ROSTEC – (12/15)Owner: Russia/PakistanProject: Karachi-Lahore PipelineType: Project includes the construction of new
pipeline and eight compressor stations along the route
Length: 684 milesLocation: Karachi - Lahore Completion: 2018Comments: Project will have a capacity of 12.4 Bcm/y
will link the liquefied natural gas terminals in the port of Karachi and the city of Lahore
STROYGAZMONTAZH – (2/17)Owner: GazpromProject: Ukhta-Torzhok 2 PipelineType: Project includes the construction and
installation of 60-inch pipeline and seven compressor stations
Length: 173 miles (602 miles total)Location: Yamal - Ukhta - Torzhok Completion: 2019Comments: Project will play a key role in ensuring
the delivery of the needed gas volumes to northwestern Russia for domestic consumption and export purposes, including an order to deliver natural gas into Nord Stream 2, and will have an annual capacity of 45 Bcm of natural gas
TANAP NATURAL GAS TRANSMISSION CO. – (REV 9/17)
Owner 1: TANAP Natural Gas Transmission Co.Owner 2: SOCAR (58%)Owner 3: BOTAS (30%)Owner 4: BP (12%)Project: Trans-Anatolian Natural Gas PipelineType: Project includes pipeline construction,
two take-off stations and associated facilities
Length: 1,690 milesDiameter: 56 inchesLocation: Türkgözü – EdirneCost: $10 billionCapacity: 16 Bcm/yCompletion: 2018Comments: Project will bring natural gas produced
from Azerbaijan’s Shah Deniz-2 gas field,
www.pipeline-news.com • November 2017 • Pipeline News 47
ONGOINGProjects construction underway
and other areas of the Caspian Sea, primarily to Turkey, but also on to Europe. The TANAP Project, along with the South Caucasus Pipeline (SCP) and the Trans-Adriatic Pipeline (TAP) form the elements of the Southern Gas Corridor
Contractor: BechtelType: Project includes front-end engineering
and design
Contractor: Corinth PipeworksType: Project includes pipeline supply
Contractor: SalzgittlerType: Project includes pipeline supply
Contractor: IntertekType: Project includes pipeline inspection and
testing services
Contractor: SpiecapagType: Project includes onshore engineering,
procurement and construction
Contractor: SaipemType: Project includes offshore engineering,
procurement and construction
Contractor: FERNAS Insaat ASType: Project includes pipeline constructionSpread: 1
Contractor: Sicim/Yüksel/Akkord Type: Project includes pipeline constructionSpread: 2
Contractor: Tefken Insaat ve Tesisat ASType: Project includes pipeline constructionSpread: 3
Contractor: SapuraKencana TL Offshore Sdn BhdType: Project includes offshore pipeline
construction
TRANS ADRIATIC PIPELINE AG – (10/16)Contractor: Himachal Futuristic Communications Ltd. Owner: Trans Adriatic Pipeline AG Project: Trans Adriatic PipelineType: Project includes the supply and delivery of
963 miles of fiber optic cableLength: 545 milesLocation: Azerbaijan – EuropeCompletion: 2020Comments: The pipeline will connect with the Trans
Anatolian Pipeline
Contractor: SPIECAPAGOwner: Trans Adriatic Pipeline AG Project: Trans Adriatic PipelineType: Project includes supplying 4-inch pre-
commissioning tools, tracking equipment, as well as accessories for the pipeline
Contractor: SiemensProject: Trans Adriatic Pipeline Type: Project includes the installation of six
15-megawatt SGT-400-driven turbo compressor trains
Contractor: TechnipProject: Trans Adriatic PipelineType: Project includes supplying 4-inch pre-
commissioning tools, tracking equipment, as well as accessories for the pipeline
Contractor: TechnipProject: Trans Adriatic PipelineType: Project includes the overall project and
site management, procurement and subcontracting for all the EPC packages throughout the engineering, procurement and construction phases, as well as warranty management and the project close-out
Contractor: Industria Meccanica Bassi S.p.AProject: Trans Adriatic PipelineType: Project includes two contracts: first,
for engineering, manufacturing and delivery of 48-inch and 36-inch piggable T-pieces and welded elbows of different characteristics and, second, scraper traps units for intelligent pigging
Contractor: Nuova GiungasProject: Trans Adriatic PipelineType: Project includes the engineering,
manufacturing and delivery of 48-inch and 36-inch isolating joints
Middle EastEXOVA – (12/16)Owner: SEPCOType: Project includes testing and validating
materials and environments throughout construction of a gas compressor station for the second phase of the Kingdom’s master gas system
Location: Saudi ArabiaCompletion: 2018Comments: Pipeline capacity will be boosted to 12.5
Bcf/d of gas
GASCO – (3/14)Project: Habshan-Maqta-Taweelah PipelineType: Project includes the demolition of two
existing pipelines and installation of two new 52-inch pipelines and one 42-inch pipeline
Length: 372 milesLocation: Habshan-Maqta-TaweelahCompletion: 2017
ILF CONSULTING ENGINEERS – (4/17)Owner: Asian Development BankProject: TAPI PipelineType: Project includes the front-end
engineering and design of 56-inch pipeline along with providing project management and technical supervision services
Length: 1,127 milesLocation: Turkmenistan-Afghanistan-Pakistan-IndiaCompletion: 2019Comments: TAPI Pipeline plans to export up to 33
Bcm/y of natural gas
JSIW INFRASTRUCTURE PVT. LTD/IL&FS ENGINEERING & CONSTRUCTION CO. LTD – (REV 12/16)Owner: GAIL IndiaProject: Jagadishpur-Haldia-Bokaro-Dhamra Gas
PipelineType: Project includes pipelaying on 214 miles
of the pipelineLength: 1,118 milesLocation: Phulpur - DobhiCompletion: 2020Comments: First phase of project will cover 470 miles
along Phulpur, Mani, Gorakhpur, Varanasi, Dobhi, Silao, Patna and Barauni
NATIONAL IRANIAN OIL CO. – (REV 8/14)Project: Iran-Kuwait PipelineType: Project includes the construction of new
pipelineLength: 350 milesLocation: Iran-Kuwait
NATIONAL IRANIAN OIL ENGINEERING AND CONSTRUCTION CO. – (REV 7/13)Type: Project includes the construction of
48-inch, 42-inch and 36-inch pipelineLength: 970 milesLocation: Neka - JaskDirector: Mir Aliasghar Sajedi
TAPI — (2/16)Project: Turkmenistan-Afghanistan-Pakistan-India
PipelineType: Project includes the construction of
56-inch pipelineLength: 1,118 milesLocation: Turkmenistan-Afghanistan-Pakistan-IndiaCompletion: 2019Comments: Pipeline will export up to 33 Bcm/y of
natural gas
Contractor: Esso AustraliaProject: Turkmenistan-Afghanistan-Pakistan-India
PipelineType: Project includes pipeline replacementLength: 116 milesLocation: Longford and Long Island PointCompletion: 2018
PETROJET – (3/17)Owner: Oman Gas Co.Project: Duqm PipelineType: Project includes the construction and
looping of 36-inch pipelineLength: 137 milesLocation: Saih Nihayda - Wusta coastCompletion: 2018
LNG - InternationalAsia PacificKUMUL PETROLEUM HOLDINGS LTD. —
(10/17)Project: Kikori Energy HubType: Project includes a mid-scale LNG
liquefaction and regional export facility,180MW power generation facility, methanol process facility and a condensate stabilization, storage and regional export facility
Location: Gulf Province, Papua New GuineaStatus: Project is in the preliminary front-end
engineering and design stageComments: Project is part of the Western Pipeline
Extension Project, which will allow stranded oil and gas fields in the western provinces to come to the coast for export
Contractor: KBR Inc.
48 Pipeline News November 2017 • www.pipeline-news.com
Ad Index Index provided as a courtesy to readers. While every effort is made to compile accurate listings, publisher assumes no responsibility for errors.
Aegion Corporation............................................................aegion.com ...........................29AGS ..........................................................................................agsgps.com ........................... 51BKW .........................................................................................bkwinc.com ........................... 52Challenger Services .................................................challengerservices.com ................ 53CRC-Evans Pipeline International ................................ crc-evans.com ........................IFCDarby Equipment Company .........................................darbyequip.com ......................... 3Denso North America ...................................................... densona.com ............................ 5Enduro Pipeline Services................................................enduropls.com ........................ 35E-Z Line Pipe Support Co., Inc. .........................................ezline.com .............................. 3Geo Corr ...............................................................................geocorr.com .......................... 53Geo360 Water Logistics ........................................... geo360logistics.com ................... 52Horizontal Technology, Inc. ..................................... horizontaltech.com .............35, 39HUB International Mid-America .............................hubinternational.com .................. 52Illinois Truck & Equipment ................................................ iltruck.com .....................26, 52Kidd Pipeline & Specialties...........................................kiddpipeline.com ...................... 21Knapp Polly Pig, Inc. ..........................................................pollypig.com ..........................23KS Energy Services, Inc. ........................................... ksenergyservices.com .................. 53LaBarge Coating LLC .................................................. labargecoating.com .................... 53Meridien Energy, LLC ................................................ meridienenergy.com ................... 37Midwestern Manufacturing Co. ...................................sidebooms.com ..........................7Montgomery Trucking Company ................................mtilogistics.com .......................39
Outlaw Padding Company .......................................outlawpadding.com .................... 52OZ Directional Drilling .......................................... ozdirectionaldrilling.com ............... 13Pe Ben USA......................................................................... pebenusa.com ......................... 51Pigs Unlimited International, Inc. ............................ pigsunlimited.com ..................... 15Pipeline & Gas Journal.................................................... pgjonline.com ......................... 52Pipeline Machinery .............................................................plmcat.com ........................... 31Pipeline Opportunities Conference ................pipeline-opportunities.com............. 53Pipeline Pigging Products, Inc. ..................................... pipepigs.com .......................... 52Pipeliners Local Union 798.........................................value.local798.org ......................11Polyguard Products, Inc. ................................................polyguard.com .......................... 9Precision Welding & Fabrication ....................................weweld.com........................... 19Proline Pipe Equipment ..............................................proline-global.com .................... 51Southeast Connections ............................................. seconnections.com ....................25Steel Etc. ....................................................................................................................................17Superior Tire & Rubber Company .............................. superiortire.com ....................... 33T&C Rentals ..................................................................... tcrentalsinc.com ....................... 51Tek Rock Trenching ............................................................................................................... 53Thomson Equipment Co ...................................... thomsonequipment.com ............... 52United Piping Inc. ............................................................ unitedpiping.us ........................ 13Williams Forestry and Associates .................................. wfatrees.com .......................... 53
Type: Project includes conceptual development and feasibility study services for the Kikori Energy Hub
OIL - InternationalAsia PacificCHINA – (8/16)Project: Gwadar-Kashgar PipelineType: Project includes the construction of
pipelineLength: 1,500 milesLocation: Gwadar - KashgarStart: 2017Completion: 2021
SOCAR – (11/13)Owner: Esso AustraliaProject: Batam Refinery ProjectType: Project includes the construction of a 600
Mbdp refineryLocation: Batam Island, IndonesiaCompletion: 2017
UGANDA/TOTAL E&P – (7/17)Contractor: Gulf Interstate Engineering has been
awarded a contract for the front-end engineering and design of the pipeline
Project: Uganda–Tanzania Crude Oil PipelineType: Project includes the construction of an
export pipeline and an associated oil refinery
Length: 897 milesDiameter: 24 inchesLocation: Hoima, Uganda - Tanga, TanzaniaCapacity: 200 MbpdCost: $4 billionStatus: President Museveni and his Tanzanian
counterpart John Pombe Magufuli signed the East African Crude Oil Pipeline Agreement in Dar es Salaam to express intent to go ahead with the construction of the project
Completion: 4Q 2020
AfricaBLACK RHINO/MOGS OIL & GAS SERVICES – (REV 12/16)Operator: EthiopiaProject: Lapsset ProjectType: Project includes the construction of new
pipelineLength: 341 milesLocation: Juba – LamuCompletion: 2018Comments: Project will transport diesel, gasoline and
jet fuel from Djibouti to central Ethiopia
PETROLEUM PRODUCTS PIPELINE SA/GOVIND DEVELOPMENT – (2/15)Owner: Esso AustraliaType: Project includes the construction of new
pipelineLength: 220 milesLocation: Limbe - Yaounde
FSU Eastern EuropeAFINA PALLADA – (10/15)Owner: RosneftProject: Eastern Siberia - Pacific Ocean PipelineType: Project includes the construction of new
pipelineLocation: Komsomolsk-on-Amur oil refinery - port
of De-KastriComments: Pipeline will have a capacity of 60 million
tons of oil per year
AMBO LLC – (9/13)Project: AMBO Pipeline Type: Project includes the construction of new
pipelineLength: 575 milesLocation: Burgas - VloreComments: Pipeline is on hold due to the lack of
availability of crude oil coupled with financial hurdles
HILL INTERNATIONAL – (REV 8/15) Owners: General Electric Oil and Gas/China
National Offshore Oil Corp./Chevron/
Texaco/BPProject: Pan-European Oil PipelineType: Project includes evaluating transport
capacity and the use of existing transit facilities; examining legal and environmental issues relating to the project; preparing cost and economic analyses; making recommendations on a route for the new pipeline; and developing a project execution plan
Length: 805 milesLocation: Romanian port of Constantza – Serbia -
Croatia - Slovenia - TriesteComments: Pipeline will have a capacity of 60 million
tons of oil per year
TRANSNEFT – (2/14)Project: Kuyumba-Taishet PipelineType: Project includes the construction of new
pipelineLength: 435 milesLocation: Kuyumba-TaishetComments: Pipeline will have an initial transportation
capacity of 15 million tons of oil per year
Project: Zapolyarye-Purpe PipelineType: Project includes the construction of new
pipeline and gathering lines, which will be completed in three phases
Length: 311 milesLocation: Zapolyarye-PurpeComments: Pipeline will have an initial transportation
capacity of up to 45 million tons of oil per year
Middle EastAL ROBAYA HOLDING CO./NATIONAL PETROLEUM CONSTRUCTION CO. – (11/15)Owners: Saudi Arabia/BahrainType: Project includes the construction of new
pipelineLength: 72 milesLocation: Saudi Arabia - BahrainCompletion: 2018Comments: Pipeline will have an initial transportation
capacity of 350 Mbpd of oil