NATIONAL HIGHWAYS AUTHORITY OF INDIA(Ministry of Road Transport & Highways)
Consultancy Services as Independent Engineer during Operation &Maintenance of 4-lane divided carriageway facility of Tambaram – Tindivanam Section of NH-45 (Km
28/000 to 121/000), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 121/000 to 192/250), of NH-45 to Section of NH-45 in the State of Tamil Nadu under
BOT basis (Package 1)
L.N.MALVIYA INFRA PROJECTS PVT.LTD
MAY-2017
1
CONTENT
S NoDescription Page
No
1Summary of Current Monthly Progress
3
2Pending Issues & Action Log
4
3Obligations as per contract
5
4Project Milestones
6
5Location Map
7
6Detailed Scope of Work & Physical Progress by Component
8
7Land Acquisition and Clearances
9
8LA Detail by CALA
10
99Status of Utilities Shifting
13
10Change Of Scope
14
11Mobilization Of Resources
15
12Financial Progress Details
16
13
IE Inspection Report for the month of May
17
13
Monitoring Of Operations & Maintenance Obligations
19
14Weather Report
20
15Safety Features
21
16Accident/Incident Report, Escrow Bank Details, Toll Traffic Data and Schedule
23
17Important Events
40
2
Summary of Current Month's Progress
Consultancy Services as Independent Engineer during Operation & Maintenance of 4-lane divided carriageway facility of Tambaram – Tindivanam Section of NH-45 (Km 28/000 to 121/000), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 121/0 to 192/25in the State of Tamil Nadu under BOT basis (Package 2A)
Sample Summary – Illustrative, for reference
Summary of Current Month Maintenance activities like cleaning of carriage way, cleaning of drains, removal of garbage,
repairing of sign boards, repairing or replacement of damaged metallic crash barriers, pedestrian
guard rails, kerb, etc are in progress.
Accident victims have been rescued through ERP (Emergency Response Protocol), intimating to
the nearest police and ambulances and in coordination with hospitals.
All project facilities like wayside amenities, truck lay byes including attending repairs to
illumination, landscaping, water supply, drainage, waste disposal system, litterbins, and toilets
have been maintained properly.
Round the clock patrolling is being done for surveillance of the ROW in respect of the Project /
Project Facilities.
Maintenance of illuminations Toll plazas, Truck lay byes, Rest rooms, Bus shelters, Major
junctions is in progress.
Maintenance of bus bays, truck lay byes, rest rooms, toll plazas, toll plaza buildings, etc is in
progress.
Replacing of dead / missing plants, watering, manuring, etc. in progress for median / avenue
plantation.
Repair to the damaged portions of lined drains is in progress.
Cleaning of vents of culverts and bridges is in progress.
Encroachments are being removed periodically at service roads and ROW areas.
Cleaning of lined drains and toe drains are in progress.
Guard post fixing and painting is in progress in high embankment.
Rectification of earthen shoulder is in progress.
Trimming median plants in median is in progress.
Replacement of damaged pedestrian grills is in progress.
Cutting and trimming of grass and weeds in the median and ROW is in progress.
Replacing of missed / damaged cluster boards, sign boards, etc. is in progress.
Numbering and replacing of missed / damaged HM / KM stones are in progress.
Milling of damaged BC surface is in progress.
Inlaying of BC over the milled surface is in progress.
3
Critical Issues and Action Log
Pending Issues and Action Log
S No
Issue Descriptio
n
Type
Ongoing/ New Issue/
Resolved
Concerned
Authority
Chainage(s) affected due to the
issue
Length affected (km)
Action(s) taken till now
Action(s) suggested by the IE
Expected
date/ Actual Date for
resolving
issue
4
Critical Issues and Action Log
Obligations as per Contract
NOTE: Please include important issues requiring intervention of various parties, giving details and background wherever necessary
5
PROJECT MILESTONE
Project Milestone
Description(Days from Appointed
Date)
Planned ActualDelay(No
. of Months)
Current StatusPhysical
Progress
Scheduled Date
Physical Progres
s
Revised Date
Milestone I
Milestone II
Milestone III
Scheduled Completion
6
LOCATION MAP
7
Physical Progress
Detailed Scope of Work and Physical Progress by Component
Component
Cost Weight age in Project
(%)
Item Descriptio
n
Cost Weight age in
Component (%)
Planned in Scope (As per Scope of Work)
Progress till Date
% Physical Progress
Value of Physical Progress
(7X4)
1 2 3 4 5 6 7 8
GRAND TOTAL
8
Land Acquisition and Clearances
LA Summary
Description Total Required (ha) Total in possession at start (ha)
Total to be acquired (ha)
Existing ROW
Pvt. Land To be Acquired
Public Land To be Transferred
Grand Total 0 0 0
9
Land Acquisition and Clearances
LA Detail by CALA
CALA
Total Land left to
be Acqui
red (Ha)
3H Pendi
ng (ha)
3H Done (ha
)
3G Pendi
ng (ha)
3G Done (ha
)
3D Pendi
ng (ha)
3D Done (ha
)
3A Pendi
ng (Ha)
3A Done (ha
)
Amount
Awarded
(Crore Rs.)
Amount
Deposited
(Crore Rs.)
Amount
Disbursed by CALA
Pending
Amoun
t
(Crore Rs.)
(Crore Rs.
)[CALA 1]
[CALA 2]
[CALA 3]
Grand Total
Land Acquisition and Clearances10
Clearance Summary
Environment
Proposal Description Status Length Impacted Current
Stage
Issues/ Commen
ts
Forest Land
Proposal Description Status Length Impacted Current Stage
Issues/ Commen
ts
Wildlife
Proposal Description Status Length Impacted Current
Stage
Issues/ Commen
ts
Tree Cutting
11
Proposal Description Status Length Impacted Current Stage
Issues/ Commen
ts
Railways (ROBs/ RUBs)
GAD Number Status Location/ Chainage
Current Stage
Issues/ Commen
ts
Land Acquisition and Clearances
12
Status of Utilities Shifting
Utility
Category
Name
Status
Length
affected
Department Name
Date of
request by Authority for
estimate
Date when Estim
ate was
Received
from concerned dept.
Date of
Approval by
Authority RO/ HQ
Date of
Deposit of
super-
vision
charge
Progress of
Physical
Shifting
Date of Certific
ation from
Agency for
Completion
Estimate Amount
(INR Cr.)
Issue/Comm
ents
Change of Scope13
S No.
COS Proposal Details Date of first submission
to IE Current Status
COS Amount
(INR Cr.)
Expected/
Actual Date of
Approval
1 - - - - -
14
Mobilization of Resources
Equipment Name
Make
Model
Age of Equipme
nt
Planned/
Required
Quantity
Actual Quantit
y
Deployed
During the
Month
Reason(s) for
Under/Over
Mobilization
Expected Delay due to Under-Mobilizati
on (Months)
Remarks
15
Financial Progress Details
Pen Picture -Escrow
TPC (Cr)
Cumulative inflow to Escrow till previous month
(Cr)
Cumulative outflow from Escrow till previous
month
Inflow to Escrow during the month
(Cr)
Outflow from Escrow during
the month
(Cr) (Cr)
IE INSPECTION REPORT FOR THE MONTH OF MAY-201716
17
18
Monitoring of Operations and Maintenance Obligations
Maintenance Status during Construction Phase:
Project completed and provisional COD issued.
Maintenance Status during Operations & Maintenance Phase
S NO Description Chainage
Remarks/action to be taken Status
1
The Vent way of the box culvert is chocked due to the growth of vegetation, needs to be cleared as per clause 4.4.5.4 Schedule L.
Km.122/600 Concessionaire/IE Completed
2
Pitched drain of the service road needs to be cleaned as per clause 4.4.5.4. of Schedule L.
Km.124/800 Concessionaire/IE Completed
3
Cleaning of service road at the portions of C.C drains & Clearing vegetation as per Clause 4.2.1 1and 4.4.5.3 Schedule L.
Km.136/200& Km.154/200 Concessionaire/IE Completed
4
ECB’S procured at several locations in the section as per inventory is not working as per Clause 4.5.5 Schedule L
Km.138/350 Concessionaire/IEAll the
ECB’s made functional
5
Wearing coat worm out has to be rectified as per Clause 4.3.2 Schedule L.
Km.149/200 Concessionaire/IE Completed
WEATHER REPORT MAY-2017
19
Minimum Maximum Minimum Maximum1 1-May-17 0 28 35 29 382 2-May-17 0 27 34 29 383 3-May-17 0 27 35 29 384 4-May-17 0 26 35 29 385 5-May-17 0 27 35 29 386 6-May-17 0 29 36 29 387 7-May-17 0 27 35 29 388 8-May-17 0 26 35 29 389 9-May-17 0 28 37 29 38
10 10-May-17 0 24 34 29 3811 11-May-17 0 28 35 29 3812 12-May-17 0 27 34 29 3813 13-May-17 0 28 35 29 3914 14-May-17 0 29 38 29 3915 15-May-17 0 29 39 29 3916 16-May-17 0 29 39 29 3917 17-May-17 0 30 40 29 3918 18-May-17 0 30 40 29 3919 19-May-17 0 30 40 29 3920 20-May-17 0 30 39 29 3921 21-May-17 0 27 38 29 3922 22-May-17 0 29 39 29 3923 23-May-17 0 27 38 29 3924 24-May-17 0 29 39 29 3925 25-May-17 0 29 39 29 3926 26-May-17 0 29 37 29 3927 27-May-17 0 29 40 29 3928 28-May-17 0 29 39 29 3929 29-May-17 0 29 39 29 3930 30-May-17 0 29 41 29 3931 31-May-17 0 28 38 29 38
Sl. no. DateAverage
rainfall (mm)
Temperature as per site office ( c )
Temperature as per newspaper ( c)
20
Pen Picture on Safety Features
Details to be provided after assessment of the site requirement vis-à-vis provisions in the Concession Agreement.
Location of Black Spots
Suggested Remedial Measures within provisions of Concession
Agreement
Additional Remedial Measures
Financial implications of additional Remedial Measures
for Authority
(if any) (Cr.)
21
22
Accident Management Data of MAY-2017
Sl No
Date/
Month
/ Yea
r
Accident call
recd. Time
A' B' C' D' E' F' G' H'
Vehicle Responsible
No. of Affected persons No.
of Animal
s killed if
any
Help provide
d by Ambulance/ Patrol vehicle
RemarksAccident Location
Side
Nature of Accident
Classificatio
n of Accid
ent
Causes
Road
Feature
Road Condition
Intersection Typ
e and Control
Weather
Condition
Fatal
Grievous
Minor
Non Injury
1
1-May-17
2:50 145+700
LHS
2 3 2,4 4 1 0 1
CAR ( TN 77 F 4881 ) ,
SETC BUS ( TN 30 N
0970 )
NIL
NIL 1 NI
LNIL
Route Patrolling,Ambulance,Crane
LHS traveled SETC BUS applied sudden break at the same time following CAR hit on back side of the SETC BUS. Due to Bus try to park and car over speed.
2
2-May-17
1:07 148+800
LHS
3 3 2,4 4 1 0 1
TRAVELS BUS(NL01B
0967) TNSTC(TN21
N 1064)
NIL
NIL 1 NI
LNIL
Route Patrolling,Ambulance,Crane
LHS traveled TNSTC Bus applied sudden Break at the time following Travels Bus hit on backside due to careless driving.
3
2-May-17
3:45 175+800
RHS
3 2,3 2,4 4 1 0 1
TNSTC (TN45N3519)
SETC (TN01AN
0622) CAR (TN02BA7648
).
NIL
1 5 NIL
NIL
Route Patrolling,Ambulance,Crane
RHS traveled TNSTC Bus applied sudden Break at the time following SETC Bus and Car hit on backside due to careless driving.
4
3-May-17
1:45 151+150
RHS
3 3 2,4 4 1 0 1
UNKNOWN LORRY
CAR(TN48Z 0211)
NIL
NIL 5 NI
LNIL
Route Patrolling,Ambulance,Crane
RHS Fast track traveled Car hit on backside of the Unknown Lorry Due to Over speed and Careless Driving.
55-May-
2:13 144+000
LHS
3 2,3 2,4 4 1 0 1EICHER
VAN-TN18K1452,
NIL
2 1 NIL
NIL
Route Patrolling,Amb
LHS traveled EICHER VAN stopped suddenly due to some problem on the Van at the time
23
17
EICHER VAN-
TN04AR6914,SETC BUS-TN01N8862
ulance,Crane
following another EICHER VAN applied break but SETC BUS hit on the ROW tree, due to Bus went out of control & overspeed.
6
6-May-17
7:41 150+600
RHS
5 3 4 4 1 0 1
CAR TN45BE1185,
SETC BUS TN01AN0074
NIL
NIL 1 NI
LNIL
Route Patrolling,Ambulance,Crane
RHS traveled Car hit on road crossed Bus. Due to Bus careless road crossed from RHS to LHS.
7
6-May-17
20:20 134+200
RHS
2 2 4 4 1 0 1UNKNOWN VEHICLE ,
PEDESTRIAN
NIL
1NIL
NIL
NIL
Route Patrolli
ng
RHS traveled Unknown vehicle hit on road crossed Pedestrian. Due to Pedestrian careless road crossed from LHS to RHS.
8
6-May-17
11:26 166+900
LHS
5 3 5 4 2 2 1
CAR TN09BE7621, TNSTC BUS TN45N3737
NIL
NIL 1 NI
LNIL
Route Patrolling,Ambulance
LHS traveled Car hit on road crossed Bus. Due to Bus careless road crossed from RHS to LHS.
9
7-May-17
2:30 154+000
RHS
2 3 4 4 1 0 1 CAR TN05AR7301
NIL
NIL 2 NI
LNIL
Route Patrolling,Ambulance,Crane
RHS traveled Car hit on center median crash barrier. Due to driver was slept while on driving.
10
10-May-17
2:55 129+600
RHS
1 1,2,3 4 4 1 0 3CAR
(TN59AT 4050).
2 2 2 NIL
NIL
Route Patrolling,Ambulance
RHS traveled Car upset on the ROW due to driver was slept while on driving
11
12-May-17
2:25 130+600
LHS
3 2,3 4 4 1 0 1
TNSTC BUS TN68N0799,
LORRY NL02Q1711
NIL
1 14
NIL
NIL
Route Patrolling,Ambulance,Crane
LHS traveled TNSTC Bus hit on backside of the Lorry. Due to Bus driver was slept while on driving.
12
12-May-17
7:40 163+900
RHS
2 1 2 4 1 0 1
LORRY TN32Q1778,
BIKE TN22B9706
1 NIL
NIL
NIL
NIL
Route Patrolli
ng
RHS traveled Lorry hit on Two wheeler; due to Lorry was overspeed & careless driving.
13
12-May-17
15:20 184+800
RHS
4 2 4 4 1 0 1
CAR PY01AQ4757,
BIKE TN18 6228
NIL
1NIL
NIL
NIL
Route Patrolli
ng
RHS traveled Car hit on LHS to RHS road crossed TVS XL. Due to TVS XL craeless road crossing & Car overspeed.
24
14
13-May-17
8:00 164+100
LHS
4 2 2,4 4 2 3 1UNKNOWN CAR , BIKE TN32H8194
NIL
1NIL
NIL
NIL
Route Patrolli
ng
RHS to LHS road crossed Bike hit by LHS traveled unknown Car. Due to Car overspeed & Bike careless road crossed.
15
13-May-17
15:28 190+100
LHS
1 3 5 4 1 0 1 TAT ACE TN49AQ9968
NIL
NIL 1 NI
LNIL
Route Patrolli
ng
LHS traveled Tata ace upset on the ROW.Due to Tata ace tyre was burst while on running.
16
14-May-17
19:48 156+750
RHS
4 3 2 4 2 0 1BIKE
PY01BR2770, BICYCLE
NIL
NIL 3 NI
LNIL
Route Patrolling,Ambulance
RHS traveled Bike hit on road crossed Bicycle.Due to Bicycle careless road crossing.
17
14-May-17
19:56 164+400
RHS
4 3 2 4 2 0 1CAR
TN05AZ3773, PEDESTRIAN
NIL
NIL 1 NI
LNIL
Route Patrolli
ng
RHS traveled Car hit on road crossed Pedestrian.Due to Pedestrian careless road crossing.
18
15-May-17
8:10 144+900
RHS
2 3 2,4 4 1 0 1
PULSAR BIKE-
TN16C8696,TVS XL-
TN32AE7248
NIL
NIL 2 NI
LNIL
Route Patrolling,Ambulance
RHS traveled PULSAR BIKE hit on RHS to LHS road crossed TVS XL, due to TVS XL careless road crossing & PULSAR overspeed.
19
16-May-17
6:50 130+700
RHS
3 3 4 4 1 0 1
CRANE-TN04AB0722,TOURISTER
VAN-TN12T1779
NIL
NIL 5 NI
LNIL
Route Patrolling,Ambulance
RHS slowtrack traveled TOURISTER VAN hit on backside of the CRANE, due to TOURISTER VAN driver was slept while on driving.
20
16-May-17
7:40 153+000
RHS
3 3 2 4 1 0 1
AUTO-TN16Y5060,C
AR-TN09CH3355
NIL
NIL 2 NI
LNIL
Route Patrolling,Cran
e
RHS service road traveled AUTO suddenly turned to his right side at the time following CAR hit on backside of AUTO, due to car overspeed.
21
16-May-17
20:29 151+900
RHS
2 1 2,4 4 1 1 1CAR-
TN18S7659,PEDESTRIAN
1 NIL
NIL
NIL
NIL
Route Patrolli
ng
RHS traveled CAR hit on LHS to RHS road crossed PEDESTRIAN,due to pedestrian careless road crossing.
22
18-May-17
14:42 135+400
RHS
3 2 4 4 1 0 1
TRACTOR TN 32 AB
0176 , LORRY TN
28 J 0973
NIL
2NIL
NIL
NIL
Route Patrolling,Ambulance,Crane
RHS fasttrack traveled LORRY hit on backside of the TRACTOR, due to LORRY driver was slept while on driving.
25
23
20-May-17
3:15 149+600
LHS
3 3 2 4 1 0 1
SETC BUS TN01N9817,L
ORRY TN32S2082
NIL
NIL 1 NI
LNIL
Route Patrolling,Ambulance
LHS fastrack traveled TNSTC Bus hit on backside of the Lorry,due to TNSTC Bus overspeed & careless driving.
24
21-May-17
22:00 163+800
RHS
2 1,3 2,4 4 1 0 1
VAN TN05AL0164, PEDESTRIAN
.
1 NIL 8 NI
LNIL
Route Patrolli
ng
RHS traveled Van hit on road crossed Pedestrian.Due to pedestrain careless road crossing ,overspeed & careless driving.
25
22-May-17
12:03 129+000
RHS
3 3 2,4 4 2 1 1
TRACTOR-TN16A6646,T
WO WHEELER-
TN32AA2020
NIL
NIL 2 NI
LNIL
Route Patrolli
ng
RHS traveled TWO WHEELER hit on backside of the TRACTOR, due to tractor careless road crossed & two wheeler overspeed.
26
23-May-17
2:52 151+100
RHS
3 3 2,4 4 2 0 1
SETC(TN01AN 1418), 407 VAN(TN27Z
5060), PRIVATE
BUS(TN21AE 5037), TATA
ACE(TN49BA(6043)
NIL
NIL 1 NI
LNIL
Route Patrolling,Ambulance,Crane
RHS traveled SETC bus applied sudden break at the time following vehicles 407 Van,Private bus & Tata Ace hit on one by one backside of the SETC bus due to Heavy Traffic.
27
24-May-17
9:50 159+900
LHS
4 3 4 4 1 0 1
CAR(TN72AS 2790)
TWOWHEELER(TN32AA
4374)
NIL
NIL 1 NI
LNIL
Route Patrolling,Ambulance
Car hit on road crossed twowheeler due to twowheeler careless road crossed and car overspeed.
28
27-May-17
22:25 128+950
LHS
2 2,3 4 4 1 0 1
TVS SPORT-TN07BM8366
,BAJAJ-PY01AK5337
NIL
2 1 NIL
NIL
Route Patrolling,Ambulance
LHS traveled TVS SPORTS BIKE hit on LHS to RHS roadcrossed BAJAJ BIKE, due to bajaj bike careless road crossed.
29
28-May-17
3:05 188+000
RHS
2 3 4 4 2 0 1 CAR(DL4CNE 5070)
NIL
NIL 2 NI
LNIL
Route Patrolli
ng
LHS Traveled Car Passed from LHS to RHS through the centre median and upset on the road due to tyre burst while on running.
26
30
29-May-17
4:25 191+300
LHS
3 2,3 2,4 4 1 0 1
LORRY-TN61B3991,TNSTC BUS-TN32N3519
NIL
1 19
NIL
NIL
Route Patrolling,Cran
e
LHS traveled TNSTC BUS hit on backside of the LORRY, due to bus overspeed & careless driving.
31
29-May-17
6:25 182+500
RHS
2 1 4 4 0 0 1
MINI BUS-TN63AL9980,
LORRY-TN28AZ5692
1 NIL
NIL
NIL
NIL
Route Patrolli
ng
RHS traveled MINI BUS hit on backside of the LORRY, due to mini bus driver was slept while on driving.
32
31-May-17
11:55 190+020
RHS
4 2,3 4 4 1 0 1
TVS XL (TN32AW
4051) BIKE (TN38CE
4194).
NIL
2 2 NIL
NIL
Route Patrolling,Ambulance
RHS traveled bike hit on LHS to RHS Road crossed TVS XL,due to
careless road crossed.
Incident Management Data month of May-17
Sl . No.
DescriptionsGeneral
Information
Route Patrol Vehicle Ambulance Tow Away Crane Tota
lRemarks
/ Reasons for non-complian
1 NH Nos. 45 1 2 1 2 1 2
27
ce2 Stretch
km 121+000 to
km 193+900
3 Location of Incident management vehicle
150+400 175+450 150+400 175+450 150+400
4 Registration No. TN 32 AC 7790
TN 15 Y 3732
TN 22 BC 3999
PY 01 AQ 5169 TN 18 H 9174 5
5 Total number of accidents reported 32 20 12 16 4 11 2
6 Number of accident cases attended 32 20 12 16 4 11 2
7 Number of injured shifted to hospital 40 17 57
8 Number of other help provided by Route Patrol (other than accidents) 108 111 219
9 Number of help provided by Tow Away Vehicle (Other than accidents) 25 5 30
10 No. of vehicles painted in stripes as per approved colour scheme 1 1 1 1 1 5
11 No. of vehicles with requisite T & P and accessories as per contract 0
12 No. of vehicles as per approved illuminated boards on top 1 1 1 1 0 0 4
28
13 No. of vehicles with Requisite man power as per contract 0
14 No. of vehicles fitted with GPS/VTS 1 1 1 1 1 5
15 No. of reflective signage’s showing emergency contact no. 16 16
16 No. of plazas where emergency contact details boards are installed 1 1
17 No. of plaza where information is being printed on back of toll tickets 1 1
18 Date of last inspection by PD/RO
29
May -2017-MONTH ESCROW ACCOUNT STATEMENT
30
31
32
33
34
35
36
37
38
List of Dead Animals removed from Main carriage way – May – 17
S.No Date Time Chainage side Dead Animal Removed
1 2-May-17 6:00 134+700 LHS DOG REMOVED2 4-May-17 3:20 154+700 RHS DOG REMOVED3 5-May-17 5:54 125+000 RHS CAT REMOVED4 5-May-17 10:15 165+350 RHS DOG REMOVED5 7-May-17 10:30 167+000 LHS DOG REMOVED6 7-May-17 3:40 154+400 LHS DOG REMOVED7 8-May-17 7:20 142+100 LHS DOG REMOVED8 9-May-17 18:20 190+030 LHS DOG REMOVED9 9-May-17 21:50 161+600 LHS DOG REMOVED
10 10-May-17 2:10 143+000 LHS DOG REMOVED11 10-May-17 5:50 126+000 MEDIAN DOG REMOVED12 11-May-17 4:15 133+600 LHS DOG REMOVED13 11-May-17 15:30 180+100 RHS DOG REMOVED14 12-May-17 21:00 141+200 LHS DOG REMOVED15 12-May-17 22:00 134+900 RHS DOG REMOVED16 15-May-17 17:50 125+200 RHS DOG REMOVED17 16-May-17 16:55 157+000 RHS DOG REMOVED18 18-May-17 9:10 147+500 RHS DOG REMOVED19 18-May-17 6:20 192+850 LHS DOG REMOVED20 18-May-17 9:40 161+200 LHS DOG REMOVED21 21-May-17 0:35 149+600 LHS DOG REMOVED22 21-May-17 6:15 124+500 LHS DOG REMOVED23 21-May-17 6:00 191+900 LHS DOG REMOVED24 22-May-17 16:40 165+700 LHS COW REMOVED25 23-May-17 1:30 166+500 LHS PIG REMOVED26 24-May-17 6:00 126+400 RHS DOG REMOVED27 25-May-17 6:50 154+500 LHS DOG REMOVED28 27-May-17 1:45 146+200 RHS DEER REMOVED29 27-May-17 7:50 165+500 RHS PIG REMOVED30 27-May-17 10:05 154+300 LHS GOAT REMOVED31 29-May-17 22:20 182+500 LHS PIG REMOVED32 30-May-17 6:10 157+200 RHS DOG REMOVED33 31-May-17 7:10 127+900 RHS FOX REMOVED34 31-May-17 16:10 175+300 LHS DOG REMOVED35 31-May-17 16:15 172+600 LHS DOG REMOVED
39
Important Events
Sr. no. Date Visit Details Specific comments (if
any)
1. 8.05.2017Joint Inspection with Manager Technical of PIU Villupuram from KM.160+000 to 192+250.
General Inspection
2 27.05.2017 ICT, RSE Team conducted Training at Chennai.
Safety awareness Training camp for
NHAI representative.
40