8/14/2019 Metrado Fachadas 2 de Mayo
1/8
PROYECTO:
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE TACNAFECHA : JULIO 2008
LARGO ( L) ANCHO (B) ALTO (H)
01.00.00 OBRAS PROVISIONALES
01.01.00 CARTEL DE IDENTIFICACION DE OBRA UND 1.001.00 1.00
01.02.00 CARTEL DE SEALIZACION DE DESVIOS EN LA ZONA DE TRABAJO UND 4.004.00 4.00
01.03.00 MODULO DE MATERIALES Y HERRAMIENTAS P/MANTENIMIENTO GLB 1.001.00 1.00
02.00.00 TRABAJOS PRELIMINARES
02.01.00 LIMPIEZA Y LIJADO DE MUROS EXTERIORES H=2.7 M. M2 1,500.23S-01
ef. 2 1.00 area= 83.18 83.18S-04
ef. 3 1.00 area= 11.00 11.00ef. 5 1.00 area= 37.70 37.70ef. 6 1.00 area= 28.40 28.40ef. 8 1.00 area= 91.47 91.47
S-07
ef. 3 1.00 area= 16.20 16.20ef. 5 1.00 area= 30.70 30.70ef. 6 1.00 area= 28.30 28.30ef. 7 1.00 area= 17.30 17.30ef. 8 1.00 area= 15.20 15.20
S-08ef. 1 1.00 area= 29.10 29.10ef. 2 1.00 area= 73.60 73.60ef. 3 1.00 area= 19.40 19.40ef. 4 1.00 area= 11.30 11.30ef. 5 1.00 area= 12.60 12.60ef. 6
1.00 area= 31.70 31.70ef. 7 1.00 area= 78.95 78.95S-09
ef. 3 1.00 area= 20.20 20.20S-11
ef. 1 1.00 area= 143.85 143.85ef. 2 1.00 area= 11.40 11.40ef. 9 1.00 area= 118.81 118.81
S-12ef. 1 1.00 area= 75.67 75.67ef. 3 1.00 area= 8.50 8.50ef. 4 1.00 area= 16.20 16.20
S-13ef. 4 1.00 area= 11.50 11.50ef. 6 1.00 area= 79.56 79.56
S-15ef. 1 1.00 area= 48.10 48.10ef. 2 1.00 area= 29.70 29.70
S-16ef. 5 1.00 area= 5.80 5.80ef. 6 1.00 area= 3.40 3.40ef. 9 1.00 area= 4.70 4.70
ef. 14 1.00 area= 19.50 19.50
ef. 15 1.00 area= 41.99 41.99S-17ef. 3 1.00 area= 33.80 33.80
S-19ef. 2 1.00 area= 13.90 13.90ef. 4 1.00 area= 17.70 17.70
S-20ef. 3 1.00 area= 7.95 7.95ef. 4 1.00 area= 14.70 14.70ef. 7 1.00 area= 43.90 43.90
S-21ef. 4 1.00 area= 15.10 15.10ef. 5 1.00 area= 31.30 31.30
ef. 10 1.00 area= 9.20 9.20ef. 11 1.00 area= 29.50 29.50ef. 13 1.00 area= 28.20 28.20
ITEM DESCRIPCION
PLANILLA DE METRADOS
UND PARCIALMEDIDAS
TOTALCANT
VECES
8/14/2019 Metrado Fachadas 2 de Mayo
2/8
PROYECTO:
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE TACNAFECHA : JULIO 2008
LARGO (L) ANCHO (B) ALTO (H)ITEM DESCRIPCION
PLANILLA DE METRADOS
UND PARCIALMEDIDAS
TOTALCANT
VECES
02.02.00 LIMPIEZA Y LIJADO DE MUROS EXTERIORES H=5.0 M. M2 4,068.00S-02
ef. 2 1.00 area= 26.20 26.20ef. 3 1.00 area= 37.80 37.80ef. 4 1.00 area= 31.10 31.10ef. 5 1.00 area= 159.22 159.22
S-04ef. 2 1.00 area= 44.50 44.50ef. 4
1.00 area= 32.90 32.90ef. 7 1.00 area= 13.80 13.80S-07
ef. 1 1.00 area= 109.92 109.92ef. 2 1.00 area= 36.16 36.16ef. 4 1.00 area= 12.50 12.50ef. 9 1.00 area= 30.00 30.00
ef. 10 1.00 area= 29.00 29.00ef. 11 1.00 area= 203.90 203.90
S-09ef. 1 1.00 area= 192.10 192.10ef. 2 1.00 area= 43.90 43.90ef. 4 1.00 area= 165.90 165.90ef. 5 1.00 area= 64.03 64.03
S-10ef. 3 1.00 area= 230.62 230.62
S-11ef. 3 1.00 area= 14.80 14.80ef. 4 1.00 area= 12.50 12.50ef. 7 1.00 area= 15.10 15.10ef. 8 1.00 area= 9.60 9.60
S-12ef. 5 1.00 area= 20.00 20.00
ef. 6 1.00 area= 15.10 15.10ef. 7 1.00 area= 17.25 17.25ef. 8 1.00 area= 71.64 71.64
S-13ef. 1 1.00 area= 314.99 314.99ef. 2 1.00 area= 37.40 37.40ef. 3 1.00 area= 11.50 11.50ef. 5 1.00 area= 21.20 21.20
S-14ef. 1 1.00 area= 147.16 147.16ef. 2 1.00 area= 144.30 144.30ef. 3 1.00 area= 85.70 85.70
S-16ef. 2 1.00 area= 36.20 36.20ef. 3 1.00 area= 27.30 27.30ef. 4 1.00 area= 33.00 33.00ef. 8 1.00 area= 25.70 25.70
ef. 11 1.00 area= 19.10 19.10ef. 13 1.00 area= 12.20 12.20
S-17ef. 1 1.00 area= 44.80 44.80ef. 2 1.00 area= 32.14 32.14
S-19
ef. 1 1.00 area= 38.14 38.14ef. 3 1.00 area= 30.00 30.00ef. 6 1.00 area= 53.70 53.70ef. 7 1.00 area= 74.20 74.20ef. 8 1.00 area= 377.66 377.66
S-20ef. 1 1.00 area= 199.20 199.20ef. 2 1.00 area= 32.30 32.30ef. 5 1.00 area= 31.40 31.40ef. 6 1.00 area= 66.20 66.20ef. 9 1.00 area= 198.92 198.92
S-21ef. 1 1.00 area= 116.65 116.65ef. 2 1.00 area= 63.10 63.10ef. 3 1.00 area= 56.00 56.00ef. 6 1.00 area= 41.20 41.20ef. 7 1.00 area= 14.80 14.80ef. 8 1.00 area= 10.90 10.90
ef. 12 1.00 area= 31.40 31.40
8/14/2019 Metrado Fachadas 2 de Mayo
3/8
PROYECTO:
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE TACNAFECHA : JULIO 2008
LARGO (L) ANCHO (B) ALTO (H)ITEM DESCRIPCION
PLANILLA DE METRADOS
UND PARCIALMEDIDAS
TOTALCANT
VECES
02.03.00 LIMPIEZA Y LIJADO DE PUERTAS DE MADERA M2 798.05S-01
ef. 2 1.00 area= 8.10 8.10S-02
ef. 2 1.00 area= 2.20 2.20ef. 4 1.00 area= 9.80 9.80ef. 5 1.00 area= 6.18 6.18
S-04ef. 2
1.00 area= 12.90 12.90ef. 3 1.00 area= 7.30 7.30ef. 4 1.00 area= 14.70 14.70ef. 5 1.00 area= 11.70 11.70ef. 6 1.00 area= 9.40 9.40ef. 7 1.00 area= 1.90 1.90ef. 8 1.00 area= 17.84 17.84
S-07ef. 1 1.00 area= 60.53 60.53ef. 2 1.00 area= 5.20 5.20ef. 3 1.00 area= 4.80 4.80ef. 4 1.00 area= 6.30 6.30ef. 5 1.00 area= 8.40 8.40ef. 6 1.00 area= 15.40 15.40ef. 7 1.00 area= 3.00 3.00ef. 8 1.00 area= 4.30 4.30ef. 9 1.00 area= 9.20 9.20
ef. 10 1.00 area= 7.00 7.00ef. 11 1.00 area= 19.90 19.90
S-08ef. 1 1.00 area= 4.64 4.64ef. 2 1.00 area= 10.20 10.20ef. 3 1.00 area= 5.50 5.50
ef. 6 1.00 area= 12.90 12.90ef. 7 1.00 area= 10.02 10.02
S-09ef. 1 1.00 area= 6.76 6.76ef. 4 1.00 area= 16.00 16.00
S-10ef. 3 1.00 area= 45.84 45.84
S-11ef. 1 1.00 area= 27.74 27.74ef. 2 1.00 area= 3.30 3.30ef. 3 1.00 area= 3.00 3.00ef. 4 1.00 area= 7.20 7.20ef. 9 1.00 area= 20.77 20.77
S-12ef. 3 1.00 area= 3.90 3.90ef. 7 1.00 area= 2.20 2.20
S-13ef. 1 1.00 area= 90.62 90.62ef. 2 1.00 area= 5.60 5.60ef. 4 1.00 area= 5.70 5.70ef. 5 1.00 area= 2.70 2.70ef. 6 1.00 area= 11.99 11.99
S-14
ef. 1 1.00 area= 24.85 24.85ef. 2 1.00 area= 28.20 28.20ef. 3 1.00 area= 18.60 18.60
S-15ef. 1 1.00 area= 32.50 32.50ef. 2 1.00 area= 5.50 5.50
S-16ef. 2 1.00 area= 2.40 2.40ef. 3 1.00 area= 5.30 5.30ef. 4 1.00 area= 6.00 6.00ef. 7 1.00 area= 6.00 6.00
ef. 9 1.00 area= 4.40 4.40ef. 11 1.00 area= 8.10 8.10ef. 14 1.00 area= 12.60 12.60ef. 15 1.00 area= 10.07 10.07
S-17ef. 2 1.00 area= 1.70 1.70ef. 3 1.00 area= 7.50 7.50
S-19
8/14/2019 Metrado Fachadas 2 de Mayo
4/8
PROYECTO:
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE TACNAFECHA : JULIO 2008
LARGO (L) ANCHO (B) ALTO (H)ITEM DESCRIPCION
PLANILLA DE METRADOS
UND PARCIALMEDIDAS
TOTALCANT
VECES
ef. 6 1.00 area= 2.30 2.30ef. 7 1.00 area= 6.30 6.30ef. 8 1.00 area= 57.14 57.14
S-20ef. 5 1.00 area= 6.70 6.70ef. 9 1.00 area= 3.26 3.26
S-21ef. 5 1.00 area= 6.00 6.00
02.04.00 LIMPIEZA Y LIJADO DE VENTANAS, MARCOS Y BARANDAS DE MADERAM2 276.12S-04
ef. 2 1.00 area= 2.60 2.60ef. 4 1.00 area= 11.30 11.30ef. 5 1.00 area= 1.10 1.10
S-07ef. 1 1.00 area= 5.20 5.20ef. 2 1.00 area= 1.50 1.50ef. 3 1.00 area= 1.30 1.30ef. 9 1.00 area= 1.20 1.20
ef. 11 1.00 area= 4.20 4.20
S-08ef. 1 1.00 area= 1.30 1.30ef. 3 1.00 area= 6.60 6.60
S-09ef. 2 1.00 area= 2.30 2.30ef. 3 1.00 area= 3.30 3.30
S-10ef. 3 1.00 area= 25.46 25.46
S-11ef. 1 1.00 area= 7.19 7.19
ef. 2 1.00 area= 1.10 1.10ef. 3 1.00 area= 5.30 5.30ef. 4 1.00 area= 0.80 0.80ef. 7 1.00 area= 2.10 2.10ef. 9 1.00 area= 4.96 4.96
S-12ef. 3 1.00 area= 0.60 0.60ef. 7 1.00 area= 1.80 1.80ef. 8 1.00 area= 4.95 4.95
S-13ef. 1 1.00 area= 38.40 38.40ef. 2 1.00 area= 1.70 1.70ef. 6 1.00 area= 6.03 6.03
S-14ef. 1 1.00 area= 2.84 2.84ef. 2 1.00 area= 10.80 10.80ef. 3 1.00 area= 1.80 1.80
S-16ef. 3 1.00 area= 5.10 5.10ef. 4 1.00 area= 4.00 4.00
ef. 11 1.00 area= 1.60 1.60S-17
ef. 1 1.00 area= 7.80 7.80ef. 3 1.00 area= 2.20 2.20
S-19ef. 7 1.00 area= 7.40 7.40ef. 8 1.00 area= 89.39 89.39
S-21ef. 5 1.00 area= 0.90 0.90
02.05.00 LIMPIEZA Y LIJADO DE CARPINTERIA METALICA M2 977.80S-01
ef. 2 1.00 area= 4.74 4.74S-02
ef. 21.00 area= 7.10 7.10ef. 3 1.00 area= 6.40 6.40
ef. 5 1.00 area= 6.04 6.04S-04
ef. 5 1.00 area= 11.70 11.70ef. 7 1.00 area= 4.50 4.50ef. 8 1.00 area= 7.06 7.06
8/14/2019 Metrado Fachadas 2 de Mayo
5/8
8/14/2019 Metrado Fachadas 2 de Mayo
6/8
PROYECTO:
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE TACNAFECHA : JULIO 2008
LARGO (L) ANCHO (B) ALTO (H)ITEM DESCRIPCION
PLANILLA DE METRADOS
UND PARCIALMEDIDAS
TOTALCANT
VECES
02.06.00 LIMPIEZA Y LIJADO DE REJAS METALICAS EXISTENTES M2 707.68S-01
ef. 2 1.00 area= 16.80 16.80S-02
ef. 2 1.00 area= 6.20 6.20ef. 3 1.00 area= 5.30 5.30ef. 4 1.00 area= 1.00 1.00
S-04ef. 4
1.00 area= 5.20 5.20ef. 5 1.00 area= 1.10 1.10ef. 7 1.00 area= 4.40 4.40
S-07ef. 1 1.00 area= 3.10 3.10ef. 2 1.00 area= 5.00 5.00ef. 3 1.00 area= 4.80 4.80ef. 4 1.00 area= 3.00 3.00ef. 6 1.00 area= 10.20 10.20ef. 8 1.00 area= 2.30 2.30ef. 9 1.00 area= 5.30 5.30
ef. 10 1.00 area= 3.60 3.60ef. 11 1.00 area= 0.90 0.90
S-08ef. 1 1.00 area= 0.17 0.17ef. 4 1.00 area= 5.00 5.00ef. 7 1.00 area= 12.60 12.60
S-09ef. 1 1.00 area= 16.01 16.01ef. 2 1.00 area= 1.90 1.90ef. 4 1.00 area= 6.20 6.20ef. 5 1.00 area= 18.04 18.04
S-10
ef. 3 1.00 area= 11.93 11.93S-11
ef. 1 1.00 area= 3.62 3.62ef. 3 1.00 area= 1.92 1.92ef. 4 1.00 area= 4.80 4.80ef. 7 1.00 area= 8.80 8.80ef. 8 1.00 area= 7.60 7.60ef. 9 1.00 area= 3.40 3.40
S-12ef. 1 1.00 area= 22.00 22.00ef. 3 1.00 area= 9.00 9.00ef. 6 1.00 area= 7.20 7.20ef. 8 1.00 area= 4.95 4.95
S-13ef. 1 1.00 area= 50.33 50.33ef. 5 1.00 area= 8.10 8.10ef. 6 1.00 area= 29.15 29.15
S-14ef. 2 1.00 area= 12.12 12.12ef. 3 1.00 area= 6.12 6.12
S-15ef. 2 1.00 area= 7.36 7.36
S-16
ef. 2 1.00 area= 3.40 3.40ef. 3 1.00 area= 7.40 7.40ef. 4 1.00 area= 2.00 2.00ef. 7 1.00 area= 5.70 5.70ef. 8 1.00 area= 2.10 2.10ef. 9 1.00 area= 5.20 5.20
ef. 15 1.00 area= 5.21 5.21S-17
ef. 1 1.00 area= 9.10 9.10ef. 3 1.00 area= 4.40 4.40
S-19
ef. 1 1.00 area= 2.28 2.28ef. 4 1.00 area= 5.30 5.30ef. 6 1.00 area= 7.60 7.60ef. 7 1.00 area= 21.00 21.00
8/14/2019 Metrado Fachadas 2 de Mayo
7/8
PROYECTO:
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE TACNAFECHA : JULIO 2008
LARGO (L) ANCHO (B) ALTO (H)ITEM DESCRIPCION
PLANILLA DE METRADOS
UND PARCIALMEDIDAS
TOTALCANT
VECES
S-20ef. 1 1.00 area= 18.15 18.15ef. 2 1.00 area= 87.90 87.90ef. 3 1.00 area= 11.68 11.68ef. 4 1.00 area= 12.94 12.94ef. 5 1.00 area= 6.94 6.94ef. 6 1.00 area= 10.70 10.70ef. 7 1.00 area= 16.90 16.90ef. 9
1.00 area= 38.48 38.48S-21ef. 1 1.00 area= 4.57 4.57ef. 2 1.00 area= 30.24 30.24ef. 4 1.00 area= 16.63 16.63ef. 5 1.00 area= 3.98 3.98ef. 6 1.00 area= 2.80 2.80ef. 7 1.00 area= 0.25 0.25
ef. 10 1.00 area= 11.17 11.17ef. 12 1.00 area= 17.14 17.14
02.07.00 LIMPIEZA Y LIJADO DE MUROS CON PIEDRA DE CANTERA M2 125.86S-07
ef. 1 1.00 area= 10.78 10.78S-08
ef. 2 1.00 area= 34.40 34.40S-12
ef. 1 1.00 area= 22.58 22.58S-13
ef. 3 1.00 area= 4.50 4.50S-19
ef. 8 1.00 area= 53.60 53.60
02.08.00 LIMPIEZA DE MUROS ENCHAPADOS C/PIEDDRA LAJA, CERAMICO O SIMIM2 237.78S-09
ef. 5 1.00 area= 18.30 18.30S-11
ef. 4 1.00 area= 6.90 6.90ef. 7 1.00 area= 2.40 2.40
S-12ef. 1 1.00 area= 33.48 33.48ef. 2 1.00 area= 19.80 19.80ef. 7 1.00 area= 7.50
S-13ef. 1 1.00 area= 19.30 19.30ef. 5 1.00 area= 11.00 11.00
S-16ef. 7 1.00 area= 6.90 6.90
ef. 10 1.00 area= 15.30 15.30S-19
ef. 1 1.00 area= 14.90 14.90ef. 8 1.00 area= 37.40 37.40
S-20ef. 1 1.00 area= 15.70 15.70
S-21ef. 7 1.00 area= 7.20 7.20ef. 8 1.00 area= 4.80 4.80
ef. 11 1.00 area= 24.40 24.40
02.09.00 PICADO DE MUROS A RESANAR M2 22.711.00 area= 22.71 22.71
03.00.00 RESANES Y DEMAS REPARACIONES
03.01.00 RESANE EN MUROS DE ADOBE (TIPO DIABLO FUERTE) M2 8.41S-4, ef 2 1.00 area= 0.06 0.06S-4, ef 8 1.00 area= 0.14 0.14S-7, ef 1 1.00 area= 1.51 1.51S-7, ef 3
1.00 area= 0.10 0.10S-8, ef 1 1.00 area= 0.12 0.12S-8, ef 2 1.00 area= 2.20 2.20S-8, ef 3 1.00 area= 1.60 1.60S-11, ef 1 1.00 area= 0.46 0.46S-11, ef 9 1.00 area= 0.01 0.01S-21, ef 5 1.00 area= 2.21 2.21
8/14/2019 Metrado Fachadas 2 de Mayo
8/8
PROYECTO:
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE TACNAFECHA : JULIO 2008
LARGO (L) ANCHO (B) ALTO (H)ITEM DESCRIPCION
PLANILLA DE METRADOS
UND PARCIALMEDIDAS
TOTALCANT
VECES
03.02.00 RESANE EN MUROS DE ALBAILERIA M2 14.30S -1, ef 1 1.00 area= 0.50 0.50S -2, ef 2 1.00 area= 0.26 0.26S -2, ef 4 1.00 area= 0.05 0.05S -2, ef 5 1.00 area= 0.03 0.03S -4, ef 5 1.00 area= 0.37 0.37S -4, ef 6 1.00 area= 0.02 0.02S-7, ef 2 1.00 area= 0.37 0.37S-7, ef 5
1.00 area= 0.31 0.31S-7, ef 6 1.00 area= 0.28 0.28S-7, ef 8 1.00 area= 0.15 0.15S-7, ef 10 1.00 area= 0.15 0.15S-7, ef 11 1.00 area= 0.03 0.03S-8, ef 4 1.00 area= 0.40 0.40S-9, ef 2 1.00 area= 0.44 0.44S-10, ef 3 1.00 area= 0.63 0.63S-12, ef 3 1.00 area= 0.05 0.05S-12, ef 6 1.00 area= 0.20 0.20S-13, ef 4 1.00 area= 0.34 0.34S-14, ef 1 1.00 area= 0.49 0.49S-14, ef 2 1.00 area= 0.20 0.20S-14, ef 3 1.00 area= 0.85 0.85S-15, ef 1 1.00 area= 0.24 0.24S-16, ef 2 1.00 area= 0.36 0.36S-16, ef 5 1.00 area= 0.48 0.48S-16, ef 8 1.00 area= 0.80 0.80S-16, ef 11 1.00 area= 0.10 0.10S-16, ef 14 1.00 area= 0.40 0.40S-19, ef 2 1.00 area= 0.10 0.10S-19, ef 5 1.00 area= 0.50 0.50S-19, ef 7 1.00 area= 0.74 0.74
S-20, ef 3 1.00 area= 0.48 0.48S-20, ef 4 1.00 area= 0.14 0.14S-20, ef 5 1.00 area= 0.05 0.05S-20, ef 7 1.00 area= 0.43 0.43S-21, ef 2 1.00 area= 0.63 0.63S-21, ef 3 1.00 area= 0.55 0.55S-21, ef 5 1.00 area= 1.85 1.85S-21, ef 6 1.00 area= 0.21 0.21S-21, ef 8 1.00 area= 0.05 0.05S-21, ef 10 1.00 area= 0.07 0.07
03.03.00 RESANE EN CARPINTERIA DE MADERA GLB 1.001.00 1.00
03.04.00 TAPADO DE VENTANAS CON TRIPLAY M2 5.20S-8, ef 3 5.20 5.20
04.00.00 PINTURA
04.01.00 PINTURA OLEO MATE EN MUROS EXTERIORES H=2.70M. M2 1,500.231.00 area= 1,500.23 1,500.23
04.02.00 PINTURA OLEO MATE EN MUROS EXTERIORES H=5.0M. M2 4,068.001.00 area= 4,068.00 4,068.00
04.03.00 PINTURA BARNIZ EN PUERTAS DE MADERA M2 798.051.00 area= 798.05 798.05
04.04.00 PINTURA BARNIZ EN VENTANAS, MARCOS Y BARANDAS DE MADERA M2 276.121.00 area= 276.12 276.12
04.05.00 PINTURA ESMALTE EN CARPINTERIA METALICA M2 977.801.00 area= 977.80 977.80
04.06.00 PINTURA ESMALTE EN REJAS METALICAS EXISTENTES M2 707.68
1.00 area= 707.68 707.68
05.00.00 VARIOS
05.01.00 LIMPIEZA FINAL DE OBRA M2 8,327.881.00 area= 8,327.88 8,327.88