Nova Scotia, CANADA
DUFFERIN GOLD MINE
Targeting First Gold Dore Q1 2014
OU3 (FWB) / APP (TSX.V)
December 2013
Forward-Looking Statements
This presentation may contain certain forward-looking statements regarding (i) estimated resources and reserves, (ii) planned production and operating costs profiles, (iii) planned capital requirements and (iv) plans, strategies and corporate objectives.
Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Ressources Appalaches and Dufferin Resources. The forward-looking statements are inherently uncertain and may therefore differ materially from results ultimately achieved.
External and other factors may impact the Company and affect the forward-looking statements in this release since its preparation. Subject to applicable law and stock exchange listing rules, the Company does not intend to publicly update any of the forward-looking statements or any assumptions on which any such forward-looking statement is made.
2OU3 (FWB) / APP (TSX.V)
Corporate Objectives
Ressources Appalaches is Canada’s newestgold mining company.
As of December 2nd 2013 Ressources Appalaches is fully funded and permitted to proceed with gold
production at its 100% owned Dufferin Mine project in Nova Scotia.
3OU3 (FWB) / APP (TSX.V)
Corporate Objectives
Become the next Nova Scotian Gold Producer while Extending Resources andIncrease Production Capacity
Phase #1 – Restart gold production at 300 TPD by Q1-2014.
Phase #2 – Initial yearly production rate of 20,000 to 25,000 oz of gold.
Phase #3 – Explore the anticline structure towards the East and at depthsto double production capacity in 2015
4OU3 (FWB) / APP (TSX.V)
Corporate Profile
Direction & Gestion Experience
Alain Hupé, Eng.President & Cofounder
20 years in explorationEngineer-geologist, specialising in mining exploration geology, President of Gestion LesTrois Inc.
Jean-Claude Morel, M.A.DEMExecutive Vice-President & COO
25 years of management experienceDevelopment and managing of multi-disciplinary teams ranging from engineeringto logistics, including administrative, legal, environmental and financial components.
John A. Thomas, Eng Ph.D. Director
39 years in mining industryExperienced mining engineer from process development, engineering,Management, construction and operation of mines.
Jose Oro, Ph.D. Director
35 years in mining industryPh.D. in geology, held various Senior Vice-President and Chief Operating Officer position in the mining industry, as well as Director of the Ministry of Basic Industries
André Proulx, M.A. Director & Cofounder
30 years in company managementExperienced manager of mining and oil exploration companies, President andCEO of Pétrolia Inc.
Dominique Doucet, Eng.Director
28 years in explorationEngineer-geologist and has held senior management positions with Dios Exploration Inc., Sirios Inc. and Kalkhos Inc.
5
Company Description
Listed FWB: 2013Listed TSX.V: 1997
Shares Outstanding: 186,328,414 Market Cap 18 600 000 $Year Hi/Low: 0,125 / 0,05
OU3 (FWB) / APP (TSX.V)
Canada
Halifax
Sheet Harbour
0 20
kilometres
Miller Lake
Dufferin Mine
Dufferin Mine & Surrounding Appalaches Properties
Chocolate Lake
Ecum Secum
6
25 kilometers (km) radius
Dufferin EastDufferin North
OU3 (FWB) / APP (TSX.V)
Dufferin Mine
Dufferin Mine Existing Infrastructures
Existing mining infrastructure on site:
• Mining lease in good standing• 300 tonnes per day plant• Very short distance from mine to plant (150 m) • Gravity and flotation process• Tailings pound• Acces by decline
PORTAL AND DECLINE MILL
7
MILLING
OU3 (FWB) / APP (TSX.V)
Dufferin Mine Past and Existing Facilities
Ball Mill Shaking Table
Flotation System Infrasructure On-site
OU3 (FWB) / APP (TSX.V) 8
Dufferin Mine Past Operations
9
Quartz Vein – Saddle Quartz Vein – Saddle
OU3 (FWB) / APP (TSX.V)
Dufferin Mine Past Operations – Type of Veins
10OU3 (FWB) / APP (TSX.V)
Saddle Reef Vein Deposit
AnticlineFold Nose
D
Dufferin Mine Gold Quartz Vein
20-100 meters
1.4 - 8.4 km
11OU3 (FWB) / APP (TSX.V)
Potential continuity in depth and toward east open structure
Production and Exploration
Gold Surface Sample Wide Quartz Veins Milling
Dufferin Gold MineMining Lease no. 94-2
Area Drilled1,400 meters
Portal
Mined Zone450 metersMined Zone450 meters
12
Deposit OpenTowards East and at Depth
Ressources Appalaches owns claims covering anticline structure over
8.4 km long
OU3 (FWB) / APP (TSX.V)
Drilling Campaigns
13
1999-2001 2008-2009 2010-2011
OU3 (FWB) / APP (TSX.V)
Dufferin Mine PlanDufferin Mine Plan
Dufferin Mine General Layout
14APP-TSX-V
700 m
Dufferin Mine PlanDufferin Mine Plan
15APP-TSX-V
Potential Resources Defined
Dufferin Mine Plan
Milestones Achieved
Latest Goals Achieved Past 6 months
The following works have been completed since the announcement of the loan financing of US $10M (May 2013):
• December – Fully funded (gold loan) to resume gold production
• November – Fully permitted by provincial authorities
• Fall – Dufferin Mine gold mine plan documents approved by provincial authorities/lender (mine report, mine plan, surface and underground electrical installation plan, ground control procedures and ventilation plan) economic model, operating cost estimates, and capital cost estimates
• Mine underground dewatering & rehabilitation works
• Refurbished the primary and secondary underground ventilation
• Completed plant rehabilitation and testing of all crushing circuit components
• Started the vetting of more than 950 applications for the remaining approximately 54 staffing positions required to resume mining operations
16OU3 (FWB) / APP (TSX.V)
Portal Flooded – Water Level May 2013
17APP-TSX-V
Portal Rehabilitation – June 2013
18OU3 (FWB) / APP (TSX.V)
Infrastructures Rehabilitation 2013
19OU3 (FWB) / APP (TSX.V)
Galleries Rehabilitation – Summer & Fall 2013
20OU3 (FWB) / APP (TSX.V)
Mill Refurbishment – Fall 2013
21OU3 (FWB) / APP (TSX.V)
Development & Expansion Targets
Path to Production
Targeting First Gold Dore Q1 2014
2013: Complete development works required to restart production at 300 t/d
2014: Start of mining & milling ramp-up operationsresume gold production Q1 2014
2015: Reinvest profits to increase resources and upgrade plant capacity
22OU3 (FWB) / APP (TSX.V)
DUFFERIN GOLD MINE
OU3 (FWB) / APP (TSX.V)