PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE : OBRAS PROVISIONALES
FECHA MARZO DE 2014 PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
01.00.00 OBRAS PROVISIONALES01.01.00 OBRAS PROVISIONALES01.01.01 ALMACEN, CASETA DE GUARDIANIA Y OFICINA DE M2 63.30
Almacen de Obra de 10.00x3.50 m M2 1.00 3.50 10.00 35.00Caseta de Guardianía de 3.00x3.00 m M2 1.00 3.00 3.00 9.00Oficina de Residencia de 5.00x3.50 m M2 1.00 5.00 3.50 17.50Servicios Higiénicos de 1.50x1.20 m M2 1.00 1.50 1.20 1.80
01.01.02 CERCO PERIMETRICO PROVISIONAL M 60.00
Cerco pertimetroco provisional del campamento 1.00 60.00 60.00
01.01.03 MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS GLB 1.00
Movilizacion y Desmovilizacion de Equipos a la Obra 1.00 1.00
01.01.04 CARTEL DE IDENTIFICACION DE LA OBRA GLB 1.00
Carte de Identificacion de la Obra 1.00 1.00
01.02.00 INSTALACIONES PROVISIONALES01.02.01 AGUA POTABLE PROCISIONAL MES 10.00
Agua para campamento 1.00 ### 10.00
01.02.02 ENERGIA ELECTRICA PROVISIONAL MES 10.00
Instalacion electrica provisional 1.00 ### 10.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASBAS
ELARGO ALTO TOTAL
PARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSOBRAS PROVISIONALES
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :VALVULA DE CONTROL (03 UND) LINEA DE CONDUCCION
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
06.00.00 VALVULA DE CONTROL (03 UND) LINEA DE CONDUCCION CANTIDAD 3.00
06.01.00 TRABAJOS PRELIMINARES06.01.02 LIMPIEZA DE TERRENO MANUAL M2 1.92
Valvula de Purga 1.00 0.80 0.80 0.6406.01.03 TRAZO Y REPLANTEO M2 1.92
Valvula de Purga 1.00 0.80 0.80 0.6406.02.00 MOVIMIENTO DE TIERRAS06.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 1.54
Valvula de Purga 1.00 0.80 0.80 0.80 0.5106.02.02 REFINE NIVELACION Y COMPACTACION M2 1.92
Valvula de Purga 1.00 0.80 0.80 0.6406.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 2.00
Proveniente de las excavaciones 1.00 1.30 1.54 2.0006.03.00 OBRAS DE CONCRETO SIMPLE06.03.01 CONCRETO F'C=175 kg/cm2 M3 0.61
Losa fondo 1.00 0.80 0.80 0.10 0.06Muros perimetrales 2.00 0.60 0.10 0.70 0.08Muros perimetrales 2.00 0.40 0.10 0.70 0.06
06.03.02 ENCOFRADO Y DESENCOFRADO M2 16.80Muros perimetrales exterior 2.00 2.40 0.70 3.36Muros perimetrales interior 2.00 1.60 0.70 2.24
06.04.00 REBOQUES ENLUCIDOS Y MOLDURAS06.04.01 TARRAJEO EN INTERIORES MORTERO 1;2, E=1.5CM M2 1.00 1.60 0.65 1.04 3.1206.05.00 CARPINTERIA METALICA06.05.01 TAPA METALICA DE INSPECCION DE 0.50M X 0.50M GBL 1.00 1.00 3.00
06.06.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS06..06.01 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE CON GBL 2.00 2.00 2.00
Niple PVC SAP de 3"x2" UND 2.00Union universal PVC SAP para agua simple presion de 3" UND 2.00Adaptador PVC SAP de 3" UND 2.00Valvula compuerta de bronce de 3" UND 1.00
06.06.02 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE CON GBL 1.00 1.00 1.00Niple PVC SAP de 2"x2" UND 2.00Union universal PVC SAP para agua simple presion de 2" UND 2.00Adaptador PVC SAP de 2" UND 2.00
Valvula compuerta de bronce de 2" UND 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSVALVULA DE CONTROL
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :VALVULA DE AIRE (18 UND) LINEA DE CONDUCCION
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
07.00.00 VALVULA DE AIRE (18 UND) LINEA DE CONDUCCION CANTIDAD 18.00
07.01.00 TRABAJOS PRELIMINARES07.01.01 LIMPIEZA DE TERRENO MANUAL M2 11.52
Valvula de aire 1.00 0.80 0.80 0.6407.01.02 TRAZO Y REPLANTEO M2 11.52
Valvula de aire 1.00 0.80 0.80 0.6407.02.00 MOVIMIENTO DE TIERRAS07.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 9.22
Valvula de aire 1.00 0.80 0.80 0.80 0.5107.02.02 REFINE NIVELACION Y COMPACTACION M2 11.52
Valvula de aire 1.00 0.80 0.80 0.6407.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 11.98
Proveniente de las excavaciones 1.00 1.30 9.22 11.9807.03.00 OBRAS DE CONCRETO ARMADO07.03.01 CONCRETO F'C=175 kg/cm2 M3 3.67
Losa fondo 1.00 0.80 0.80 0.10 0.06Muros perimetrales 2.00 0.60 0.10 0.70 0.08Muros perimetrales 2.00 0.40 0.10 0.70 0.06
07.03.02 ENCOFRADO Y DESENCOFRADO M2 100.80Muros perimetrales exterior 2.00 2.40 0.70 3.36Muros perimetrales interior 2.00 1.60 0.70 2.24
07.04.00 REBOQUES ENLUCIDOS Y MOLDURAS07.04.01 TARRAJEO EN INTERIORES MORTERO 1;2, E=1.5CM M2 1.00 1.60 0.65 1.04 18.7207.05.00 CARPINTERIA METALICA07.05.01 TAPA METALICA DE INSPECCION DE 0.50M X 0.50M GBL 1.00 1.00 18.00
07.06.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS07.06.01 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE AIRE GBL 7.00 7.00 7.00
Abrazadera Ø 3" C/Salida Ø 2" Inc/Pernos UND 1.00Valvula de aire automatico Ø 2" (Doble golpe) UND 1.00
07.06.02 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE AIRE GBL 3.00 3.00 3.00Abrazadera Ø 2 1/2" C/Salida Ø 2" Inc/Pernos UND 1.00Valvula de aire automatico Ø 2" (Doble golpe) UND 1.00
07.06.03 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE AIRE GBL 8.00 8.00 8.00Abrazadera Ø 2" C/Salida Ø 1" Inc/Pernos UND 1.00Valvula de aire automatico Ø 1" (Doble golpe) UND 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSVALVULA DE AIRE
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :VALVULA DE PURGA TIPO I (08 UND) LINEA DE CONDUCCION
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
08.00.00 VALVULA DE PURGA TIPO I (08 UND) LINEA DE CONDUCCION CANTIDAD 8.00
08.01.00 TRABAJOS PRELIMINARES08.01.01 LIMPIEZA DE TERRENO MANUAL M2 5.12
Valvula de Purga 1.00 0.80 0.80 0.6408.01.02 TRAZO Y REPLANTEO M2 5.12
Valvula de Purga 1.00 0.80 0.80 0.6408.02.00 MOVIMIENTO DE TIERRAS08.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 4.10
Valvula de Purga 1.00 0.80 0.80 0.80 0.5108.02.02 REFINE NIVELACION Y COMPACTACION M2 5.12
Valvula de Purga 1.00 0.80 0.80 0.6408.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 5.32
Proveniente de las excavaciones 1.00 1.30 4.10 5.3208.03.00 OBRAS DE CONCRETO SIMPLE08.03.01 CONCRETO F'C=175 kg/cm2 M3 1.73
Losa fondo 1.00 0.80 0.80 0.10 0.06Muros perimetrales 2.00 0.60 0.10 0.70 0.08Muros perimetrales 2.00 0.40 0.10 0.70 0.06Dado de anclaje 1.00 0.30 0.20 0.20 0.01
08.03.02 ENCOFRADO Y DESENCOFRADO M2 46.40Muros perimetrales exterior 2.00 2.40 0.70 3.36Muros perimetrales interior 2.00 1.60 0.70 2.24Dado de anclaje 1.00 1.00 0.20 0.20
08.04.00 REBOQUES ENLUCIDOS Y MOLDURAS08.04.01 TARRAJEO EN INTERIORES MORTERO 1;2, E=1.5CM M2 1.00 1.60 0.65 1.04 8.3208.05.00 CARPINTERIA METALICA08.05.01 TAPA METALICA DE INSPECCION DE 0.50M X 0.50M GBL 1.00 1.00 8.00
08.06.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS08.06.01 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGGBL 2.00 2.00 2.00
Niple PVC SAP de 3"x2" UND 2.00Tuberia PVC SAP presion para agua C-10 EC 3" M 2.50Tapon hembra PVC SAP para agua simple presion 3" UND 1.00Codo PVC SAP para agua simple presion de 3" UND 2.00Tee PVC SAP para agua simple presion de 3" UND 1.00Union universal PVC SAP para agua simple presion de 3" UND 2.00Adaptador PVC SAP de 3" UND 2.00Valvula compuerta de bronce de 3" UND 1.00
08.06.02 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGAGBL 1.00 1.00 1.00Niple PVC SAP de 2 1/2"x2" UND 2.00Tuberia PVC SAP presion para agua C-10 EC 2 1/2" M 2.50Tapon hembra PVC SAP para agua simple presion 2 1/2" UND 1.00Codo PVC SAP para agua simple presion de 2 1/2" UND 2.00Tee PVC SAP para agua simple presion de 2 1/2" UND 1.00Union universal PVC SAP para agua simple presion de 2 UND 2.00Adaptador PVC SAP de 2 1/2" UND 2.00Valvula compuerta de bronce de 2 1/2" UND 1.00
08.06.03 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGGBL 5.00 5.00 5.00Niple PVC SAP de 2"x2" UND 2.00Tuberia PVC SAP presion para agua C-10 EC 2" M 2.50Tapon hembra PVC SAP para agua simple presion 2" UND 1.00Codo PVC SAP para agua simple presion de 2" UND 2.00Tee PVC SAP para agua simple presion de 2" UND 1.00Union universal PVC SAP para agua simple presion de 2" UND 2.00Adaptador PVC SAP de 2" UND 2.00Valvula compuerta de bronce de 2" UND 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSVALVULA DE PURGA T-1
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE : RESERVORIO DE 50M3 (01 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
10.00.00 RESERVORIO DE 50M3 (01 UND)10.01.00 TRABAJOS PRELIMINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL M2 44.22
R-1 1.00 6.65 6.65 44.2210.01.02 TRAZO Y REPLANTEO M2 44.22
R-1 1.00 6.65 6.65 44.2210.02.00 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 25.87
R-1 1.00 0.90 6.65 6.65 0.65 25.8710.02.02 EXCAVACIÓN MANUAL EN ROCA FIJA M3 2.87
R-1 1.00 0.10 6.65 6.65 0.65 2.8710.02.03 REFINE NIVELACION Y COMPACTACION M2 44.22
R-1 1.00 6.65 6.65 44.22
10.02.04 RELLENO SEMICOMPACTADO OBRAS DE ARTE M3 3.25
Veredas 1.00 27.10 0.60 0.20 3.2510.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 28.27
Proveniente de las excavaciones 1.00 1.30 22.62 Esponjamient 28.27 28.27
10.02.06 EXCAVACION CUNETAS DE CORONACION M3 4.80
R-1 1.00 30.00 0.40 0.40 4.80
10.03.00 OBRAS DE CONCRETO SIMPLE
10.03.01 SOLADO E=4", CONCRETO F'C = 100kg/cm2 M2 29.70
Fundacion de estructura 1.00 5.45 5.45 29.70
10.03.02 VEREDA DE 4", CONCRETO F'C = 175kg/cm2 M2 16.26
Veredas 1.00 0.60 27.10 16.26
10.03.03 VEREDAS ENCOFRADO Y DESENCOFRADO 2.95
Veredas 1.00 0.10 29.50 2.95
10.04.00 OBRAS DE CONCRETO ARMADO
10.04.01 CONCRETO F'C=210 kg/cm2 M3 25.35
Losa fondo 1.00 6.65 5.45 0.30 10.87
Muros perimetrales 2.00 5.05 0.20 2.65 5.35
Muros perimetrales 2.00 4.65 0.20 2.20 4.09
Losa Techo 1.00 5.05 5.05 0.20 5.10
Restar Buzon de inspeccion 1.00 0.60 0.60 0.20 0.07
10.04.02 ENCOFRADO Y DESENCOFRADO M2 131.10
Losa fondo 1.00 21.80 0.30 6.54
Muros interiores 1.00 18.60 2.65 49.29
Muros exteriores 1.00 20.20 2.65 53.53
Losa Techo 1.00 4.65 4.65 21.62
Friso de losa techo 1.00 20.20 0.20 4.04
Restar Buzon de inspeccion 1.00 0.60 0.60 0.36
Friso de Buzon de inspeccion interno 1.00 2.40 0.20 0.48
10.04.03 ACERO DE REFUERZO f'y = 4200 kg/cm2 GRADO KG 1.00 ### Del cuadro de metrados de Acero ### 1,569.48
10.05.00 REBOQUES ENLUCIDOS Y MOLDURAS
10.05.01 TARRAJEO CON IMPERMEABILIZANTE MORTERO 1 M2 49.29
Muros interiores 1.00 18.60 2.65 49.29
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSRESERVORIO DE 27 M3
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE : RESERVORIO DE 50M3 (01 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSRESERVORIO DE 27 M3
Municipalidad Distrital de Ayapata
10.05.02 TARRAJEO EN INTERIORES Y EXTERIORES MORTE M2 96.98
Muros exteriores 1.00 20.20 2.65 53.53
Losa techo interior 1.00 4.65 4.65 21.62
Restar Buzon de inspeccion 1.00 0.60 0.60 0.36
Losa techo encima 1.00 4.65 4.65 21.62
Restar Buzon de inspeccion 1.00 0.60 0.60 0.36
Friso de losa 1.00 2.20 0.20 0.44
Friso de Buzon de inspeccion 1.00 2.40 0.20 0.4810.05.03 TARRAJEO C/IMPERMEABILIZANTE PENDIENTE D M2 21.62
Losa fondo 1.00 4.65 4.65 21.62
10.06.00 PINTURA
10.06.01 PINTURA ESMALTE EN EXTERIORES M2 75.23
Muros exteriores 1.00 20.20 2.65 53.53
Losa techo encima 1.00 4.65 4.65 21.62
Restar Buzon de inspeccion 1.00 0.60 0.60 0.36
Friso de losa 1.00 2.20 0.20 0.44
10.07.00 CARPINTERIA METALICA
10.07.01 TAPA METALICA DE INSPECCION DE 0.60M X 0.6 GBL 1.00 1.00 1.00
10.08.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
10.08.03 SUMIN. E INSTAL. DE ACCESORIOS DE RESERVOR GBL 1.00 1.00 1.00
Tuberia de ventilacion de F° G° de 4" UND 1.00
Escalera Tub. F° G° Parantes de 1 1/2" y Peldaños d UND 1.0010.08.04 SUMIN. E INSTAL. DE HIPOCLORADORPOR GOTE UND 1.00 1.00 1.00
10.09.00 VARIOS
10.09.01 JUNTA DE CONSTRUCCION CON C/WATER STOP D M 1.00 20.20 20.20 20.2010.09.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A UND 1.00 1.00 1.0010.09.03 PRUEBA HIDRAULICA + DESINFECCION DE DEPO M3 1.00 4.65 4.65 2.65 57.30 57.30
#REF!
#REF!
OBRA : #REF!COMPONENTE :CASETA DE VALVULAS-RESERVORIO
FECHA #REF! PLANO R-1
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
11.00.00 CASETA DE VALVULAS-RESERVORIO DE 50m311.01.00 TRABAJOS PRELIMINARES
11.01.01 LIMPIEZA DE TERRENO MANUAL M2 2.97
Caseta de valvulas 1.00 1.80 1.65 2.9711.01.02 TRAZO Y REPLANTEO M2 2.97
Caseta de valvulas 1.00 1.80 1.65 2.9711.02.00 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 1.19
Caseta de valvulas 1.00 1.80 1.65 0.40 1.1911.02.02 REFINE NIVELACION Y COMPACTACION M2 2.97
Caseta de valvulas 1.00 1.80 1.65 2.9711.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 1.48
Proveniente de las excavaciones 1.00 1.25 1.19 1.48
11.03.00 OBRAS DE CONCRETO SIMPLE
11.03.01 SOLADO E=4", CONCRETO F'C = 100kg/cm2 M2 3.10
Fundacion de estructura 1.00 2.00 1.55 3.10
11.04.00 OBRAS DE CONCRETO ARMADO
11.04.01 CONCRETO F'C=210 kg/cm2 M3 1.51
Losa fondo 1.00 2.00 1.55 0.10 0.31
Muros perimetrales 2.00 1.50 0.15 1.30 0.59
Muros perimetrales 1.00 1.80 0.15 1.30 0.35
Losa Techo 1.00 1.80 1.65 0.10 0.30
Restar Buzon de inspeccion 1.00 0.60 0.60 0.10 0.04
11.04.02 ENCOFRADO Y DESENCOFRADO M2 15.63
Losa fondo 1.00 5.10 0.10 0.51
Muros interiores 1.00 4.50 1.30 5.85
Muros exteriores 1.00 5.10 1.30 6.63
Losa Techo 1.00 1.50 1.50 2.25
Restar Buzon de inspeccion 1.00 0.60 0.60 0.36
Friso losa techo 1.00 5.10 0.10 0.51
Friso de Buzon de inspeccion interno 1.00 2.40 0.10 0.24
11.04.03 ACERO DE REFUERZO f'y = 4200 kg/cm2 GRADO 60 KG 1.00 63.90 Del cuadro de metrados de Acero 63.90 63.90
11.05.00 REBOQUES ENLUCIDOS Y MOLDURAS
11.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MORTERO 1 M2 19.68
Losa fondo 1.00 1.50 1.30 1.95
Muros interiores 1.00 4.50 1.30 5.85
Muros exteriores 1.00 5.10 1.30 6.63
Losa Techo 1.00 1.50 1.50 2.25
Losa Techo encima 1.00 1.80 1.65 2.97
Restar Buzon de inspeccion 2.00 0.60 0.60 0.72
Friso losa techo 1.00 5.10 0.10 0.51
Friso de Buzon de inspeccion interno 1.00 2.40 0.10 0.24
11.06.00 PINTURA
11.06.01 PINTURA ESMALTE EN EXTERIORES M2 9.75
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSCASETA DE VALVULAS-R 27M3
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :CASETA DE VALVULAS-RESERVORIO
FECHA #REF! PLANO R-1
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSCASETA DE VALVULAS-R 27M3
Municipalidad Distrital de Ayapata
Muros exteriores 1.00 5.10 1.30 6.63
Losa techo encima 1.00 1.80 1.65 2.97
Restar Buzon de inspeccion 1.00 0.60 0.60 0.36
Friso de losa 1.00 5.10 0.10 0.51
11.07.00 CARPINTERIA METALICA
11.07.01 TAPA METALICA DE INSPECCION DE 0.60M X 0.60M GBL 1.00 1.00 1.00
11.08.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
11.08.04 SUMIN. E INSTAL. DE ACCES. DE INGRESO-C. DE VA GBL 1.00 1.00 1.00
Codo PVC SAP de 2"x90° UND 2.00
Niple PVC SAP de 2"x2" UND 4.00
Abrazadera de fierro galvanizado de 2" UND 1.00
Union PVC SAP para agua simple presion de 2" UND 1.00
Tee PVC SAP para agua simple presion de 2" UND 2.00
Union universal PVC SAP para agua presion de 2" UND 4.00
Adaptador PVC SAP 2" UND 4.00
Valvula compuerta de bronce de 2" UND 2.0011.08.05 SUMIN. E INSTAL. DE ACCES. DE SALIDA-C. DE VAL GBL 1.00 1.00 1.00
Codo PVC SAP de 1.5"x90° UND 2.00
Niple PVC SAP de 1.5"x2" UND 2.00
Canastilla de succion PVC SAP de 1.5"x5" UND 1.00
Union PVC SAP para agua simple presion de 1.5" UND 2.00
Tee PVC SAP para agua simple presion de 1.5" UND 1.00
Union universal PVC SAP para agua presion de 1.5" UND 2.00
Adaptador PVC SAP 1.5" UND 2.00
Valvula compuerta de bronce de 1.5" UND 1.0011.08.06 SUMIN. E INSTAL. DE ACCES. DE REBOSE Y LIMPIA-C GBL 1.00 1.00 1.00
Niple PVC SAP de 2"x2" UND 2.00
Codo PVC SAP de 2"x90° UND 4.00
Cono de rebose PVC SAP de 4"x2" UND 1.00
Abrazadera de fierro galvanizado de 2" UND 2.00
Union PVC SAP para agua simple presion de 2" UND 2.00
Tee PVC SAP para agua simple presion de 2" UND 1.00
Union universal PVC SAP para agua presion de 2" UND 2.00
Adaptador PVC SAP 2" UND 2.00
Valvula compuerta de bronce de 2" UND 1.00
11.09.00 VARIOS
11.09.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA UND 1.00 1.00 0.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :CERCO PERIMETRICO EN RESERVORIO
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
12.00.00 CERCO PERIMETRICO EN RESERVORIO DE 4M3 27M3, 41M3, 45M312.01.00 TRABAJOS PRELIMINARES
12.01.01 LIMPIEZA DE TERRENO MANUAL M2 125.00
Reservorio de 50m3 1.00 12.50 ### 125.0012.01.02 TRAZO Y REPLANTEO M2 125.00
Reservorio de 50m3 1.00 12.50 ### 125.0012.02.00 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 11.38
Reservorio de 50m3
Zapatas 18.00 0.60 0.60 0.70 4.54
Cimientos corridos 18.00 1.90 0.40 0.50 6.8412.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 14.22
Proveniente de las excavaciones 1.00 1.25 11.38 14.22
12.03.00 OBRAS DE CONCRETO SIMPLE
12.03.01 SOLADO PARA ZAPATAS E=4", CONCRETO F'C = M2 6.48
Reservorio de 50m3
Zapatas 18.00 0.60 0.60 6.48
CONCRETO F'C=175 kg/cm2 EN ZAPATAS 3.89
Reservorio de 50m3
Zapatas 18.00 0.60 0.60 0.60 3.89
12.03.02 Cimiento corrido 1:10 cemento hormigon + 30% P.G. 13.68
Reservorio de 50m3
Cimientos corridos 18.00 1.90 0.40 13.6812.03.03 Sobrecimiento C: 1:8 + 25% P.M. 3.24
Reservorio de 50m3
Sobrecimiento 18.00 2.40 0.25 0.30 3.2412.03.04 Encofrado y desencofrado de sobrecimiento 25.92
Reservorio de 50m3
Sobrecimiento 18.00 2.40 0.60 25.92
12.04.00 REBOQUES ENLUCIDOS Y MOLDURAS
12.04.01 TARRAJEO SOBRECIMIENTOS MEZCLA 1:5 E= M2 25.92
Reservorio de 50m3
Sobrecimiento 18.00 2.40 0.60 25.92
12.05.00 PINTURA
12.05.01 PINTURA ESMALTE EN EXTERIORES TUBOS DE F°G M2 10.92
Reservorio de 50m3 18.00 1.90 0.32 10.92
12.06.00 CONSTRUCCION DE MALLA EN CERCO
12.06.01 FABRICACCION DE POSTES DE F°G° DE 4" 18.00
Reservorio de 50m3 18.00 18.00
12.06.02 FABRICACCION DE PANEL ENMALLADO 1.90MX1 UND 34.00
Reservorio de 50m3
Paneles enmallados de 1.90x1.15m 34.00 34.00
12.06.03 FABRICACCION DE PANEL ENMALLADO 1.90MX1.35M 1.00
Reservorio de 50m3
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSCERCO PERIMETRICO EN R-4M3,27M3,41M3,45M3
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :CERCO PERIMETRICO EN RESERVORIO
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSCERCO PERIMETRICO EN R-4M3,27M3,41M3,45M3
Municipalidad Distrital de Ayapata
Paneles enmallados de 1.90x1.35m 1.00 1.00
12.06.04 FABRICACION DE PUERTA DE ACCESO UND 1.00
Reservorio de 50m3 1.00 1.00
12.06.05 INSTALACION DE POSTES DE F° G° DE 4" UND 18.00
Reservorio de 50m3 18.00 18.00
12.06.06 INSTALACION DE PANEL ENMALLADO UND 35.00
Reservorio de 50m3
Paneles enmallados de 1.90x1.15m 34.00 34.00
Paneles enmallados de 1.90x1.35m 1.00 1.00
12.06.07 INSTALACION DE PUERTA DE ACCESO UND 1.00
Reservorio de 50m3 1.00 1.00
12.06.08 CERROJO DE FIERRO REDONDO DE 1/2" x 0.35 m. UND 1.00
Reservorio de 50m3 1.00 1.00
12.06.09 PINTADO DE PANEL ENMALLADO UND 35.00
Reservorio de 50m3
Paneles enmallados de 1.90x1.15m 34.00 34.00
Paneles enmallados de 1.90x1.35m 1.00 1.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :CERCO PERIMETRICO EN RESERVORIO
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSCERCO PERIMETRICO EN R-4M3,27M3,41M3,45M3
Municipalidad Distrital de Ayapata
12.06.10 PINTADO DE PUERTA DE ACCESO UND 1.00
Reservorio de 50m3 1.00 1.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
13.00.00 LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)13.01.00 TRABAJOS PRELIMINARES13.01.01 LIMPIEZA DE TERRENO MANUAL M ###
SISTEMA I PUEBLO JOVEN 968.601" 506.72
P-1 1.00 1.00 38.90 38.90P-2 1.00 1.00 58.19 58.19P-3 1.00 1.00 176.96 176.96P-4 1.00 1.00 121.08 121.08P-5 1.00 1.00 33.67 33.67P-7 1.00 1.00 77.92 77.92
3/4" 461.88P-8 1.00 1.00 10.00 10.00P-9 1.00 1.00 97.80 97.80P-10 1.00 1.00 34.60 34.60P-15 1.00 1.00 58.78 58.78P-18 1.00 1.00 122.41 122.41P-20 1.00 1.00 10.55 10.55P-22 1.00 1.00 67.93 67.93P-24 1.00 1.00 3.76 3.76P-26 1.00 1.00 56.05 56.05
SISTEMA II SECTOR ESCALERA 4,033.913" 514.81
P-1 1.00 1.00 13.57 13.57P-5 1.00 1.00 73.23 73.23P-6 1.00 1.00 38.65 38.65P-8 1.00 1.00 12.37 12.37P-10 1.00 1.00 48.23 48.23P-12 1.00 1.00 84.35 84.35P-16 1.00 1.00 39.10 39.10P-18 1.00 1.00 130.17 130.17P-19 1.00 1.00 26.33 26.33P-25 1.00 1.00 13.32 13.32P-27 1.00 1.00 35.49 35.49
2.5" 828.20P-40 1.00 1.00 18.27 18.27P-42 1.00 1.00 22.30 22.30P-61 1.00 1.00 24.61 24.61P-62 1.00 1.00 78.29 78.29P-79 1.00 1.00 44.04 44.04P-131 1.00 1.00 100.15 100.15P-133 1.00 1.00 16.74 16.74P-135 1.00 1.00 68.96 68.96P-139 1.00 1.00 44.13 44.13P-142 1.00 1.00 15.57 15.57P-144 1.00 1.00 42.90 42.90P-148 1.00 1.00 39.94 39.94P-150 1.00 1.00 13.17 13.17P-152 1.00 1.00 4.96 4.96P-154 1.00 1.00 18.24 18.24P-156 1.00 1.00 6.91 6.91P-158 1.00 1.00 4.47 4.47P-161 1.00 1.00 7.15 7.15P-164 1.00 1.00 7.83 7.83P-167 1.00 1.00 5.38 5.38P-169 1.00 1.00 5.27 5.27P-171 1.00 1.00 4.98 4.98P-173 1.00 1.00 2.68 2.68P-175 1.00 1.00 4.39 4.39P-177 1.00 1.00 6.34 6.34P-180 1.00 1.00 3.70 3.70P-182 1.00 1.00 4.42 4.42P-185 1.00 1.00 5.71 5.71P-187 1.00 1.00 5.09 5.09P-190 1.00 1.00 5.13 5.13P-193 1.00 1.00 4.64 4.64P-315 1.00 1.00 33.47 33.47
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-316 1.00 1.00 62.78 62.78P-319 1.00 1.00 46.13 46.13P-320 1.00 1.00 49.46 49.46
2" 479.56P-80 1.00 1.00 29.44 29.44P-82 1.00 1.00 10.79 10.79P-216 1.00 1.00 4.62 4.62P-218 1.00 1.00 8.75 8.75P-220 1.00 1.00 6.15 6.15P-222 1.00 1.00 5.85 5.85P-224 1.00 1.00 5.03 5.03P-226 1.00 1.00 5.76 5.76P-228 1.00 1.00 6.59 6.59P-230 1.00 1.00 12.83 12.83P-233 1.00 1.00 6.36 6.36P-235 1.00 1.00 6.36 6.36P-237 1.00 1.00 7.67 7.67P-239 1.00 1.00 31.16 31.16P-240 1.00 1.00 40.93 40.93P-242 1.00 1.00 8.88 8.88P-244 1.00 1.00 7.61 7.61P-246 1.00 1.00 12.46 12.46P-248 1.00 1.00 7.75 7.75P-250 1.00 1.00 9.02 9.02P-252 1.00 1.00 41.65 41.65P-254 1.00 1.00 8.26 8.26P-256 1.00 1.00 11.24 11.24P-258 1.00 1.00 27.00 27.00P-260 1.00 1.00 5.17 5.17P-268 1.00 1.00 10.02 10.02P-270 1.00 1.00 19.88 19.88P-274 1.00 1.00 19.78 19.78P-277 1.00 1.00 11.21 11.21P-317 1.00 1.00 11.35 11.35P-318 1.00 1.00 49.35 49.35P-321 1.00 1.00 5.83 5.83P-322 1.00 1.00 24.81 24.81
1" ###P-31 1.00 1.00 15.86 15.86P-43 1.00 1.00 19.21 19.21P-44 1.00 1.00 66.91 66.91P-45 1.00 1.00 48.87 48.87P-47 1.00 1.00 11.83 11.83P-49 1.00 1.00 74.76 74.76P-63 1.00 1.00 32.31 32.31P-64 1.00 1.00 23.26 23.26P-65 1.00 1.00 49.88 49.88P-66 1.00 1.00 22.31 22.31P-68 1.00 1.00 38.11 38.11P-70 1.00 1.00 13.21 13.21P-72 1.00 1.00 13.21 13.21P-74 1.00 1.00 21.06 21.06P-85 1.00 1.00 33.91 33.91P-86 1.00 1.00 10.13 10.13P-93 1.00 1.00 47.60 47.60P-95 1.00 1.00 11.94 11.94P-106 1.00 1.00 16.79 16.79P-107 1.00 1.00 7.98 7.98P-109 1.00 1.00 49.27 49.27P-111 1.00 1.00 7.22 7.22P-122 1.00 1.00 33.18 33.18P-194 1.00 1.00 12.14 12.14P-197 1.00 1.00 5.40 5.40P-199 1.00 1.00 5.21 5.21P-201 1.00 1.00 6.64 6.64P-203 1.00 1.00 6.03 6.03P-205 1.00 1.00 4.67 4.67P-207 1.00 1.00 4.42 4.42P-209 1.00 1.00 5.38 5.38
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-211 1.00 1.00 9.37 9.37P-261 1.00 1.00 59.13 59.13P-278 1.00 1.00 56.99 56.99P-280 1.00 1.00 32.21 32.21P-288 1.00 1.00 15.83 15.83P-290 1.00 1.00 11.45 11.45P-292 1.00 1.00 14.14 14.14P-294 1.00 1.00 11.84 11.84P-296 1.00 1.00 34.07 34.07P-298 1.00 1.00 26.96 26.96P-300 1.00 1.00 13.25 13.25P-302 1.00 1.00 30.85 30.85P-323 1.00 1.00 34.11 34.11P-324 1.00 1.00 59.35 59.35
3/4" ###P-2 1.00 1.00 8.03 8.03P-13 1.00 1.00 53.35 53.35P-20 1.00 1.00 83.30 83.30P-22 1.00 1.00 7.46 7.46P-28 1.00 1.00 28.86 28.86P-33 1.00 1.00 21.17 21.17P-35 1.00 1.00 40.30 40.30P-51 1.00 1.00 19.76 19.76P-52 1.00 1.00 37.73 37.73P-53 1.00 1.00 36.54 36.54P-55 1.00 1.00 91.45 91.45P-57 1.00 1.00 17.06 17.06P-76 1.00 1.00 41.90 41.90P-88 1.00 1.00 15.04 15.04P-90 1.00 1.00 48.10 48.10P-96 1.00 1.00 8.95 8.95P-98 1.00 1.00 9.53 9.53P-101 1.00 1.00 46.43 46.43P-103 1.00 1.00 18.54 18.54P-113 1.00 1.00 6.30 6.30P-115 1.00 1.00 3.19 3.19P-117 1.00 1.00 5.21 5.21P-119 1.00 1.00 15.75 15.75P-124 1.00 1.00 18.16 18.16P-126 1.00 1.00 11.29 11.29P-128 1.00 1.00 47.45 47.45P-136 1.00 1.00 23.22 23.22P-145 1.00 1.00 11.57 11.57P-213 1.00 1.00 8.81 8.81P-263 1.00 1.00 29.40 29.40P-265 1.00 1.00 20.66 20.66P-283 1.00 1.00 19.54 19.54P-285 1.00 1.00 14.92 14.92P-306 1.00 1.00 56.48 56.48P-308 1.00 1.00 35.89 35.89P-310 1.00 1.00 107.27 107.27P-312 1.00 1.00 14.48 14.48
SISTEMA III SECTOR CHURQUINUYOC 3,868.332.5" 609.23
P-1 1.00 1.00 80.72 80.72P-3 1.00 1.00 82.00 82.00P-4 1.00 1.00 58.89 58.89P-5 1.00 1.00 74.38 74.38P-34 1.00 1.00 18.90 18.90P-35 1.00 1.00 79.44 79.44P-36 1.00 1.00 30.18 30.18P-38 1.00 1.00 16.62 16.62P-42 1.00 1.00 60.26 60.26P-44 1.00 1.00 5.96 5.96P-208 1.00 1.00 31.42 31.42P-209 1.00 1.00 70.46 70.46
2" ###P-43 1.00 1.00 7.48 7.48P-71 1.00 1.00 18.35 18.35
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-73 1.00 1.00 25.88 25.88P-75 1.00 1.00 27.56 27.56P-90 1.00 1.00 72.10 72.10P-92 1.00 1.00 18.43 18.43P-94 1.00 1.00 8.24 8.24P-98 1.00 1.00 30.33 30.33P-100 1.00 1.00 62.64 62.64P-101 1.00 1.00 96.35 96.35P-109 1.00 1.00 10.11 10.11P-110 1.00 1.00 23.44 23.44P-114 1.00 1.00 18.64 18.64P-136 1.00 1.00 16.43 16.43P-138 1.00 1.00 97.46 97.46P-139 1.00 1.00 28.90 28.90P-141 1.00 1.00 34.96 34.96P-143 1.00 1.00 103.45 103.45P-144 1.00 1.00 65.10 65.10P-147 1.00 1.00 42.64 42.64P-148 1.00 1.00 48.02 48.02P-158 1.00 1.00 51.67 51.67P-160 1.00 1.00 28.64 28.64P-162 1.00 1.00 72.65 72.65P-173 1.00 1.00 39.91 39.91P-175 1.00 1.00 9.76 9.76P-192 1.00 1.00 84.71 84.71P-216 1.00 1.00 59.07 59.07P-217 1.00 1.00 14.66 14.66P-218 1.00 1.00 23.22 23.22
1" ###P-7 1.00 1.00 31.55 31.55P-9 1.00 1.00 15.58 15.58P-12 1.00 1.00 52.72 52.72P-13 1.00 1.00 159.79 159.79P-15 1.00 1.00 15.25 15.25P-17 1.00 1.00 14.78 14.78P-19 1.00 1.00 23.16 23.16P-21 1.00 1.00 15.30 15.30P-23 1.00 1.00 24.90 24.90P-45 1.00 1.00 18.72 18.72P-49 1.00 1.00 12.09 12.09P-50 1.00 1.00 11.25 11.25P-52 1.00 1.00 7.89 7.89P-55 1.00 1.00 52.70 52.70P-57 1.00 1.00 11.91 11.91P-59 1.00 1.00 25.37 25.37P-61 1.00 1.00 16.84 16.84P-76 1.00 1.00 66.68 66.68P-80 1.00 1.00 28.17 28.17P-82 1.00 1.00 32.28 32.28P-84 1.00 1.00 12.47 12.47P-102 1.00 1.00 28.74 28.74P-103 1.00 1.00 96.19 96.19P-115 1.00 1.00 47.92 47.92P-121 1.00 1.00 17.23 17.23P-123 1.00 1.00 27.37 27.37P-125 1.00 1.00 17.54 17.54P-149 1.00 1.00 21.10 21.10P-176 1.00 1.00 11.24 11.24P-195 1.00 1.00 18.14 18.14P-197 1.00 1.00 24.55 24.55P-199 1.00 1.00 105.88 105.88P-201 1.00 1.00 50.30 50.30P-203 1.00 1.00 42.40 42.40P-205 1.00 1.00 12.75 12.75P-210 1.00 1.00 13.41 13.41P-211 1.00 1.00 14.25 14.25P-212 1.00 1.00 7.62 7.62P-213 1.00 1.00 16.95 16.95P-219 1.00 1.00 17.58 17.58
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-220 1.00 1.00 93.48 93.483/4" 684.26
P-25 1.00 1.00 7.16 7.16P-26 1.00 1.00 5.17 5.17P-29 1.00 1.00 18.70 18.70P-31 1.00 1.00 25.90 25.90P-39 1.00 1.00 30.97 30.97P-63 1.00 1.00 31.66 31.66P-64 1.00 1.00 20.34 20.34P-67 1.00 1.00 44.06 44.06P-68 1.00 1.00 38.16 38.16P-77 1.00 1.00 7.23 7.23P-86 1.00 1.00 16.04 16.04P-111 1.00 1.00 13.70 13.70P-116 1.00 1.00 21.72 21.72P-118 1.00 1.00 37.91 37.91P-127 1.00 1.00 11.85 11.85P-129 1.00 1.00 13.14 13.14P-131 1.00 1.00 21.60 21.60P-133 1.00 1.00 14.71 14.71P-154 1.00 1.00 12.52 12.52P-163 1.00 1.00 12.03 12.03P-165 1.00 1.00 16.43 16.43P-167 1.00 1.00 13.22 13.22P-169 1.00 1.00 29.01 29.01P-178 1.00 1.00 86.95 86.95P-180 1.00 1.00 26.07 26.07P-183 1.00 1.00 22.11 22.11P-185 1.00 1.00 40.99 40.99P-187 1.00 1.00 30.50 30.50P-189 1.00 1.00 14.41 14.41
SISTEMA VI SECTOR IÑAPAMPA 6,024.923" 168.69
P-1 1.00 1.00 96.52 96.52P-3 1.00 1.00 16.29 16.29P-402 1.00 1.00 3.69 3.69P-403 1.00 1.00 52.19 52.19
2.5" 725.42P-9 1.00 1.00 22.91 22.91P-11 1.00 1.00 26.17 26.17P-13 1.00 1.00 25.87 25.87P-15 1.00 1.00 19.93 19.93P-17 1.00 1.00 10.95 10.95P-20 1.00 1.00 11.65 11.65P-26 1.00 1.00 17.38 17.38P-28 1.00 1.00 14.04 14.04P-30 1.00 1.00 9.37 9.37P-32 1.00 1.00 10.70 10.70P-34 1.00 1.00 12.11 12.11P-36 1.00 1.00 6.68 6.68P-44 1.00 1.00 9.16 9.16P-46 1.00 1.00 9.96 9.96P-48 1.00 1.00 12.51 12.51P-52 1.00 1.00 27.80 27.80P-55 1.00 1.00 14.93 14.93P-58 1.00 1.00 8.55 8.55P-61 1.00 1.00 13.31 13.31P-64 1.00 1.00 55.86 55.86P-67 1.00 1.00 12.99 12.99P-69 1.00 1.00 10.97 10.97P-71 1.00 1.00 11.02 11.02P-73 1.00 1.00 19.83 19.83P-75 1.00 1.00 12.10 12.10P-77 1.00 1.00 15.41 15.41P-79 1.00 1.00 15.12 15.12P-81 1.00 1.00 16.95 16.95P-84 1.00 1.00 11.75 11.75P-86 1.00 1.00 21.76 21.76P-88 1.00 1.00 19.84 19.84
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-90 1.00 1.00 32.29 32.29P-92 1.00 1.00 10.07 10.07P-97 1.00 1.00 31.53 31.53P-255 1.00 1.00 86.88 86.88P-404 1.00 1.00 10.36 10.36P-405 1.00 1.00 46.71 46.71
2" ###P-99 1.00 1.00 9.65 9.65P-101 1.00 1.00 6.39 6.39P-104 1.00 1.00 20.70 20.70P-106 1.00 1.00 7.40 7.40P-108 1.00 1.00 7.75 7.75P-111 1.00 1.00 15.62 15.62P-113 1.00 1.00 19.77 19.77P-115 1.00 1.00 12.38 12.38P-117 1.00 1.00 33.16 33.16P-119 1.00 1.00 6.53 6.53P-122 1.00 1.00 7.17 7.17P-124 1.00 1.00 37.25 37.25P-126 1.00 1.00 11.39 11.39P-128 1.00 1.00 23.38 23.38P-130 1.00 1.00 13.95 13.95P-132 1.00 1.00 7.04 7.04P-134 1.00 1.00 16.79 16.79P-136 1.00 1.00 13.00 13.00P-138 1.00 1.00 9.98 9.98P-140 1.00 1.00 7.35 7.35P-142 1.00 1.00 7.76 7.76P-144 1.00 1.00 6.94 6.94P-146 1.00 1.00 15.71 15.71P-150 1.00 1.00 11.93 11.93P-152 1.00 1.00 8.20 8.20P-155 1.00 1.00 6.61 6.61P-157 1.00 1.00 5.44 5.44P-159 1.00 1.00 5.84 5.84P-161 1.00 1.00 2.71 2.71P-165 1.00 1.00 18.59 18.59P-167 1.00 1.00 12.57 12.57P-169 1.00 1.00 8.69 8.69P-171 1.00 1.00 20.43 20.43P-173 1.00 1.00 7.69 7.69P-175 1.00 1.00 57.68 57.68P-177 1.00 1.00 24.19 24.19P-179 1.00 1.00 43.82 43.82P-181 1.00 1.00 12.80 12.80P-183 1.00 1.00 7.42 7.42P-186 1.00 1.00 6.58 6.58P-188 1.00 1.00 6.58 6.58P-191 1.00 1.00 7.23 7.23P-194 1.00 1.00 10.30 10.30P-196 1.00 1.00 8.88 8.88P-198 1.00 1.00 10.09 10.09P-200 1.00 1.00 5.03 5.03P-202 1.00 1.00 3.77 3.77P-204 1.00 1.00 6.74 6.74P-206 1.00 1.00 4.79 4.79P-208 1.00 1.00 6.24 6.24P-210 1.00 1.00 9.18 9.18P-212 1.00 1.00 10.70 10.70P-214 1.00 1.00 8.84 8.84P-273 1.00 1.00 18.36 18.36P-275 1.00 1.00 40.41 40.41P-277 1.00 1.00 58.76 58.76P-279 1.00 1.00 20.90 20.90P-281 1.00 1.00 14.76 14.76P-283 1.00 1.00 185.84 185.84P-287 1.00 1.00 200.79 200.79P-288 1.00 1.00 152.34 152.34P-290 1.00 1.00 50.82 50.82
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-292 1.00 1.00 172.63 172.63P-294 1.00 1.00 52.55 52.55P-296 1.00 1.00 19.01 19.01P-298 1.00 1.00 108.34 108.34P-300 1.00 1.00 19.25 19.25P-302 1.00 1.00 17.50 17.50P-304 1.00 1.00 24.23 24.23P-306 1.00 1.00 52.45 52.45P-316 1.00 1.00 8.00 8.00P-327 1.00 1.00 10.45 10.45P-338 1.00 1.00 45.43 45.43P-340 1.00 1.00 13.55 13.55P-342 1.00 1.00 86.78 86.78P-344 1.00 1.00 31.69 31.69P-348 1.00 1.00 16.60 16.60P-350 1.00 1.00 15.80 15.80P-352 1.00 1.00 17.55 17.55P-354 1.00 1.00 121.02 121.02P-356 1.00 1.00 66.15 66.15P-358 1.00 1.00 49.01 49.01P-360 1.00 1.00 154.81 154.81P-362 1.00 1.00 12.94 12.94P-364 1.00 1.00 25.89 25.89P-366 1.00 1.00 14.29 14.29P-371 1.00 1.00 77.65 77.65P-373 1.00 1.00 29.89 29.89P-406 1.00 1.00 50.70 50.70P-407 1.00 1.00 102.09 102.09P-408 1.00 1.00 17.16 17.16P-409 1.00 1.00 200.77 200.77
1" ###P-37 1.00 1.00 23.12 23.12P-216 1.00 1.00 51.91 51.91P-217 1.00 1.00 46.54 46.54P-219 1.00 1.00 71.78 71.78P-221 1.00 1.00 43.67 43.67P-223 1.00 1.00 106.79 106.79P-225 1.00 1.00 125.55 125.55P-227 1.00 1.00 44.85 44.85P-229 1.00 1.00 17.45 17.45P-231 1.00 1.00 11.86 11.86P-233 1.00 1.00 8.34 8.34P-235 1.00 1.00 112.24 112.24P-237 1.00 1.00 78.18 78.18P-256 1.00 1.00 20.73 20.73P-258 1.00 1.00 23.19 23.19P-260 1.00 1.00 43.92 43.92P-262 1.00 1.00 74.96 74.96P-264 1.00 1.00 23.39 23.39P-307 1.00 1.00 26.32 26.32P-309 1.00 1.00 10.53 10.53P-311 1.00 1.00 9.31 9.31P-313 1.00 1.00 39.02 39.02P-377 1.00 1.00 53.21 53.21P-379 1.00 1.00 39.38 39.38P-381 1.00 1.00 12.96 12.96P-383 1.00 1.00 86.40 86.40P-385 1.00 1.00 77.85 77.85P-387 1.00 1.00 28.96 28.96P-389 1.00 1.00 12.34 12.34P-391 1.00 1.00 32.75 32.75
3/4" 719.53P-4 1.00 1.00 30.57 30.57P-6 1.00 1.00 13.30 13.30P-21 1.00 1.00 17.14 17.14P-23 1.00 1.00 11.37 11.37P-39 1.00 1.00 94.64 94.64P-41 1.00 1.00 45.80 45.80P-93 1.00 1.00 25.51 25.51
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-147 1.00 1.00 15.17 15.17P-162 1.00 1.00 21.19 21.19P-240 1.00 1.00 16.96 16.96P-242 1.00 1.00 10.71 10.71P-244 1.00 1.00 12.12 12.12P-246 1.00 1.00 12.33 12.33P-248 1.00 1.00 8.57 8.57P-250 1.00 1.00 8.33 8.33P-252 1.00 1.00 5.41 5.41P-266 1.00 1.00 9.32 9.32P-268 1.00 1.00 12.09 12.09P-270 1.00 1.00 6.69 6.69P-315 1.00 1.00 6.42 6.42P-318 1.00 1.00 4.52 4.52P-320 1.00 1.00 6.41 6.41P-323 1.00 1.00 12.21 12.21P-326 1.00 1.00 4.69 4.69P-329 1.00 1.00 4.87 4.87P-331 1.00 1.00 22.55 22.55P-333 1.00 1.00 12.37 12.37P-335 1.00 1.00 10.86 10.86P-345 1.00 1.00 103.12 103.12P-368 1.00 1.00 8.14 8.14P-393 1.00 1.00 13.84 13.84P-395 1.00 1.00 14.53 14.53P-397 1.00 1.00 101.77 101.77P-399 1.00 1.00 16.01 16.01
SISTEMA V SECTOR LEVITA 6,443.692.5" 509.58
P-1 1.00 1.00 56.67 56.67P-2 1.00 1.00 190.34 190.34P-3 1.00 1.00 24.18 24.18P-14 1.00 1.00 11.50 11.50P-163 1.00 1.00 139.14 139.14P-164 1.00 1.00 87.75 87.75
2" ###P-4 1.00 1.00 8.71 8.71P-8 1.00 1.00 8.69 8.69P-10 1.00 1.00 5.29 5.29P-11 1.00 1.00 12.22 12.22P-13 1.00 1.00 140.59 140.59P-16 1.00 1.00 33.98 33.98P-18 1.00 1.00 87.95 87.95P-31 1.00 1.00 26.72 26.72P-33 1.00 1.00 6.91 6.91P-48 1.00 1.00 8.57 8.57P-50 1.00 1.00 6.21 6.21P-52 1.00 1.00 1.94 1.94P-54 1.00 1.00 5.36 5.36P-56 1.00 1.00 15.42 15.42P-58 1.00 1.00 4.77 4.77P-60 1.00 1.00 8.88 8.88P-62 1.00 1.00 15.59 15.59P-64 1.00 1.00 20.60 20.60P-66 1.00 1.00 4.94 4.94P-68 1.00 1.00 10.00 10.00P-70 1.00 1.00 10.53 10.53P-72 1.00 1.00 13.65 13.65P-74 1.00 1.00 16.77 16.77P-109 1.00 1.00 18.08 18.08P-113 1.00 1.00 5.24 5.24P-115 1.00 1.00 2.76 2.76P-117 1.00 1.00 4.60 4.60P-119 1.00 1.00 3.82 3.82P-122 1.00 1.00 6.09 6.09P-125 1.00 1.00 73.42 73.42P-126 1.00 1.00 89.92 89.92P-128 1.00 1.00 23.35 23.35P-129 1.00 1.00 41.64 41.64
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-130 1.00 1.00 53.84 53.84P-132 1.00 1.00 6.57 6.57P-134 1.00 1.00 5.64 5.64P-190 1.00 1.00 176.93 176.93P-193 1.00 1.00 72.47 72.47P-195 1.00 1.00 177.72 177.72P-196 1.00 1.00 73.58 73.58P-198 1.00 1.00 14.52 14.52P-200 1.00 1.00 11.98 11.98P-202 1.00 1.00 27.42 27.42P-205 1.00 1.00 87.62 87.62P-208 1.00 1.00 13.97 13.97P-210 1.00 1.00 17.86 17.86P-214 1.00 1.00 17.69 17.69P-259 1.00 1.00 142.71 142.71P-260 1.00 1.00 41.00 41.00P-265 1.00 1.00 105.51 105.51P-266 1.00 1.00 53.12 53.12P-267 1.00 1.00 94.00 94.00P-268 1.00 1.00 61.97 61.97P-269 1.00 1.00 39.39 39.39P-270 1.00 1.00 57.17 57.17P-277 1.00 1.00 19.02 19.02P-278 1.00 1.00 13.41 13.41
1" ###P-19 1.00 1.00 32.36 32.36P-35 1.00 1.00 26.06 26.06P-76 1.00 1.00 35.53 35.53P-78 1.00 1.00 6.93 6.93P-84 1.00 1.00 10.24 10.24P-86 1.00 1.00 2.03 2.03P-91 1.00 1.00 17.32 17.32P-136 1.00 1.00 13.53 13.53P-138 1.00 1.00 10.85 10.85P-140 1.00 1.00 42.81 42.81P-142 1.00 1.00 31.45 31.45P-144 1.00 1.00 19.57 19.57P-146 1.00 1.00 11.48 11.48P-148 1.00 1.00 55.70 55.70P-150 1.00 1.00 129.94 129.94P-152 1.00 1.00 7.08 7.08P-154 1.00 1.00 11.17 11.17P-165 1.00 1.00 70.14 70.14P-166 1.00 1.00 41.73 41.73P-168 1.00 1.00 58.47 58.47P-172 1.00 1.00 12.44 12.44P-215 1.00 1.00 118.37 118.37P-217 1.00 1.00 36.84 36.84P-219 1.00 1.00 59.15 59.15P-221 1.00 1.00 56.40 56.40P-223 1.00 1.00 34.27 34.27P-225 1.00 1.00 24.16 24.16P-234 1.00 1.00 20.86 20.86P-235 1.00 1.00 108.31 108.31P-238 1.00 1.00 230.63 230.63P-242 1.00 1.00 70.83 70.83P-243 1.00 1.00 54.03 54.03P-245 1.00 1.00 13.40 13.40P-247 1.00 1.00 30.93 30.93P-261 1.00 1.00 11.15 11.15P-262 1.00 1.00 55.37 55.37P-271 1.00 1.00 11.83 11.83P-272 1.00 1.00 54.55 54.55P-279 1.00 1.00 48.35 48.35P-280 1.00 1.00 46.06 46.06P-281 1.00 1.00 125.92 125.92P-282 1.00 1.00 83.45 83.45
3/4" ###P-21 1.00 1.00 104.09 104.09
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-22 1.00 1.00 53.07 53.07P-24 1.00 1.00 31.33 31.33P-36 1.00 1.00 41.69 41.69P-39 1.00 1.00 4.09 4.09P-41 1.00 1.00 60.26 60.26P-43 1.00 1.00 14.16 14.16P-79 1.00 1.00 20.20 20.20P-81 1.00 1.00 15.86 15.86P-93 1.00 1.00 92.28 92.28P-95 1.00 1.00 9.61 9.61P-97 1.00 1.00 10.27 10.27P-101 1.00 1.00 33.30 33.30P-103 1.00 1.00 19.21 19.21P-104 1.00 1.00 48.78 48.78P-106 1.00 1.00 16.19 16.19P-149 1.00 1.00 6.61 6.61P-156 1.00 1.00 8.41 8.41P-158 1.00 1.00 7.28 7.28P-160 1.00 1.00 10.59 10.59P-173 1.00 1.00 9.53 9.53P-175 1.00 1.00 38.20 38.20P-177 1.00 1.00 95.35 95.35P-180 1.00 1.00 38.25 38.25P-182 1.00 1.00 68.82 68.82P-183 1.00 1.00 47.92 47.92P-186 1.00 1.00 95.63 95.63P-188 1.00 1.00 47.93 47.93P-218 1.00 1.00 15.17 15.17P-220 1.00 1.00 10.05 10.05P-222 1.00 1.00 39.43 39.43P-224 1.00 1.00 24.84 24.84P-226 1.00 1.00 37.12 37.12P-227 1.00 1.00 18.53 18.53P-229 1.00 1.00 16.82 16.82P-231 1.00 1.00 5.51 5.51P-236 1.00 1.00 30.00 30.00P-248 1.00 1.00 32.35 32.35P-250 1.00 1.00 59.84 59.84P-255 1.00 1.00 73.36 73.36P-263 1.00 1.00 247.83 247.83P-264 1.00 1.00 20.11 20.11P-273 1.00 1.00 71.25 71.25P-274 1.00 1.00 61.82 61.82P-275 1.00 1.00 27.63 27.63P-276 1.00 1.00 23.53 23.53
13.01.02 TRAZO NIVELACION Y REPLANTEO DE ZANJAS M ###Según detalle de la partida anterior
SISTEMA I PUEBLO JOVEN 968.60Redes de 1" 1.00 1.00 506.72 506.72Redes de 3/4" 1.00 1.00 461.88 461.88SISTEMA II SECTOR ESCALERA ###Redes de 3" 1.00 1.00 514.81 514.81Redes de 2.5" 1.00 1.00 828.20 828.20Redes de 2" 1.00 1.00 479.56 479.56Redes de 1" 1.00 1.00 1,128.25 1,128.25Redes de 3/4" 1.00 1.00 1,083.09 1,083.09SISTEMA III SECTOR CHIRQUINUYOC ###Redes de 2.5" 1.00 1.00 609.23 609.23Redes de 2" 1.00 1.00 1,240.80 1,240.80Redes de 1" 1.00 1.00 1,334.04 1,334.04Redes de 3/4" 1.00 1.00 684.26 684.26SISTEMA IV SECTOR IÑAPAMPA ###Redes de 3" 1.00 1.00 168.69 168.69Redes de 2.5" 1.00 1.00 725.42 725.42Redes de 2" 1.00 1.00 3,053.78 3,053.78Redes de 1" 1.00 1.00 1,357.50 1,357.50Redes de 3/4" 1.00 1.00 719.53 719.53SISTEMA V SECTOR LEVITA ###Redes de 2.5" 1.00 1.00 509.58 509.58
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
Redes de 2" 1.00 1.00 2,128.32 2,128.32Redes de 1" 1.00 1.00 1,941.69 1,941.69Redes de 3/4" 1.00 1.00 1,864.10 1,864.10
13.02.00 MOVIMIENTO DE TIERRAS13.02.01 EXCAVACIÓN MANUAL ZANJA H=0.70M, A=0. M ###
SISTEMA I PUEBLO JOVENRedes de 1" 1.00 1.00 506.72 506.72Redes de 3/4" 1.00 1.00 461.88 461.88SISTEMA II SECTOR ESCALERARedes de 3" 1.00 1.00 514.81 514.81Redes de 2.5" 1.00 1.00 828.20 828.20Redes de 2" 1.00 1.00 479.56 479.56Redes de 1" 1.00 1.00 1,128.25 1,128.25Redes de 3/4" 1.00 1.00 1,083.09 1,083.09SISTEMA III SECTOR CHIRQUINUYOCRedes de 2.5" 1.00 1.00 609.23 609.23Redes de 2" 1.00 1.00 1,240.80 1,240.80Redes de 1" 1.00 1.00 1,334.04 1,334.04Redes de 3/4" 1.00 1.00 684.26 684.26SISTEMA IV SECTOR IÑAPAMPARedes de 3" 1.00 1.00 168.69 168.69Redes de 2.5" 1.00 1.00 725.42 725.42Redes de 2" 1.00 1.00 3,053.78 3,053.78Redes de 1" 1.00 1.00 1,357.50 1,357.50Redes de 3/4" 1.00 1.00 719.53 719.53SISTEMA V SECTOR LEVITARedes de 2.5" 1.00 1.00 509.58 509.58Redes de 2" 1.00 1.00 2,128.32 2,128.32Redes de 1" 1.00 1.00 1,941.69 1,941.69Redes de 3/4" 1.00 1.00 1,864.10 1,864.10
13.02.02 EXCAVACIÓN MANUAL ZANJA H=0.70M, A=0.5 M 4,267.89SISTEMA I PUEBLO JOVENRedes de 1" 1.00 1.00 506.72 506.72Redes de 3/4" 1.00 1.00 461.88 461.88SISTEMA II SECTOR ESCALERA 0.00 0.00 0.00 0.00Redes de 3"Redes de 2.5" 1.00 1.00 828.20 828.20Redes de 2" 1.00 1.00 479.56 479.56Redes de 1" 1.00 1.00 1,128.25 1,128.25Redes de 3/4" 1.00 1.00 1,083.09 1,083.09SISTEMA III SECTOR CHIRQUINUYOC 0.00 0.00 0.00 0.00Redes de 2.5"Redes de 2" 1.00 1.00 1,240.80 1,240.80Redes de 1" 1.00 1.00 1,334.04 1,334.04Redes de 3/4"SISTEMA IV SECTOR IÑAPAMPA 0.00 0.00 0.00 0.00Redes de 3" 1.00 1.00 168.69 168.69Redes de 2.5" 1.00 1.00 725.42 725.42Redes de 2" 1.00 1.00 3,053.78 3,053.78Redes de 1" 1.00 1.00 1,357.50 1,357.50Redes de 3/4" 1.00 1.00 719.53 719.53SISTEMA V SECTOR LEVITARedes de 2.5" 1.00 1.00 509.58 509.58Redes de 2" 1.00 1.00 2,128.32 2,128.32Redes de 1" 1.00 1.00 1,941.69 1,941.69Redes de 3/4" 1.00 1.00 1,864.10 1,864.10
13.02.03 EXCAVACION CON EQUIPO ZANJA H=0.70M, A M 2,560.73SISTEMA I PUEBLO JOVENRedes de 1" 1.00 1.00 506.72 506.72Redes de 3/4" 1.00 1.00 461.88 461.88SISTEMA II SECTOR ESCALERA 0.00 0.00 0.00 0.00Redes de 3"Redes de 2.5" 1.00 1.00 828.20 828.20Redes de 2" 1.00 1.00 479.56 479.56Redes de 1" 1.00 1.00 1,128.25 1,128.25Redes de 3/4" 1.00 1.00 1,083.09 1,083.09SISTEMA III SECTOR CHIRQUINUYOC 0.00 0.00 0.00 0.00Redes de 2.5"Redes de 2" 1.00 1.00 1,240.80 1,240.80
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
Redes de 1" 1.00 1.00 1,334.04 1,334.04Redes de 3/4"SISTEMA IV SECTOR IÑAPAMPA 0.00 0.00 0.00 0.00Redes de 3" 1.00 1.00 168.69 168.69Redes de 2.5" 1.00 1.00 725.42 725.42Redes de 2" 1.00 1.00 3,053.78 3,053.78Redes de 1" 1.00 1.00 1,357.50 1,357.50Redes de 3/4" 1.00 1.00 719.53 719.53SISTEMA V SECTOR LEVITARedes de 2.5" 1.00 1.00 509.58 509.58Redes de 2" 1.00 1.00 2,128.32 2,128.32Redes de 1" 1.00 1.00 1,941.69 1,941.69Redes de 3/4" 1.00 1.00 1,864.10 1,864.10
13.02.04 EXCAVACION CON EQUIPO ZANJA H=0.70M, A= M 1,707.16SISTEMA I PUEBLO JOVENRedes de 1" 1.00 1.00 506.72 506.72Redes de 3/4" 1.00 1.00 461.88 461.88SISTEMA II SECTOR ESCALERA 0.00 0.00 0.00 0.00Redes de 3"Redes de 2.5" 1.00 1.00 828.20 828.20Redes de 2" 1.00 1.00 479.56 479.56Redes de 1" 1.00 1.00 1,128.25 1,128.25Redes de 3/4" 1.00 1.00 1,083.09 1,083.09SISTEMA III SECTOR CHIRQUINUYOC 0.00 0.00 0.00 0.00Redes de 2.5"Redes de 2" 1.00 1.00 1,240.80 1,240.80Redes de 1" 1.00 1.00 1,334.04 1,334.04Redes de 3/4"SISTEMA IV SECTOR IÑAPAMPA 0.00 0.00 0.00 0.00Redes de 3" 1.00 1.00 168.69 168.69Redes de 2.5" 1.00 1.00 725.42 725.42Redes de 2" 1.00 1.00 3,053.78 3,053.78Redes de 1" 1.00 1.00 1,357.50 1,357.50Redes de 3/4" 1.00 1.00 719.53 719.53SISTEMA V SECTOR LEVITARedes de 2.5" 1.00 1.00 509.58 509.58Redes de 2" 1.00 1.00 2,128.32 2,128.32Redes de 1" 1.00 1.00 1,941.69 1,941.69Redes de 3/4" 1.00 1.00 1,864.10 1,864.10
13.02.05 REFINE NIV. Y COF. FONDO DE ZANJA A=0.50 M ###SISTEMA I PUEBLO JOVENRedes de 1" 1.00 1.00 506.72 506.72Redes de 3/4" 1.00 1.00 461.88 461.88SISTEMA II SECTOR ESCALERARedes de 3" 1.00 1.00 514.81 514.81Redes de 2.5" 1.00 1.00 828.20 828.20Redes de 2" 1.00 1.00 479.56 479.56Redes de 1" 1.00 1.00 1,128.25 1,128.25Redes de 3/4" 1.00 1.00 1,083.09 1,083.09SISTEMA III SECTOR CHIRQUINUYOCRedes de 2.5" 1.00 1.00 609.23 609.23Redes de 2" 1.00 1.00 1,240.80 1,240.80Redes de 1" 1.00 1.00 1,334.04 1,334.04Redes de 3/4" 1.00 1.00 684.26 684.26SISTEMA IV SECTOR IÑAPAMPARedes de 3" 1.00 1.00 168.69 168.69Redes de 2.5" 1.00 1.00 725.42 725.42Redes de 2" 1.00 1.00 3,053.78 3,053.78Redes de 1" 1.00 1.00 1,357.50 1,357.50Redes de 3/4" 1.00 1.00 719.53 719.53SISTEMA V SECTOR LEVITARedes de 2.5" 1.00 1.00 509.58 509.58Redes de 2" 1.00 1.00 2,128.32 2,128.32Redes de 1" 1.00 1.00 1,941.69 1,941.69Redes de 3/4" 1.00 1.00 1,864.10 1,864.10
13.02.06 COLOCACION CAMA DE APOYO A=0.50M, E=0 M ###SISTEMA I PUEBLO JOVENRedes de 1" 1.00 1.00 506.72 506.72Redes de 3/4" 1.00 1.00 461.88 461.88
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
SISTEMA II SECTOR ESCALERARedes de 3" 1.00 1.00 514.81 514.81Redes de 2.5" 1.00 1.00 828.20 828.20Redes de 2" 1.00 1.00 479.56 479.56Redes de 1" 1.00 1.00 1,128.25 1,128.25Redes de 3/4" 1.00 1.00 1,083.09 1,083.09SISTEMA III SECTOR CHIRQUINUYOCRedes de 2.5" 1.00 1.00 609.23 609.23Redes de 2" 1.00 1.00 1,240.80 1,240.80Redes de 1" 1.00 1.00 1,334.04 1,334.04Redes de 3/4" 1.00 1.00 684.26 684.26SISTEMA IV SECTOR IÑAPAMPARedes de 3" 1.00 1.00 168.69 168.69Redes de 2.5" 1.00 1.00 725.42 725.42Redes de 2" 1.00 1.00 3,053.78 3,053.78Redes de 1" 1.00 1.00 1,357.50 1,357.50Redes de 3/4" 1.00 1.00 719.53 719.53SISTEMA V SECTOR LEVITARedes de 2.5" 1.00 1.00 509.58 509.58Redes de 2" 1.00 1.00 2,128.32 2,128.32Redes de 1" 1.00 1.00 1,941.69 1,941.69Redes de 3/4" 1.00 1.00 1,864.10 1,864.10
13.02.07 RELLENO APISONADO MANUAL DE ZANJA H=0. M ###SISTEMA I PUEBLO JOVENRedes de 1" 1.00 1.00 506.72 506.72Redes de 3/4" 1.00 1.00 461.88 461.88SISTEMA II SECTOR ESCALERARedes de 3" 1.00 1.00 514.81 514.81Redes de 2.5" 1.00 1.00 828.20 828.20Redes de 2" 1.00 1.00 479.56 479.56Redes de 1" 1.00 1.00 1,128.25 1,128.25Redes de 3/4" 1.00 1.00 1,083.09 1,083.09SISTEMA III SECTOR CHIRQUINUYOCRedes de 2.5" 1.00 1.00 609.23 609.23Redes de 2" 1.00 1.00 1,240.80 1,240.80Redes de 1" 1.00 1.00 1,334.04 1,334.04Redes de 3/4" 1.00 1.00 684.26 684.26SISTEMA IV SECTOR IÑAPAMPARedes de 3" 1.00 1.00 168.69 168.69Redes de 2.5" 1.00 1.00 725.42 725.42Redes de 2" 1.00 1.00 3,053.78 3,053.78Redes de 1" 1.00 1.00 1,357.50 1,357.50Redes de 3/4" 1.00 1.00 719.53 719.53SISTEMA V SECTOR LEVITARedes de 2.5" 1.00 1.00 509.58 509.58Redes de 2" 1.00 1.00 2,128.32 2,128.32Redes de 1" 1.00 1.00 1,941.69 1,941.69Redes de 3/4" 1.00 1.00 1,864.10 1,864.10
13.03.00 SUMINISTRO E INSTALACION DE TUBERIAS PVC AGUA13.03.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC NM 683.50
SISTEMA II SECTOR ESCALERAP-1 1.00 13.57 13.57P-5 1.00 73.23 73.23P-6 1.00 38.65 38.65P-8 1.00 12.37 12.37P-10 1.00 48.23 48.23P-12 1.00 84.35 84.35P-16 1.00 39.10 39.10P-18 1.00 130.17 130.17P-19 1.00 26.33 26.33P-25 1.00 13.32 13.32P-27 1.00 35.49 35.49SISTEMA IV SECTOR IÑAPAMPAP-1 1.00 96.52 96.52P-3 1.00 16.29 16.29P-402 1.00 3.69 3.69P-403 1.00 52.19 52.19
13.03.02 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC NM 2,672.43SISTEMA II SECTOR ESCALERA
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-40 1.00 18.27 18.27P-42 1.00 22.30 22.30P-61 1.00 24.61 24.61P-62 1.00 78.29 78.29P-79 1.00 44.04 44.04P-131 1.00 100.15 100.15P-133 1.00 16.74 16.74P-135 1.00 68.96 68.96P-139 1.00 44.13 44.13P-142 1.00 15.57 15.57P-144 1.00 42.90 42.90P-148 1.00 39.94 39.94P-150 1.00 13.17 13.17P-152 1.00 4.96 4.96P-154 1.00 18.24 18.24P-156 1.00 6.91 6.91P-158 1.00 4.47 4.47P-161 1.00 7.15 7.15P-164 1.00 7.83 7.83P-167 1.00 5.38 5.38P-169 1.00 5.27 5.27P-171 1.00 4.98 4.98P-173 1.00 2.68 2.68P-175 1.00 4.39 4.39P-177 1.00 6.34 6.34P-180 1.00 3.70 3.70P-182 1.00 4.42 4.42P-185 1.00 5.71 5.71P-187 1.00 5.09 5.09P-190 1.00 5.13 5.13P-193 1.00 4.64 4.64P-315 1.00 33.47 33.47P-316 1.00 62.78 62.78P-319 1.00 46.13 46.13P-320 1.00 49.46 49.46SISTEMA III SECTOR CHURQUINUYOC 0.00P-1 1.00 80.72 80.72P-3 1.00 82.00 82.00P-4 1.00 58.89 58.89P-5 1.00 74.38 74.38P-34 1.00 18.90 18.90P-35 1.00 79.44 79.44P-36 1.00 30.18 30.18P-38 1.00 16.62 16.62P-42 1.00 60.26 60.26P-44 1.00 5.96 5.96P-208 1.00 31.42 31.42P-209 1.00 70.46 70.46SISTEMA IV SECTOR IÑAPAMPA 0.00P-9 1.00 22.91 22.91P-11 1.00 26.17 26.17P-13 1.00 25.87 25.87P-15 1.00 19.93 19.93P-17 1.00 10.95 10.95P-20 1.00 11.65 11.65P-26 1.00 17.38 17.38P-28 1.00 14.04 14.04P-30 1.00 9.37 9.37P-32 1.00 10.70 10.70P-34 1.00 12.11 12.11P-36 1.00 6.68 6.68P-44 1.00 9.16 9.16P-46 1.00 9.96 9.96P-48 1.00 12.51 12.51P-52 1.00 27.80 27.80P-55 1.00 14.93 14.93P-58 1.00 8.55 8.55P-61 1.00 13.31 13.31P-64 1.00 55.86 55.86
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-67 1.00 12.99 12.99P-69 1.00 10.97 10.97P-71 1.00 11.02 11.02P-73 1.00 19.83 19.83P-75 1.00 12.10 12.10P-77 1.00 15.41 15.41P-79 1.00 15.12 15.12P-81 1.00 16.95 16.95P-84 1.00 11.75 11.75P-86 1.00 21.76 21.76P-88 1.00 19.84 19.84P-90 1.00 32.29 32.29P-92 1.00 10.07 10.07P-97 1.00 31.53 31.53P-255 1.00 86.88 86.88P-404 1.00 10.36 10.36P-405 1.00 46.71 46.71SISTEMA V SECTOR LEVITA 0.00P-1 1.00 56.67 56.67P-2 1.00 190.34 190.34P-3 1.00 24.18 24.18P-14 1.00 11.50 11.50P-163 1.00 139.14 139.14P-164 1.00 87.75 87.75
13.03.03 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC NM 6,902.46SISTEMA II SECTOR ESCALERAP-80 1.00 29.44 29.44P-82 1.00 10.79 10.79P-216 1.00 4.62 4.62P-218 1.00 8.75 8.75P-220 1.00 6.15 6.15P-222 1.00 5.85 5.85P-224 1.00 5.03 5.03P-226 1.00 5.76 5.76P-228 1.00 6.59 6.59P-230 1.00 12.83 12.83P-233 1.00 6.36 6.36P-235 1.00 6.36 6.36P-237 1.00 7.67 7.67P-239 1.00 31.16 31.16P-240 1.00 40.93 40.93P-242 1.00 8.88 8.88P-244 1.00 7.61 7.61P-246 1.00 12.46 12.46P-248 1.00 7.75 7.75P-250 1.00 9.02 9.02P-252 1.00 41.65 41.65P-254 1.00 8.26 8.26P-256 1.00 11.24 11.24P-258 1.00 27.00 27.00P-260 1.00 5.17 5.17P-268 1.00 10.02 10.02P-270 1.00 19.88 19.88P-274 1.00 19.78 19.78P-277 1.00 11.21 11.21P-317 1.00 11.35 11.35P-318 1.00 1.00 49.35 49.35P-321 1.00 5.83 5.83P-322 1.00 1.00 24.81 24.81SISTEMA III SECTOR CHURQUINUYOC 0.00P-43 1.00 7.48 7.48P-71 1.00 18.35 18.35P-73 1.00 25.88 25.88P-75 1.00 27.56 27.56P-90 1.00 72.10 72.10P-92 1.00 18.43 18.43P-94 1.00 8.24 8.24P-98 1.00 30.33 30.33P-100 1.00 62.64 62.64
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-101 1.00 96.35 96.35P-109 1.00 10.11 10.11P-110 1.00 23.44 23.44P-114 1.00 18.64 18.64P-136 1.00 16.43 16.43P-138 1.00 97.46 97.46P-139 1.00 28.90 28.90P-141 1.00 34.96 34.96P-143 1.00 103.45 103.45P-144 1.00 65.10 65.10P-147 1.00 42.64 42.64P-148 1.00 48.02 48.02P-158 1.00 51.67 51.67P-160 1.00 28.64 28.64P-162 1.00 72.65 72.65P-173 1.00 39.91 39.91P-175 1.00 9.76 9.76P-192 1.00 84.71 84.71P-216 1.00 59.07 59.07P-217 1.00 14.66 14.66P-218 1.00 23.22 23.22SISTEMA IV SECTOR IÑAPAMPA 0.00P-99 1.00 9.65 9.65P-101 1.00 6.39 6.39P-104 1.00 20.70 20.70P-106 1.00 7.40 7.40P-108 1.00 7.75 7.75P-111 1.00 15.62 15.62P-113 1.00 19.77 19.77P-115 1.00 12.38 12.38P-117 1.00 33.16 33.16P-119 1.00 6.53 6.53P-122 1.00 7.17 7.17P-124 1.00 37.25 37.25P-126 1.00 11.39 11.39P-128 1.00 23.38 23.38P-130 1.00 13.95 13.95P-132 1.00 7.04 7.04P-134 1.00 16.79 16.79P-136 1.00 13.00 13.00P-138 1.00 9.98 9.98P-140 1.00 7.35 7.35P-142 1.00 7.76 7.76P-144 1.00 6.94 6.94P-146 1.00 15.71 15.71P-150 1.00 11.93 11.93P-152 1.00 8.20 8.20P-155 1.00 6.61 6.61P-157 1.00 5.44 5.44P-159 1.00 5.84 5.84P-161 1.00 2.71 2.71P-165 1.00 18.59 18.59P-167 1.00 12.57 12.57P-169 1.00 8.69 8.69P-171 1.00 20.43 20.43P-173 1.00 7.69 7.69P-175 1.00 57.68 57.68P-177 1.00 24.19 24.19P-179 1.00 43.82 43.82P-181 1.00 12.80 12.80P-183 1.00 7.42 7.42P-186 1.00 6.58 6.58P-188 1.00 6.58 6.58P-191 1.00 7.23 7.23P-194 1.00 10.30 10.30P-196 1.00 8.88 8.88P-198 1.00 10.09 10.09P-200 1.00 5.03 5.03P-202 1.00 3.77 3.77
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-204 1.00 6.74 6.74P-206 1.00 4.79 4.79P-208 1.00 6.24 6.24P-210 1.00 9.18 9.18P-212 1.00 10.70 10.70P-214 1.00 8.84 8.84P-273 1.00 18.36 18.36P-275 1.00 40.41 40.41P-277 1.00 58.76 58.76P-279 1.00 20.90 20.90P-281 1.00 14.76 14.76P-283 1.00 185.84 185.84P-287 1.00 200.79 200.79P-288 1.00 152.34 152.34P-290 1.00 50.82 50.82P-292 1.00 172.63 172.63P-294 1.00 52.55 52.55P-296 1.00 19.01 19.01P-298 1.00 108.34 108.34P-300 1.00 19.25 19.25P-302 1.00 17.50 17.50P-304 1.00 24.23 24.23P-306 1.00 52.45 52.45P-316 1.00 8.00 8.00P-327 1.00 10.45 10.45P-338 1.00 45.43 45.43P-340 1.00 13.55 13.55P-342 1.00 86.78 86.78P-344 1.00 31.69 31.69P-348 1.00 16.60 16.60P-350 1.00 15.80 15.80P-352 1.00 17.55 17.55P-354 1.00 121.02 121.02P-356 1.00 66.15 66.15P-358 1.00 49.01 49.01P-360 1.00 154.81 154.81P-362 1.00 12.94 12.94P-364 1.00 25.89 25.89P-366 1.00 14.29 14.29P-371 1.00 77.65 77.65P-373 1.00 29.89 29.89P-406 1.00 50.70 50.70P-407 1.00 102.09 102.09P-408 1.00 17.16 17.16P-409 1.00 200.77 200.77SISTEMA V SECTOR LEVITA 0.00P-4 1.00 8.71 8.71P-8 1.00 8.69 8.69P-10 1.00 5.29 5.29P-11 1.00 12.22 12.22P-13 1.00 140.59 140.59P-16 1.00 33.98 33.98P-18 1.00 87.95 87.95P-31 1.00 26.72 26.72P-33 1.00 6.91 6.91P-48 1.00 8.57 8.57P-50 1.00 6.21 6.21P-52 1.00 1.94 1.94P-54 1.00 5.36 5.36P-56 1.00 15.42 15.42P-58 1.00 4.77 4.77P-60 1.00 8.88 8.88P-62 1.00 15.59 15.59P-64 1.00 20.60 20.60P-66 1.00 4.94 4.94P-68 1.00 10.00 10.00P-70 1.00 10.53 10.53P-72 1.00 13.65 13.65P-74 1.00 16.77 16.77
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-109 1.00 18.08 18.08P-113 1.00 5.24 5.24P-115 1.00 2.76 2.76P-117 1.00 4.60 4.60P-119 1.00 3.82 3.82P-122 1.00 6.09 6.09P-125 1.00 73.42 73.42P-126 1.00 89.92 89.92P-128 1.00 23.35 23.35P-129 1.00 41.64 41.64P-130 1.00 53.84 53.84P-132 1.00 6.57 6.57P-134 1.00 5.64 5.64P-190 1.00 176.93 176.93P-193 1.00 72.47 72.47P-195 1.00 177.72 177.72P-196 1.00 73.58 73.58P-198 1.00 14.52 14.52P-200 1.00 11.98 11.98P-202 1.00 27.42 27.42P-205 1.00 87.62 87.62P-208 1.00 13.97 13.97P-210 1.00 17.86 17.86P-214 1.00 17.69 17.69P-259 1.00 142.71 142.71P-260 1.00 41.00 41.00P-265 1.00 105.51 105.51P-266 1.00 53.12 53.12P-267 1.00 94.00 94.00P-268 1.00 61.97 61.97P-269 1.00 39.39 39.39P-270 1.00 57.17 57.17P-277 1.00 19.02 19.02P-278 1.00 13.41 13.41
13.03.04 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC NTP 3 M 6,268.20SISTEMA I PUEBLO JOVENP-1 1.00 38.90 38.90P-2 1.00 58.19 58.19P-3 1.00 176.96 176.96P-4 1.00 121.08 121.08P-5 1.00 33.67 33.67P-7 1.00 77.92 77.92SISTEMA II SECTOR ESCALERAP-31 1.00 15.86 15.86P-43 1.00 19.21 19.21P-44 1.00 66.91 66.91P-45 1.00 48.87 48.87P-47 1.00 11.83 11.83P-49 1.00 74.76 74.76P-63 1.00 32.31 32.31P-64 1.00 23.26 23.26P-65 1.00 49.88 49.88P-66 1.00 22.31 22.31P-68 1.00 38.11 38.11P-70 1.00 13.21 13.21P-72 1.00 13.21 13.21P-74 1.00 21.06 21.06P-85 1.00 33.91 33.91P-86 1.00 10.13 10.13P-93 1.00 47.60 47.60P-95 1.00 11.94 11.94P-106 1.00 16.79 16.79P-107 1.00 7.98 7.98P-109 1.00 49.27 49.27P-111 1.00 7.22 7.22P-122 1.00 33.18 33.18P-194 1.00 12.14 12.14P-197 1.00 5.40 5.40P-199 1.00 5.21 5.21
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-201 1.00 6.64 6.64P-203 1.00 6.03 6.03P-205 1.00 4.67 4.67P-207 1.00 4.42 4.42P-209 1.00 5.38 5.38P-211 1.00 9.37 9.37P-261 1.00 59.13 59.13P-278 1.00 56.99 56.99P-280 1.00 32.21 32.21P-288 1.00 15.83 15.83P-290 1.00 11.45 11.45P-292 1.00 14.14 14.14P-294 1.00 11.84 11.84P-296 1.00 34.07 34.07P-298 1.00 26.96 26.96P-300 1.00 13.25 13.25P-302 1.00 30.85 30.85P-323 1.00 34.11 34.11P-324 1.00 59.35 59.35
SISTEMA III SECTOR CHURQUINUYOCP-7 1.00 31.55 31.55P-9 1.00 15.58 15.58P-12 1.00 52.72 52.72P-13 1.00 159.79 159.79P-15 1.00 15.25 15.25P-17 1.00 14.78 14.78P-19 1.00 23.16 23.16P-21 1.00 15.30 15.30P-23 1.00 24.90 24.90P-45 1.00 18.72 18.72P-49 1.00 12.09 12.09P-50 1.00 11.25 11.25P-52 1.00 7.89 7.89P-55 1.00 52.70 52.70P-57 1.00 11.91 11.91P-59 1.00 25.37 25.37P-61 1.00 16.84 16.84P-76 1.00 66.68 66.68P-80 1.00 28.17 28.17P-82 1.00 32.28 32.28P-84 1.00 12.47 12.47P-102 1.00 28.74 28.74P-103 1.00 96.19 96.19P-115 1.00 47.92 47.92P-121 1.00 17.23 17.23P-123 1.00 27.37 27.37P-125 1.00 17.54 17.54P-149 1.00 21.10 21.10P-176 1.00 11.24 11.24P-195 1.00 18.14 18.14P-197 1.00 24.55 24.55P-199 1.00 105.88 105.88P-201 1.00 50.30 50.30P-203 1.00 42.40 42.40P-205 1.00 12.75 12.75P-210 1.00 13.41 13.41P-211 1.00 14.25 14.25P-212 1.00 7.62 7.62P-213 1.00 16.95 16.95P-219 1.00 17.58 17.58P-220 1.00 93.48 93.48
SISTEMA IV SECTOR IÑAPAMPA 0.00P-37 1.00 23.12 23.12P-216 1.00 51.91 51.91P-217 1.00 46.54 46.54P-219 1.00 71.78 71.78P-221 1.00 43.67 43.67P-223 1.00 106.79 106.79P-225 1.00 125.55 125.55
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-227 1.00 44.85 44.85P-229 1.00 17.45 17.45P-231 1.00 11.86 11.86P-233 1.00 8.34 8.34P-235 1.00 112.24 112.24P-237 1.00 78.18 78.18P-256 1.00 20.73 20.73P-258 1.00 23.19 23.19P-260 1.00 43.92 43.92P-262 1.00 74.96 74.96P-264 1.00 23.39 23.39P-307 1.00 26.32 26.32P-309 1.00 10.53 10.53P-311 1.00 9.31 9.31P-313 1.00 39.02 39.02P-377 1.00 53.21 53.21P-379 1.00 39.38 39.38P-381 1.00 12.96 12.96P-383 1.00 86.40 86.40P-385 1.00 77.85 77.85P-387 1.00 28.96 28.96P-389 1.00 12.34 12.34P-391 1.00 32.75 32.75
SISTEMA V SECTOR LEVITA 0.00P-19 1.00 32.36 32.36P-35 1.00 26.06 26.06P-76 1.00 35.53 35.53P-78 1.00 6.93 6.93P-84 1.00 10.24 10.24P-86 1.00 2.03 2.03P-91 1.00 17.32 17.32P-136 1.00 13.53 13.53P-138 1.00 10.85 10.85P-140 1.00 42.81 42.81P-142 1.00 31.45 31.45P-144 1.00 19.57 19.57P-146 1.00 11.48 11.48P-148 1.00 55.70 55.70P-150 1.00 129.94 129.94P-152 1.00 7.08 7.08P-154 1.00 11.17 11.17P-165 1.00 70.14 70.14P-166 1.00 41.73 41.73P-168 1.00 58.47 58.47P-172 1.00 12.44 12.44P-215 1.00 118.37 118.37P-217 1.00 36.84 36.84P-219 1.00 59.15 59.15P-221 1.00 56.40 56.40P-223 1.00 34.27 34.27P-225 1.00 24.16 24.16P-234 1.00 20.86 20.86P-235 1.00 108.31 108.31P-238 1.00 230.63 230.63P-242 1.00 70.83 70.83P-243 1.00 54.03 54.03P-245 1.00 13.40 13.40P-247 1.00 30.93 30.93P-261 1.00 11.15 11.15P-262 1.00 55.37 55.37P-271 1.00 11.83 11.83P-272 1.00 54.55 54.55P-279 1.00 48.35 48.35P-280 1.00 46.06 46.06P-281 1.00 125.92 125.92P-282 1.00 83.45 83.45
13.03.05 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC NTP 39M 4,812.86SISTEMA I PUEBLO JOVENP-8 1.00 10.00 10.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-9 1.00 97.80 97.80P-10 1.00 34.60 34.60P-15 1.00 58.78 58.78P-18 1.00 122.41 122.41P-20 1.00 10.55 10.55P-22 1.00 67.93 67.93P-24 1.00 3.76 3.76P-26 1.00 56.05 56.05SISTEMA II SECTOR ESCALERAP-2 1.00 8.03 8.03P-13 1.00 53.35 53.35P-20 1.00 83.30 83.30P-22 1.00 7.46 7.46P-28 1.00 28.86 28.86P-33 1.00 21.17 21.17P-35 1.00 40.30 40.30P-51 1.00 19.76 19.76P-52 1.00 37.73 37.73P-53 1.00 36.54 36.54P-55 1.00 91.45 91.45P-57 1.00 17.06 17.06P-76 1.00 41.90 41.90P-88 1.00 15.04 15.04P-90 1.00 48.10 48.10P-96 1.00 8.95 8.95P-98 1.00 9.53 9.53P-101 1.00 46.43 46.43P-103 1.00 18.54 18.54P-113 1.00 6.30 6.30P-115 1.00 3.19 3.19P-117 1.00 5.21 5.21P-119 1.00 15.75 15.75P-124 1.00 18.16 18.16P-126 1.00 11.29 11.29P-128 1.00 47.45 47.45P-136 1.00 23.22 23.22P-145 1.00 11.57 11.57P-213 1.00 8.81 8.81P-263 1.00 29.40 29.40P-265 1.00 20.66 20.66P-283 1.00 19.54 19.54P-285 1.00 14.92 14.92P-306 1.00 56.48 56.48P-308 1.00 35.89 35.89P-310 1.00 107.27 107.27P-312 1.00 14.48 14.48SISTEMA III SECTOR CHURQUINUYOC 0.00P-25 1.00 7.16 7.16P-26 1.00 5.17 5.17P-29 1.00 18.70 18.70P-31 1.00 25.90 25.90P-39 1.00 30.97 30.97P-63 1.00 31.66 31.66P-64 1.00 20.34 20.34P-67 1.00 44.06 44.06P-68 1.00 38.16 38.16P-77 1.00 7.23 7.23P-86 1.00 16.04 16.04P-111 1.00 13.70 13.70P-116 1.00 21.72 21.72P-118 1.00 37.91 37.91P-127 1.00 11.85 11.85P-129 1.00 13.14 13.14P-131 1.00 21.60 21.60P-133 1.00 14.71 14.71P-154 1.00 12.52 12.52P-163 1.00 12.03 12.03P-165 1.00 16.43 16.43P-167 1.00 13.22 13.22
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-169 1.00 29.01 29.01P-178 1.00 86.95 86.95P-180 1.00 26.07 26.07P-183 1.00 22.11 22.11P-185 1.00 40.99 40.99P-187 1.00 30.50 30.50P-189 1.00 14.41 14.41SISTEMA IV SECTOR IÑAPAMPA 0.00P-4 1.00 30.57 30.57P-6 1.00 13.30 13.30P-21 1.00 17.14 17.14P-23 1.00 11.37 11.37P-39 1.00 94.64 94.64P-41 1.00 45.80 45.80P-93 1.00 25.51 25.51P-147 1.00 15.17 15.17P-162 1.00 21.19 21.19P-240 1.00 16.96 16.96P-242 1.00 10.71 10.71P-244 1.00 12.12 12.12P-246 1.00 12.33 12.33P-248 1.00 8.57 8.57P-250 1.00 8.33 8.33P-252 1.00 5.41 5.41P-266 1.00 9.32 9.32P-268 1.00 12.09 12.09P-270 1.00 6.69 6.69P-315 1.00 6.42 6.42P-318 1.00 4.52 4.52P-320 1.00 6.41 6.41P-323 1.00 12.21 12.21P-326 1.00 4.69 4.69P-329 1.00 4.87 4.87P-331 1.00 22.55 22.55P-333 1.00 12.37 12.37P-335 1.00 10.86 10.86P-345 1.00 103.12 103.12P-368 1.00 8.14 8.14P-393 1.00 13.84 13.84P-395 1.00 14.53 14.53P-397 1.00 101.77 101.77P-399 1.00 16.01 16.01SISTEMA V SECTOR LEVITA 0.00P-21 1.00 104.09 104.09P-22 1.00 53.07 53.07P-24 1.00 31.33 31.33P-36 1.00 41.69 41.69P-39 1.00 4.09 4.09P-41 1.00 60.26 60.26P-43 1.00 14.16 14.16P-79 1.00 20.20 20.20P-81 1.00 15.86 15.86P-93 1.00 92.28 92.28P-95 1.00 9.61 9.61P-97 1.00 10.27 10.27P-101 1.00 33.30 33.30P-103 1.00 19.21 19.21P-104 1.00 48.78 48.78P-106 1.00 16.19 16.19P-149 1.00 6.61 6.61P-156 1.00 8.41 8.41P-158 1.00 7.28 7.28P-160 1.00 10.59 10.59P-173 1.00 9.53 9.53P-175 1.00 38.20 38.20P-177 1.00 95.35 95.35P-180 1.00 38.25 38.25P-182 1.00 68.82 68.82P-183 1.00 47.92 47.92
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-186 1.00 95.63 95.63P-188 1.00 47.93 47.93P-218 1.00 15.17 15.17P-220 1.00 10.05 10.05P-222 1.00 39.43 39.43P-224 1.00 24.84 24.84P-226 1.00 37.12 37.12P-227 1.00 18.53 18.53P-229 1.00 16.82 16.82P-231 1.00 5.51 5.51P-236 1.00 30.00 30.00P-248 1.00 32.35 32.35P-250 1.00 1.00 59.84 59.84P-255 1.00 73.36 73.36P-263 1.00 1.00 247.83 247.83P-264 1.00 20.11 20.11P-273 1.00 1.00 71.25 71.25P-274 1.00 1.00 61.82 61.82P-275 1.00 1.00 27.63 27.63P-276 1.00 23.53 23.53P-270 1.00 6.69 6.69P-315 1.00 6.42 6.42P-318 1.00 4.52 4.52P-320 1.00 6.41 6.41P-323 1.00 12.21 12.21P-326 1.00 4.69 4.69P-329 1.00 4.87 4.87P-331 1.00 22.55 22.55P-333 1.00 12.37 12.37P-335 1.00 10.86 10.86P-345 1.00 103.12 103.12P-368 1.00 8.14 8.14P-393 1.00 13.84 13.84P-395 1.00 14.53 14.53P-397 1.00 101.77 101.77P-399 1.00 16.01 16.01P-52 0.00P-21 1.00 104.09 104.09P-22 1.00 53.07 53.07P-24 1.00 31.33 31.33P-36 1.00 41.69 41.69P-39 1.00 4.09 4.09P-41 1.00 60.26 60.26P-43 1.00 14.16 14.16P-79 1.00 20.20 20.20P-81 1.00 15.86 15.86P-93 1.00 92.28 92.28P-95 1.00 9.61 9.61P-97 1.00 10.27 10.27P-101 1.00 33.30 33.30P-103 1.00 19.21 19.21P-104 1.00 48.78 48.78P-106 1.00 16.19 16.19P-149 1.00 6.61 6.61P-156 1.00 8.41 8.41P-158 1.00 7.28 7.28P-160 1.00 10.59 10.59P-173 1.00 9.53 9.53P-175 1.00 38.20 38.20P-177 1.00 95.35 95.35P-180 1.00 38.25 38.25P-182 1.00 68.82 68.82P-183 1.00 47.92 47.92P-186 1.00 95.63 95.63P-188 1.00 47.93 47.93P-218 1.00 15.17 15.17P-220 1.00 10.05 10.05P-222 1.00 39.43 39.43P-224 1.00 24.84 24.84
#REF!
#REF!
OBRA : #REF!COMPONENTE :LINEA DE ADUCCION Y REDES DE DISTRIBUCION DE AGUA (21 339.45 M)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
BASE LARGO ALTO TOTALPARCIAL
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLINEA DE ADUCCION Y REDES DISTRIBUCIONMunicipalidad Distrital
de Ayapata
P-226 1.00 37.12 37.12P-227 1.00 18.53 18.53P-229 1.00 16.82 16.82P-231 1.00 5.51 5.51P-236 1.00 30.00 30.00P-248 1.00 32.35 32.35P-250 1.00 1.00 59.84 59.84P-255 1.00 73.36 73.36P-263 1.00 1.00 247.83 247.83P-264 1.00 20.11 20.11P-273 1.00 1.00 71.25 71.25P-274 1.00 1.00 61.82 61.82P-275 1.00 1.00 27.63 27.63P-276 1.00 23.53 23.53
13.03.06 PRUEBA HIDRÁULICA MAS DESINFECCIÓN TUB. PVC NM 1.00 683.50 683.50 683.50
13.03.07 PRUEBA HIDRÁULICA MAS DESINFECCIÓN TUB. PVC NM 1.00 2,672.43 2,672.43 2,672.43
13.03.08 PRUEBA HIDRÁULICA MAS DESINFECCIÓN TUB. PVC NM 1.00 6,902.46 6,902.46 6,902.46
13.03.09 PRUEBA HIDRÁULICA MAS DESINFECCIÓN TUB. PVC NM 1.00 6,268.20 6,268.20 6,268.20
13.03.10 PRUEBA HIDRÁULICA MAS DESINFECCIÓN TUB. PVC NM 1.00 4,812.86 4,812.86 4,812.86
13.04.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS13.04.01 SUMIN. E INSTAL. DE ACCESORIOS RED DE ADUCCI GLB 1.00 1.00 1.00
13.04.02 SUMIN. E INSTAL. DE ACCESORIOS RED DE ADUCC GLB 1.00 1.00 1.00
13.04.03 SUMIN. E INSTAL. DE ACCESORIOS RED DE ADUCCI GLB 1.00 1.00 1.00
13.04.04 SUMIN. E INSTAL. DE ACCESORIOS RED DE ADUCCIOGLB 1.00 1.00 1.00
13.04.05 INSTALACION DE ACESORIOS PVC SAP SP (PROMEDIUND ### 1,123.00 1,123.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :CAMARA ROMPEPRESION TIPO - VI (02 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
14.00.00 CAMARA ROMPE PRESION TIPO 7 (25 UND) CANTIDAD 25.00
14.01.00 TRABAJOS PRELIMINARES14.01.01 LIMPIEZA DE TERRENO MANUAL M2 53.00
Camara humeda 1.00 1.60 1.10 1.76Camara de valvulas 1.00 0.60 0.60 0.36
14.01.02 TRAZO Y REPLANTEO M2 53.00Camara humeda 1.00 1.60 1.10 1.76Camara de valvulas 1.00 0.60 0.60 0.36
14.02.00 MOVIMIENTO DE TIERRAS14.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 48.50
Camara humeda 1.00 1.60 1.10 1.00 1.76Camara de valvulas 1.00 0.60 0.60 0.50 0.18
14.02.02 REFINE NIVELACION Y COMPACTACION M2 53.00Camara humeda 1.00 1.60 1.10 1.76Camara de valvulas 1.00 0.60 0.60 0.36
14.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 68.90Proveniente de la excavacion 1.00 1.30 53.00 68.90
14.03.00 OBRAS DE CONCRETO SIMPLE14.03.01 SOLADO CONCRETO E=4", F'C = 100kg/cm2 M2 44.00
Camara humeda 1.00 1.60 1.10 1.7614.04.00 OBRAS DE CONCRETO ARMADO14.04.01 CONCRETO f'c 210kg/cm2 M3 27.77
Losa de piso camara humeda 1.00 1.60 1.10 0.15 0.26Losa de piso caja de valvulas 1.00 0.60 0.60 0.10 0.04Muros longitudinales camara humeda 2.00 1.40 0.15 1.00 0.42Muros Transversales camara humeda 2.00 0.60 0.15 1.00 0.18Muros longitudinales caja de valvulas 2.00 0.60 0.10 0.40 0.05Muros Transversales caja de valvulas 2.00 0.40 0.10 0.40 0.03Losa de cubierta 1.00 1.40 1.00 0.10 0.14Restar buzon de inspeccion 1.00 0.60 0.60 0.10 0.04Dado de Concreto 1.00 0.30 0.30 0.30 0.03
14.04.02 ENCOFRADO Y DESENCOFRADO M2 302.00Interior de Camara humeda 1.00 3.40 0.90 3.06Interior de caja de valvulas 1.00 1.60 0.40 0.64Exterior de Camara humeda 1.00 4.60 0.90 4.14Exterior de caja de valvulas 1.00 2.40 0.40 0.96Fondo de losa camara humeda 1.00 4.80 0.15 0.72Fondo de losa caja de valvulas 1.00 2.40 0.10 0.24Losa cubiertacamara humeda 1.00 1.40 0.90 1.26Restar buzon de inspeccion 1.00 0.60 0.60 0.36Friso de losa de cubierta 1.00 4.60 0.10 0.46Friso de Buzon de Inspección 1.00 2.40 0.10 0.24
14.04.03 ACERO CORRUGADO f`y = 4200 kg/cm2 GRADO 6 KG ### Del cuadro de metrados de Acero 34.61 865.20
14.05.00 REBOQUES ENLUCIDOS Y MOLDURAS14.05.01 TARRAJEO CON IMPERMEABILIZANTE MORTERO 1: M2 76.50
Interior de Camara humeda 1.00 3.40 0.90 3.0614.05.02 TARRAJEO EN INTERIORES Y EXTERIORES MORTER M2 166.00
Exterior de Camara humeda 1.00 4.60 0.90 4.14Exterior de caja de valvulas 1.00 1.80 0.50 0.90Encima Losa de Cubierta 1.00 1.40 0.90 1.26Restar buzon de Inspeccion 1.00 0.60 0.60 0.36Friso de losa de cubierta 1.00 4.60 0.10 0.46Friso de Buzon de Inspección 1.00 2.40 0.10 0.24
14.05.02 TARRAJEO C/IMPERMEABILIZANTE PENDIENTE DE M2 1.00 1.10 0.60 0.66 16.50
14.06.00 PINTURA14.06.01 PINTURA ESMALTE EN EXTERIORES M2 89.00
Exterior de Muros Camara Humeda 1.00 4.60 0.40 1.84Friso de Losa de Cubierta 1.00 4.60 0.10 0.46Encima Losa de Cubierta Camara Humeda 1.00 1.40 0.90 1.26
14.07.00 CARPINTERIA METALICA14.07.01 TAPA METALICA DE INSPECCION DE 0.60M X 0.60 GBL 1.00 1.00 25.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSCAMARA ROMPE PRESION T-7
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :CAMARA ROMPEPRESION TIPO - VI (02 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSCAMARA ROMPE PRESION T-7
Municipalidad Distrital de Ayapata
14.07.02 TAPA METALICA DE INSPECCION DE 0.40M X 0.40 GBL 1.00 1.00 25.00
14.08.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS14.08.01 SUMIN. E INST. DE VALVULAS Y ACCESORIOS EN CRP-7 EN TUB. DE 3"
14.08.01.01 SUMIN. E INSTAL. DE ACCESORIOS DE INGRESO GBL 1.00 1.00 1.00Codo PVC SAP para agua simple presion de 3" X 90 UND 1.00Niple PVC SAP de 3"x2" UND 2.00Union universal PVC SAP para agua a presion 3" UND 2.00Adaptador PVC SAP 3" UND 2.00Valvula compuerta de bronce de 3" UND 1.00Valvula flotador de 3" UND 1.00Union PVC SAP para agua simple presion de 3" UND 1.00
14.08.01.02 SUMIN. E INSTAL. DE ACCESORIOS DE REBOSE, GBL 1.00 1.00 1.00Tuberia de ventilacion F° G° de 2" UND 1.00Cono de rebose PVC SAP 4"x2" UND 1.00Union PVC SAP para agua simple presion de 2" UND 2.00Codo PVC SAP para agua simple presion de 2" X 90 UND 2.00Tapon hembra PVC SAP para agua simple presion d UND 1.00Tuberia PVC SAP presion para agua C-7.5 EC 2" M 2.50
14.08.01.03 SUMIN. E INSTAL. DE ACCESORIOS DE SALIDA C GBL 1.00 1.00 1.00Canastilla de succion PVC SAP de 3"x6" UND 1.00Union PVC SAP para agua simple presion de 3" UND 2.00
14.08.02 SUMIN. E INST. DE VALVULAS Y ACCESORIOS EN CRP-7 EN TUB. DE 2 1/2"14.08.02.01 SUMIN. E INSTAL. DE ACCESORIOS DE INGRESO GBL 3.00 3.00 3.00
Codo PVC SAP para agua simple presion de 2 1/2" UND 1.00Niple PVC SAP de 2 1/2"x2" UND 2.00Union universal PVC SAP para agua a presion 2 1/2 UND 2.00Adaptador PVC SAP 2 1/2" UND 2.00Valvula compuerta de bronce de 2 1/2" UND 1.00Valvula flotador de 2 1/2" UND 1.00Union PVC SAP para agua simple presion de 2 1/2" UND 1.00
14.08.02.02 SUMIN. E INSTAL. DE ACCESORIOS DE REBOSE, GBL 3.00 3.00 3.00Tuberia de ventilacion F° G° de 2" UND 1.00Cono de rebose PVC SAP 4"x2" UND 1.00Union PVC SAP para agua simple presion de 2" UND 2.00Codo PVC SAP para agua simple presion de 2" X 90 UND 2.00Tapon hembra PVC SAP para agua simple presion d UND 1.00Tuberia PVC SAP presion para agua C-7.5 EC 2" M 2.50
14.08.02.03 SUMIN. E INSTAL. DE ACCESORIOS DE SALIDA C GBL 3.00 3.00 3.00Canastilla de succion PVC SAP de 2 1/2"x5" UND 1.00Union PVC SAP para agua simple presion de 2 1/2" UND 2.00
14.08.03 SUMIN. E INST. DE VALVULAS Y ACCESORIOS EN CRP-7 EN TUB. DE 2"14.08.03.01 SUMIN. E INSTAL. DE ACCESORIOS DE INGRESO GBL ### 10.00 10.00
Codo PVC SAP para agua simple presion de 2" X 90 UND 1.00Niple PVC SAP de 2"x2" UND 2.00Union universal PVC SAP para agua a presion 2" UND 2.00Adaptador PVC SAP 2" UND 2.00Valvula compuerta de bronce de 2" UND 1.00Valvula flotador de 2" UND 1.00Union PVC SAP para agua simple presion de 2" UND 1.00
14.08.03.02 SUMIN. E INSTAL. DE ACCESORIOS DE REBOSE, GBL ### 10.00 10.00Tuberia de ventilacion F° G° de 2" UND 1.00Cono de rebose PVC SAP 4"x2" UND 1.00Union PVC SAP para agua simple presion de 2" UND 2.00Codo PVC SAP para agua simple presion de 2" X 90 UND 2.00Tapon hembra PVC SAP para agua simple presion d UND 1.00Tuberia PVC SAP presion para agua C-7.5 EC 2" M 2.50
14.08.03.03 SUMIN. E INSTAL. DE ACCESORIOS DE SALIDA C GBL ### 10.00 10.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :CAMARA ROMPEPRESION TIPO - VI (02 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSCAMARA ROMPE PRESION T-7
Municipalidad Distrital de Ayapata
Canastilla de succion PVC SAP de 2"x4" UND 1.00Union PVC SAP para agua simple presion de 2 " UND 2.00
14.08.04 SUMIN. E INST. DE VALVULAS Y ACCESORIOS EN CRP-7 EN TUB. DE 1"14.08.04.01 SUMIN. E INSTAL. DE ACCESORIOS DE INGRESO GBL 8.00 8.00 8.00
Codo PVC SAP para agua simple presion de 1" X 90 UND 1.00Niple PVC SAP de 1"x2" UND 2.00Union universal PVC SAP para agua a presion 1" UND 2.00Adaptador PVC SAP 1" UND 2.00Valvula compuerta de bronce de 1" UND 1.00Valvula flotador de 1" UND 1.00Union PVC SAP para agua simple presion de 1" UND 1.00
14.08.04.02 SUMIN. E INSTAL. DE ACCESORIOS DE REBOSE, GBL 8.00 8.00 8.00Tuberia de ventilacion F° G° de 2" UND 1.00Cono de rebose PVC SAP 4"x2" UND 1.00Union PVC SAP para agua simple presion de 2" UND 2.00Codo PVC SAP para agua simple presion de 2" X 90 UND 2.00Tapon hembra PVC SAP para agua simple presion d UND 1.00Tuberia PVC SAP presion para agua C-7.5 EC 2" M 2.50
14.08.04.03 SUMIN. E INSTAL. DE ACCESORIOS DE SALIDA C GBL 8.00 8.00 8.00Canastilla de succion PVC SAP de 1"x2" UND 1.00Union PVC SAP para agua simple presion de 1" UND 2.00
14.08.05 SUMIN. E INST. DE VALVULAS Y ACCESORIOS EN CRP-7 EN TUB. DE 3/4"14.08.05.01 SUMIN. E INSTAL. DE ACCESORIOS DE INGRESO GBL 3.00 3.00 3.00
Codo PVC SAP para agua simple presion de 3/4" X UND 1.00Niple PVC SAP de 3/4"x2" UND 2.00Union universal PVC SAP para agua a presion 3/4" UND 2.00Adaptador PVC SAP 3/4" UND 2.00Valvula compuerta de bronce de 3/4" UND 1.00Valvula flotador de 3/4" UND 1.00Union PVC SAP para agua simple presion de 3/4" UND 1.00
14.08.05.02 SUMIN. E INSTAL. DE ACCESORIOS DE REBOSE, GBL 3.00 3.00 3.00Tuberia de ventilacion F° G° de 2" UND 1.00Cono de rebose PVC SAP 4"x2" UND 1.00Union PVC SAP para agua simple presion de 2" UND 2.00Codo PVC SAP para agua simple presion de 2" X 90 UND 2.00Tapon hembra PVC SAP para agua simple presion d UND 1.00Tuberia PVC SAP presion para agua C-7.5 EC 2" M 2.50
14.08.05.03 SUMIN. E INSTAL. DE ACCESORIOS DE SALIDA C GBL 3.00 3.00 3.00Canastilla de succion PVC SAP de 3/4"x1.5" UND 1.00Union PVC SAP para agua simple presion de 3/4" UND 2.00
14.09.00 VARIOS14.09.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A UND 1.00 1.00 25.0014.09.02 PRUEBA HIDRAULICA + DESINFECCION DE DEPOS M3 1.00 1.10 0.60 0.90 0.59 14.85
14.10.00 CERCO PERIM.DE ALAMBRE DE PUAS 'C/ROLLIZOS DE EUCALIPTO-CRP614.10.01 TRABAJOS PRELIMINARES
14.10.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 3.00 3.00 9.00 225.0014.10.01.02 TRAZO Y REPLANTEO M2 1.00 3.00 3.00 9.00 225.00
14.10.02 MOVIMIENTO DE TIERRAS14.10.02.01 EXCAVACION MANUAL EN TERRENO C/PIEDRAS M3 9.00 0.40 0.40 0.60 0.86 21.6014.10.02.02 ELIMINACIÓN DE MATERIAL EXCEDENTE D = 30M M3 9.00 1.30 0.40 0.40 0.60 1.12 28.08
14.10.03 OBRAS DE CONCRETO SIMPLE14.10.03.01 CONCRETO F'C = 140kg/cm2 M3 9.00 0.40 0.40 0.60 0.86 21.6014.10.03.01 ENCOFRADO Y DESENCOFRADO M2 9.00 1.60 0.10 1.44 36.00
14.10.04 PINTURA14.10.04.01 PINTURA ESMALTE EN EXTERIORES M2 9.00 0.24 2.00 4.24 106.03
#REF!
#REF!
OBRA : #REF!COMPONENTE :CAMARA ROMPEPRESION TIPO - VI (02 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSCAMARA ROMPE PRESION T-7
Municipalidad Distrital de Ayapata
14.10.04 VARIOS14.10.04.01 SUMINISTRO E INSTALACION ALAMBRE DE PUA M 1.00 ### 12.00 300.0014.10.04.02 SUMINISTRO E INSTALACION ROLLIZO DE EUCALUND 9.00 9.00 225.0014.10.04.03 PUERTA DE ALAMBRE DE PUAS Y MARCO DE M UND 1.00 1.00 25.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :CRUCE AEREO DE RIO L = 15 M (03 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
15.00.00 CRUCE AEREO DE RIO L = 15 M (03 UND) CANTIDAD 3.00
15.01.00 TRABAJOS PRELIMINARES
15.01.01 LIMPIEZA DE TERRENO MANUAL M2 17.28
Zapatas 2.00 1.20 1.20 2.88
Camara de anclaje 2.00 1.20 1.20 2.8815.01.02 TRAZO Y REPLANTEO M2 17.28
Zapatas 2.00 1.20 1.20 2.88
Camara de anclaje 2.00 1.20 1.20 2.88
15.02.00 MOVIMIENTO DE TIERRAS
15.02.01 EXCAVACIÓN MANUAL PARA ESTRUCTURAS M3 13.82
Zapatas 2.00 1.20 1.20 0.60 1.73
Camara de anclaje 2.00 1.20 1.20 1.00 2.8815.02.02 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 17.97
Proveniente de las excavaciones 1.00 1.30 13.82 17.97
15.03.00 OBRAS DE CONCRETO SIMPLE
15.03.01 CONCRETO CAMARAS DE ANCLAJE F'C = 140kg/c M3 8.64
Camara de anclaje 2.00 1.20 1.20 1.00 2.8815.03.02 SOLADO E=4", CONCRETO F'C = 100kg/cm2 M2 4.32
Zapatas 1.00 1.20 1.20 1.44
15.04.00 OBRAS DE CONCRETO ARMADO
15.04.01 CONCRETO F'C=210 kg/cm2 M3 5.67
Zapatas 2.00 1.20 1.20 0.50 1.44
Columnas 2.00 0.30 0.25 3.00 0.45
15.04.02 ENCOFRADO Y DESENCOFRADO M2 9.90
Columnas 1.00 1.10 3.00 3.30
15.04.03 ACERO DE REFUERZO f'y = 4200 kg/cm2 GRADO KG 1.00 95.27 Del cuadro de metrados de Acero 95.27 285.80
15.05.00 REBOQUES ENLUCIDOS Y MOLDURAS
15.05.01 TARRAJEO EN EXTERIORES MORTERO 1;5, E=1.5 M2 19.80
Columnas 2.00 1.10 3.00 6.60
15.06.00 PINTURA
15.06.01 PINTURA ESMALTE EN EXTERIORES M2 19.80
Columnas 2.00 1.10 3.00 6.60
15.07.00 TUBERIAS, CABLES Y ACCESORIOS
15.07.01 SUMINISTRO Y COLOCACION SISTEMA DE SUSPE UND 1.00 1.00 3.00
Cable de acero tipo boa de 3/8" M 25.00
Templador de cable de acero Ø 3/8" UND 2.00
Cable de acero de 1/4" M 10.00
Grilletes de acero de 3 pernos Ø 3/8" PZA 4.00
Grilletes de acero de 3 pernos Ø 1/4" PZA 22.00
Platina de acero 5X2.5 cm, E=3/8" PZA 4.00
Plancha de acero 15X15 cm, E=3/8" PZA 8.00
Plancha de acero 30X35 cm, E=3/8" PZA 4.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSCRUCE AEREO DE RIO L=15M
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :CRUCE AEREO DE RIO L = 15 M (03 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDAS
LARGOANCHO ALTO PARCIAL
RESULTADOSPERIMT.
%AREA TOTAL
HOJA DE METRADOSCRUCE AEREO DE RIO L=15M
Municipalidad Distrital de Ayapata
15.07.02 SUM. Y COLOC. TUB. F°G° D = 2 1/2" Y ACCES. UND 1.00 1.00 1.00
Codo de fierro galvanizado 2 1/2" X 45° UND 4.00
Union simple de fierro galvanizado 2 1/2" UND 2.00
Union universal de fierro galvanizado 2 1/2" UND 2.00
Niple de Fº Gº Ø 2 1/2" X 45 CM. UND 2.00
Niple Fº Gº Ø 2 1/2" X 70 CM. UND 2.00
Adaptador PVC SAP 2 1/2" UND 2.00
Tuberia de FºGº de 2 1/2" M 20.00
15.07.03 SUM. Y COLOC. TUB. F°G° D = 2" Y ACCES. EN C UND 2.00 2.00 2.00
Codo de fierro galvanizado 2" X 45° UND 4.00
Union simple de fierro galvanizado 2" UND 2.00
Union universal de fierro galvanizado 2" UND 2.00
Niple de Fº Gº Ø 2" X 45 CM. UND 2.00
Niple Fº Gº Ø 2" X 70 CM. UND 2.00
Adaptador PVC SAP 2" UND 2.00
Tuberia de FºGº de 2" M 20.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :VALVULA DE CONTROL (8 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
16.00.00 VALVULA DE CONTROL (8 UND) CANTIDAD 8.00
16.01.00 TRABAJOS PRELIMINARES16.01.01 LIMPIEZA DE TERRENO MANUAL M2 5.12
Valvula de Purga 1.00 0.80 0.80 0.6416.01.02 TRAZO Y REPLANTEO M2 5.12
Valvula de Purga 1.00 0.80 0.80 0.6416.02.00 MOVIMIENTO DE TIERRAS16.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 4.10
Valvula de Purga 1.00 0.80 0.80 0.80 0.5116.02.02 REFINE NIVELACION Y COMPACTACION M2 5.12
Valvula de Purga 1.00 0.80 0.80 0.6416.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 5.32
Proveniente de las excavaciones 1.00 1.30 4.10 5.3216.03.00 OBRAS DE CONCRETO ARMADO16.03.01 CONCRETO F'C=175 kg/cm2 M3 1.63
Losa fondo 1.00 0.80 0.80 0.10 0.06Muros perimetrales 2.00 0.60 0.10 0.70 0.08Muros perimetrales 2.00 0.40 0.10 0.70 0.06
16.03.02 ENCOFRADO Y DESENCOFRADO M2 44.80Muros perimetrales exterior 2.00 2.40 0.70 3.36Muros perimetrales interior 2.00 1.60 0.70 2.24
16.04.00 REBOQUES ENLUCIDOS Y MOLDURAS16.04.01 TARRAJEO EN INTERIORES MORTERO 1;2, E=1.5CM M2 1.00 1.60 0.65 1.04 8.3216.05.00 CARPINTERIA METALICA16.05.01 TAPA METALICA DE INSPECCION DE 0.50M X 0.50M GBL 1.00 1.00 8.00
16.06.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS16.06.01 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE CONTGBL 2.00 2.00 2.00
Niple PVC SAP de 2 1/2"x2" UND 2.00Union universal PVC SAP para agua simple presion de 2 UND 2.00Adaptador PVC SAP de 2 1/2" UND 2.00Valvula compuerta de bronce de 2 1/2" UND 1.00
16.06.02 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE CONTGBL 3.00 3.00 3.00Niple PVC SAP de 1 1/2 "x2" UND 2.00Union universal PVC SAP para agua simple presion de 1 UND 2.00Adaptador PVC SAP de 1 1/2" UND 2.00Valvula compuerta de bronce de 1 1/2" UND 1.00
16.06.03 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE CON GBL 3.00 3.00 3.00Niple PVC SAP de 1"x2" UND 2.00Union universal PVC SAP para agua simple presion de 1" UND 2.00Adaptador PVC SAP de 1" UND 2.00Valvula compuerta de bronce de 1" UND 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSVALVULA DE CONTROL
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE : VALVULA DE AIRE (4 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
17.00.00 VALVULA DE AIRE (4 UND) CANTIDAD 4.00
17.01.00 TRABAJOS PRELIMINARES17.01.01 LIMPIEZA DE TERRENO MANUAL M2 2.56
Valvula de aire 1.00 0.80 0.80 0.6417.01.02 TRAZO Y REPLANTEO M2 2.56
Valvula de aire 1.00 0.80 0.80 0.6417.02.00 MOVIMIENTO DE TIERRAS17.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 2.05
Valvula de aire 1.00 0.80 0.80 0.80 0.5117.02.02 REFINE NIVELACION Y COMPACTACION M2 2.56
Valvula de aire 1.00 0.80 0.80 0.6417.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 2.66
Proveniente de las excavaciones 1.00 1.30 2.05 2.6617.03.00 OBRAS DE CONCRETO ARMADO17.03.01 CONCRETO F'C=175 kg/cm2 M3 0.82
Losa fondo 1.00 0.80 0.80 0.10 0.06Muros perimetrales 2.00 0.60 0.10 0.70 0.08Muros perimetrales 2.00 0.40 0.10 0.70 0.06
17.03.02 ENCOFRADO Y DESENCOFRADO M2 22.40Muros perimetrales exterior 2.00 2.40 0.70 3.36Muros perimetrales interior 2.00 1.60 0.70 2.24
17.04.00 REBOQUES ENLUCIDOS Y MOLDURAS17.04.01 TARRAJEO EN INTERIORES MORTERO 1;2, E=1.5CM M2 1.00 1.60 0.65 1.04 4.1617.05.00 CARPINTERIA METALICA17.05.01 TAPA METALICA DE INSPECCION DE 0.50M X 0.50M GBL 1.00 1.00 4.00
17.06.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS17.06.02 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE AIRE GBL 1.00 1.00 1.00
Abrazadera Ø 2 1/2" C/Salida Ø 2" Inc/Pernos UND 1.00Valvula automatico de aire triple efecto Ø 2" UND 1.00
17.06.03 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE AIRE GBL 1.00 1.00 1.00Abrazadera Ø 1 1/2" C/Salida Ø 1" Inc/Pernos UND 1.00Valvula automatico de aire triple efecto Ø 1" UND 1.00
17.06.04 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE AIRE GBL 2.00 2.00 2.00Abrazadera Ø 1" C/Salida Ø 3/4" Inc/Pernos UND 1.00
Valvula automatico de aire triple efecto Ø 3/4" UND 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSVALVULA DE AIRE
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :VALVULA DE PURGA TIPO I (07 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
18.00.00 VALVULA DE PURGA TIPO I (07 UND) CANTIDAD 3.00
18.01.00 TRABAJOS PRELIMINARES18.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.92
Valvula de Purga 1.00 0.80 0.80 0.6418.01.02 TRAZO Y REPLANTEO M2 1.92
Valvula de Purga 1.00 0.80 0.80 0.6418.02.00 MOVIMIENTO DE TIERRAS18.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 1.54
Valvula de Purga 1.00 0.80 0.80 0.80 0.5118.02.02 REFINE NIVELACION Y COMPACTACION M2 1.92
Valvula de Purga 1.00 0.80 0.80 0.6418.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 2.00
Proveniente de las excavaciones 1.00 1.30 1.54 2.0018.03.00 OBRAS DE CONCRETO SIMPLE18.03.01 CONCRETO F'C=175 kg/cm2 M3 0.65
Losa fondo 1.00 0.80 0.80 0.10 0.06Muros perimetrales 2.00 0.60 0.10 0.70 0.08Muros perimetrales 2.00 0.40 0.10 0.70 0.06Dado de anclaje 1.00 0.30 0.20 0.20 0.01
18.03.02 ENCOFRADO Y DESENCOFRADO M2 17.40Muros perimetrales exterior 2.00 2.40 0.70 3.36Muros perimetrales interior 2.00 1.60 0.70 2.24Dado de anclaje 1.00 1.00 0.20 0.20
18.04.00 REBOQUES ENLUCIDOS Y MOLDURAS18.04.01 TARRAJEO EN INTERIORES MORTERO 1;2, E=1.5CM M2 1.00 1.60 0.65 1.04 3.1218.05.00 CARPINTERIA METALICA18.05.01 TAPA METALICA DE INSPECCION DE 0.50M X 0.50M GBL 1.00 1.00 3.00
18.06.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS18.06.01 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGAGBL 1.00 1.00 1.00
Niple PVC SAP de 2 1/2"x2" UND 2.00Tuberia PVC SAP presion para agua C-10 EC 2 1/2" M 2.50Tapon hembra PVC SAP para agua simple presion 2 1/2" UND 1.00Codo PVC SAP para agua simple presion de 2 1/2"X90° UND 2.00Tee PVC SAP para agua simple presion de 2 1/2" UND 1.00Union universal PVC SAP para agua simple presion de 2 UND 2.00Adaptador PVC SAP de 2 1/2" UND 2.00Valvula compuerta de bronce de 2 1/2" UND 1.00
18.06.02 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGAGBL 1.00 1.00 1.00Niple PVC SAP de 1 1/2"x2" UND 2.00Tuberia PVC SAP presion para agua C-10 EC 1 1/2" M 2.50Tapon hembra PVC SAP para agua simple presion 1 1/2" UND 1.00Codo PVC SAP para agua simple presion de 1 1/2"X90° UND 2.00Tee PVC SAP para agua simple presion de 1 1/2" UND 1.00Union universal PVC SAP para agua simple presion de 1 UND 2.00Adaptador PVC SAP de 1 1/2" UND 2.00Valvula compuerta de bronce de 1 1/2" UND 1.00
18.06.03 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGGBL 1.00 1.00 1.00Niple PVC SAP de 1"x2" UND 2.00Tuberia PVC SAP presion para agua C-10 EC 1" M 2.50Tapon hembra PVC SAP para agua simple presion 1" UND 1.00Codo PVC SAP para agua simple presion de 1"X90° UND 2.00Tee PVC SAP para agua simple presion de 1" UND 1.00Union universal PVC SAP para agua simple presion de 1" UND 2.00Adaptador PVC SAP de 1" UND 2.00
Valvula compuerta de bronce de 1" UND 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSVALVULA DE PURGA T-1
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :VALVULA DE PURGA TIPO II (29 UND)
FECHA #REF! PLANO R-1
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
19.00.00 VALVULA DE PURGA TIPO II (29 UND) CANTIDAD 5.00
19.01.00 TRABAJOS PRELIMINARES19.01.01 LIMPIEZA DE TERRENO MANUAL M2 3.20
Valvula de Purga 1.00 0.80 0.80 0.6419.01.02 TRAZO Y REPLANTEO M2 3.20
Valvula de Purga 1.00 0.80 0.80 0.6419*.02.00 MOVIMIENTO DE TIERRAS19.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 2.56
Valvula de Purga 1.00 0.80 0.80 0.80 0.5119.02.02 REFINE NIVELACION Y COMPACTACION M2 3.20
Valvula de Purga 1.00 0.80 0.80 0.6419.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 3.33
Proveniente de las excavaciones 1.00 1.30 2.56 3.3319.03.00 OBRAS DE CONCRETO SIMPLE19.03.01 CONCRETO F'C=175 kg/cm2 M3 1.08
Losa fondo 1.00 0.80 0.80 0.10 0.06Muros perimetrales 2.00 0.60 0.10 0.70 0.08Muros perimetrales 2.00 0.40 0.10 0.70 0.06Dado de anclaje 1.00 0.30 0.20 0.20 0.01
19.04.02 ENCOFRADO Y DESENCOFRADO M2 29.00Muros perimetrales exterior 2.00 2.40 0.70 3.36Muros perimetrales interior 2.00 1.60 0.70 2.24Dado de anclaje 1.00 1.00 0.20 0.20
19.04.00 REBOQUES ENLUCIDOS Y MOLDURAS19.04.01 TARRAJEO EN INTERIORES MORTERO 1;2, E=1.5CM M2 1.00 1.60 0.65 1.04 5.2019.05.00 CARPINTERIA METALICA19.05.01 TAPA METALICA DE INSPECCION DE 0.50M X 0.50M GBL 1.00 1.00 5.00
19.06.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS19.06.01 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGAGBL 1.00 1.00 1.00
Adaptador PVC SAP de 2 1/2" UND 2.00Union universal PVC SAP para agua simple presion de 2 UND 2.00Niple PVC SAP de 2 1/2"x2" UND 2.00Valvula compuerta de bronce de 2 1/2" UND 1.00Tapon hembra PVC SAP para agua simple presion 2 1/2" UND 1.00Tuberia PVC SAP presion para agua C-10 EC 2 1/2" M 2.00
19.06.01 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGAGBL 2.00 2.00 2.00Adaptador PVC SAP de 1 1/2" UND 2.00Union universal PVC SAP para agua simple presion de 1 UND 2.00Niple PVC SAP de 1 1/2"x2" UND 2.00Valvula compuerta de bronce de 1 1/2" UND 1.00Tapon hembra PVC SAP para agua simple presion 1 1/2" UND 1.00Tuberia PVC SAP presion para agua C-10 EC 1 1/2" M 2.00
19.06.02 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE PURGAGBL 2.00 2.00 2.00Adaptador PVC SAP de 1" UND 2.00Union universal PVC SAP para agua simple presion de 1" UND 2.00Niple PVC SAP de 1"x2" UND 2.00Valvula compuerta de bronce de 1" UND 1.00Tapon hembra PVC SAP para agua simple presion 1" UND 1.00Tuberia PVC SAP presion para agua C-10 EC 1" M 2.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSVALVULA DE PURGA TIPO-II
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :VALVULA REDUCTORA DE PRESION (6 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
16.00.00 VALVULA REDUCTORA DE PRESION (6 UND) CANTIDAD 6.00
16.01.00 TRABAJOS PRELIMINARES16.01.01 LIMPIEZA DE TERRENO MANUAL M2 3.84
Valvula de Purga 1.00 0.80 0.80 0.6416.01.02 TRAZO Y REPLANTEO M2 3.84
Valvula de Purga 1.00 0.80 0.80 0.6416.02.00 MOVIMIENTO DE TIERRAS16.02.01 EXCAVACIÓN MANUAL EN TERRENO C/PIEDRAS M3 3.07
Valvula de Purga 1.00 0.80 0.80 0.80 0.5116.02.02 REFINE NIVELACION Y COMPACTACION M2 3.84
Valvula de Purga 1.00 0.80 0.80 0.6416.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 3.99
Proveniente de las excavaciones 1.00 1.30 3.07 3.9916.03.00 OBRAS DE CONCRETO ARMADO16.03.01 CONCRETO F'C=175 kg/cm2 M3 1.22
Losa fondo 1.00 0.80 0.80 0.10 0.06Muros perimetrales 2.00 0.60 0.10 0.70 0.08Muros perimetrales 2.00 0.40 0.10 0.70 0.06
16.03.02 ENCOFRADO Y DESENCOFRADO M2 33.60Muros perimetrales exterior 2.00 2.40 0.70 3.36Muros perimetrales interior 2.00 1.60 0.70 2.24
16.04.00 REBOQUES ENLUCIDOS Y MOLDURAS16.04.01 TARRAJEO EN INTERIORES MORTERO 1;2, E=1.5CM M2 1.00 1.60 0.65 1.04 6.2416.05.00 CARPINTERIA METALICA16.05.01 TAPA METALICA DE INSPECCION DE 0.50M X 0.50M GBL 1.00 1.00 6.00
16.06.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS16.06.01 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE CONTGBL 3.00 3.00 3.00
Niple PVC SAP de 2 1/2"x2" UND 2.00Union universal PVC SAP para agua simple presion de 2 UND 2.00Adaptador PVC SAP de 2 1/2" UND 2.00Valvula Reductora de presion de 2 1/2" UND 1.00
16.06.02 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE CONTGBL 1.00 1.00 1.00Niple PVC SAP de 1 1/2"x2" UND 2.00Union universal PVC SAP para agua simple presion de 1 UND 2.00Adaptador PVC SAP de 1 1/2" UND 2.00Valvula Reductora de presion de 1 1/2" UND 1.00
16.06.03 ACCESORIOS GLOVAL PARA C. DE VALVULAS DE CON GBL 2.00 2.00 2.00Niple PVC SAP de 1"x2" UND 2.00Union universal PVC SAP para agua simple presion de 1" UND 2.00Adaptador PVC SAP de 1" UND 2.00Valvula Reductora de presion de 1" UND 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSVALVULA DE CONTROL
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :CONEXIONES DE AGUA POTABLE (592 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
20.00.00 CONEXIONES DE AGUA POTABLE (592 UND)20.01.00 TRABAJOS PRELIMINARES20.01.02 TRAZO Y REPLANTEO M 830.00
### 5.00 830.00
20.02.00 MOVIMIENTO DE TIERRAS20.02.01 EXCAVACIÓN MANUAL ZANJA H=0.70M, A=0.50M M 996.00
### 6.00 996.0020.02.02 REFINE NIV. Y COF. FONDO DE ZANJA A=0.50M M 996.00
### 6.00 996.0020.02.03 COLOCACION CAMA DE APOYO A=0.50M, E=0.10M M 996.00
### 6.00 996.0020.02.04 RELLENO APISONADO MANUAL DE ZANJA H=0.60M, M 996.00
### 6.00 996.0020.03.00 SUMINISTRO E INSTALACION DE TUBERIAS PVC AGUA20.03.01 SUMINISTRO E INSTALACION DE TUBERIA NTP 399.0 M 996.00
### 6.00 996.0020.03.02 PRUEVA HIDRÁULICA MAS DESINFECCIÓN DE TUBE M 996.00
### 6.00 996.00
20.04.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
20.04.02 CONEXIONES DOMICILIARIAS AGUA TUB. 1/2" A TUB.UND 42.00 42.00 42.00Niple PVC SAP C-10x1/2" para reemplazar medidor de 1UND 1.00Niple PVC SAP de 1/2"x1 1/2" UND 1.00Arena Gruesa M3 0.06Grava para filtro M3 0.01Cemento Portland tipo I (42.5 kg) BLS 0.56Caja prefabricada de concreto de 0.31mx0.375mx0.23 UND 1.00Marco y tapa de fierro fundido P/medidor de agua UND 1.00Racor PVC para agua (tuerca-niple) de 1/2" UND 1.00Abrzadera PVC de 1/2"x 2 1/2" UND 1.00Codo PVC SAP para agua simple presion de 1/2"x90° UND 2.00Union universal PVC SAP para agua presion de 1/2" UND 2.00Adaptador PVC SAP 1/2" UND 2.00Valvula corporation PVC para agua de 1/2" UND 1.00Valvula de paso PVC para agua de 1/2" UND 1.00
20.04.03 CONEXIONES DOMICILIARIAS AGUA TUB. 1/2" A TUB.UND 59.00 59.00 59.00Niple PVC SAP C-10x1/2" para reemplazar medidor de 1UND 1.00Niple PVC SAP de 1/2"x1 1/2" UND 1.00Arena Gruesa M3 0.06Grava para filtro M3 0.01Cemento Portland tipo I (42.5 kg) BLS 0.56Caja prefabricada de concreto de 0.31mx0.375mx0.23 UND 1.00Marco y tapa de fierro fundido P/medidor de agua UND 1.00Racor PVC para agua (tuerca-niple) de 1/2" UND 1.00Abrzadera PVC de 1/2"x 1 1/2" UND 1.00Codo PVC SAP para agua simple presion de 1/2"x90° UND 2.00Union universal PVC SAP para agua presion de 1/2" UND 2.00Adaptador PVC SAP 1/2" UND 2.00Valvula corporation PVC para agua de 1/2" UND 1.00Valvula de paso PVC para agua de 1/2" UND 1.00
20.04.04 CONEXIONES DOMICILIARIAS AGUA TUB. 1/2" A TUBUND 65.00 65.00 65.00Niple PVC SAP C-10x1/2" para reemplazar medidor de 1UND 1.00Niple PVC SAP de 1/2"x1 1/2" UND 1.00Arena Gruesa M3 0.06Grava para filtro M3 0.01Cemento Portland tipo I (42.5 kg) BLS 0.56Caja prefabricada de concreto de 0.31mx0.375mx0.23 UND 1.00Marco y tapa de fierro fundido P/medidor de agua UND 1.00Reduccion PVC SAP para agua con rosca 1" a 1/2" UND 1.00Codo PVC SAP para agua simple presion de 1/2"x90° UND 2.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTO
S
MEDIDAS
BASE LARGO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSCONEXIONES DE AGUA POTABLEMunicipalidad Distrital
de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :CONEXIONES DE AGUA POTABLE (592 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTO
S
MEDIDAS
BASE LARGO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSCONEXIONES DE AGUA POTABLEMunicipalidad Distrital
de Ayapata
Tee PVC SAP para agua simple presion de 1" UND 1.00Union universal PVC SAP para agua presion de 1/2" UND 2.00Adaptador PVC SAP 1/2" UND 2.00Valvula de paso PVC para agua de 1/2" UND 1.00
20.04.06 SUMIN. E INSTAL. VALVULA COMPUERTA DE BRONCEUND ### 166.00 166.00Niple PVC SAP de 1/2" x 1 1/2" UND 2.00Arena gruesa M3 0.06Grava para filtro M3 0.01Cemento portland tipo I (42.5 kg) BLS 0.56Caja prefabricada de concreto de 0.31mx0.375mx0.23 UND 3.00Tapa metalica C/Plancha estriada de 0.30mX0.30m, E= UND 1.00Union universal PVC SAP para agua presion de 1/2" UND 2.00Adaptador PVC SAP 1/2" UND 2.00Valvula compuerta de bronce de 1/2" UND 1.00
#REF!
#REF!
OBRA : #REF!COMPONENTE :LAVADEROS DOMICILIARIOS (583 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
21.00.00 LAVADEROS DOMICILIARIOS (583 UND) CANTIDAD 583.00
21.01.00 TRABAJOS PRELIMINARES21.01.01 LIMPIEZA DE TERRENO MANUAL M2 577.17
Lavadero 1.00 1.65 0.60 0.9921.01.02 TRAZO Y REPLANTEO M2 577.17
Lavadero 1.00 1.65 0.60 0.99
21.02.00 MOVIMIENTO DE TIERRAS21.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL M3 492.64
Cimientos 3.00 0.60 0.25 0.10 0.05Pozo percolador 1.00 1.00 1.00 0.80 0.80
21.02.02 REFINE NIVELACION Y COMPACTACION M2 262.35Lavadero 3.00 0.60 0.25 0.45
21.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 640.43Proveniente de la excavacion 1.00 1.30 ### 640.43
21.03.00 OBRAS DE CONCRETO SIMPLE21.03.01 CONCRETO CICLOPEO f'c 175/kg/cm2+30% PM 153.04
Muretes 1.00 0.60 0.25 0.85 0.13Muretes 2.00 0.60 0.25 0.45 0.14
21.03.02 ENCOFRADO Y DESENCOFRADO M2 1,437.10Muretes (longitudinal) 2.00 0.60 0.75 0.90Muretes (longitudinal) 4.00 0.60 0.35 0.84Muretes (transversal) 2.00 0.25 0.75 0.38Muretes (transversal) 4.00 0.25 0.35 0.35
21.04.00 OBRAS DE CONCRETO ARMADO21.04.01 CONCRETO f'c 175/kg/cm2, LOSAS MACISAS M3 74.33
Losa para lavado 1.00 0.80 0.60 0.05 0.02Losa fondo batea 1.00 0.90 0.60 0.05 0.03Muretes perimetrales de vatea 2.00 0.45 0.05 0.35 0.02Muretes perimetrales de vatea 1.00 0.90 0.05 0.35 0.02Murete en forma de trapezoide de vatea 1.00 0.10 0.45 0.05
21.04.02 ENCOFRADO Y DESENCOFRADO M2 1,690.70Losa para lavado 1.00 0.60 0.50 0.30Friso de losa 1.00 2.00 0.05 0.10Losa fondo vatea 1.00 0.60 0.40 0.24Muretes perimetrales de vatea 4.00 0.45 0.40 0.72Muretes perimetrales de vatea 1.00 0.90 0.40 0.36Muretes perimetrales de vatea 1.00 0.80 0.35 0.28Murete en forma de trapezoide de vatea 2.00 0.45 0.90
21.04.03 ACERO CORRUGADO f`y = 4200 kg/cm2 GRADO 6 KG 6.35 Del cuadro de metrados de Acero 6.35 3,701.35
21.05.00 REBOQUES ENLUCIDOS Y MOLDURAS21.05.01 TARRAJEO CON IMPERMEABILIZANTE MORTERO 1: M2 510.13
Muretes 1.00 0.35 2.50 0.88
21.05.02 TARRAJEO EN INTERIORES Y EXTERIORES MORTER M2 2,387.38Muretes (longitudinal) 2.00 0.60 0.75 0.90Muretes (longitudinal) 4.00 0.60 0.35 0.84Muretes (transversal) 1.00 0.25 0.75 0.19Muretes (transversal) 1.00 0.25 0.35 0.09Losa para laba dointerior 1.00 0.60 0.50 0.30Losa encima 1.00 0.80 0.60 0.48Friso de losa para lavado 1.00 1.40 0.05 0.07Losa fondo batea (interior) 1.00 0.60 0.40 0.24Muretes perimetrales de vatea 1.00 0.45 0.40 0.18Muretes perimetrales de vatea 1.00 0.90 0.40 0.36Murete en forma de trapezoide de batea 1.00 0.45 0.45
21.05.03 TARRAJEO C/IMPERMEABILIZANTE PENDIENTE DE M2 1.00 0.80 0.45 0.36 209.88
21.06.00 PINTURA21.06.01 PINTURA ESMALTE EN EXTERIORES M2 1,661.55
Muretes (longitudinal) 2.00 0.60 0.75 0.90Muretes (longitudinal) 4.00 0.60 0.35 0.84
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLAVADEROS DOMICILIARIOS
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :LAVADEROS DOMICILIARIOS (583 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLAVADEROS DOMICILIARIOS
Municipalidad Distrital de Ayapata
Muretes (transversal) 1.00 0.25 0.75 0.19Muretes (transversal) 1.00 0.25 0.35 0.09Friso de losapara labado 1.00 1.40 0.05 0.07Muretes perimetrales de batea 1.00 0.45 0.40 0.18Muretes perimetrales de batea 1.00 0.90 0.40 0.36Murete en forma de trapezoide de batea 1.00 0.12 0.12Encima de muro 1.00 2.10 0.05 0.11
21.07.00 SUMINISTRO E INSTALACION DE TUBERIAS DE PVC21.07.01 SUMIN.E INSTAL.TUB.PVC SAL DESAGUE DE 2" M 1.00 ### 10.00 5,830.00
21.08.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS21.08.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN GBL 1.00 1.00 583.00
Trampa P de PVC de 2" P/desague UND 1.00Grifo de bronce cromado 1/2" UND 1.00Union de Fierro galvanizado de 1/2" UND 1.00Sumidero de bronce 2" UND 1.00Tuberia PVC SAP presion para agua C-10 EC 1/2" M 2.00Codo PVC SAP para agua simple presion de 1/2" UND 2.00Adaptador PVC SAP 1/2" UND 1.00Codo PVC SAL 2"x90° UND 2.00
21.09.00 VARIOS21.09.01 DRENAJE M3 466.40
Drenaje 1.00 1.00 1.00 0.80 0.80
#REF!
#REF!
OBRA : #REF!COMPONENTE :LAVADEROS TIPO INSTITUCION EDUCATIVA (09 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
22.00.00 LAVADEROS TIPO INSTITUCION EDUCATIVA (09 UND) CANTIDAD IEI, IEP 8.00 CANTIDAD IES 1.00
22.01.00 TRABAJOS PRELIMINARES22.01.01 LIMPIEZA DE TERRENO MANUAL M2 20.61
Lavadero I.E.I. e I.E.P.Lavadero 1.00 2.00 0.60 1.20Pozo percolador 1.00 1.00 1.00 1.00Caja de paso 1.00 0.30 0.30 0.09
Lavadero I.E.S.Lavadero 1.00 2.00 0.60 1.20Pozo percolador 1.00 1.00 1.00 1.00Caja de paso 1.00 0.30 0.30 0.09
22.01.02 TRAZO Y REPLANTEO M2 20.61Lavadero I.E.I. e I.E.P.
Lavadero 1.00 2.00 0.60 1.20Pozo percolador 1.00 1.00 1.00 1.00Caja de paso 1.00 0.30 0.30 0.09
Lavadero I.E.S.Lavadero 1.00 2.00 0.60 1.20Pozo percolador 1.00 1.00 1.00 1.00Caja de paso 1.00 0.30 0.30 0.09
0.0022.02.00 MOVIMIENTO DE TIERRAS22.02.01 EXCAVACIÓN MANUAL EN TERRENO NORMAL M3 27.00
Lavadero I.E.I. e I.E.P.Tuberia PVC SAL de 2" 1.00 6.00 0.40 0.60 1.44Cimentacion 2.00 0.60 0.25 0.20 0.06Pozo de dreanje 1.00 1.00 1.00 1.50 1.50
Lavadero I.E.S.Tuberia PVC SAL de 2" 1.00 6.00 0.40 0.60 1.44Cimentacion 2.00 0.60 0.25 0.20 0.06Pozo de dreanje 1.00 1.00 1.00 1.50 1.50
22.02.02 REFINE NIVELACION Y COMPACTACION M2 10.35Lavadero I.E.I. e I.E.P.
Cimentacion 1.00 0.60 0.25 0.15Pozo de dreanje 1.00 1.00 1.00 1.00
Lavadero I.E.S.Cimentacion 1.00 0.60 0.25 0.15Pozo de dreanje 1.00 1.00 1.00 1.00
22.02.03 ELIMINACIÓN DE MATERIAL EXCEDENTE D=30M M3 35.10Proveniente de la excavacion 1.00 1.30 27.00 35.10
22.03.00 OBRAS DE CONCRETO SIMPLE22.03.01 CONCRETO CICLOPEO f'c 175/kg/cm2+30% PM 1.42
Lavadero I.E.I. e I.E.P.Muretes 2.00 0.60 0.25 0.50 0.15
Lavadero I.E.S.Muretes 3.00 0.60 0.25 0.50 0.22
22.03.02 ENCOFRADO Y DESENCOFRADO M2 9.69Lavadero I.E.I. e I.E.P.
Muretes (longitudinal) 4.00 0.60 0.30 0.72Muretes (transversal) 4.00 0.25 0.30 0.30
Lavadero I.E.S.Muretes (longitudinal) 6.00 0.60 0.30 1.08Muretes (transversal) 6.00 0.25 0.30 0.45
22.04.00 OBRAS DE CONCRETO ARMADO22.04.01 CONCRETO f'c 175/kg/cm2, LOSAS MACISAS M3 3.30
Lavadero I.E.I. e I.E.P.Losa pileta simple 1.00 0.60 0.60 0.10 0.04Losa pileta doble 1.00 1.40 0.60 0.10 0.08Muretes pileta simple 1.00 0.60 0.10 0.20 0.01Muretes pileta simple 1.00 0.60 0.15 0.20 0.02
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLAVADEROS TIPO INSTITUCION EDUCATIVA
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :LAVADEROS TIPO INSTITUCION EDUCATIVA (09 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLAVADEROS TIPO INSTITUCION EDUCATIVA
Municipalidad Distrital de Ayapata
Muretes pileta simple 1.00 0.35 0.10 0.20 0.01Muretes pileta simple(trapezoide) 1.00 0.15 0.21 0.03Muretes pileta doble 1.00 1.40 0.10 0.30 0.04Muretes pileta doble 1.00 1.40 0.15 0.30 0.06Muretes pileta doble 2.00 0.35 0.10 0.30 0.02Muretes pileta doble (trapezoide) 1.00 0.15 0.34 0.05
Lavadero I.E.S.Losa pileta 1.00 2.00 0.60 0.10 0.12Muretes pileta 1.00 2.00 0.10 0.30 0.06Muretes pileta 1.00 2.00 0.15 0.30 0.09Muretes pileta 2.00 0.30 0.10 0.35 0.02Murete pileta (trapezoide) 1.00 0.15 0.58 0.09
22.04.03 ENCOFRADO Y DESENCOFRADO M2 49.20Lavadero I.E.I. e I.E.P.
Friso losa pileta simple 1.00 0.10 2.40 0.24Muretes pileta simple (interno) 1.00 0.20 1.70 0.34Muretes pileta simple (Externo) 1.00 0.20 2.40 0.48Muretes pileta simple(trapezoide) 2.00 0.34 0.68Losa fondo pileta doble 1.00 0.90 0.60 0.54Friso losa pileta doble 1.00 0.10 4.00 0.40Muretes pileta doble (interno) 1.00 0.30 3.10 0.93Muretes pileta doble (externo) 1.00 0.30 4.00 1.20Muretes pileta doble (trapezoide) 2.00 0.34 0.68
Lavadero I.E.S.Losa pileta 2.00 0.63 0.60 0.75Friso losa pileta 1.00 0.10 5.20 0.52Muretes pileta (interior) 1.00 0.30 4.30 1.29Muretes pileta (exterior) 1.00 0.30 5.20 1.56Muretes pileta (trapezoide) 2.00 0.58 1.16
22.04.04 ACERO CORRUGADO f`y = 4200 kg/cm2 GRADO 6 KG Del cuadro de metrados de Acero 97.75Institucion educativa inicial y primaria ### 10.91Institucion educativa secundaria ### 10.45
22.05.00 REBOQUES ENLUCIDOS Y MOLDURAS22.05.01 TARRAJEO CON IMPERMEABILIZANTE MORTERO 1: M2 11.45
Lavadero I.E.I. e I.E.P.Muretes pileta simple (interno) 1.00 0.20 1.70 0.34Muretes pileta doble (interno) 1.00 0.30 3.10 0.93
Lavadero I.E.S.Muretes pileta (interior) 1.00 0.30 4.30 1.29
22.05.02 TARRAJEO EN INTERIORES Y EXTERIORES MORTER M2 28.49Lavadero I.E.I. e I.E.P.
Muretes pileta simple (Externo) 1.00 0.20 1.80 0.36Muretes pileta simple(trapezoide) 1.00 0.34 0.34Losa fondo pileta doble 1.00 0.90 0.60 0.54Muretes pileta doble (externo) 1.00 0.30 4.00 1.20Muretes pileta doble (trapezoide) 1.00 0.34 0.34Muros Longitudinales 3.00 0.30 0.30 0.27Muros Transversales 2.00 0.25 0.30 0.15
Lavadero I.E.S.Losa fondo pileta 2.00 0.63 0.60 0.75Muretes pileta (exterior) 1.00 0.30 5.20 1.56Muretes pileta (trapezoide) 1.00 0.58 0.58
22.05.03 TARRAJEO C/IMPERMEABILIZANTE PENDIENTE DE M2 5.39Lavadero I.E.I. e I.E.P.
Losa fondo pileta simple 1.00 0.50 0.35 0.18Losa fondo pileta simple 1.00 1.20 0.35 0.42
Lavadero I.E.I. e I.E.P.Losa fondo pileta 1.00 1.80 0.35 0.63
22.06.00 PINTURA
#REF!
#REF!
OBRA : #REF!COMPONENTE :LAVADEROS TIPO INSTITUCION EDUCATIVA (09 UND)
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTOS
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSLAVADEROS TIPO INSTITUCION EDUCATIVA
Municipalidad Distrital de Ayapata
22.06.01 PINTURA ESMALTE EN EXTERIORES M2 23.42Lavadero I.E.I. e I.E.P.
Muretes pileta simple (Externo) 1.00 0.20 1.80 0.36Muretes pileta simple(trapezoide) 1.00 0.34 0.34Muretes pileta doble (externo) 1.00 0.30 4.00 1.20Muretes pileta doble (trapezoide) 1.00 0.34 0.34Muros Longitudinales 3.00 0.30 0.30 0.27Muros Transversales 2.00 0.25 0.30 0.15
Lavadero I.E.S.Muretes pileta (exterior) 1.00 0.30 5.20 1.56Muretes pileta (trapezoide) 1.00 0.58 0.58
22.07.00 SUMINISTRO E INSTALACION DE TUBERIAS DE PVC22.07.01 SUMIN.E INSTAL.TUB.PVC SAL DESAGUE DE 2" M 90.00
Lavadero I.E.I. e I.E.P. 1.00 ### 10.00Lavadero I.E.S. 1.00 ### 10.00
22.08.00 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS22.08.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN LGBL 9.00 9.00 9.00
Tee PVC SAP de 1/2"Trampa P de PVC de 2" P/desagueCodo de F° G° de 1/2"Grifo de bronce cromado 1/2"Bushing de bronce 1/2" x 1"Niple de fierro galvanizado de 1/2" x 1"Sumidero de bronce 2"Tuberia PVC SAP presion para agua C-10 EC 1/2"Codo PVC SAP para agua simple presion de 1/2"Union universal PVC SAP 1/2"Adaptador PVC SAP 1/2"Codo PVC SAL 2"x90°Llave de paso PVC SAP 1/2"
22.09.00 VARIOS22.09.01 DRENAJE M3 13.50
Material seleccionado lavadero I.E.I. e I.E.P. 1.00 1.00 1.00 1.50 1.50Material seleccionado lavadero I.E.S. 1.00 1.00 1.00 1.50 1.50
#REF!
#REF!
OBRA : #REF!COMPONENTE : FLETES
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
23.00.00 FLETES23.01.00 FLETE TERRESTRE GLB 1.00 1.00 1.00
23.02.00 FLETE EN RURAL GLB 1.00 1.00 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UNDN°
ELEMENTOS
MEDIDASBAS
ELARG
O ALTO TOTALPARCIAL
RESULTADOSPERIMT.
%AREA
HOJA DE METRADOSFLETES
Municipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE :MEDIDAS DE SEGURIDAD Y MITIGACION AMBIENTAL
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
24.00.00 MEDIDAS DE SEGURIDAD Y MITIGACION AMBIENTAL24.01 Cinta Plastica Señalizadora-Limite Seguridad de Obra M 206.00
Reservorio 50m3 1.00 46.00 46.00Valvula de control 4.00 10.00 40.00Valvula de aire 4.00 10.00 40.00Valvula de purga tipo-I 4.00 10.00 40.00Valvula de purga tipo-II 4.00 10.00 40.00
24.02 Tranquera tipo baranda de 2.40mx1.2m provisional-señalizacion protec UND 10.0010.00 10.00
24.03 Cono de Fibra de vidrio fosforescente para señal UND 8.008.00 8.00
24.04 Señales de Iluminación Nocturna con lámpara intermitente M 60.0060.00 60.00
24.05 Revegetación de Areas afectadas con especies de la zona HA 0.010.01 0.01
24.01.00 MEDIDAS DE SEGURIDAD Y MITIGACION AMBIENT GLB 1.00 1.00 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTO
S
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSMEDIDAS DE SEGURIDAD Y MITIGACION
AMBIENTALMunicipalidad Distrital de Ayapata
#REF!
#REF!
OBRA : #REF!COMPONENTE : EXPEDIENTE SOCIAL
FECHA #REF! PLANOLUGAR : AYAPATA - CARABAYA - PUNO HOJA
25.00.00 EXPEDIENTE SOCIAL25.01.00 CAPACITACION SOCIAL GLB 1.00 1.00 1.00
CÓDIGO DENOMINACIÓN Y/O DESCRIPCIÓN UND
N°ELEMENTO
S
MEDIDASLARGO
ANCHO ALTO TOTALPARCIA
L
RESULTADOSPERIMT
%AREA
HOJA DE METRADOSEXPEDIENTE SOCIAL
Municipalidad Distrital de Ayapata
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
01.- CAPTACION DE LADERA N° 01Losa fondo de captacion 3/8" 1 8 1.40 - 11.2 - - - - 6.272
3/8" 1 7 1.80 - 12.6 - - - - 7.056 Muros -
Vertical 3/8" 1 26 1.65 - 42.9 - - - - 24.024 Horizontal 3/8" 1 6 6.50 - 39.0 - - - - 21.840
- Losa tapa camara humeda 3/8" 1 11 1.60 - 17.6 - - - - 9.856
3/8" 1 9 2.00 - 18.0 - - - - 10.080 -
Muros de confinamiento (Aleros) - 3/8" 2 6 1.80 - 21.6 - - - - 12.096 3/8" 2 5 1.60 - 16.0 - - - - 8.960
Losa de cubierta de confinamiento - 3/8" 1 6 3.00 - 18.0 - - - - 10.080 3/8" 1 16 1.00 - 16.0 - - - - 8.960
- Losa fondo Caja de valvulas 1/4" 2 8 0.70 11.2 - - - - - 2.778
- Muros Caja de valvulas 1/4" 1 25 0.60 15.0 - - - - - 3.720
PESO DEL ACERO TOTAL EN CAPTACION N° 01 125.722
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
02.- CAPTACION DE LADERA N° 02Losa fondo de captacion 3/8" 1 7 1.50 - 10.5 - - - - 5.880
3/8" 1 7 1.50 - 10.5 - - - - 5.880 Muros -
Vertical 3/8" 1 23 1.55 - 35.7 - - - - 19.964 Horizontal 3/8" 1 6 5.80 - 34.8 - - - - 19.488
- Losa tapa camara humeda 3/8" 1 7 1.60 - 11.2 - - - - 6.272
3/8" 1 7 1.60 - 11.2 - - - - 6.272 -
Muros de confinamiento (Aleros) - 3/8" 2 6 1.80 - 21.6 - - - - 12.096 3/8" 2 5 1.60 - 16.0 - - - - 8.960
Losa de cubierta de confinamiento - 3/8" 1 6 2.40 - 14.4 - - - - 8.064 3/8" 1 13 0.90 - 11.7 - - - - 6.552
- Losa fondo Caja de valvulas 1/4" 2 8 0.70 11.2 - - - - - 2.778
- Muros Caja de valvulas 1/4" 1 25 0.60 15.0 - - - - - 3.720
PESO DEL ACERO TOTAL EN CAPTACION N° 02 105.926
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
3.- CAMARA ROMPE PRESION TIPO 6Losa fondo 3/8" 1.00 7.00 0.80 - 5.6 - - - - 3.136
3/8" 1.00 5.00 1.30 - 6.5 - - - - 3.640 Muros 3/8" 1.00 5.00 4.30 - 21.5 - - - - 12.040
3/8" 1.00 14.00 1.30 - 18.2 - - - - 10.192 Losa tapa 3/8" 1.00 7.00 0.80 - 5.6 - - - - 3.136
3/8" 1.00 2.00 1.30 - 2.6 - - - - 1.456 3/8" 1.00 12.00 0.15 - 1.8 - - - - 1.008
PESO DEL ACERO TOTAL EN CAMARA ROMPE PRESION TIPO 6 34.608
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
4.- CAMARA DISTRIBUIDOR DE CAUDAL (01 UND) Losa fondo 3/8" 1.00 12.00 1.45 - 17.4 - - - - 9.744
3/8" 1.00 8.00 2.15 - 17.2 - - - - 9.632 -
Muros Perimetrales - Vertical 3/8" 1.00 34.00 1.85 - 62.9 - - - - 35.224 Horizontal 3/8" 1.00 9.00 7.00 - 63.0 - - - - 35.280
Muros internos - Vertical 3/8" 1.00 5.00 1.25 - 6.3 - - - - 3.500 Vertical 3/8" 1.00 7.00 1.25 - 8.8 - - - - 4.900 Horizontal 3/8" 1.00 5.00 0.80 - 4.0 - - - - 2.240 Horizontal 3/8" 1.00 5.00 1.20 - 6.0 - - - - 3.360
- Losa tapa 3/8" 1.00 11.00 1.30 - 14.3 - - - - 8.008
3/8" 1.00 8.00 2.00 - 16.0 - - - - 8.960 PESO DEL ACERO TOTAL EN CAMARA DISTRIBUIDOR DE CAUDAL 120.848
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
5.- CAMARA DISTRIBUIDOR DE CAUDAL (01 UND) Losa fondo 3/8" 1.00 12.00 1.80 - 21.6 - - - - 12.096
3/8" 1.00 10.00 2.20 - 22.0 - - - - 12.320 -
Muros Perimetrales - Vertical 3/8" 1.00 37.00 1.85 - 68.5 - - - - 38.332 Horizontal 3/8" 1.00 9.00 7.50 - 67.5 - - - - 37.800
Muros internos - Vertical 3/8" 1.00 8.00 1.25 - 10.0 - - - - 5.600 Vertical 3/8" 2.00 5.00 1.25 - 12.5 - - - - 7.000 Horizontal 3/8" 1.00 5.00 1.40 - 7.0 - - - - 3.920 Horizontal 3/8" 2.00 5.00 0.80 - 8.0 - - - - 4.480
- Losa tapa 3/8" 1.00 11.00 1.64 - 18.0 - - - - 10.102
3/8" 1.00 9.00 2.00 - 18.0 - - - - 10.080 PESO DEL ACERO TOTAL EN CAMARA DISTRIBUIDOR DE CAUDAL 141.730
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
06.- CRUCE AEREO DE RIO L = 15M LINEA DE CONDUCCIONZapatas 1/2" 2 7 1.00 - - 14.0 - - - 13.916
1/2" 2 7 1.00 - - 14.0 - - - 13.916 Columnas 1/2" 2 6 3.40 - - 40.8 - - - 40.555 Estribos 3/8" 2 24 1.00 - 48.0 - - - - 26.880
PESO DEL ACERO TOTAL EN CRUCE AEREO DE RIO 95.267
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
08.- RESERVORIO DE 50 M3Losa techoSuperior 3/8" 2 26 5.00 - 260.0 - - - - 145.600 Inferior 1/2" 2 26 5.00 - - 260.0 - - - 258.440
Losa de fondoSuperior 1/2" 1 28 5.27 - - 147.6 - - - 146.675 Inferior 1/2" 1 28 5.27 - - 147.6 - - - 146.675
Losa de fondo (Zapata)Superior 1/2" 4 13 2.13 - - 110.8 - - - 110.095 Inferior 1/2" 4 13 2.13 - - 110.8 - - - 110.095
MurosHorizontal 3/8" 1 17 20.00 - 340.0 - - - - 190.400 Vertical 3/8" 1 98 2.96 - 290.1 - - - - 162.445 Vertical 1/2" 1 98 3.07 - - 300.9 - - - 299.055
PESO DEL ACERO TOTAL EN RESERVORIO DE 27 M3 1,569.480
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
12.- CASETA DE VALVULAS-RESERVORIO 50M3
Losa techo 3/8" 1 8 1.60 - 12.8 - - - - 7.168 3/8" 1 7 1.70 - 11.9 - - - - 6.664
Muros 3/8" 1 20 1.55 - 31.0 - - - - 17.360 3/8" 1 6 4.50 - 27.0 - - - - 15.120
Losa fondo 3/8" 1 8 1.90 - 15.2 - - - - 8.512 3/8" 1 9 1.80 - 16.2 - - - - 9.072
PESO DEL ACERO TOTAL ENCASETA DE VALVULAS DE 27 M3, 41 M3, 45 M3 63.896
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
13.- CAMARA ROMPE PRESION TIPO 7Losa fondo 3/8" 1.00 7.00 0.80 - 5.6 - - - - 3.136
3/8" 1.00 5.00 1.30 - 6.5 - - - - 3.640 Muros 3/8" 1.00 5.00 4.30 - 21.5 - - - - 12.040
3/8" 1.00 14.00 1.30 - 18.2 - - - - 10.192 Losa tapa 3/8" 1.00 7.00 0.80 - 5.6 - - - - 3.136
3/8" 1.00 2.00 1.30 - 2.6 - - - - 1.456 3/8" 1.00 12.00 0.15 - 1.8 - - - - 1.008
PESO DEL ACERO TOTAL EN CAMARA ROMPE PRESION TIPO 7 34.608
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
14.- LAVADERO DOMICILIARIOSLosa fondo batea 1/4" 1.00 5.00 0.50 2.5 - - - - - 0.620
1/4" 1.00 4.00 0.80 3.2 - - - - - 0.794 Losa de batea 1/4" 1.00 5.00 0.50 2.5 - - - - - 0.620
1/4" 1.00 4.00 0.80 3.2 - - - - - 0.794 Muretes 1/4" 1.00 14.00 0.40 5.6 - - - - - 1.389
1/4" 1.00 2.00 1.30 2.6 - - - - - 0.645 1/4" 1.00 2.00 3.00 6.0 - - - - - 1.488
PESO DEL ACERO TOTAL EN LAVADEROS DOMICILIARIOS 6.349
PROYECTO A NIVEL DE ESTUDIO DEFINITIVO Y EXPEDIENTE TÉCNICO
#REF!
OBRA : #REF!COMPONENTE :
FECHA #REF!
LUGAR : AYAPATA - CARABAYA - PUNO HOJA
Descripcion
Diseño
Ø
Longitud (m) por Ø Peso del 1/4" 3/8" 1/2" 5/8" 3/4" 1"
kg fierro 0.248 0.560 0.994 1.552 2.235 3.973
N° de elementos iguales
N° de piezas
por elemento
Long. Por
pieza
HOJA DE METRADOSACERO
15.- LAVADERO TIPO INSTITUCION EDUCATIVALavadero I.E.I. e I.E.P.
Losa pileta doble 1/4" 1.00 8.00 0.54 4.3 - - - - - 1.071 1/4" 1.00 4.00 1.34 5.4 - - - - - 1.329
Losa de pileta simple 1/4" 1.00 4.00 0.54 2.2 - - - - - 0.536 1/4" 1.00 4.00 0.54 2.2 - - - - - 0.536
Muretes pileta doble 1/4" 1.00 19.00 0.40 7.6 - - - - - 1.885 1/4" 1.00 2.00 3.90 7.8 - - - - - 1.934
Muretes pileta doble (trapecio) 1/4" 1.00 5.00 0.35 1.8 - - - - - 0.434 1/4" 1.00 3.00 0.80 2.4 - - - - - 0.595
Muretes pileta simple 1/4" 1.00 11.00 0.30 3.3 - - - - - 0.818 1/4" 1.00 2.00 2.30 4.6 - - - - - 1.141
Muretes pileta simple (trapecio) 1/4" 1.00 3.00 0.35 1.0 - - - - - 0.260 1/4" 1.00 3.00 0.50 1.5 - - - - - 0.372
PESO DEL ACERO TOTAL EN LAVADERO TIPO INSTITUCION EDUCATIVA IEI E IEP 10.912 Lavadero I.E.S.
Losa pileta 1/4" 1.00 11.00 0.54 5.9 - - - - - 1.473 1/4" 1.00 4.00 1.34 5.4 - - - - - 1.329
Murees pileta 1/4" 1.00 25.00 0.35 8.8 - - - - - 2.170 1/4" 1.00 3.00 5.10 15.3 - - - - - 3.794
Muretes pileta simple (trapecio) 1/4" 1.00 7.00 0.35 2.4 - - - - - 0.608 1/4" 1.00 3.00 1.45 4.4 - - - - - 1.079
PESO DEL ACERO TOTAL EN LAVADERO TIPO INSTITUCION EDUCATIVA IES 10.453