Page 1: Offshore access gangway

Visit Shell E&P to Ampelmann

Rotterdam, August 24th 2009

Page 2: Offshore access gangway

AMPELMANNOffshore access as easy as crossing the street

Page 3: Offshore access gangway

July 2002

• Conference on wind energy

• A presentation on access

• Design something better• Design something better

• An invention needs a codename: Ampelmann

“Offshore access, as easy as crossing the street”

Page 4: Offshore access gangway

The problem

Page 5: Offshore access gangway

The problem

Page 6: Offshore access gangway

The solution

Page 7: Offshore access gangway

The solution

Page 8: Offshore access gangway

The solution

Page 9: Offshore access gangway

Demonstrator phase

• 2 meter stroke cylinders

• Offshore proof

• Design for safety

• Test in offshore environment

• Design:

Hs = 2.5m, 50m vessel à no motions

Page 10: Offshore access gangway

The Ampelmann

Page 11: Offshore access gangway

Offshore testing

Transfer succeeded!

Page 12: Offshore access gangway

Operational experience: P14-A

• Removal

• Operator: Wintershall

• Client: SMIT Marine Projects

• Vessel: Taklift 4• Vessel: Taklift 4

• Dutch HSE demand:

“Use safe gangway!”

Page 13: Offshore access gangway

P14 removal

Page 14: Offshore access gangway

As easy as crossing the street…

Page 15: Offshore access gangway

Topside lift on 5th of June

Page 16: Offshore access gangway

P14 statistics

• Maximum transfer wave height (visual): Hs = 2.8m

• Maximum wind speed: 7 Bft

• Transfers: 750• Transfers: 750

• Landings: 170

Page 17: Offshore access gangway

Brunei Shell Petroleum - Operations

Page 18: Offshore access gangway

Brunei Shell Petroleum - Operations

Page 19: Offshore access gangway

As easy as crossing the street…

Page 20: Offshore access gangway

Brunei Shell Petroleum - Evacuation

•Gangway stays outside vessel

•Speed up transfers

•Access crew via stair on wheels

•Onshore induction:

•68 pax in 18 minutes

Page 21: Offshore access gangway

Evacuation drill: 45 people in 10 min

Page 22: Offshore access gangway

Brunei Shell Petroleum - Operations

• Maximum transfer wave height : Hs = 1.2m Hmax = 1.8

• Evacuation drill: 45 people in 10 minutes

• Access within 15 minutes of choosing the landing zone

• Transfers: 730

• Landings: 85

• Locations: 3

Page 23: Offshore access gangway

Access testing Oil & Gas

Page 24: Offshore access gangway

Mobilization 3 weeks ago

• Jumbo Javelin

• Turbine installation

Page 25: Offshore access gangway

Last week: trial in UK

Page 26: Offshore access gangway

Safety & Certification

Safety

• Core mission: fail-safe and hazardous free design

• Extensive applied safety management systems: - Failure Mode Effect Analysis- Hazard Identification (HAZID)*

Certification

• Fabrication survey: Lloyd’s Register

• Load test: Lloyd’s Register

• Design Appraisal: Lloyd’s Register

*In cooperation with: Shell, Lloyd's, Staatstoezicht op de Mijnen & Smit

Page 27: Offshore access gangway

FMEA

• Component level “what if”

• Reduction to basics

• Redundant units where critical:

• Hoses• Hoses

• Valves

• Computers

• Power packs

• Sensors

Page 28: Offshore access gangway

ASMS

• Ampelmann Safety Management System

• Failures: green, yellow, orange, red

• No warning to crew à continue

• Use traffic light

Page 29: Offshore access gangway

Alarm

• RELAX

• On tip: step off

• On gangway:• On gangway:

• Stand + hold on

• Wait for the operator’s orders

Page 30: Offshore access gangway

Transfer safety

• No connection à pressure outward (200kg on structure)

• All hydraulics à free floating

• Possible disconnecting from main power

Page 31: Offshore access gangway

Landing options (10 different structures)

Page 32: Offshore access gangway

Free floating

Page 33: Offshore access gangway

Cylinder designMechanical design:

• Worst case safety factor > 2.8

• No lock-up: hinged connections

Page 34: Offshore access gangway

Cylinder design

Manufacturing:

• Certified material & manufacturing

• Pressure test: 350 bar

Page 35: Offshore access gangway

Cylinder design

Operations:

• Redundant actuation: valves, sensors, PLC

• Filters on pilot & pressure oil

Page 36: Offshore access gangway

Workability on support vessels

Anchor handler25m, Hs = 2.0m, 85%

Multi purpose vessel50m, Hs = 2.5m, 93%50m, Hs = 2.5m, 93%

Offshore Supplier 70m, Hs = 3.0m, 97%

In blue the percentage of operability in the Southern North Sea

Page 37: Offshore access gangway

Installation on vessel

• Installation less than 8 hours

• Welded on deck

• Stand alone system: •

• Own power supply

• Fits on any vessel or barge

Page 38: Offshore access gangway

Continuous access

• Container top fitting

• Sliding rail

• Pivot and slew

• Ball-bearing on• Ball-bearing onMercedes frame

• Normal gangway (10m)

Page 39: Offshore access gangway

“Slideway”

Page 40: Offshore access gangway

“Slideway” on Belait Barakah (center)

Page 41: Offshore access gangway

DP envelope

Page 42: Offshore access gangway

Ampelmann II

Page 43: Offshore access gangway

Grand opening 15 May

Page 44: Offshore access gangway

Improvements Ampelmann II

• More piping instead of hoses

• Moving hoses on the inside

• New design bottom frame

Page 45: Offshore access gangway

Improvements Ampelmann II

• Max length increased: 15 à 20m

• Weight reduction: 4t à 2t

• Telescoping cable pulley system

Page 46: Offshore access gangway

Improvements Ampelmann II

• Redundant control cabinets

• Redundant motion sensor and safety PLC

Page 47: Offshore access gangway

Improvements Ampelmann II

3m freeboard 3m

5.2m lowest point above sea level 2.4m

13.8m highest point above sea level 14.8m

8.6m total range 12.4m

Page 48: Offshore access gangway

Solution for fast crew boats

Page 49: Offshore access gangway

Offshore Wind: O&M

Page 50: Offshore access gangway

The Ampelmann – Workability on vessel

Workability depending on

• RAO’s of the vessel

• Location of the Ampelmann on the vessel• Location of the Ampelmann on the vessel

• Heading of the vessel

• Sea state

Page 51: Offshore access gangway

Trial SNS pool

• Operators interested: Total, NAM, Wintershall, BP

• Planning: one week testing in October

• Test objective very clear: we want to cross people onto different platformsdifferent platforms

Page 52: Offshore access gangway

Offshore access…

As easy as crossing the street