Dear Stakeholder,
NOTIFICATION OF APPLICATION FOR ENVIRONMENTAL AUTHORISATION BY ESKOM FOR THE PROPOSED CONSTRUCTION OF THE 88KV CASHAN SUBSTATION AND ASSOCIATED POWER LINE TO THE EXISTING HEKPOORT SUBSTATION, GAUTENG AND NORTH WEST PROVINCES OF SOUTH AFRICA DEA Reference Number: 14/12/16/3/3/1/1273
NOTIFICATION AND AVAILABILITY OF THE DRAFT BASIC ASSESSMENT REPORT(DBAR) FOR PUBLIC
REVIEW AND COMMENT SRK Consulting (Pty) Ltd (SRK) has been appointed by Eskom Holdings SOC Limited (Eskom) to conduct a Draft Basic
Assessment Report (DBAR) process for an Environmental Authorisation (EA) application. In terms of the National
Environmental Management Act (NEMA, Act No. 107 of 1998) EIA Regulations (GN R. 543), dated June 2010, the
landowner/ land occupier must be informed of any development on, or adjacent to, the land that is subject to an
environmental authorisation application. Eskom hereby gives notice, in terms of the above mentioned Regulations,
of its application for environmental authorisation for the proposed construction of the Cashan substation and
associated power connecting to the existing Hekpoort substation.
Please see the attached letter for more information.
I&APs are requested to submit comments by means of e-mail, fax and postage. Alternatively, I&APs are also
welcome to submit telephonic comments by contacting SRKs Stakeholder Engagement Office:
Ms Donn Du Toit/ Ms Fiona Evens
SRK Consulting
P O Box 35290, Menlo Park, 0102 2157
Tel - 012 361 9821
Fax - 012 361 9912
Due date for comment:
16 April 2015
Block A
Menlyn Woods Office Park
21 Sprite Ave, Faerie Glen
P O Box 35290
Menlo Park 0102
South Africa
T: +27 (0) 12 361 9821
F: +27 (0) 12 361 9912
www.srk.co.za
Partners JCJ Boshoff, AH Bracken, MJ Braune, JM Brown, CD Dalgliesh, JR Dixon, DM Duthe, BM Engelsman, R Gardiner, T Hart, GC Howell, WC Joughin, PR Labrum, DJ Mahlangu, RRW McNeill, HAC Meintjes, MJ Morris, WA Naismith, GP Nel, VS Reddy, PN Rosewarne, PE Schmidt, PJ Shepherd, VM Simposya, AA Smithen, KM Uderstadt, DJ Venter, ML Wertz, A Wood Directors AJ Barrett, JR Dixon, DM Duthe, PR Labrum, DJ Mahlangu, VS Reddy, PE Schmidt, PJ Shepherd
Associate Partners DJD Gibson, M Hinsch, DA Kilian, SA McDonald, M Ristic, MJ Sim, JJ Slabbert, CF Steyn, HFJ Theart, D Visser, DP van den Berg, MD Wanless Consultants AC Burger, BSC(Hons); IS Cameron-Clarke, PrSciNat, MSc; JAC Cowan, PrSciNat, BSc(Hons); JH de Beer, PrSci Nat, MSc; GA Jones, PrEng, PhD; TR Stacey, PrEng, DSc; OKH Steffen, PrEng, PhD; PJ Terbrugge, PrSciNat, MSc; DW Warwick, PrSciNat, BSc(Hons)
SRK Consulting (South Africa) (Pty) Ltd Reg No 1995.012890.07
African Offices:
Cape Town + 27 (0) 21 659 3060
Durban + 27 (0) 31 279 1200
East London + 27 (0) 43 748 6292
Johannesburg + 27 (0) 11 441 1111
Kimberley + 27 (0) 53 861 5798
Pietermaritzburg + 27 (0) 33 345 6311
Port Elizabeth + 27 (0) 41 509 4800
Pretoria + 27 (0) 12 361 9821
Rustenburg + 27 (0) 14 594 1280
Accra + 23 (3) 24 485 0928
Harare + 263 (4) 49 6182
Lubumbashi + 243 (0) 81 999 9775
Group Offices:
Africa
Asia
Australia
Europe
North America
South America
March 2015 465044 Dear Stakeholder,
NOTIFICATION OF APPLICATION FOR ENVIRONMENTAL AUTHORISATION BY ESKOM FOR THE PROPOSED CONSTRUCTION OF THE 88KV CASHAN SUBSTATION AND ASSOCIATED POWER LINE TO THE EXISTING HEKPOORT SUBSTATION, GAUTENG AND NORTH WEST PROVINCES OF SOUTH AFRICA DEA Reference Number: 14/12/16/3/3/1/1273
NOTIFICATION AND AVAILABILITY OF THE DRAFT BASIC ASSESSMENT REPORT (DBAR) FOR PUBLIC REVIEW AND COMMENT
SRK Consulting (Pty) Ltd (SRK) has been appointed by Eskom Holdings SOC Limited (Eskom) to conduct a Draft Basic Assessment Report (DBAR) process for an Environmental Authorisation (EA) application. In terms of the National Environmental Management Act (NEMA, Act No. 107 of 1998) EIA Regulations (GN R. 543), dated June 2010, the landowner/ land occupier must be informed of any development on, or adjacent to, the land that is subject to an environmental authorisation application. Eskom hereby gives notice, in terms of the above mentioned Regulations, of its application for environmental authorisation for the proposed construction of the Cashan substation and associated power connecting to the existing Hekpoort substation. 1 Project Description Eskom is in the process of expanding their power supply grid by supplying additional substations to areas in need of additional capacity and supplying electricity to areas with increasing electricity demand in the North West and Gauteng Province. The proposed project includes the construction of a substation in Cashan and a 9 km powerline to the existing Hekpoort substation. The proposed Cashan substation falls within the Gauteng province, North West of Krugersdorp and is intended to alleviate the pressure exerted on the existing Eskom infrastructure in the area. The proposed Cashan substation will be connected to the existing Hekpoort substation via a 88kv powerline which runs approximately 9 km in a North Easterly direction from Cashan into the North West Province. 2 Location
The proposed project footprint straddles the following municipal areas:
Mogale City Local Municipality (Gauteng);
Madibeng Local Municipality (North West Province);
West Rand District Municipality (Gauteng); and
Bojanala Platinum District Municipality (North West Province).
http://www.srk.co.za/
SRK Consulting Page 2
DUTD/POLL 465044_201500303_Stakeholder Notification Letter_DBAR__Eskom Substation.docx March 2015
The following farms and farm portions fall within the proposed project footprint area:
Province Farm Names Portion Numbers
North West
Bultfontein 475 42; 112; 125; 129; 130; 131; 141; 144; 157; 158; 179
Gauteng Donrath 463 1
Gauteng Hartebeestfontein 472 1; 106; 125; 126; 129; 146; 147; 148; 149; 153; 155; 156; 157; 166; 168; 169; 171; 172; 176; 181; 182; 230; 231; 241; 242; 246; 247; 294; 295; 296; 297; 298; 302; 309; 310; 334; 335; 336; 337; 338; 342; 343; 359; 360; 362; 363; 364; 365; 366; 367; 368; 370; 371; 372; 375; 388; 389; 391; 392; 406
Gauteng Hekpoort 504 2; 57; 69; 74; 76; 79; 82; 91; 101; 104; 105; 106; 122; 125; 127; 128; 129; 146; 152; 153; 154; 176; 177; 178; 179; 180; 181; 182; 183; 184; 185; 186; 187; 188; 190; 198; 202; 203; 204; 207; 212; 276; 298; 299; 320; 321; 322; 323; 328; 337; 356; 381; 382; 402; 404; 406; 421; 426; 466; 467; 469
Gauteng Hekpoort 526 0; 96
Gauteng Spokie 428 0
Gauteng Vogelzang 429 1
3 Environmental Authorisation Process Eskom Holdings SOC Ltd has appointed SRK Consulting (SA) (Pty) Ltd to undertake the required EA process. A BA process will be undertaken in terms of Chapter 3, Part 2 of GN R. 543 of the NEMA, for submission to the competent authority, in this case the Department of Environmental Affairs (DEA) 4 Stakeholder Engagement Process Deviation Request Deviation is requested in terms of Public Participation, from GN R 543 Regulation No 54 (2) (b) (ii) and (iii), due to the linear nature of the proposed power line and substation as well as the potential number of squatters on the properties affected by the proposed power line and substation. Notification and Availability of the Draft Basic Assessment Report for public review and comment The DBAR for the EA is available for a public review and commenting period of 40 days. Please note that the commenting period starts on 4 March 2015 and ends on 16 April 2015.Notification is hereby given to all Stakeholders of the proposed project. Site notices have been placed in and around the proposed project area and a DBAR have been placed at 2 public places in the area. Interested and Affected Parties (I&APs) are encouraged to participate in the Public Participation Process by asking questions, raising issues of concern and making suggestions towards the improvement of the proposed project for enhancement of benefits. Copies of the DBAR can be found at the following locations:
PUBLIC PLACE LOCALITY TELEPHONE
Hekpoort Public Library Hekpoort (Coordinates S 25 53' 46.32"; E 27 36' 4.68")
(011) 668 0769
Hekpoort Village Pharmacy
Gauteng Hekpoort (Coordinates S 255326.39, E 273644.94)
(014 576 1237)
SRK Website http://www.srk.co.za/en/za-dbar-ea-proposed-construction-new-88kv-kashan-substation
(012) 361 9821
I&APs are requested to submit comments by means of e-mail, fax and postage. Alternatively, I&APs are also welcome to submit telephonic comments by contacting SRKs public participation office:
SRK Public Participation Office: Ms Donne Du Toit SRK Consulting
Public Participation Office P O Box 35290, Menlo Park, 0102 2157
Tel - (012) 361 9821 Fax - (012) 361 9912
Due date for comment: 16 April 2015
http://www.srk.co.za/en/za-dbar-ea-proposed-construction-new-88kv-kashan-substationhttp://www.srk.co.za/en/za-dbar-ea-proposed-construction-new-88kv-kashan-substationmailto:[email protected]
SRK Consulting Page 3
DUTD/POLL 465044_201500303_Stakeholder Notification Letter_DBAR__Eskom Substation.docx March 2015
I&APs will be informed again once the Final Basic Assessment Report becomes available for public review and comment. Please do not hesitate to contact us should you require additional information or clarification regarding the proposed project Our team welcomes your participation and looks forward to your involvement throughout the public participation process Yours faithfully,
SRK Consulting (Pty) Ltd
Manda Hinsch Associate Partner/ Principal Scientist
From: StakeholderBcc: "[email protected]"; "[email protected]"; "[email protected]";
"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; [email protected];"[email protected]"; "[email protected]"; "[email protected]"; BELOT, BONISWA(GDACE) ([email protected]); "[email protected]"; "[email protected]";[email protected]; "[email protected]"; [email protected]; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; Kelebogile Mekgoe([email protected]); "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; [email protected];"[email protected]"; "[email protected]"; Evans, Fiona; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; Hinsch, Manda; Masango, Vusi;"[email protected]"; [email protected]; "[email protected]";"[email protected]"
Subject: 465044 20150303 Stakeholder Notification and DBAR Available for commentDate: Wednesday, March 04, 2015 5:34:00 PMAttachments: 465044_201500303_Stakeholder Notification Letter_DBAR__Eskom Substation.pdf
Dear Stakeholder, NOTIFICATION OF APPLICATION FOR ENVIRONMENTAL AUTHORISATION BY
ESKOM FOR THE PROPOSED CONSTRUCTION OF THE 88KV CASHAN
SUBSTATION AND ASSOCIATED POWER LINE TO THE EXISTING HEKPOORT
SUBSTATION, GAUTENG AND NORTH WEST PROVINCES OF SOUTH AFRICADEA Reference Number: 14/12/16/3/3/1/1273 NOTIFICATION AND AVAILABILITY OF THE DRAFT BASIC ASSESSMENT REPORT(DBAR) FORPUBLIC REVIEW AND COMMENT
SRK Consulting (Pty) Ltd (SRK) has been appointed by Eskom Holdings SOC Limited (Eskom) toconduct a Draft Basic Assessment Report (DBAR) process for an Environmental Authorisation (EA)application. In terms of the National Environmental Management Act (NEMA, Act No. 107 of 1998)EIA Regulations (GN R. 543), dated June 2010, the landowner/ land occupier must be informed ofany development on, or adjacent to, the land that is subject to an environmental authorisationapplication. Eskom hereby gives notice, in terms of the above mentioned Regulations, of itsapplication for environmental authorisation for the proposed construction of the Cashan substationand associated power connecting to the existing Hekpoort substation. Please see the attached letter for more information. I&APs are requested to submit comments by means of e-mail, fax and postage. Alternatively, I&APsare also welcome to submit telephonic comments by contacting SRKs Stakeholder Engagement Office: Ms Donn Du Toit/ Ms Fiona Evens
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]Block A
Menlyn Woods Office Park
21 Sprite Ave, Faerie Glen
P O Box 35290
Menlo Park 0102
South Africa
T: +27 (0) 12 361 9821
F: +27 (0) 12 361 9912
www.srk.co.za
Partners JCJ Boshoff, AH Bracken, MJ Braune, JM Brown, CD Dalgliesh, JR Dixon, DM Duthe, BM Engelsman, R Gardiner, T Hart, GC Howell, WC Joughin, PR Labrum, DJ Mahlangu, RRW McNeill, HAC Meintjes, MJ Morris, WA Naismith, GP Nel, VS Reddy, PN Rosewarne, PE Schmidt, PJ Shepherd, VM Simposya, AA Smithen, KM Uderstadt, DJ Venter, ML Wertz, A Wood Directors AJ Barrett, JR Dixon, DM Duthe, PR Labrum, DJ Mahlangu, VS Reddy, PE Schmidt, PJ Shepherd
Associate Partners DJD Gibson, M Hinsch, DA Kilian, SA McDonald, M Ristic, MJ Sim, JJ Slabbert, CF Steyn, HFJ Theart, D Visser, DP van den Berg, MD Wanless Consultants AC Burger, BSC(Hons); IS Cameron-Clarke, PrSciNat, MSc; JAC Cowan, PrSciNat, BSc(Hons); JH de Beer, PrSci Nat, MSc; GA Jones, PrEng, PhD; TR Stacey, PrEng, DSc; OKH Steffen, PrEng, PhD; PJ Terbrugge, PrSciNat, MSc; DW Warwick, PrSciNat, BSc(Hons)
SRK Consulting (South Africa) (Pty) Ltd Reg No 1995.012890.07
African Offices:
Cape Town + 27 (0) 21 659 3060
Durban + 27 (0) 31 279 1200
East London + 27 (0) 43 748 6292
Johannesburg + 27 (0) 11 441 1111
Kimberley + 27 (0) 53 861 5798
Pietermaritzburg + 27 (0) 33 345 6311
Port Elizabeth + 27 (0) 41 509 4800
Pretoria + 27 (0) 12 361 9821
Rustenburg + 27 (0) 14 594 1280
Accra + 23 (3) 24 485 0928
Harare + 263 (4) 49 6182
Lubumbashi + 243 (0) 81 999 9775
Group Offices:
Africa
Asia
Australia
Europe
North America
South America
March 2015 465044 Dear Stakeholder,
NOTIFICATION OF APPLICATION FOR ENVIRONMENTAL AUTHORISATION BY ESKOM FOR THE PROPOSED CONSTRUCTION OF THE 88KV CASHAN SUBSTATION AND ASSOCIATED POWER LINE TO THE EXISTING HEKPOORT SUBSTATION, GAUTENG AND NORTH WEST PROVINCES OF SOUTH AFRICA DEA Reference Number: 14/12/16/3/3/1/1273
NOTIFICATION AND AVAILABILITY OF THE DRAFT BASIC ASSESSMENT REPORT (DBAR) FOR PUBLIC REVIEW AND COMMENT
SRK Consulting (Pty) Ltd (SRK) has been appointed by Eskom Holdings SOC Limited (Eskom) to conduct a Draft Basic Assessment Report (DBAR) process for an Environmental Authorisation (EA) application. In terms of the National Environmental Management Act (NEMA, Act No. 107 of 1998) EIA Regulations (GN R. 543), dated June 2010, the landowner/ land occupier must be informed of any development on, or adjacent to, the land that is subject to an environmental authorisation application. Eskom hereby gives notice, in terms of the above mentioned Regulations, of its application for environmental authorisation for the proposed construction of the Cashan substation and associated power connecting to the existing Hekpoort substation. 1 Project Description Eskom is in the process of expanding their power supply grid by supplying additional substations to areas in need of additional capacity and supplying electricity to areas with increasing electricity demand in the North West and Gauteng Province. The proposed project includes the construction of a substation in Cashan and a 9 km powerline to the existing Hekpoort substation. The proposed Cashan substation falls within the Gauteng province, North West of Krugersdorp and is intended to alleviate the pressure exerted on the existing Eskom infrastructure in the area. The proposed Cashan substation will be connected to the existing Hekpoort substation via a 88kv powerline which runs approximately 9 km in a North Easterly direction from Cashan into the North West Province. 2 Location
The proposed project footprint straddles the following municipal areas:
Mogale City Local Municipality (Gauteng);
Madibeng Local Municipality (North West Province);
West Rand District Municipality (Gauteng); and
Bojanala Platinum District Municipality (North West Province).
http://www.srk.co.za/
SRK Consulting Page 2
DUTD/POLL 465044_201500303_Stakeholder Notification Letter_DBAR__Eskom Substation.docx March 2015
The following farms and farm portions fall within the proposed project footprint area:
Province Farm Names Portion Numbers
North West
Bultfontein 475 42; 112; 125; 129; 130; 131; 141; 144; 157; 158; 179
Gauteng Donrath 463 1
Gauteng Hartebeestfontein 472 1; 106; 125; 126; 129; 146; 147; 148; 149; 153; 155; 156; 157; 166; 168; 169; 171; 172; 176; 181; 182; 230; 231; 241; 242; 246; 247; 294; 295; 296; 297; 298; 302; 309; 310; 334; 335; 336; 337; 338; 342; 343; 359; 360; 362; 363; 364; 365; 366; 367; 368; 370; 371; 372; 375; 388; 389; 391; 392; 406
Gauteng Hekpoort 504 2; 57; 69; 74; 76; 79; 82; 91; 101; 104; 105; 106; 122; 125; 127; 128; 129; 146; 152; 153; 154; 176; 177; 178; 179; 180; 181; 182; 183; 184; 185; 186; 187; 188; 190; 198; 202; 203; 204; 207; 212; 276; 298; 299; 320; 321; 322; 323; 328; 337; 356; 381; 382; 402; 404; 406; 421; 426; 466; 467; 469
Gauteng Hekpoort 526 0; 96
Gauteng Spokie 428 0
Gauteng Vogelzang 429 1
3 Environmental Authorisation Process Eskom Holdings SOC Ltd has appointed SRK Consulting (SA) (Pty) Ltd to undertake the required EA process. A BA process will be undertaken in terms of Chapter 3, Part 2 of GN R. 543 of the NEMA, for submission to the competent authority, in this case the Department of Environmental Affairs (DEA) 4 Stakeholder Engagement Process Deviation Request Deviation is requested in terms of Public Participation, from GN R 543 Regulation No 54 (2) (b) (ii) and (iii), due to the linear nature of the proposed power line and substation as well as the potential number of squatters on the properties affected by the proposed power line and substation. Notification and Availability of the Draft Basic Assessment Report for public review and comment The DBAR for the EA is available for a public review and commenting period of 40 days. Please note that the commenting period starts on 4 March 2015 and ends on 16 April 2015.Notification is hereby given to all Stakeholders of the proposed project. Site notices have been placed in and around the proposed project area and a DBAR have been placed at 2 public places in the area. Interested and Affected Parties (I&APs) are encouraged to participate in the Public Participation Process by asking questions, raising issues of concern and making suggestions towards the improvement of the proposed project for enhancement of benefits. Copies of the DBAR can be found at the following locations:
PUBLIC PLACE LOCALITY TELEPHONE
Hekpoort Public Library Hekpoort (Coordinates S 25 53' 46.32"; E 27 36' 4.68")
(011) 668 0769
Hekpoort Village Pharmacy
Gauteng Hekpoort (Coordinates S 255326.39, E 273644.94)
(014 576 1237)
SRK Website http://www.srk.co.za/en/za-dbar-ea-proposed-construction-new-88kv-kashan-substation
(012) 361 9821
I&APs are requested to submit comments by means of e-mail, fax and postage. Alternatively, I&APs are also welcome to submit telephonic comments by contacting SRKs public participation office:
SRK Public Participation Office: Ms Donne Du Toit SRK Consulting
Public Participation Office P O Box 35290, Menlo Park, 0102 2157
Tel - (012) 361 9821 Fax - (012) 361 9912
Due date for comment: 16 April 2015
http://www.srk.co.za/en/za-dbar-ea-proposed-construction-new-88kv-kashan-substation
http://www.srk.co.za/en/za-dbar-ea-proposed-construction-new-88kv-kashan-substation
mailto:[email protected]
SRK Consulting Page 3
DUTD/POLL 465044_201500303_Stakeholder Notification Letter_DBAR__Eskom Substation.docx March 2015
I&APs will be informed again once the Final Basic Assessment Report becomes available for public review and comment. Please do not hesitate to contact us should you require additional information or clarification regarding the proposed project Our team welcomes your participation and looks forward to your involvement throughout the public participation process Yours faithfully,
SRK Consulting (Pty) Ltd
Manda Hinsch Associate Partner/ Principal Scientist
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
masvHighlight
SRK ConsultingP O Box 35290, Menlo Park, 0102 2157Tel - 012 361 9821Fax - 012 361 [email protected] date for comment:16 April 2015
1
Masango, Vusi
From: Bogopa Lebogang (MMB)
Sent: 05 March 2015 01:33 PM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
DISCLAIMER: This message and any attachments are confidential and intended solely for the addressee. If you have
received this message in error, please notify the system manager/sender. Any unauthorized use, alteration or
dissemination is prohibited. The Department of Water and Sanitation further accepts no liability whatsoever for any
loss, whether it be direct, indirect or consequential, arising from this e-mail, nor for any consequence of its use or
storage.
1
Masango, Vusi
From: Kelebogile Mekgoe
To: Stakeholder
Sent: 05 March 2015 11:06 AM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Thursday, March 5, 2015 11:17:36 AM (UTC+02:00) Harare, Pretoria was read on Thursday, March 5, 2015 11:06:15 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: BELOT, BONISWA (GDACE)
Sent: 05 March 2015 11:12 AM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: ATT00001
Your message
To: BELOT, BONISWA (GDACE)
Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Sent: Wednesday, March 04, 2015 5:34:40 PM (UTC+02:00) Harare, Pretoria
was read on Thursday, March 05, 2015 11:11:35 AM (UTC+02:00) Harare, Pretoria.
Disclaimer:
This message may contain confidential information and is intended only for the individual named.
If you are not the named addressee you should not disseminate, distribute or copy this e-mail.
Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail
from your system. E-mail transmission cannot be guaranteed to be secured or error-free as information could be
intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not
accept liability for any errors or omissions in the content of this message, which arise as a result of e-mail
transmission.
The Gauteng Provincial Government does not take responsibility for Gauteng Provincial Government users' personal
views. Gauteng Provincial Government services available online at: www.gautengonline.gov.za
1
Masango, Vusi
From: Systek - Madeleine
To: Stakeholder
Sent: 05 March 2015 10:44 AM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Thursday, March 5, 2015 10:44:20 AM (UTC+02:00) Harare, Pretoria was read on Thursday, March 5, 2015 10:44:12 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Dorothy Steyn
To: Stakeholder
Sent: 05 March 2015 10:05 AM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Thursday, March 5, 2015 10:20:44 AM (UTC+02:00) Harare, Pretoria was read on Thursday, March 5, 2015 10:05:13 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Electro Link
To: Stakeholder
Sent: 05 March 2015 10:07 AM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Thursday, March 5, 2015 10:06:50 AM (UTC+02:00) Harare, Pretoria was read on Thursday, March 5, 2015 10:06:32 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: MAILE, JUSTICE (GDACE)
Sent: 05 March 2015 09:16 AM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: ATT00001
Your message
To: MAILE, JUSTICE (GDACE)
Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Sent: Wednesday, March 04, 2015 5:34:40 PM (UTC+02:00) Harare, Pretoria
was read on Thursday, March 05, 2015 9:12:47 AM (UTC+02:00) Harare, Pretoria.
Disclaimer:
This message may contain confidential information and is intended only for the individual named.
If you are not the named addressee you should not disseminate, distribute or copy this e-mail.
Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail
from your system. E-mail transmission cannot be guaranteed to be secured or error-free as information could be
intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not
accept liability for any errors or omissions in the content of this message, which arise as a result of e-mail
transmission.
The Gauteng Provincial Government does not take responsibility for Gauteng Provincial Government users' personal
views. Gauteng Provincial Government services available online at: www.gautengonline.gov.za
1
Masango, Vusi
From: Neo Masemola
To: Stakeholder
Sent: 05 March 2015 08:56 AM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Thursday, March 5, 2015 8:56:05 AM (UTC+02:00) Harare, Pretoria was read on Thursday, March 5, 2015 8:55:42 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Van Der Merwe Paul (MMB)
Sent: 05 March 2015 08:48 AM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
DISCLAIMER: This message and any attachments are confidential and intended solely for the addressee. If you have
received this message in error, please notify the system manager/sender. Any unauthorized use, alteration or
dissemination is prohibited. The Department of Water and Sanitation further accepts no liability whatsoever for any
loss, whether it be direct, indirect or consequential, arising from this e-mail, nor for any consequence of its use or
storage.
1
Masango, Vusi
From: Lillian Sefike
To: Stakeholder
Sent: 05 March 2015 08:31 AM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Thursday, March 5, 2015 8:47:25 AM (UTC+02:00) Harare, Pretoria was read on Thursday, March 5, 2015 8:30:45 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Jacobs, Jay-Ann
Sent: 05 March 2015 08:31 AM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: ATT00001
Your message To: Jacobs, Jay-Ann Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 04, 2015 5:34:40 PM (UTC+02:00) Harare, Pretoria was read on Thursday, March 05, 2015 8:30:35 AM (UTC+02:00) Harare, Pretoria.
Pioneer Foods subscribes to professional business practices. (Telephone hotline 0800 005 909, or e-mail pioneerfoods@tip-
offs.com)
For more information and disclaimer: http://www.pioneerfoods.co.za/downloads/pdf/email_disclaimer.pdf
1
Masango, Vusi
From: du Bois, Francois
Sent: 05 March 2015 08:07 AM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: ATT00001
Your message To: du Bois, Francois Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 4, 2015 5:34:40 PM (UTC+02:00) Cairo was read on Thursday, March 5, 2015 8:06:20 AM (UTC+02:00) Cairo.
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. This email has been scanned for viruses and malware, and automatically archived by Mimecast SA (Pty) Ltd, an innovator in Software as a Service (SaaS) for business. Mimecast Unified Email Management (UEM) offers email continuity, security, archiving and compliance with all current legislation. To find out more, contact Mimecast.
1
Masango, Vusi
From: Yonanda Martin
To: Stakeholder
Sent: 05 March 2015 07:53 AM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Thursday, March 5, 2015 7:53:01 AM (UTC+02:00) Harare, Pretoria was read on Thursday, March 5, 2015 7:52:30 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Karen De Almeida
Sent: 05 March 2015 07:38 AM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: ATT00001
Your message To: Karen De Almeida Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 04, 2015 5:34:40 PM (UTC+02:00) Harare, Pretoria was read on Thursday, March 05, 2015 7:38:24 AM (UTC+02:00) Harare, Pretoria.
The provisions of Sections 11,12, and 13 of the Electronic Communications and Transactions Act, 25 of 2002, in so far as e-contracting is concerned are expressly excluded and contracted out of by Barloworld South Africa (Pty) Ltd (Barloworld) and, unless clearly stated to the contrary in the body of the data message or electronic communication no data message or electronic
communication will be recognised as having legal contractual status as per the aforementioned provisions under any circumstances. All contracts concluded by Barloworld, its Business Units, Divisions and Subsidiaries will only be legally binding and recognised once reduced to physical writing and physically signed by a duly authorised representative of Barloworld. All other provisions of the Electronic Communications and Transactions Act, 25 of 2002 are accepted.
Barloworld Equipment - 8 Values: Safety + Integrity + Uncompromising Customer Service + Long Term Customer Relationships + Passion For Our Brands + Professionalism + Effective Communication + Winning Through Team Work.
itevomcid
1
Masango, Vusi
From: Jan Kleynhans
To: Stakeholder; Stakeholder
Sent: 05 March 2015 07:24 AM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Thursday, March 5, 2015 7:24:27 AM (UTC+02:00) Harare, Pretoria was read on Thursday, March 5, 2015 7:24:27 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Mpho Lesolle
To: Stakeholder
Sent: 04 March 2015 07:24 PM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 4, 2015 7:25:05 PM (UTC+02:00) Harare, Pretoria was read on Wednesday, March 4, 2015 7:24:23 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Cindy Benyane
To: Stakeholder
Sent: 04 March 2015 06:25 PM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 4, 2015 6:25:19 PM (UTC+02:00) Harare, Pretoria was read on Wednesday, March 4, 2015 6:24:36 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Roux, Phil
Sent: 04 March 2015 06:21 PM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: ATT00001
Your message To: Roux, Phil Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 04, 2015 5:34:40 PM (UTC+02:00) Harare, Pretoria was read on Wednesday, March 04, 2015 6:21:16 PM (UTC+02:00) Harare, Pretoria.
Pioneer Foods subscribes to professional business practices. (Telephone hotline 0800 005 909, or e-mail pioneerfoods@tip-
offs.com)
For more information and disclaimer: http://www.pioneerfoods.co.za/downloads/pdf/email_disclaimer.pdf
1
Masango, Vusi
From: Vivien Laverge
To: Stakeholder
Sent: 04 March 2015 05:56 PM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 4, 2015 5:56:01 PM (UTC+02:00) Harare, Pretoria was read on Wednesday, March 4, 2015 5:55:46 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Sipho Zitha
To: Stakeholder
Sent: 04 March 2015 05:52 PM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 4, 2015 5:52:33 PM (UTC+02:00) Harare, Pretoria was read on Wednesday, March 4, 2015 5:51:49 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Inge la Barr
To: Stakeholder
Sent: 04 March 2015 05:35 PM
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Your message To: Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment Sent: Wednesday, March 4, 2015 5:36:30 PM (UTC+02:00) Harare, Pretoria was read on Wednesday, March 4, 2015 5:35:29 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Nkosana Zali
Sent: 04 March 2015 05:34 PM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Email Disclaimer "The information contained in this email is confidential and may contain proprietary information. It
is meant solely for the intended recipient. Access to this email by anyone else is unauthorised. If you are not the
intended recipient, any disclosure, copying, distribution or any action taken or omitted in reliance on this, is
prohibited and may be unlawful. No liability or responsibility is accepted if information or data is, for whatever
reason corrupted or does not reach its intended recipient. No warranty is given that this email is free of viruses. The
views expressed in this email are, unless otherwise stated, those of the author and not those of MogaleCity Local
Municipality or its management. MogaleCity Local Municipality reserves the right to monitor, intercept and block
emails addressed to its users or take any other action in accordance with its email use policy."
1
Masango, Vusi
From: Bogopa Lebogang (MMB)
Sent: 23 April 2015 07:59 AM
To: Stakeholder
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Attachments: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
DISCLAIMER: This message and any attachments are confidential and intended solely for the addressee. If you have
received this message in error, please notify the system manager/sender. Any unauthorized use, alteration or
dissemination is prohibited. The Department of Water and Sanitation further accepts no liability whatsoever for any
loss, whether it be direct, indirect or consequential, arising from this e-mail, nor for any consequence of its use or
storage.
1
Masango, Vusi
From: Jan Roeloffs
To: Stakeholder
Sent: 28 April 2015 09:06 PM
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Your message To: Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND POWELINE OPEN-HOUSE Sent: Tuesday, April 28, 2015 9:06:26 PM (UTC+02:00) Harare, Pretoria was read on Tuesday, April 28, 2015 9:06:00 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Keet Marius (GAU)
Sent: 05 March 2015 04:10 PM
To: Stakeholder
Subject: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Attachments: Read: 465044 20150303 Stakeholder Notification and DBAR Available for comment
DISCLAIMER: This message and any attachments are confidential and intended solely for the addressee. If you have
received this message in error, please notify the system manager/sender. Any unauthorized use, alteration or
dissemination is prohibited. The Department of Water and Sanitation further accepts no liability whatsoever for any
loss, whether it be direct, indirect or consequential, arising from this e-mail, nor for any consequence of its use or
storage.
1
Masango, Vusi
From: Keet Marius (GAU)
Sent: 21 April 2015 09:34 AM
To: Stakeholder
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Attachments: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
DISCLAIMER: This message and any attachments are confidential and intended solely for the addressee. If you have
received this message in error, please notify the system manager/sender. Any unauthorized use, alteration or
dissemination is prohibited. The Department of Water and Sanitation further accepts no liability whatsoever for any
loss, whether it be direct, indirect or consequential, arising from this e-mail, nor for any consequence of its use or
storage.
1
Masango, Vusi
From: Neo Masemola
To: Stakeholder
Sent: 21 April 2015 09:37 AM
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Your message To: Subject: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND POWELINE OPEN-HOUSE Sent: Tuesday, April 21, 2015 9:44:02 AM (UTC+02:00) Harare, Pretoria was read on Tuesday, April 21, 2015 9:36:53 AM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Electro Link
To: Stakeholder
Sent: 21 April 2015 01:03 PM
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Your message To: Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND POWELINE OPEN-HOUSE Sent: Tuesday, April 21, 2015 1:03:25 PM (UTC+02:00) Harare, Pretoria was read on Tuesday, April 21, 2015 1:03:16 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Systek - Madeleine
To: Stakeholder
Sent: 21 April 2015 01:59 PM
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Your message To: Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND POWELINE OPEN-HOUSE Sent: Tuesday, April 21, 2015 1:59:01 PM (UTC+02:00) Harare, Pretoria was read on Tuesday, April 21, 2015 1:58:57 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Vivien Laverge
To: Stakeholder
Sent: 21 April 2015 04:48 PM
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Your message To: Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND POWELINE OPEN-HOUSE Sent: Tuesday, April 21, 2015 4:48:40 PM (UTC+02:00) Harare, Pretoria was read on Tuesday, April 21, 2015 4:48:25 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Van Der Merwe Paul (MMB)
Sent: 22 April 2015 08:37 AM
To: Stakeholder
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Attachments: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
DISCLAIMER: This message and any attachments are confidential and intended solely for the addressee. If you have
received this message in error, please notify the system manager/sender. Any unauthorized use, alteration or
dissemination is prohibited. The Department of Water and Sanitation further accepts no liability whatsoever for any
loss, whether it be direct, indirect or consequential, arising from this e-mail, nor for any consequence of its use or
storage.
1
Masango, Vusi
From: Systek - Madeleine
To: Stakeholder
Sent: 22 April 2015 01:56 PM
Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND
POWELINE OPEN-HOUSE
Your message To: Subject: Read: 465044_20150420_INVITATION TO PROPOSED CASHAN SUBSTATION AND POWELINE OPEN-HOUSE Sent: Wednesday, April 22, 2015 1:56:02 PM (UTC+02:00) Harare, Pretoria was read on Wednesday, April 22, 2015 1:55:54 PM (UTC+02:00) Harare, Pretoria.
1
Masango, Vusi
From: Microsoft Outlook
To: Hinsch, Manda
Sent: 22 April 2015 01:33 PM
Subject: Delivered: RE: 465044_20150420_INVITATION TO PROPOSED CASHAN
SUBSTATION AND POWELINE OPEN-HOUSE
Your message has been delivered to the following recipients: Hinsch, Manda ([email protected]) Subject: RE: 465044_20150420--_INVITATION TO PROPOSED CASHAN SUBSTATION AND POWELINE OPEN-HOUSE
2
Masango, Vusi
From: Microsoft Outlook
To: Evans, Fiona
Sent: 22 April 2015 01:33 PM
Subject: Delivered: RE: 465044_20150420_INVITATION TO PROPOSED CASHAN
SUBSTATION AND POWELINE OPEN-HOUSE
Your message has been delivered to the following recipients: Evans, Fiona ([email protected]) Subject: RE: 465044_20150420--_INVITATION TO PROPOSED CASHAN SUBSTATION AND POWELINE OPEN-HOUSE
3
Masango, Vusi
From: Microsoft Outlook
To: Hinsch, Manda
Sent: 13 April 2015 03:06 PM
Subject: Delivered: 465044.2015.04.13.Comment.FW: FaxEmail Fax from 0145762426 to
0865449911
Your message has been delivered to the following recipients: Hinsch, Manda ([email protected]) Subject: 465044.2015.04.13.Comment.FW: FaxEmail Fax from 0145762426 to 0865449911
4
Masango, Vusi
From: Microsoft Outlook
To: Evans, Fiona
Sent: 13 April 2015 03:06 PM
Subject: Delivered: 465044.2015.04.13.Comment.FW: FaxEmail Fax from 0145762426 to
0865449911
Your message has been delivered to the following recipients: Evans, Fiona ([email protected]) Subject: 465044.2015.04.13.Comment.FW: FaxEmail Fax from 0145762426 to 0865449911
5
Masango, Vusi
From: [email protected]
Sent: 04 March 2015 05:36 PM
Subject: Delivered: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Your message has been delivered to the following recipients: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
6
Masango, Vusi
From: [email protected]
Sent: 04 March 2015 05:36 PM
Subject: Delivered: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Your message has been delivered to the following recipients: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
7
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Delivered: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Your message has been delivered to the following recipients: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
8
Masango, Vusi
From: Microsoft Outlook
To: Hinsch, Manda
Sent: 04 March 2015 05:35 PM
Subject: Delivered: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Your message has been delivered to the following recipients: Hinsch, Manda Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment _____ Sent by Microsoft Exchange Server 2007
9
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Delivered: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Your message has been delivered to the following recipients: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
1
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected]; [email protected]
Sent: 04 March 2015 06:05 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
2
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:50 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
3
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected];
[email protected]; [email protected]
Sent: 04 March 2015 05:50 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
4
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:50 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
5
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected];
Sent: 04 March 2015 05:50 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
6
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:50 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
7
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected];
[email protected]; [email protected];
Sent: 04 March 2015 05:36 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
8
Masango, Vusi
From: Mail Delivery System
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
9
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
10
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
11
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected]; [email protected]
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
12
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected]
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
13
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
14
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
15
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected]; [email protected]
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
16
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected]; [email protected];
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
17
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected]; [email protected];
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
18
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
19
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
20
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
21
Masango, Vusi
From: Microsoft Outlook
To: [email protected]; [email protected]; [email protected]
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] [email protected] [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
22
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
23
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
24
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
25
Masango, Vusi
From: Microsoft Outlook
Sent: 04 March 2015 05:35 PM
Subject: Relayed: 465044 20150303 Stakeholder Notification and DBAR Available for
comment
Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: [email protected] Subject: 465044 20150303 Stakeholder Notification and DBAR Available for comment
Top Related