37
LAMPIRAN
Lampiran 1 : Uji Keseragaman Data
38
Lampiran 1 : Uji Keseragaman Data
39
Lampiran 1 : Uji Keseragaman Data
40
Lampiran 1 : Uji Keseragaman Data
41
Lampiran 1 : Uji Keseragaman Data
42
Lampiran 2 : Performance Rating
Coil Assembly
Skill Good +0.03
Effort Good +0.02
Condition Average +0.00
Consistency Average +0.01
PR 1,06
Vertical Expand
Skill Good +0.03
Effort Good +0.02
Condition Average +0.00
Consistency Average +0.01
PR 1,06
Final Assembly
Skill Good +0.03
Effort Good +0.02
Condition Average +0.00
Consistency Good +0.01
PR 1,06
Brazing Preparation
Skill Good +0.03
Effort Good +0.02
Condition Average +0.00
Consistency Excellent +0.03
PR 1,08
43
Lampiran 2 : Performance Rating
Brazing Header & U-bend
Skill Good +0.03
Effort Good +0.05
Condition Average +0.00
Consistency Excellent +0.03
PR 1,11
Leak Test
Skill Good +0.03
Effort Good +0.02
Condition Average +0.00
Consistency Good +0.01
PR 1,06
Washing
Skill Good +0.03
Effort Good +0.05
Condition Average +0.00
Consistency Good +0.01
PR 1,09
Blowing
Skill Good +0.03
Effort Good +0.02
Condition Average +0.00
Consistency Average +0.01
PR 1,06
44
Lampiran 2 : Performance Rating
Inspeksi
Skill Good +0.03
Effort Good +0.02
Condition Average +0.00
Consistency Average +0.01
PR 1,06
45
Lampiran 3 : Allowance
Coil Assembly Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 0
Kelelahan Mata 0
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 15,5
Vertical Expand Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 0
Kelelahan Mata 0
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 15,5
46
Lampiran 3 : Allowance
Final Assembly Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 0
Kelelahan Mata 3
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 18,5
Brazing Preparation Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 0
Kelelahan Mata 3
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 18,5
47
Lampiran 3 : Allowance
Brazing Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 0
Kelelahan Mata 7,5
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 23
Leak test Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 0
Kelelahan Mata 3
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 18,5
48
Lampiran 3 : Allowance
Washing Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 5
Kelelahan Mata 0
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 20,5
Blowing Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 2,5
Kelelahan Mata 0
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 18
49
Lampiran 3 : Allowance
Inspection Allowance
Personal Allowances 2,5
Fatigue Allowances
Tenaga yang Dikeluarkan 2
Sikap Kerja 1
Gerakan Kerja 0
Kelelahan Mata 7,5
Keadaan Temperatur Kerja 5
Keadaan Atmosfer 0
Keadaan Lingkungan yang Baik 5
Total Allowances 23
50
Lampiran 4 : Perbandingan Kondisi Awal, Perbaikan I dan Perbaikan II
𝑰𝒅𝒍𝒆 𝑻𝒊𝒎𝒆 = (𝟏𝟎 × 𝟏𝟑𝟑, 𝟐𝟐) − 𝟕𝟐𝟖, 𝟓𝟒
= 603,66 detik
𝑰𝒅𝒍𝒆 𝑻𝒊𝒎𝒆′ = (𝟏𝟎 × 𝟖𝟓, 𝟎𝟕) − 𝟓𝟗𝟑, 𝟎𝟕
= 257,62 detik
𝑰𝒅𝒍𝒆 𝑻𝒊𝒎𝒆′′ = (𝟏𝟎 × 𝟔𝟔, 𝟔𝟏) − 𝟓𝟏𝟔, 𝟓𝟑
= 149,57 detik
Line Efficiency = (133,22+18,81+…+85.07)
10 × (133,22) x 100%
= 54,69 %
Line Efficiency’ = (66,61+43,98+…+85.07)
10 × (85,07) x 100%
= 69,72 %
Line Efficiency’’ = (66,61+43,98+…+56,71)
10 × (66,61) x 100%
= 77,55 %
51
Lampiran 4 : Perbandingan Kondisi Awal, Perbaikan I dan Perbaikan II
Balance Delay = 𝟏𝟎𝟎% − 𝟓𝟒, 𝟓𝟗%
= 45,31 %
Balance Delay’ = 𝟏𝟎𝟎% − 𝟔𝟗, 𝟕𝟐%
= 30,28%
Balance Delay’’ = 𝟏𝟎𝟎% − 𝟕𝟕, 𝟓𝟓%
= 22,45 %
Kapasitas Produksi = (21600)
(133,22)
= 162 Unit / Hari
Kapasitas Produksi’ = (21600)
(85,07)
= 253 Unit / Hari
Kapasitas Produksi’’ = (21600)
(66,61)
= 324 Unit / Hari
Lampiran 4 : Perbandingan Kondisi Awal, Perbaikan I dan Perbaikan II
52
Biaya Pekerja Kondisi Awal
Permintaan 600 Unit
Output / Shift 162 Unit
Permintaan Selesai 3,70 Shift
29,63 Jam
UMR / Bulan (176 Jam) Rp 3,570,000
UMR / Jam Rp 20,284
Jumlah Operator 15
UMR / Shift / Jam Rp 304,261
Total Biaya Pekerja Rp 9,015,151
Biaya Pekerja / 1 Coil Rp 15,025
Biaya Pekerja Perbaikan I
Permintaan 600 Unit
Output / Shift 253 Unit
Permintaan Selesai 2,37 Shift
18,97 Jam
UMR / Bulan (176 Jam) Rp 3,570,000
UMR / Jam Rp 20,284
Jumlah Operator 15
UMR / Shift / Jam Rp 304,261
Total Biaya Pekerja Rp 5,772,548
Biaya Pekerja / 1 Coil Rp 9,620
Biaya Pekerja Perbaikan II
Permintaan 600 Unit
Output / Shift 324 Unit
Permintaan Selesai 1,85 Shift
14,81 Jam
UMR / Bulan (176 Jam) Rp 3,570,000
UMR / Jam Rp 20,284
Jumlah Operator 17
UMR / Shift / Jam Rp 344,829
Total Biaya Pekerja Rp 5,108,586
Biaya Pekerja / 1 Coil Rp 8,514