LET’S GO!Installation instructions for the UTBASEhttps://www.campbellsci.com/utbase#documents_
An anchor bolt installed on anangle will inhibit the leg adjustments
needed to level the tower.
Make sure the anchor bolts remainvertical while placing the concrete.
Top Related