STANDARD
FOR
FIELD ERECTED STORAGE TANKS
DOC.
NO. KOC-MV-007
STANDARDS DIVISION
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 2/73
DOC. NO. KO C MV 007
Page 2
of
73
REV. 1
KOC STANDARD
FOR
FIELD ERECTED STORAGE
T NKS
DOC.
NO. KOC MV 007
ISSUING AUTHORITY:
STANDARDS DIVISION
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 3/73
DOC NO. KOC-MV-007
Page
3 of 73 REV. 1
TABLE OF CONTENTS
FOREWORD
SCOPE
EALTH, SAFETY AND ENVIRONMENT
SEFERENCE CODES, STANDARDS AND SPECIFICATIONS
4.1 National/lnternational Standards
4.2 KOC Standards
4.3 Other Relevant KOC Standards
4.4 Project Specifications
4.5 Units
4.6 Conflicts
4.7 Exceptions/Deviations
ENVIRONMENTAL CONDITIONS
QUALITY SYSTEMS
6.1 Documentation Accreditation
6 2 Inspection Test Plan
6.3 Sub-contractors and Vendors
MATERIALS
7.1 .Material Selection
7.2 Procurement
7.3 Inspection of Materials
7.4 Certification Requirements
7.5 Marking
7.6 Weld Consumables etc.
7.7 Notch Ductility
7.8 Weld Repairs to Materials
DESIGN
GENERAL REQUIREMENTS
8.1 Safe Practice
8.2 Capacity
8.3 Seismic Loads
8.4 Wind Loads
8.5 Wind Girders
8.6
Uplift Overturning Sliding Stability
8.7 Foundations
8.8 Design Metal Temperature
8.9 Corrosion Allowance
8.10 Tank Bottoms
8.1 1 Bottom Connections
8.12 Shell
8 13 Shell Connections General
8.14 Shell Access Connections
PAGE NO.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 4/73
DOC.
NO
KOC MV 007
Page 4
of 7
REV. 1
8.15 Stairways Ladders and Platforms
8.16
Cathodic Protection
8.1 7
Earthing Clips
8.18 Settlement References
8.1 9 Calculations
8.20 Drawings
8.21 Weld Details
8 A . 0
REQUIREMENTS SPEClFIC TO FIXED CONICAL ROOF TANKS
8A. 1 Vapour Pressure
8A.2 Vacuum
8A.3 Roof Loads
8A.4 UplifttOverturning Stability
8A.5
Shell Conn ections General
8A.6
Top Angle
8A.7
Roof
8A.8
Roof Support
8A.9
Roof Connections
8A . 10
Sta irway s Ladders Platforms
8A.1 1
Weld Details
PAGE NO.
86 0
REQUIREMENTS SPECIFIC TO EXTERNAL FLOA TING ROOF TAN KS 27
Overall Configuration
Design and Operating Levels
Roof Types
Pon toon Configuration
Double-Deck Configuration
Flotation Compartments
Centre Deck of Pontoon Type
Operating Flowrates
Stability
Ma in Tank Connections
Roof Connections and Openings
Rolling Ladder
Anti-Rotation and Centering Devices
Roof Sealing
Earthing
Roof Support Legs
Gauging
9 0 LOSS PREVENTION
9.1 Fire Protection
9.2 Overpressure Protection
9.3 Venting Capacity
9 4 Sett ing of Protective Devices
9.5
Design of PressureNacuum Protective Devices
9.6
Sparing of PressureNacuum Protective Devices
9.7
Location Installation of Protective Devices
9.8 Overfil l Protection
9 9 Boilover Prevention
9.10 Evaporation Loss Control
9.1
1
Protection Against
Ignition
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 5/73
DOC. NO. KOC MV 007
Page 5 of
73 REV.
FABRICATION ERECTION
10.1 Health Safe ty Environment
10.2 Fabrication a nd Erection Procedure
10.3
Plate Squareness
10.4 Cutting Forming and Pre-fabrication
10.5 Ma rking and Traceabi li ty
10.6 Plate Preservation
10.7 lnterpass Cleaning
10.8 Weld P rox imi ty
10.9 Preheating
10.10 Post Weld H eat Treatment
10.1 1 Temporary Attachments
10.1 2 Tank Isolat ion
10.13 Coating Lining
10.14
Tank Calibration
SIT INSPECTION TESTING
11.1 General
1 1.2 Welded Joints
1 1.3 Dimensions
1 1.4 lnternals
1 1.5 Floating Roof C ompartments
11.6 Testing Procedure
1 1.7 Shell Tes t
11.8 Floating Roof Test
1 1.9
Fixed Roof Test
11.10 Coils
1 1.11
Internal Examination
.
NON DESTRUCTIVE EXAMINATION
12.1 General
12.2 Volu me tric Examination General Requirements
12.3 Image Quality Indicators
12.4 Film De nsity
12.5 F i l m T y p e
12.6
KOC Acceptance
12.7
Retention o f Radiographs
12.8
Surface Examination
WELDING PROCEDURES QUALIFICATIONS
13.1
General
13.2 We ld Procedures
13.3 Qualification Testing of Weld Procedures
13.4
Welder Qualification
MARKING FINAL DOCUMEN TATION
14.1
Certi fy ing Letter
14.2 Mark ing
14.3
Safety Precautions
14.4
Certification Dossier
.
14.5
Technical Operating and Maintenance Manuals
PAGE NO.
39
39
39
39
39
40
40
40
40
4 1
4
1
42
42
42
43
44
44
45
46
47
47
47
48
49
49
50
50
5
5 1
5 1
5 1
52
52
52
52
52
5 3
53
53
53
54
55
55
55
55
55
56
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 6/73
PAGE NO
15 0 SPARE PARTS MAINTENANCE 56
APPENDICES
APPENDIX A
A.
A.2
A.3
A.4
A. 5
A 6
A.7
A.8
A.9
A. 10
APPENDIX B
APPENDIX C
C.
C.2
APPENDIX
D
APPENDIX E
FIELD
INSPECTION CO:ORDINATION 57
Scope 57
57
orms
Design Documents
Punchlisting
Communications
lnspection Test Equipment Personnel
Activity Notification
lnspection Notification
lnspection Test Records
Repairs, Non-Conformities etc.
ESTABLISHMENT MAINTENANCE OF
WELDER QUALIFICATIONS 60
Qualification Testing
Qualification on Production Welds
Qualification Test Records
Identity Cards
Records
Maintenance of Qualifications through Produl: ior; Welding
DA TA SHEETS
Standard Data Sheet for Fixed Roof or Unroofed Tank
Standard Data Sheet for External Floating Roof Storage Tank.
SUM MAR Y OF DOCUMENTS ACTIONS FOR
KOC APPROVAL 7 1
TA NK CAPA CITY LEVEL DEFINITIONS
7 2
TABLES
Table 8 9
Summary : Internal Coatings, Lining Corrosion Allowance
Table 11 7 5
Hydrotest Hold Points
Table 12 3
Radiographic Sensitivity
ACKNOWLEDGEMENT 73
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 7/73
DOC. NO. KOC MV 007
Page
7
of
7 3
REV.
FOREWORD
This docu me nt has been generated by the Task Force TF-Mech.102) and is approved by the
Standard Technical Comm ittee STC) and Standards Division for use throu gho ut the co rporate
engineering and operat ional funct ion s of Ku wa it Oi l Company KSC).
The docu ment sets o ut t o achieve the fo l lowing:-
To set standard requirements for tanks wh ich are no t project-specif ic bu t wh ich
have general appl icabi li ty for al l n e w construct ion and wi l l ensure a consistent
approach.
To reference established KOC Standards wherever possible bu t to al low other
specif icat ions wherever KOC Standards are pending. A l ist of these to be
appended b y the control l ing departmen t of a part icular project or contract.)
The ut i l izat ion of past operat ional experience to avoid repeti t ion of problems and
t o con sol idate worth wh i le and beneficial features.
Recogn it ion of the di f ferent cr it ical it ies of the dut ies of di f feren t categories of
tanks.
To compreh ensively and clearly cover al l aspects of design, cons truct ion and
tes t ing so as to m inimize clar if icat ions and t o a void disputes.
To avoid con fl icts w ith the basic requirements of API 6 5 0 or other KOC
standards.
To avoid repeti t ion of basic API 6 5 0 requirements.
To standardize wherever a benefi t to KOC is envisaged, b ut to al low some
freedom of design where i t is envisaged tha t th is might resul t in a more
econom ical design or more com peti t ive tendering.
To main tain KOC requirements for safety and environmental prote ct ion as
establ ished b y KOC regulat ions and procedures.
To int roduce data sheets w hich:
i
incorporate al l essential features o f the API 6 5 0 Data Sheet.
ii
maintain consistency w i th th e te xt o f the standard.
iii act as a check sheet to assist in ensuring that al l relevant topics are
considered.
iv) provid e a mecha nism for KOC engineers to specify opt ions perm itted bo th
by th is s tandard and b y API 6 50 .
V
wi l l serve as a us eful consol idat ion of data no t only during design and
cons truct ion bu t also for long term reco rd purposes.
vi)
m ay be ut i l ized retrospect ively for exist ing tanks.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 8/73
Feedback as we l l as any com men ts or suggestions derived fro m the appl icat ion of this
Standard at any stage of design, con struct ion or operat ion are encouraged and should be
d i rec ted t o
The Superintenden t Standard Division
Chairman, KOC Stds Technical Com mittee)
Engineering Group, K.O.C.
Compliance with this KO Standard
oes
not of itself confer immunity from legal or statutory
obligations
Acknowledsernent
The preparat ion
of this docu me nt has been entrusted by the Standards Technical Com mittee
STC) to th e Task Force TF-Mech102) comprising the fol lowing members:-
Mr. Mo ha mm ed Emam Insp. Corr. Div.) Team Leader
M r. Phil Brooks Insp. Corr. Div.) Autho r, Me mb er
M r. Salah Heika l Insp. Corr. Div.) Me mbe r
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 9/73
DOC.
NO. KOC-MV-007
1 0 SCOPE
This Standard specifies the minimum requirements for materials, design, fabrication,
erection, inspection and testing of vertical, aboveground, field erected, welded steel
tanks.
This Standard is based on API Standard 650 : Welded Steel Tanks for Oil Storage, and
modifies
and/or amplifies the requirements of that standard to suit the specific
requirements of Kuwait Oil Company (KOC) hereafter referred to as KOC . It
extends beyond the scope of API 650 to include tanks which have
a
process rather
than a storage funct ion and also to include tanks intended to contain water for fire
fighting or process use. Tanks with open tops for firewater storage or similar
applications are described as unroofed in this standard to avoid confusion with
external floating roof tanks which are sometimes also described as open .
This Standard is not intended to be applied to the following:
(a) Tanks wi th structurally supported Aluminum dome roofs (API-650
Appendix
G
(b)
Tanks with internal floating roofs (Appendix H)
(c)
Shop assembled tanks (Appendix J)
(d)
Tanks operating at elevated temperatures (Appendix M)
(el
Austenitic stainless steel tanks (Appendix
S
This Standard complements the data sheets (Appendix C] for the equipment, in which
the operating conditions and other basic design requirements are listed in detail.
This Standard is based on the Ninth Edition of API Standard 650 including up to the
1995
Addendum. However, this does not necessarily preclude its use in conjunction
with later editions.
Note To facilitate cross-reference corresponding API
650
clauses which
have been amplified or modified are shown in brackets { ]. These
references are for information only. It should not be assumed that
the API 650 references are comprehensive or complete.
2 0
TERMINOLOGY
Throughout this Standard, the following terms shall have the meaning indicated for
each one:
shall is used where the provision is a requirement to be followed strictly in
order to conform to the standard. (Deviations wil l only be permitted as outlined in
4 7 of this standard.)
will is used normally in connection with an action by KOC rather than by a
contractor or supplier.
should is used where a provision is recommended. (A Contractor must, on
request, be ready to justify any deviation from these provisions.)
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 10/73
DOC NO KOC MV 007
ase
10 of 73 REV. 1
mus t is used where a requirement or act ion is statutory or considered to be
essential.
may is used where an al ternative course of act ion is acceptable within the
l imits of th e standard.
KOC me ans Kuw ai t Oil Compa ny (K.S.C.I.
3.0
HEALTH,
SAFETY AND ENVIRONMENT
Design and con stru ct ion pract ices ( including those of any sub-contractorl shall be
consistent with KOC's Health, Safety and Environment policies and guidelines. In
particular, dur ing construction , and as far as practical during subsequent ope ration and
maintenance, th e risks of all of th e follow ing shall be minimized:-
*
Safety and H ealth of Personnel
Damage to or Degradation of KOC Assets
Dam age to or Degradation of the Environmen t (l iquid discharges or gaseous
emissions whether planned or unplanned)
4.0 REFERENCE CODES, S TA ND AR DS AN D SPECIFICATIONS
4.1
Nationa l Internat ional Standards
Except as modif ied r ampli fied by this Standard, the requirements of API 65 0
latest edit ion shal l be m et together w it h all relevant requirements and
recom men dations of th e standards referenced therein. Standards referenced
herein are l isted b elow:
API RP 2003
A PI 2555
API Manu al o
NFPA-11
NFPA- 15
NFPA-30
API RP 6 51
Cathodic P rotect ion of A bove Ground Petroleum
Storage Tanks.
A PI S TD 65 3
Tank Inspection, Repair, Alteration Reco nstruction
API STD 2 0 0 0 Venting Atmospheric and Lo w Pressure Storage
Tanks.
Protect ion Against Ignit ion Arising ou t of Static,
Lightnin g and Stray Currents.
Me thod for Liquid Cal ibrat ion o f Tanks.
f Petroleum Manage ment Standards Sections 2 A 2B.
Standard for Low-Expan sion Foam.
Water Spray Fixed Systems for Fire Protection.
Flammable and Com bustible Liquids Code
1S0 .900 0 series Qual ity Management and Qual ity Assurance
Standards.
EN. 1 0 2 0 4
Metal l ic Products Types of Inspect ion Documen ts.
A S T M A S M E
As
referenced in the te xt.
BS 3 9 7 1
Image Quality Indica tors for Industrial Radiography.
lnstitut
of Petroleum : Model Code of Safe Practice.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 11/73
I
DOC. NO.
KOC MV 007 Page 11 of 7 REV. 1
4.2 KOC Standards
This Standard makes reference to the fol lowing KOC Standards, Recommended
Practices and Standard Drawings:-
4.2.1 Standards
KOC-C-026 : Storage Tank Foundations
KOC-G-007 : Basic Design D ata
KOC-G-009 : Spare Parts Mainte nanc e Data
KOC-ME-026 : Tank Side Entry Impeller Mixers
KOC-P-001 : Painting and Coating of Me tal Surfaces New
Construct ion
KOC-P-002
:
Internal Lining of Tanks and Vessels Part 2 : Rigid
Reinforced Fibreglass Lining
4.2 .2 Recommended Practices
KOC-E-024 : Earthing Bonding
KOC-L-026 : External Cathodic Protection of New Steel Tank
Bot toms
4.2.3 Standard Drawinas
0 1 5-CB-1013 : Earthing Clip
0 1 5-MB-1002
:
Standard Handrail Details
4.3
Other Relevant
KOC
Standards
KOC- 2-033
Bund Wall for Storage Tanks
4.4 Proiect S pecif ications
This Standard also makes reference t o other specifications wh ich should be
designated b y the Control ling Departmen t on a project specif ic addendum sheet.
i) General Welding R equirements
ii
Stru ctura l Steel Design, Materials Fabrication
iii)
Cathodic Protect ion Design Requirements
iv )
The Use of Brackish Wate r for Site Hyd rotest ing
V
Fire Protection Safety Equipment
v i )
Fire Gas Detec t ion Equipment
I
4.5
Uni ts
Uni ts adopted by this Standard are general ly SI metr ic bu t some US Customary
units have been retained for consistency w it h API and AS TM standards or where
these are mo re familiar with in the industry.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 12/73
DOC. NO. KO C MV 007 Pane 12 of 7 REV. 1
4 6 C onf l i c t s
A n y co nfl ict be twe en this Standard and other drawings, standards, codes,
specif icat ions, contractual or purchase requirements, shall be not i f ied in wri t ing
t o the Superintenden t of the Co ntract for clar if icat ion.
Except ions or deviat ions w i l l only be considered when sub mit ted in wr i t ing and
supported b y evidence of me r i t or just i ficat ion. ( I f docum ents are inadver tent ly
approved or re leased for cons truct ion wh en these sh ow except ions or
deviat ions f ro m th is Standard wh ich have no t received pr ior approval, the n th is
w i l l n o t be deemed to cons t i tu te acceptance b y KOC of these var ia t ions)
Where proposed exceptions and deviations are judged to have general
relevance then the Superintendent of a Contract
m y
bring
these to the
attention of KOC Standards Division for possible incorporation into the next
revision of the standard.
5 0 ENVIRONMENTAL CONDITIONS
For environmen tal condit ions in Kuwait, refer to KOC Standard for Basic Design Data
(KOC-G-0071, wh ic h provides the detailed design inform ation regarding the
environmen tal, si te and ut i l i ty supply condit ions prevai ling throu gho ut the KOC
facil i t ies.
6 0
QUALITY SYSTEMS
6 1 Docum entat ion and Accredi tat ion
The cons tructor shall operate a qual i ty system to ensure tha t the technical and
qua l i ty requirements are achieved. The qua l i ty syste m should be based on IS 0
9 0 0 0 series of specifications or other internat ional ly recognized standard. I t shall
be ful ly d ocum ented and should have been veri f ied by a recognized accreditat ion
scheme.
6 2
Inspe ct ion Te st Plans
Inspe ct ion and test plans covering procurement, pre-fabricat ion and f ield erect ion
shal l be sub mitted for KOC s approval pr ior to comm encem ent. This shall include
bu t no t be rest r ic ted to the re levant inspect ion not if icat ion points lis ted in para.
A . 8 of Ap pendix A of th is s tandard.
6.3 Sub-contractors Vendors
6.3.1
A contra ctor shall ensure tha t
QA
requirements specif ied in the inquiry
and purchase do cumen ts are applied t o al l m aterials, equipme nt and
services provided b y vendors and sub-contractors.
6 3 2
The select ion of sub-contractors for fabrication, erect ion, non-
des truct ive test ing, coatin g and lining shall be subject to KOC approval.
Sub contra ctors wh o fabricate p ipe supports and other non-containment
i tems but with
th
exception of roof trusses may how ever be selected in
accordance
wit
th
contra ctor s qual i ty
system.
------- --.------ --
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 13/73
DOC. NO. KOC MV 007
7 0 MATERIALS
7.1 Material Selection
7.1.1
Materials used for tank fabrication shall be as specified on the tank data
sheet. The materials shall be n e w and shall no t have suffered undue
deterioration in storage or transit. A ny substitutions shall be agreed in
wri t ing by KOC before any procurement or fabr ication commences.
7.1.2
Except wh ere materials have been specified on the data sheet by
KOC,
a Contractor ma y select appropr iate AS TM plate mater ials from those
listed under para. 2.2.2 of API 650, except as below:-
a)
AS TM A 67 8 shall not be used.
b) AS TM A 3 6 shall n ot be used for shell , roof, bo tto m or annular
plates.
2.2.2a)
C)
Com ponents o f frangible joints shall be Group ll lA as a minimum .
d l The bo tto m shell course and annular plates of crude oil tanks in
excess of 50 ,00 0 bbls nominal capacity shall be Group ll lA as a
min imum.
Whe re steels com plyin g w it h specifications of other standards
organizations are offe red as equivalents, the n thes e shall be subject to
KO C s approval.
7.1.3
Selection of plate material for shells and annular r ings shall be limited to
steels
w i t h
a specif ied m inimum tensi le strength of 70 0 0 0 psi or less,
bu t
in
exceptional circumstances, higher grades ma y be acceptable to
KOC in order to l imit shell thickness.
7.1.4
Shell and annular r ing plates shall have a minimum manganese to carbon
ratio of 2.5:1. Rimming steel shall no t be used.
2.2.6)
7.1.5
Annu lar plates shall be of the same material specification and grade as
the bot tom course of shel l plates.
7 1 - 6
All shell nozzle flanges shall be in accordance with A ST M A 1 0 5 or A3 5 0
Gr.LF2.
2.5.1.2)
7.1.7
Piping fo r internal or external connec tion shall be seamless to AS TM
A 1 0 6 Gr. 8, A 33 3- 6 or API 5L Gr. or alternatively m ay be rolled and
weld ed plate of the same specification as the shell. Electr ic resistance
weld ed (ERW) pipe is no t perm itted for shell connections or loaded
structural components bu t may be used for internal distributor or
col lector piping
2.5.1.1)
7 1 8 Bol ts and nuts shall conform to AST M A1
93
Gr. 8 7 and ASTM A 1
94
Gr.2H respectively.
2.7)
7.1.9 Selection of materials f or internals shall take due account of the
possibil it ies of galvanic corrosion and static discharge.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 14/73
7.2
Procurement
Manufacturers of p lates for the shel l and bo t tom shal l be subject to
KOC's approval.
2.2.6.1)
Unpriced sub-orders for these materials and
for weld ed pipe used for shell nozzle or ma nw ay necks shall also be
subject t o KOC's approval together w i th technical purchase
spe cifications . These should include any relevant requirements for
steelmaking, hea t treatm ent, toughness, form ing, beve ling or coating.
Technical purchase specif ications shall also be sub mitted for f i t t ings
su ch as seals, drains, ventin g devices, f lame arrestors, heating coils,
foam pourers, gauging devices and anodes,
7.3 lns~ection Materials
7.3.1
KOC shal l be afforded th e r ight to inspect any or all material at source.
7.3 .2 In the event tha t KOC opts no t to inspect shel l and bo t tom plates at
source, bu t w he n th e ta nk data sheet indicates any special material
requirements to be applied, then mil l cert i f icates shal l be submitted for
approval pr ior t o loading for transportat ion to Kuw ait. Cert i f icat ion of
any other materials wi l l be subject to checking on receipt of the
materials.
7.3.3
W h e n t is proposed to make large diameter shel l connections fro m plate
rol led and welde d at the C onstructor 's local shop, the n the plate shall be
subject t o insp ect ion on receipt.
7.4 Certification Requirements
7.4.1 Cert i f icat ion shall be provided to the 3.1 .B evel of EN 10 20 4 (DIN
50 04 9) fo r the fo llow ing:- 4.2.1)
(a)
Materials comprising the containmen t envelope.
(b)
W ind girders and compression r ings.
c )
Anchorag e and other load bearing attachm ents.
( d l
Primary supporting sections of roof trusses and girders.
7.4.2
For shell plate and annular ring materials, a check analysis shall be made
b y th e mill , stockis t or contractor to at least the same frequency as
required b y the relevant material s pecif icat ion for tensi le test ing. The
results shal l be furnished to KOC. All elements included in the long
formu la for carbon equivalent as below shall be determined.
7. 4. 3 Th e Carbon Equivalent (C.E.) shall be determined and reported for
materials l isted above u sing the fol lowin g formula:
C.E.
=
C
+
( M n / 6 ) + ( Cr +M o +V ) / 5 N i + C u ) I 1 5
The CE shall no t exceed
0.42
for plates exceeding
25
m m thickness
and 0.4 3 for other
materials comprising or intended to be welded t o
the containment envelope.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 15/73
Lim its apply to bo th ladle and to produc t or check analyses.
It
wi l l no t
be acceptab le t o assume zero content for a non-determined element for
plates.
However, for materials other than plates for which the relevant
standard does n ot require analysis of all the above elements, it wil l be in
order for acceptance to be on the basis of a maxim um carbon equivalent
of 0 . 35 by the short formula (C
+
MnI6 )
Shell and annular plates shall be marked in accordance w it h the relevan t material
specif ication by the mil l by die stamping.
Other plates m ay be marked by
stenci ling w he n p erm itted by th e material specif ication.
Weld Consumables, etc.
The constructor shall maintain sufficient records to
provide assurance of th e
identity and quality of weld consumables and other materials of construction.
Notch Duc t i l it y
2.2.9.1, 2.2.7.4)
For tank s wh ic h are designed to c ontain hydrocarbons, all plates in excess of 1 9
m m
thickn ess for shell, annular r ing, nozzle and m anw ay necks, anchors and
reinforceme nt shall be subject to impa ct testing. Testing shall be in accordance
w it h sectio n 2.2.10 of API-650 , bu t the tes t temperature shall be O°C in all
cases.
Weld Repairs t o Mater ials
7.8.1
W hen unacceptable defects are found in mater ials forming part of the
tank containm ent (other than after removal of temporary attachments
wh ich is covered by paragraph 10.1 1 of this Standard), and whe n a
cons tructo r proposes t o undertake we ld repair, he shall subm it his
proposals to KOC 's site representative for approval, including we ld
procedures, qualification records, heat treatm ent procedures and
NDE
proposals.
7.8.2
The cons tructo r is required to keep records of w eld repairs t o materials,
t o make these avai lable for review, and to include the m in cert if ication
dossiers. These should record the nature, location and depth of defects,
th e w el d procedure(s) used and NDE techniques emp loyed and include
NDE and hea t treatm ent records.
7.8.3
W he n defects have been excavated w it h a view t o repair, ncr i f ication
shall be given t o KOC's f ield inspection representative for w.
. . qC
of
NDE and inspection.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 16/73
8
DESIGN
GENERAL REQUIREMENTS
8 1 Safe
ractice
For topic s and features n ot addressed in detai l 'in this Standard, the design shall
incorporate the relevant recommenda tions contained in the various parts of the
Inst i tu te of Petroleum Mod el Code of Safe Practice.
8 2 Caoacity
8.2.1
The basis of capacities shall be as indicated on the Appe ndix
E
sketch.
8.2.2 Fixed roof and unroofed tanks shall be ordered on the basis of nominal
(rated) capacity .
8.2.3
Floating roof tanks m ay be ordered on the basis of either safe operating
capa city or net working capacity . Whichever basis is used, the tank
designer shall determine and set the other defined capacities.
8 3
Seismic Loads
W he n the T ank Data Sheet specifies tha t seismic design applies:-
a)
b
c
d
e
8 4 Wind Loads
Importance factor shall be taken as 1.0 except where otherwise
specif ied on the Data Sheet.
Site coe fficien ts shall be as specified o n the Data Sheet or as
agreed b y KOC based o n a si te survey.
Whe re seismic design requires shell thickness t o be added, the
min imu m amount to be added shall be the greater of the seismic
element or the corrosion allowance.
Appro priate consideration shall be given to possible comb inations
of
loadings fr om sources such as earthquake, wi nd and internal
pressure.
Configurat ions of f loat ing roof crude oil storage tanks whic h
require anchorage against seismic effects shall be subject to
KO
approval.
Tanks shall be designed for wind loads arising from a design wind speed
V
of
45
m /s o r 10 0 mph .
Prevail ing wind directions are given in KOC-G-007.
8 5 Wind Girders
8.5.1
The spacing of intermediate wind girders shall be based on the net
thick nes s (i.e: corroded thicknes s) o f shell plate.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 17/73
DOC.
NO.
KOC MV 007
Page 17
of 7 3
REV.
8.5.2.
A
suf ficien t numbe r af holes shall be provided for drainage of rain or
deluge water when the section is not inherently self-draining.
8.5.3
The top of an open tank
(unroofed or external floating ro of) shall be
sti f fened by a top curb angle 3.9.3.2) and by a wi nd girder located one
metre be low the top of the curb angle which shall also be designed to
serve as a aal kw ay. 3.9.4) The ef fect ive w idth of the w alkwa y shall
be 1 0 0 0 m m minimum, and an outer handrail and kickplate shall be
provided around th e en tire periphery. The wa lkw ay shall be reached
from th e access stairway of an open top tank or by access stairway
from th e gauger s platform of a f loating roof tank.
8.6
U ~ l i f t Ove rturnina Slidina Stab ilitv
Stability and /or anchor loads shall be calculated for all tanks.
safety fact or of 1.5 shall be applied to sliding.
8 7
Foundations
The tank foundations shall be in accordance w ith KOC-C-026.
8.8 Des ian Me ta l Tem ~er a tu r e
M inim um m eta l design temperature shall be nominally plus 1OVdegreesCelsius.
This is a conservative f igure equal to the minimum al lowable test water
temperature an d is som ewh at low er than the f igure der ived fro m published
lowest one day mean temperature data for Kuwait.
2.2.9.3)
In any case,
impa ct testing of plate mater ials shall be in accordance w ith paragraph 7.7 of
this Standard and we ld procedure qual i f ication impa ct testing shall be in
accordance w it h paragraph 13.3.2 of this Standard.
8.9 Corrosion Al lowance
Corrosion allowances shall be as Table
8 9
below:
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 18/73
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 19/73
DOC. NO. KOC MV 007 age 9 of
73
REV.
8.10 Tank Bottoms
The tank bottom shall have a slope of 1 in 120 from the centre down to
the periphery (Apex up).
All tanks shall be provided with annular plates on which the shell plates
shall rest. 3.5.1)Minimum width for annular plates shall be 750 mm.
{3.5.2){E.4.2)
Minimum un-corroded thickness of annular plates shall
be 0.35 x the thickness of the bottom shell course or 0.375 whichever
is the greater.
3.5.3)
Water draw-off sumps shall be provided as shown on the tank data
sheet. These shall be located so as to clear any 3-plate lap joints in the
tank bottom and the bottom to annular joint by a minimum of 12 inches.
Plating shall be 0.375 thick minimum. Draw-off piping from sumps
shall be provided with a single pair of flanges inside the shell to facilitate
removal and shall be securely supported from the tank bottom.
The minimum thickness of rectangular and sketch bottom plates shall be
0.375 including corrosion allowance.
3.4.1)
Flat wear plates shall be provided below dip pipes and under pipes
discharging against the tank bottom.
Wear plates shall also be provided in the vicinity of mixers. These shall
be minimum 0.1875 plates continuously welded to the bottom and
around the shell connections prior to applying the bottom lining.
8.1 Bottom Connections
when. connections are required to be made to a tank bottom, the
recommendations of A3pendix of API 650 shall in general be followed. Unless
otherwise agreed by KOC, the arrangement shown in fig.O-2 shall be provided.
The connections shall be located so as to clear any lap joints in the tank bottom.
The shell thickness shall be calculated using the one foot method for
tanks up to and including 30 metres diameter.
3.6.3.1)
Finite element
analysis techniques shall
be applied to tanks with diameters 61 metres
and larger. 3.6.5)
Any proposal to utilize banding to confine
the shell stress of large
tanks within the limits allowed by API 650
shall be subject to KOC
approval.
A
specific gravity of 1.02 shall be used for computing both the design
shell thickness 3.6.1.3)and the hydrostatic test shell thickness
3.6.1.4)except that when a higher value s indicated on the data sheet
this higher value shall be used.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 20/73
8.13 Shell Conn ections General
8.1 3.1 In general, all nozzles
/
manholes shall be of the flanged type. Howe ver
foa m cham bers ma y be moun ted on studded pads welded t o the shell .
8.1 3.2 Wh ere anti-v ortex arrangements are required for pum pout, th ese shall be
as indicated on the tank data sheet. In the case of the oi l out lets of
f loat in g roof tanks, vortex breakers are mandatory t o a l low for the
possibi l i ty of t he installat ion of pumps in the future.
8.1 3. 3 Anc horin g brackets, if required, shall be provided at centres specified in
API 650. Caution shall be exercised in locating brackets so as not to
lan d or interfe re w it h stress relieved assemblies, shell vertic al seams or
other appurtenances or reinforcement plates.
8.13.4 Shel l
nozzles shall be designed no t only for the static l iquid load (3.7.2)
bu t also for the loads imposed by connecting pipework, and in the case
of ma nw ay s ut i lized for moun ting of side entry mixers, for the loads
trans mitted b y the mixers. For connections si tuated in the bo tto m shell
course, it shall be verif ied that allowable loads derived fro m Appendix
P
of A PI-65 0 are not exceeded. (3.7.1.5)
8.13.6
L o w typ e shel l reinforcement plates 3.7.3.3) hall only be used where
it
is impract ical to raise the nozzle opening by an amount suff ic ient to
avoid this condit ion.
8 .1 3.5 All shell nozzle reinforcem ent plates shall be of the same m aterial as the
shell. These plates shall be provided w it h
114
diameter threaded vent
tel l tale holes to faci l itate pneu matic test ing and after test ing shall be left
unplugg ed bu t weather sealed w ith grease.
(3.7.6.1)
8.13 .7 For piping route d t o nozzles at high shell elevat ions or on the tank roof,
sui table support pads and reinforcing steelwork shal l be provided to
enable such piping to be completed after tank hy drotest.
8.14 Shell Access Connections
8.14 .1 Requirements for the number and
or ientation of 36 x
48
f lush type
clea nou t doors shall be as indicated on the tank data sheet.
8.14 .2 One of the shell ma nwa ys shall be located near the foo t of the main
acces s s tairwa y or ladder. The others shall be spaced approx imately
equally.
8 . 14.3 Shel l ma nw ay s shall be at least
24
nominal and shall be provided wit h
suitable hinged
cover davits. Man way s shall be provided wit h external
hand grips positioned approximately
400
m m above the top o f the
manhole. Internal handgrips shall also be provided excep t th at whe n
the y wo uld be located in a f ibreglassed area they shal l be omitted.
8.14.4 Wh en rnanwa ys are also
used
for mounting side-entry mixers, they shall
have ANSI type forged flanges.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 21/73
DOC. NO. KOC MV 007 Page
21 of
73 REV.
1
8 15
Stairways, Ladders Platform s
8.1 5.1
M ain access t o the to p of a f ixed or f loating roof tank shal l be provided
b y an outside double str inger radial stairwa y 1000 m m wide or, for f ixed
roof tanks only, b y a spiral stairwa y where so indicated on the tank data
sheet.
A
rad ia l s ta i rway shal l ex tend to the tank bund wal l wi th
addition al provision for access from inside the tank bund area.
8.15.2
M ain access to the top windgirder wa lkway of an unroofed tank shal l be
by spiral stairway.
8.15.3 Stairways shal l have a minimum width of 1000 m m and be arranged
w it h the angle of s lope t o the hor izontal plane from 35 degrees to 40
degrees. Angles greater than 4 0 degrees shall be subject to approval by
KOC.
8.1 5 .4
Interm ediate landings shall be provided at approximately
6
metre
intervals for all types of fix ed sta irways and ladders.
8.1 5.5
All treads and plat form floors shall be galvanized safe ty tread or equal as
approved by KOC Hand and knee rails and 200 m m high toe kick plates
shall be pro vide d f or platform s, and hand and knee rails shall also be
provided for stairway s. Handrails shall confo rm to Standard Draw ing
0 1 5-MB-1002.
8 16
Cathodic Protection
8.16.1
Cath odic Protec tion shall be generally in accordance w it h the designated
Project Specification and with API RP 651. Reference should also be
ma de to t he S cope of W ork fo r delineation o f responsibil it ies.
8.1
6.2 In addition t o protective coating, the underside of all tank bo ttom s shall
be cathod ically protected by an impressed current system i n accordance
w i t h KOC-L-026.
8.1 6.3
An
impressed current system shall be applied to the internal surfaces of
tan ks contain ing predominantly aggressive wate r such as fire, brackish
or untreate d seawater. Cable support studs shall be provided for
unro ofe d tanks, and arrangements shall be m ade for conn ecting and
suspending the
C.P.
Anodes.
8.1
6.4 Fixed sacrificial anodes shall be installed in tanks conta ining fuel gas
blanketed or treated wa ter.
.
8.16.5 N o additional internal cathodic protection is required for oi l tanks w ith
bo tto m s lined wi th fiberglass (or equivalent thick ) l inings.
8 17 E arth in a C l i ~ s
Earthing facil it ies shall be in accordance with c lause
8.5
of KOC-E-024 and
Standard Drawing 0 1 5-CB-1013.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 22/73
8.18 Sett lement References
TO facil i tate settlem ent checks, reference markers shall be prov ided on the shell
at an elevat ion of
1
m and at an early stage of erection. They shall be made
from angle bar, 5 0 x 5 0 mm and 10 0 m m long. The number and distr ibution
of markers shal l be accordance w it h 10.5.1.2 of API Standard 653 except that N
shall be roun ded up to the ne xt mult iple of four. Whe n large connections are
made to th e tank bottom , additional reference markers shall be provided inside
th e shell to enable their sett lemen t to be checked. Wh en a tank is to be
con structe d b y a jack-up metho d, the erection procedure shall address other
means of mo nitor ing foundation sett lement during erect ion.
8.1 Calculations
8.19.1
Detailed design calculations are required. Com puter printo uts wh ich
hav e insuff ic ie nt steps or wh ich do no t declare input data and
assumptions wi l l n ot be acceptable.
8 19 2 Calculat ions t o be subm itted for approval or information shall include
any o f th e fol lowin g aspects which are applicable.
Nozzle sizing, process and hy draulic.
Deriva tion of allowable stresses. (3.6.2)
Design pressure
P
(F.4.1) and ma ximu m design pressure P
(F.4.2) for tanks su bject to small internal pressures.
Found ation and annular ring loading.
Required comp ression area at th e roo f to shell.
Shell thicknesse s.
(3.6.1.3,
3.6.1.4)
Ven ting ( including open vents, r im vents and autom atic bleeder
vents) and emergency pressure relief.
Overf low capacity.
Anchorage.
Cathod ic prote ction (curren t density, anode l ife etc.)
Uplift.
Sliding.
Required top win d girder sect ions for open to p tanks.
{3.9.1){3.9.6.1}
W ind induced buckl ing
/
intermediate win d girder heigh t section.
(3.9.7)
Roof support.
Shell opening reinforcemen ts (3.7.2) (including significant piping
loads a t nozzles (3.7.1.5))
Support of b otto m connections (0.2.3)
Rainwater drainage from floating roofs.
Buoyancy, stabil i ty and strength of f loating roofs.(C.3.4)
Wa ter and foam requirements for f i refight ing.
Derivat ion of sett lement l imits.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 23/73
DOC. NO. KOC MV 007
8.20
rawinqs
Drawings shall be issued to provide as a minimum the information listed below.
8.21 Weld
Details
8.21.1 The
Design pressure (for fixed roof tanks) and design temperatures
(minimum design metal temperature and other limitations such as
for coatings or linings).
Allowable stresses.
Material specifications and grades.
Required and/or nominal thicknesses.
Dimensions.
Weights
Dimensional tolerances.
Slopes.
References to any Standard Drawings.
NDE
requirements (including any NDE of butt welds in roof support
trusses or rafters.)
Proximity limits for openings 3.7.3)and for both permanent and
temporary attachment welds.
Location of major load bearing temporary attachments (eg for roof
raising)
Weld details and dimensions. Special attention shall be given to
the profiles and tolerances of fillet welds connecting the shell plate
to the bottom annular plate and to frangible joints.
shell to bottom joint shall be made with a minimum of two weld
passes on each side of the shell. Each leg of the finished weld shall be
of equal length.
8.21.2 The bottom rectangular and sketch plates shall be lap welded with
double-pass fillet welds to provide continuous drainage to the periphery.
8.21.3 The shell vertical and horizontal joints shall be double butt-welded with
full penetration and fusion. For floating roof tanks only, abutting shell
plates at horizontal joints may at the designer's option have their internal
surfaces aligned. However there shall be no measurable overhang .
3.1.5.2, 3.1.5.3)
4
All piping supports and other welded attachments to the shell, bottom
and roof shall be welded to pads and not directly except for nameplate
brackets, earthing clips and settling markers. Pads welded to the shell
shall have any corners radiused to 5 mm minimum.
8.21.5 Internal fillet welded attachments shall
as far as practicable be seal
welded.
The use of non-seal welded internal fillets direct to the shell or
bottom shall be subject to KOC's approval.
Seal welding is mandatory
on tanks susceptible to pyrophoric scaling.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 24/73
DOC.
NO. KOC-MV-007 I
age
24
of
73 REV.
1
8A .0 REQUIREMENTS SPECIFIC TO FIXED CONICAL ROOF TANKS
8A.
1
V a ~ o u r r es su re
8A .2 Vacuum
8A.Z . 1
Tanks w it h f ixed roofs shal l always be designed for a vapour pressure.
Tanks w it h open vents shall have a design vapour pressure assigned
such as to avoid l if t ing of the roof plates
1.1.1)
Tanks wh ich normal ly operate wi th a vapour pressure whether this
arises fro m gas blanketing or from vapour evolut ion from the contained
liquid shall have a design vapour pressure assigned to provide a
suitable operat ing margin t o minimize discharge to the environment
fro m pressure relief valves.
Tanks w it h open vents shall be assigned the basic 1 inch water gauge
vacuum design.
3.2.4)
The basic 1 inch water gauge vacuum design shall also be applied t o
other tan ks as far as practicable. How ever a higher design vacu um
m ay b e deemed necessary for operational reasons, or t o l imit the
number o f vacuum breakers required for tanks from wh ich vapour
recovery compressors draw .
In
such cases, the higher design vacuum
shall be supported b y finite element analysis or other appropriate
calculat ion method, and shal l take into considerat ion the combined
effe cts of win d loading and external pressure vacuum ) on the empty
tank.
8A .3 Roof Loads
The uniform l ive load to be applied in the design of a f ixed roof and i ts support ing
structure shall be in accordance wi th API 6 5 0 3.10.2 .1.
8A.4 Uulift Overturnins Stabi l i ty
Shel l dead we ight
W)
shall be corrected for up lift due to design pressure rather
tha n due t o operat ing pressure.
3.1
1)
8A.5 Shell Conne ctions General
8A.5 .1 Inclined inlet distributor pipe w it h slots/perforations ex cep t on upper
3
me ters section) shall be provided inside crude test tank s and dry crude
tanks . Horizo ntal spreader co llecto r pipes shall be provid ed inside
w e t crude tanks. Oi l inlets shall be sized such tha t f l ow veloci ty does
no t exceed 1.25 m/s.
Interna l pipes shall be provided w it h flanges t o ensure easy removal /
installation throug h manholes and shall be protected internally and
externally w ith epoxy coatings. When agreed by KOC, they may be
designed for rem oval through cleanou t doors.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 25/73
A top angle shall be provided with the horizontal leg turned outwards 3.1.5.9)
except where a strong roof to shell joint is specified by KOC in which case detail
h of API 650 Fig
F 1
shall be used.
Roofs shall be of conical form whether they are supported or of the self
su,pporting type.
8A.8 Roof u ~ ~ o r t
8A.8.1
Roof supporting columns and trusses shall be designed in accordance
with the designated Project Specification covering structural steelwork,
and taking into account the appropriate loadings applied to them from
all possible sources. Roof suppox columns of hollow section shall be
designed to be internally dry and shall be seal welded top and bottom.
It shall be verified that the loading of any support column will ensure
that it cannot become buoyant.
8A.8.2
Support columns shall be provided with means of height adjustment to
compensate for settlement.
8A.8.3 The base of support columns shall be restrained against lateral
movement irrespective of whether or not the tank is designed to
withstand seismic loads.
E.8.2)
8A . 9
Roof Connections
8A.9.1
One or more 24 diameter roof manways shall be provided complete
with suitable davit arms / hinges. These will be primarily for venting
purposes during maintenance work rather than for access.
8A.9.2 Unless otherwise specified, oil tank roofs shall be equipped with a
centre cylindrical gas dome to which the tank vapour line and vent
shall be connected. Both the diameter and cylindrical height of the
dome shall be at least twice the diameter of the vapour outlet
connection, but with a minimum of 900 mm.
8A.9.3 Main vapour connections to the tank roof shall be adequately
reinforced to take care of vibration tress transmitted by piping.
8A.9.4
2 diametrically opposed dip hatches with covers and dip-tubes shall be
provided near the stair and ladder heads of crude oil tanks. The
hatches shall be readily accessible and suitable for manual dipping. The
dip-tubes shall be protected internally and externally with epoxy
coatings, and shall be provided with two rows of slots (50 mm
x
300
mm) facing the shell and continued above the maximum level of the
liquid.
Flat plates, not be less than 600 mm square, shall be provided below
the dip pipes. They shall be mounted level not less than 7 mm from
the tank bottom and supported from the tank shell.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 26/73
8A.9.5
Nozzles for purging the tank shall be provided at the highest point of oi l
tanks (gas dome) and at an elevat ion of
900
m m above the tank
bo t tom.
8A.10 Stairways, Ladders
Platforms
{Tables 3 -19 to 3-21)
8A. 10.1 A wa lkw ay shall be provided giv ing access to the ro of f rom the head
of the s ta i rway.
8A. 10.2
W hen the roof s lope exceeds 1
12,
access to al l accessories located
aw ay fro m the r im shal l be bar t readed. Handrai ls shall surround the
acces sories area, and hand and knee rails and
200
m m h igh toe k ick
plates shall be provided for plat forms and the complete c ircumference
of the roof .
8A.10.2 A vertical caged ladder shall be provided as a secon d means of
escape from the roof and shall be located at the opposi te side of the
tank roof t o the main stairway. This ladder may also be ut i lized in
conjunc t ion w it h plat forms to access instruments, valves, foam
chambers etc.
8A .
1 Weld Details
8A .
1 1 1 The top angle-to-shel l jo int of f ixed roof tanks shall be butt-welde d
w i t h complete penetra tion and complete fus ion except where
KOC
approves a design with continuous double f i l let welding. 3.1 -5.3)
8A.1 1.2
Frangible roof to shel l jo ints shall not be offse t by mo re than hal f the
dimension of the angle leg from the vertical l ine of the shell.
8A. 1 1.3 Roof plates shall
be lapped so tha t the lower edge of the up permost
plate is beneath the upper edge of the lower plate ( ie. opt imized for
internal drainage of conde nsation rather than for external drainage).
Plates shall be cont inuous f i llet welded on the outside wit h a
min imum 25 mm over lap.
3.1.3.5)
Double pass welding is
man datory on roofs requiring leak t ightness. Double lap or bu tt
welding is mandatory on tank s suscept ible to pyrophoric scaling.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 27/73
88 .0 REQUIREMENTS SPECIFIC TO EXTERNAL FLOATING ROOF TANKS
8 8 .1 Overall Confiauration
Prior t o proceeding w it h detailed design, the fo l lowing features shall be
established:-
Overall height and diameter.
Min imu m and m axim um operat ing levels and measures proposed to
optimize these.
Roof type.
Shell material specification(s1 and gra de b).
Proposed arrangement o f m ixers ( if required) and mixin g timetab le.
Rim seal ty pe and materials.
Roof drain typ e and m inimum maintenance / replacement intervals.
Sealing facil i t ies for deck fitt ings.
Note ontractor should be required to submit the above data prior to
award
8B.2 Oesian and Operatina Levels
86 2 1
Levels and associated capacities shall be as defined in Appe ndix E o f
this standard.
8B 2 2 For the purposes of c alculating shell thicknesses o f f loating roof
tanks, the level t o the to p of the top angle shal l be used in
conjunct ion w it h the hy drostat ic test stress S,
3.6.1.4)
and the
design l iquid level shall be used in conjunct ion wi th the product
des ign stress S,
3.6.1.3).
8 8 .3 Roof Tvpes
Floating roofs shall be ei ther o f the pontoon or double deck typ e. Pan typ e roofs
are no t permissible.
C.1)
8 8 .4 Pontoon Confiquration
The top pontoon deck shal l s lope downw ards towards the centre o f the tank
and the bo tto m pontoon shall slope upward s towards the centre. ( ie low ty pe
roofs are no t permissib le) The height of attachment of the centre deck to the
inner pon toon r im shall be at a height such that no signif icant bendin? mom ent
is
applied to th is jo int wh en the roof is f loat ing normally (w itho ut s. id it iona1
loading from rainwater accum ulat ion or po ntoon f looding).
88.5 Double
Deck
Confiauration
The bo tto m deck shall slope upwa rds towards the centre of the tank. The top
deck ma y either slope t o drain tow ards the centre ( converging double deck
type) or
t
may s lope d ow n f rom both the r im and the'centre.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 28/73
DOC. NO.
KOC MV 007
Paae 28 of 7 I REV. 1
8B.6
Flotation orn~artrnents
88.6.1
Com partme nts shall be designed and constructed so as t o provide
reasonable
access for inspection and maintenance. Where stiffen ing
is necessary, preference shall be given t o underside external
stiffen ing. A ny internal stiffen ing shall be essentially non-ob structive
to personnel.
88 .6 .2
All com partme nts and bulkheads shall be internally seal welded along
top, bo ttom and vertical edges.
88.6.3
Topside surfaces, including the outer r im, shall
be
painted.
88 .6.4 The m inimum thickness of the botto m deck shall be 6 mm . The
minim um thickness of outer r im plat ing shall also be 6 mm except
whe re a greater thickness is specified on the D ata Sheet. C.3.3.2)
88 7 entre Deck of Pontoon Tvoe
85.7.1 The minim um thickness of the botto m deck shall be 6 mm.
C.3.3.2)
8B.7.2 The joint betwe en the centre deck and inner pontoo n r im shall be
sufficie ntly reinforced whe re necessary to minimize the possibil ity
of fai lure at this location due to f lexing of the deck.
88.7.3 Fabrication of th e centre deck shall ensure that
t
is essentially flat in
form. If fabricated on the tank bo ttom, steps shell be taken to ensure
that th e deck does not take the conical form of the b ottom .
8B.8 O~era t inaFlowrates
For oil storage tank s the overall design and the operating ma nual shall specify
a suitably lo w fil l ing rate at comm issioning and at start-up after maintenance
shu tdow n to avoid the tendency of bal looning of the centre deck of
pon toon typ e roofs due to higher than normal amounts of gas being
introduced in to the tank. In any case the inf low rate shall be such that a f lo w
veloc i ty of
3
f t / s is no t exceeded up to the p oint at wh ich the roo f leaves i ts
supports, in accordance with the recommendation in c lause 4.2.b of API
RP.2003.
88.9 Stabi l i ty
88.9 .1 In addit ion to the buoyancy cr i ter ia of C.3.4.1 of API-650, a
pontoo n type roof shall also have suff ic ient buoyancy to
remain afloat on product of the low est specif ied specif ic gravity
wi th the centre deck f looded wi th f i rewater and two adjacent
pontoons concurrently f looded with product.
88 9 2
The designer shall declare the allowa ble stress and stab ility criteria
tha t he proposes to use to ver i fy strength and stabi li ty. The t lt
which needs to be taken into account in sett ing the up ward height
of
sl w~ s
rocnd deck
penetrations shall
e detsrmined. C.3.4.2)
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 29/73
DOC. NO. KOC MV 007 Page
29
of
73
REV.
1
88 10 M ain Tank Connect ions
8B.10.1 The oi l in let shal l be arranged to project wel l into th e tan k so as to
avoid th e local accumulation o f entrained gas under the roof deck or
overpressur ing o f the seal. I t shal l also be arranged to minimize
turbulen ce whi ch m ay affe ct the roof seal, roof drains, m ixers, etc.
88.10.2 The oi l outlet shall connect to the tank bott om plates unless
otherwise agreed by KOC. A
weir shall be provided around this
connection wh ich shall also be provided w ith
a
vortex breaker. The
weir height shall be as indicated on th e Da ta Sheet.
The bore of the oi l outlet, up to th e fi rs t flange outside the tank, shall
be lined wit h the same system as applied to the tank bottom .
88 11 Roof Connections 8 O~en inc rs
8B.11.1 M a n w a v s
A
second m anw ay shal l be provided for each double-deck buoya ncy
com partm ent i f , in KOC s judgment, th e size and/or configuration is
such th at a s ing le ma nwa y wo uld be insuf f ic ient to prov ide safe and
rapid escape. (C.3.5)
8B. 1 1.2 Deck Ha tche s (C.3.11)
T w o 30 deck hatches shal l be provided for al l tanks, located
diametr ical ly opposite to provide access from th e underside t o
tops ide
of the roof dur ing maintenance. In the case of double deck
roofs , the top and bot t om deck openings shal l be connected by a
tube w i t h ladder rungs. The b ot to m deck opening shal l not be
covered.
88.1 1.3 Primarv Roof Drains (C.3.8)
88.1 1.3.1 The rainfal l to be considered in s iz ing roof drains is
defined in KO C-G-007.
88.1 1.3.2 Primary roo f drains shall be of either th e articulated joint
or f lexible hose typ e as specif ied on the D ata Sheet. The
drain pipes shal l be located so tha t they are not unduly
af fected by the forces imposed by the operation of the
mixers or by th e tank in le t f low.
88.1 1.3.3 The ma xim um nom inal size of ar t iculated drain l ines shal l
be 4 .
A n ad dit ional drain shall be provided i f one - 4
dra in would have insuf f ic ient capac i ty . t is not
permissible t o branch t w o drain l ines fro m a single deck
opening.
8B.11.3.4 For pontoon type
roof s the check valve shall be made
access ib le f rom the top of the deck by mount ing it i n a
recess. This shalt afiow the va lve to be rep laced wi th out
entry in to the tank.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 30/73
88.1 1.3.5 The dra in shall be va lved at the tank shell so tha t t can
be iso la ted in the event o f fa ilure of the p ipe ins ide the
tank.
I f more than one dra in is prov ided then each one
shal l be indiv idual ly valved at the shel l.
Emerqencv Drains
Double deck roofs shall be provided w ith at least one emergency
drain (draining into the product) .
It
shall be located close to the
centre. I ts upwa rd project ion shal l be such as to be mid wa y between
t h e
high and low p oints of the upper deck. Inside the tank, th e drain
shall be f i t te d w ith a def lector to minimize vapour losses.
Maintenance Drains
Pontoon type roofs shall be prov ided wi t h tw o 3 brass drain plugs,
one located close t o the centre and the other c lose to the inner r im
and f i t ted f rom the top for use when the roof is landed on i ts
supports.
The drainage o f double deck roofs may be achieved by removing
(unscrew ing) the emergency drain.
Roof Vents
C.3.9)
88.1
1.6.1
The arrangement and configura tion of al l roof vents shall
be such as to m inimize the possibi l ity of oi l contaminat ion
of w orking snd seal ing components.
88.11 6 2
A minim um of one r im vent shall be installed for each
tank.
88.1
1 6 3
The design, size and location of automatic bleeder vents
shall be adequate to breathe air / vapours at a volum etric
rate at least equal to the maximum tank out f lo w and to
tw ic e the specif ied commissioning l iquid inf low . A t least
one bleeder v ent shall be located near the centre of the
deck.
88.11.6.4 Pontoon type roofs shal l a lso be prov ided w i th t w o
weigh ted pressure relief valves to discharge excess tank
vapour and incondensibles whi lst the roof is af loat. One
of these dev ices shall be located wi th in one to tw o
metres of the centre and the other shall be located
adjacent to th e inner r im and or iented 180 f rom the p ivot
of the roll ing ladder. The set pressure of each valve shall
be
2 5 %
above the pressure exerted by th e we ight o f the
centre deck and i ts f i t t ings so that there wi l l be no
discharge under normal operat ion, b ut only in the event of
a pronounced bal looning of the centre deck.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 31/73
88.1 1.7 Sam~ lina atch
A sampling hatch shall be provided where required by the Data Sheet.
The hinged cover shall be brass to preclude the risk of sparking. A
bare steel datum plate shall be provided below the sampling hatch to
enable this fitting
to be used as an alternative gauging device. This
shall be mounted level on the lined bottom and held in place y resin
as for the manual still well.
88.1 Rollina Ladder (C.3.7)
88.12.1
A rolling ladder with rails shall be provided for all floating roof tanks.
The rails shall be welded to pads and not direct onto the roof deck.
The ladder shall connect to the gauger s platform. The pivot and
wheel bearings shall be of a type which does not require any
lubrication after commissioning. The wheels shall be non-sparking.
The slope of the ladder shall not exceed
50
o the horizontal at the
extreme low position. Treads shall be self-leveling. The minimum
inside width of the ladder shall be 750 mm. If it is necessary for the
rails to be significantly elevated, then suitable steps shall be provided
down to the deck.
8B.12.2
The design shall ensure that the ladder will not be damaged or
derailed when exposed to the design wind velocity with the roof at its
highest operational level. The anti-derailment device shall be such
that there is no locking or permanent distortion.
88.1 2.3 The tilt ing effect of the loading from the rolling ladder and runway
shall be assessed and avoidance of the accumulation of rainwater at
local depressions shall be addressed for centredecks of pontoon
type roofs.
88.13 Anti-Rotation and Centerina Devices (C.3.12)
The type and configuration of anti-rotation and centering devices shall limit
lateral and rotational movement to the extent necessary to ensure that free
vertical movement and rim sealing are not compromised and that drain piping is
not unduly stressed. Roller type devices shall be provided with grease nipples.
88.14 Roof Sealing
The roof perimeter shall incorporate a flexible double sealing mechanism except
where
KOC
approves an alternative type. Irrespective of the type of seal,
details
of the proposed sealing mechanism shall be provided to
KO
for
approval. Details shall include data on the following:-
the suitability of non-metallic materials for the stored product and for
temperatures up to
80°C;
the fire-retardant properties of non-metallic materials;
foam application considerations;
the shell and roof (or rim gap) tolerances necessary to maintain the
seal;
operational constraints for inspection, maintenan,ce and component
replacement;
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 32/73
-
wh ethe r maintenance can be performed on secondary sealing w itho ut
affec t ing th e primary sealing;
-
self cleaning characteristics (eg. wax scraping);
means of electr ical insulat ion o f mechanical shoe hangers to ensure
th at no l ightning induced arcing can occur;
drainage of the seal sys tem for maintenance;
-
Corrosion resistance of metall ic sealing materials.
I r respect ive of the type of pr imary
/
secondary rim sealing, a weather shield
shall also be provided. This shal l be selected primari ly on i ts abi l ity to prote ct
th e ma in seals from du st, sand and paint ing operations rather than i ts rainwater
shedding capabi l ity
Bonding of th e roof and rol ling ladder to the shell shall be in accordance wit h
KOC-E-024.
88 . 1
Roof
S U D P O ~ ~
eqs
Roof supports shal l be designed to support the we ight of the roof
w i th adjacent f looded compartments and wi th 5 pounds per
square foo t uni form loading of the centre deck of pontoo n type roofs.
Pads of minimum 6 m m diameter shal l be provided to distr ibute
the support loads at the landing of the legs to the tank bot tom. The
pads shall be cont inuously welded to the tank b ot tom. Af te r l in ing of
th is p ad along w i th th e tank bot tom, an addit ional pad shall be
provided to avoid damage to the bot to m l in ing by the legs. This
second pad shall be slight ly smaller tha n the f i rst and shall be located
and l ight ly secured by an epoxy f i l let ro und i ts edges. C.3.10.2)
Drain holes at the bo ttom of support legs shall be ample to ensure
th at blockage b y sludge does n ot prevent th e legs from draining
completely w i t h the tank empt ied. C.3.10.1)
The upw ard project ion of support leg sleeves through the centre deck
shall be suf f ic ient to ensure tha t produ ct cannot f lo w onto the deck
under ei ther of the cond it ions described in
C 3 4 1
f API
650
Sleeves shall be adequately reinforced by means of topside pads and
gusse ts bu t shall also be welded t o the underside of the deck.
Supporting legs shall be adjustable so that, whatever is the grounding
height for operation, the height can be set to give 2 metres clearance
up to th e lowe st deck for maintenance. C.3.10.1)
T w o s lot ted st i ll wel ls of minimum 8 diameter sh all be provided for
man ual dipping and for level gauging. These shall be located close to
th e shel l so tha t they are operable from the gauger s p latform or the
wind girder accessway.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 33/73
88 17 2 The stil l wells for manual dipping shall be provided with a hinged
brass cover to preclude the risk of sparking. semicircular top
reference plate notched 25 mm wide x
40
mm deep shall be welded
inside the manual still well.
88 17 3
The lower end of the still well pipes shall be restrained from lateral
movement
by
sleeves supported from the shell.
88 17 4
datum plate shall be provided below the manual still.wel1. This
shall be bare steel mounted level on the lined bottom and held in
place by resin.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 34/73
DOC NO. KOC MV 007 Page 34 of 73 REV 1
9 0 LOSS PREVENTION
This sect ion deals w i th potent ia l losses associated w i th tan ks used to store or process
liquids.
Where issues are not str ict ly wit hin the scope of this standard and ma y also
no t be wit hin the tank con structor s scope, then the relevant provisions are wri t te n as
recommendat ions.
9 1 Fire Protection
9.1 .1 Wa ter SoravlDeluqe
A f ixed water spray deluge system shal l be provided to cover the
exposed side(s) of ro ofs of f ixed ro of tanks as per the designated project
specif icat ion for Fire Protect ion Safety Equipment and NFPA-15 in the
fol lowing circumstances.
a) Wh en the tank is designed to contain crude or other low f lash
flammable l iquid.
b ) Other tanks whe re KOC has determined that the locat ion or
conte nt necessitates protec t ion from adjacent tanks or other
facil i t ies.
9.1.2 Fixed Foam installations
9.1.2.1 Fixed roof oi l ta nks require f ixed instal lat ions to apply a foam
blanket to the liquid surface. KOC may also require these
faci l it ies to be provided for other tan ks w hich are primari ly
designed to contain water bu t which normally have a layer of
f lammable l iquid having a volume of 1 0 m3 or more f loat ing on
th e surface. The foa m pourers shall be of the f langed typ e as
speci f ied on the data
sheet and shall be readily accessible for
maintenance.
9.1.2.2 Float ing roof tank s require faci l it ies for applying foam to the r im
space
and these shall also be fixed installations w he n specified
on the data sheet.
They shall be arranged to be compatible
w it h the selected roof seals.
9.1.2.3 In either of the above cases, fixed installation s shall be
according to NFPA-1 1 except that a minimum of
4
pourers shall
be required for tanks f rom 12 0 f t t o 1 4 0
t
in diameter.
9.1.3 Heat Detectors
F ixed roof tanks sha ll have fusib le l ink heat de tec tors i r ~ s r ~ ~ t..
indicated
on the Data Sheet . F loat ing roof tanks shal l have I~ i?a=r
ea t
dete ctors insta l led as indicated on the Data Sheet. Heat detectors
shal l com ply w i t h the designated project speci f icat ion for Fire Gas
Dete ct ion Equipment .
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 35/73
DOC NO. KOC MV 007 Page 35 of 73
REV. 1
9 2 Ove r~ress ure rotection
9.2.1
Fixed roof open vented tanks shall be provided with weather shielded
open type breather vents. The vent shall not include flanges or any
other device which may introduce the possibility of inadvertent
obstruction. Vents shall be sized so that neither the design pressure nor
half the design vacuum may be exceeded at maximum tank breathing
rates.
9.2.2
Whether an essentially vapour tight roof is provided principally to limit
evaporation losses, or to allow recovery of tank vapour, or to retain an
inert gas blanket, such tanks shall be protected by pressure/vacuum
breather valves to limit the vapour space pressure within the design
pressure as established per paragraph 8A.
1
above.
9.2.3 Fixed roof pressurized tanks may additionally be protected by the
provision of a frangible roof to shell joint when required or agreed by
KOC. This feature may provide additional protection against preferential
failure of the shell to bot tom joint in circumstances such as:-
a liquid overfill
an internal explosion
an unexpectedly high degassing rate (where relie
not provide adequate discharge capacity),
or in the event of:-
failure of relief valves to operate
f valves might
However, wherever the risk of these events is judged to be acceptably
low, and the risk of failure by other mechanisms to be unacceptably
high, then KOC may prohibit frangible joints.
9.2.4
The venting of floating roof tanks is covered in Section 88 and none of
the provisions of this Section 9 apply.
9 3 Ventinq
Ca~acity
9.3.1 Normal Ventinq
Vent valves shall be sized for normal venting due to product
movement (including degassing and flashing) and for thermal effects in
accordance wi th API Std. 2000. Sizing shall also assume the coincident
failure of any vapour recovery compressor and of any control valve
designed for alternate vapour take-off or make-up under normal
operating conditions.
9.3.2 Emernencv Venting
9.3.2.1 Calculations shall be provided in accordance wi th API Std. 2000
for the emergency venting of
all fixed roof tanks intended to
contain flammable liquid. Environmental factor F shall be
t ken as 1.0 in all cases.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 36/73
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 37/73
9 6 S ~ a r in q f PressureNacuum Protective evices
9.6.1
The number and ty pe of instal led devices shall satisfy the fol lowing
criteria:-
(a) Normal venting requirement
2
spare valves, (one spare t o be
blocked open
t o provide a safety m argin in the event o f a st icking
pal let and the other wi l l be also normally be blocked open but wi l l
be
a
maintenance spare.)
(b) Emergency venting requirement 1 spare valve which will be a
maintenance spare.
c) Flame arrested open vent requirement + safetylmaintenance
spare.
( d l Plain open or blanked ven ts d o no t require sparing.
9.6.2 The above sparing requirements shall be satisfied for both inbreathing
and outbreathing.
9.6.3
P IDv s shou ld indicate all protective valves or vents to be normally in
service. In addition,
a
note should be added to the effect th at only one
m ay be removed at a t ime for maintenance inspection when the tank is
in service.
9 7 Location and Installation of Protective evices
9.7.1
Pressure vacuu m valves shall be more or less equally spaced around the
tank per iphery except as ma y otherwise be approved by
KOC.
Butterfly
isolating valves shall be provide d and these shall have locking devices
fitted, and shall have clear indication of the position of the disk. Drip
accu mu lation trays and drain l ines shall be provided t o ground level for
fixed roof oil tanks.
9.7.2
Open vents shall be located near to the apex of the roof.
9 8 Overfill Protection
9.8.1
All tanks containing f lammable and / or combustible liquids should be
provided w it h a high level alarm located to avoid overf i ll .
9.8.1 I
In th e case of crude storage tanks, the alarms should satisfy
criterion (b) or (c) of NFPA
30
lause
2 10.1
f the tank w i l l not
be gauged at frequent intervals in accordance w it h criterion (a).
9.8.1.2 n
th e case of process tanks w hic h normally receive continuous
in flo w of flammab le and combu stible l iquids, the alarms should
normally satisfy criterion (b) of N FPA 30 lause 2 1 .1.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 38/73
DOC.
NO
K O C M V 0 0 7
9.8.1.3 In the case of process tanks which receive only intermittent
inflow which is manually controlled, then the avoidance of
overflow may be achieved by application of either (a) or (b) of
NFPA 30 clause 2-10.1, irrespective of whether the inflowing
liquid is flammable and or combustible.
9 8 2
Fixed roof water tanks with inert gas blanketing shall be provided with
an overflow through a device designed to preclude discharge of blanket
gas or (if present) the oil layer.
9.8.3
Fixed roof water tanks without inert gas blanketing shall be provided
wit h a conventional liquid overflow. The downpipe shall be external to
the tank (except for the internal elbow tundish).
9 8 4
Calculations shall be provided to demonstrate that the required overflow
capacity will be achieved with the height of the overflow pipe(s) set at
an appropriate level below the design liquid level.
9 9
Boilover Prevention
The phenomenon of 'boilover' may occur when a large floating roof tank suffers
a full surface area fire and the heat wave travels down to reach the tank bottoms
where a significant quantity of water may be present. The resultant rapid boiling
action could eject large quantities of burning oil over the tank rim and into the
bund. To avoid this, a route should be provided to safely draw off the water
bottoms during such a fire to a location outside the bund.
9 10
Eva~oration oss Control
A
study of anticipated evaporative losses shall be performed for floating roof
tanks. This shall include losses from the rim seal and also around deck
penetrating fittings.
The study shall quantify the annual savings to be expected
from:-
a)
Selection of different roof types.
b
The installation of the different available rim seals and other loss control
devices.
The cost of procurement and installation of these devices shall be estimated on a
unit basis together with typical replacement intervals.
9 11
Protection Aqainst lqnition
The recommendations of API RP-2003 shall be implemented as far as practicable
in the design of tanks. Those operating recommendations that are contained in
this RP and which are pertinent to the actual design of the tank shall be writ ten
into the Technical, Operation Maintenance Manual.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 39/73
DOC.
NO. KOC MV 007
Page 39
of
73
REV.
1
10.0 FABRICATION 8 ERECTION
10.1
Health, Safety
8
Environment
During tan k fabrication and erection, all field activities shall adhere to KOC's
Fire and Sa fety Regulations and its Hea lth Safe ty Environment policies.
~ Fabrication Erection Procedure
A fabrication and erection procedure shall be subm itted for KOC 's approval and
shall describe the follow ing:-
Locatio ns for material receiving, cutting, shaping and pre-fabrication
operations.
Methods, techniques and equipment for cutting, shaping straightening
and marking.
Traceability and marking of m aterials and componen ts.
Pre-coating of material surfaces or edges.
Me thod (s) of positioning plates for w elding. 5.2.1.7)
Weather conditions under wh ich welding work may not proceed or
m ay only proceed under shielded conditions (described), or wi th
preheat. 5.2.1.2)
Dimensional control.
Erection sequence t o avoid built- in stresses and distortion 5.2.2)
and arrangements t o minimize cons truction loads and vulnerability to
buckling and other wi nd damage. (Win d girders and fixe d roo fs shall
be we lded at the earliest possible stage.)
Precautions t o be taken to maintain the slope of f ixed roof sheets
fro m the centre t o the shell and to prevent the development of f lat
areas or depressions.
Fabrication sequence to avoid distortion of floating roo f centre decks.
C.3.3.4)
10.3
Plate Suuareness
All shell plates shall be profiled t o a tolerance of k 2 m m in length and * 1
m m width . In addit ion, t o ensure tha t plates are truly rectangular, the
diagonals, measured across the rectangle formed by scr ibing lines 5 0 m m from
each edge, shal l not dif fer by more than 3 mm. 3.6.1.2) For lapped and
we lded r oof and bo tto m plates, no rmal mill tolerances are acceptable.
10.4 Cuttina , Forrnina Pre-fabrication
10.4.1
Plate material shall be straightened and or flattened by p
f y
r
rol l ing and this shall be done before the mater ial is pro ce s~ ~? r: r
way . 4.1.1.2)
10.4 .2 A ny proposals to extend the API-650 thickness l imitat ion of 0.375 up
t o w hic h plates for b uttweld ing ma y be cu t by shearing, shall be
submit ted for KO approval at th e tim e of tendering.
4.1.2)
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 40/73
DOC. NO. KOC-MV-007
I
ane
40
of
7
I
REV. 1
10.4 .3 When
the rat io of ta nk nominal diameter to shel l plate thickness is less
than
5000:l then the shel l plates shal l be rol led to the required
curvature. Addit ional pre-forming of plate ends to th e tank radius is
man datory for the fol lowing:- 14.1.3)
When the th ickness exceeds219mm or
-
Wh en the th ickness exceeds 1 0 mm and the diameter: th ickness
rat io is less than 10 00 : 1.
10.4.4 Manual gas cut t ing may be used for t r imming the corners of bot to m
plates whe re t w o lapped joints intersect and for cutt in g openings for
f i t t ings posit ioned on
site. Man ual gas cuttin g shall no t be othe rwise
ut i lized for con tainment par ts w i tho ut the approval of
KOC s
representative.
10.5 Ma rkinq an d Traceabi li ty
Al l plates and structural mem bers shall be marked for traceabi li ty in accordance
wi th the scheme out l ined in the Fabrication and Erection Procedure together
with any addit ional marks as may be required to faci l i tate si te erect ion.
Erect ion marks shall be painted clearly on plates and structural memb ers in
w h i t e
pain t and shall be at least 50 m m high. Heat numbers on each plate shal l
be
highl ighted to faci l i tate correlation w it h mi l l cert if icates and shall be located
on the outs ide of the completed tank e xcept for bo t tom plates.
10.6 Plate Preservat ion
10.6.1
Al l plate materials shall be shop primed for temporary protect ion during
shipment storage and construc t ion.
10.6.2 The
underside of tank bottom plates shal l be blasted and coated
according to System A 1 2 of KOC-P-001.
10.7 i n t e r ~ a s s le an in q
10.7.1 Al l completed welds shall be free from slag brushed and thoroughly
cleaned
before final inspection and subsequent painting / l ining.
Peening of we ld caps is prohibi ted.
10.7.2 The reverse side of double-welded
vert ical b ut t joints shall be back-
chipped ground or f lame gouged before the appl icat ion of the fi rst run
of welding to th is s ide and in a manner wh ich w i ll leave the exposed
surface
accessio le and sat is factory for the fus ion of the w eld m etal to
be added. Al l f lame-gouged surfaces mu st be dressed by grinding.
5.2.3.3)
10.8 We ld Proximi ty
10.8.1 Vert ical joints i n botto m shel l courses shall be at least 30 0 m m clear of
any annular plate joint.
10.8.2 Ver tical joints in adjacent shell courses shall in.general be offs et by at
least
3rd of
plate length but with
a
minimum of 500 where
make-up plates are used. 3.1.5.2)
--
.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 41/73
DOC. NO. KOC MV 007 Page 41 of 73 REV.
10.8.3 Vert ical and as far as pract icable, horizontal shel l seams shal l be
located t o clear all shel l connections and their reinforcing pads by the
minimum distances speci f ied in API-650. 3.7.3) n the event that
KOC agrees for horizontal seams only that it i s not practicable to
com ply w it h the above requirements, then penetrated, covered or
closely a pproached seams shall b e 1 0 0 % radiographed for at least
three t imes +he opening diameter or the length of the interference.
3.7.3.4)
10.8.4 Other shell at tachment welds shall clear these seams by 5 0 m m
exc ept whe re larger spacings are required by API-650 for the higher
material groups 3.8.1.2) Where it is impract ical to achieve these
spacings, the attachm ent should preferably be modif ied such that the
f i l le t we ld crosses the main seam by at least 50 m m and these welds
shal l be examined per para
1
1.2.2 of this Standard.
10.8 .5 Bu tt weld s joining compression r ings, top angles or win d girder
sect ions shal l be at least 1 5 0 m m a way f r om any shell ver t ical seam.
10.8.6 Rat-holesi ' shall be provided t o avoid con tact bet we en the radial
we lds o f st i f fening r ings and the shel l, and be twe en shell vert ical
seams and the r ings. The f i lle t welds that jo in the sect ions on to the
shell shall be deposi ted b y star t ing 5 0 m m from the rat -hole and
welding awa y f rom the rat-hole.
10.9.1 Requirements for preheating w i l l be established b y the welding
proced ure and tests. Howe ver, unless otherwis e agreed by KOC, the
fol low ing minim um requirements shal l apply:-
(a) Automat ical ly welded hor izontal seams may be welded wi tho ut
p rehea t up t o 3 8 m m th ick .
(b) Other plates over 2 5 m m and irrespect ive of locat ion shall be
preheated t o
1
OO°C m ini mu m.
( c )
Other shel l p la tes f rom 1 9 m m to 25 m m sha ll be preheated to
50°C minimum.
The above preheat requirements shall also apply t o attachm ent welds
and repairs to p late surfaces and shal l be based o n the thickness of the
shell or annu lar plate.
10 .9. 2 A n appropriate level of preheat shall also be appl ied wh en materials of
Group IV or h igher and 1 9 m m or th icker are f lame cut or arc-air
-
gouged.
10.10
Post
W eld
Heat
Treatment 3.7.4)
10.10.1 Hea t treatm ent procedures shall
be subject t o approval. These shall
include any temporary sup port or other provisions to avoid distort ion.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 42/73
DOC. NO. KOC MV 007
Page 42 o 7
REV
1
10.1 0.2 Clean ou t doo rs and any other assemb ly requiring stress rel ief shall be
furnace heat t reated
as per API
65 0. No local stress rel ief of these
assemblies is perm itted.
10.10.3 When s ide ent ry mixers wi l l or may be mounted on shel l manways,
then pos t weld heat t reatment o f the pre- fabricated man way assembly
shal l be mandatory.
3.7.4.3)
10.1 1 T e m ~ o r a r v
ttachments
10 .1 1.1 Holes in platework, to assist in erection, are not perm itted. Lugs, nuts,
c lamps, and other devices to assist in erection may b e attached to the
tank plates by welding, bu t all such attachments required only for the
purpose of erect ion shall u l t imately be removed and any not iceable
project ions of we ld metal remaining shall be careful ly ground or
ch ipped away.
10.1 1.2 Great care shall be exercised to avoid gouging or tearing of plates in
the process of removing attachments. 5.1.5) Howeve r when such
instance s do occur, remedial weldin g shall be restricted to areas whe re
th e dep th exceeds 1.5 mm . Shallower areas shall be careful ly
blended b y grinding only.
10.1 1.3 W hen required by KOC, repair welds shal l, on complet ion, be ground
smo oth (but not necessari ly f lush w i th the p la te) .
1Q.11 .4When it is proposed to use arc-air gouging on plates to remove
temp orary at tachments, the procedure to be used shall be subject to
approval by KOC The preheat requirements shall no t be less tha n
those speci fied in the procedure test for welding plates of equivalent
thickness b y the w elding m ethod and procedure under considerat ion.
10.12 Tank Isolation
After hydrostat ic tes t ing
of
the tank, it shall be sw ept c lean internally pr ior to
paint ing act iv i ties. Al l nozzles shall be blanked-off using temporary steel
blanks.
10.13
Coatinrr
&
Lining
10.13.1 The external and internal coat ing shall be in accordance w it h the Tank
Data Sheet and the referenced KOC-P-001 Appendix 3 systems. A
summary of surfaces requir ing coat ing
is also given in Table 8 9 in
Sect ion 8
10.13.2 Sur face
preparation shall include the rem oval of rem aining shop primer
as required by clause 1 0.6.1 of th is standard, exce pt where no internal
coat ing is required b y the Tank Data Sheet in wh ich case the shop
primer ma y b e lef t in place.
10.13 .3 Except for
the temporary shop pr imer, coat ing and l in ing is not
permi t ted pr ior
to hydrostat ic tes t ing of the tank. No pa in t or coating
shall be appl ied to we ld seams w hich are subject to leak test ing.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 43/73
10.1 3.4.Bottom s shall have a thic k interna l lining in a ccordance w ith KOC-P-
0 0 2 Part 2. This lining shall extend up the shell as follows:-
i 0.5 m above the oil-water interface for Wet Crude Tanks
(including Test Tanks).
ii
0.5 m above the bottom for others.
10.13.5 Procedures for surface treatments and for the application, examination
and testing of coatings and linings shall be submitted for KOC's
approval together w ith product data.
10 14 Tank
alibration
10 .14 .1 Calibration is mandatory for tanks used for hyd rocarbon storage. The
liquid calibration method in accordance with API
2555
shall be used
unless otherwise agreed by KOC. Howe ver, calibration of the volume
below the minimum operating level of f loating roof tanks may
alternatively be calculated from linear measurements within the
guidelines contained in Appendix F of Section
2A
of the API Manual of
Petroleum M anagement Standard.
10.14.2Other oil tanks shall be calibrated when require'd by the Data Sheet.
Fixed roof Wet , Dry or Test tanks shall be taken as being for
operating control as defined in para l 3 ( a ) ( l ) of API 2550
The
metho d shall be at the Constructor's option within the
guidelines contained in Appendix F of Section 2A of the API Manual of
Petroleum Management Standard.
10 .14 .3 Calibration shall be performed and certified by an internationally
recognized specialized agency approved by KOC. Capacities shall be
tabulated for all oil tanks in millimeters and API (4 2 gallon) barrels.
Calibration data and tables shall be subject to KOC approval prior to
final issue.
10.14.4Water tanks whether with fixed or open roof need not be subject to
as-built calibration.
Their nominal capacity may be as calculated
from the design, and variations within the required dimensional
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 44/73
11.0
SITE INSPECTION TESTING
1 1 I General
1
1.1.1
lnspection shal l be performed by or on behalf of the constructor to an
extent necessary to ensure that all requirements of the Code, the
specification(s), the drawings and the inspection and test plans are
met.
1 1
I 2 KOC's inspection representatives shall have, at all times, free entry to
all work locations while work is in progress.
The constructor shall
afford reasonable facil it ies to ensure that the work is being carried out
in accordance w ith the requirements of this S tandard. 5.3.1
.I
11.1.3
The construc tor shall submit a Field lnspection Co-ordination
Procedure wh ich shall as a minim um deal wit h all the topics covered
in Appendix 8 f this Standard. Timely wr it ten activ i ty and
inspection notifications shall be provided to KOC's field inspection
representative as outlined in Appendix
8.
lnspection surveillance and
mo nitoring wi ll also be performed by KOC.
11.1.4
Mil l and shop mater ial test reports shal l be submitted to KOC for
approval prior to shop fabrication.
11.1.5
Shell plates shall be inspected by KOC at the tank fabricator's shop or
at site or both. (depending on the scope of any shop activities.)
11.1.6
Impact test results of plates after heat treatment ( if any) shall be
submitted to KOC for evaluation. Welding procedure qualification
records shall include such results.
11.1.7
The constructor shall inspect and keep stock of all materials and shall
also be fully responsible for their safekeeping and traceability. All
fittings, valves, plates, etc., shall be properly laid out on wooden
supp orts clear of the soil. Special care mus t be taken to ensure tha t
no damage or harmful sand or water ingress occurs.
11.1.8
All site welding shall be subjected to close visual inspection by
competent welding inspectors of the constructor as the work
progresses, and any faults or bad practices shall be corrected as soon
as possible. In particular, each pass of main shell seams shall be
examined after thorough cleaning for faults such as lack of fusion,
surface cracks, slag inclusions and unde rcutting. Special care shall be
tak en in the examination of double-bevel joints b efore welding the
second side.
Exam ination of fi l let welds shall not be confined t o the we ld itself. The
reverse side of fi l let welds on the shell and the floating roof
compartments and decks shall be examined for evidence of burn-
through. Such indications shall be repaired irrespective of the abil ity to
pass a leak test.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 45/73
1
1 1 9
Assemblies wh ich will be stress relieved such as man ways , nozzles
and flush type clean-out f i tt ings shall be inspected by KOC at the tank
fabrica tor's shop prior to heat treatmen t.
11.2 Welded Joints
1 1.2.1 Tack Welds
Tack welds in shell to bo ttom welds shall be subject to visual
inspe ction p rior to comp leting th e jo int and any cracked tack welds
completely removed.
if tac k welds are to be incorporated into horizontal shell seams, these
shall be dressed to the general satisfac tion of KOC 's inspection
representative.
1 1.2.2 Fil let Welds
Fillet welds th at cross vertical or horizontal shell seams shall be 10 0
magnetic particle inspected.
Permanent fi llet welded attachme nts to the bo ttom shell course shall
be 1 0 0 magnetic particle examined irrespective of the material group
of the shell.
5.2.3.5)
1 1.2.3 Annular Rinas
Irrespective of whether radial joints in annular rings are single or double
welded , one spot radiograph shall be taken of each radial joint.
6.1.2.9)
Com pleted annular rings for tanks to contain hydrocarb ons and tanks
t o operate w ith gas blanke ting shall be ultrasonically examined for
laminations in a 150 mm wide band centered on the attachment
location of the shell. Any lam ination shall be cause for replacing that
segment of the ring.
1 1.2.4 Leak Testina of Bottom Joints
After welding of the bot to m plates has been completed, all welds shall
be leak tested b y using a vacuum box and soapsuds. The test shall be
mad e as soon as possible after welding of the bottom , removal of slag
and w ire brushing, but before any surface coating is applied. 5.3.4)
A partial vacuum of at least psi shall be applied. 5.3.3.4)
1 1.2.5 Shell t o Botto m Weld
The shell to botto m plate weld shall be we t m agnetic particle inspected
on th e inside and ou tside, after the first pass each side and after
hydrotest on the completed welds p rior to l ining.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 46/73
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 47/73
DOC
NO. KOC MV 007 I
REV.
11 .3.2 A t horizontal and vertical shell seams the shell profile shall not deviate
from its design form by more tha n the fol lowing, measured over a
gauge length of 1m: 5.5.4)
-
1 0 mm for plates up to and including 13 m m thick.
8
m m for plates over 1 3 m m and up to and including
5
mm.
6 m m for plates over
25
mm. thick.
11.3 .3 The plumbness and roundness o f th e tan k shall be checked during
con structio n and in the eve nt of ma jor departures, the c onstructor shall
advise KOC of the situation and of the steps proposed to deal with it
11 .3.4 An y indication that the tank is settl ing unevenly during erection, such
as th e appearance of excessive gaps in the set up of circumferential
seams
or departure of the shell from the vertical shall prompt a
measurement of foundation settlement which shall be reported to
KOC.
In no circumstance s shall excessive force be applied to rectify such
dimensional deviations.
11.3 .5 The tank shell shall be carefully checked for circularity, dimensions and
level before the roof m embers (fix ed roof tank) are erected.
11.4 lnternals
11.4.1 Before installation in the tank, any gauging or dip tube shall be
inspected for straightness, freed om fr om internal o bstructions, e.g.
we lding burrs and drilling chips, and for correct positioning of all vent
holes along the leng th of th e pipe.
11 .4.2 W hen propeller mixers are installed, special attentio n shall be given to
their mounting. The m ixer man ufacturer's recommenda tion shall be
follow ed unless otherwise agreed in writ ing.
11.4 .3 Some form of leak test shall be applied to hollow section roof support
columns to ensure that product w il l no t rise up inside the column.
11.5 Floatina Roof C omaartments
Irrespective of any in-house pene trating oil tes ts performe d during fabrication,
each comp artmen t shail be subjected to a low pressure pneumatic leak test and
examined w it h a soapy water solution. (C.3.6)
1
1.6
Testina Procedure
11.6.1
or
hydrotesting,
brackish water shall be used in accordance w ith the
designated Project Specification covering this topic.
11 .6 .2 Procedures for h ydro static and leak testing shall be subm itted for
approval and shall address the follo win g topics as a minimum :-
(a)
Sequence of activities (including any anchorage checks)
(b)
Test level (and test pressure for fixed roofs)
(c)
Extent of any coating w hic h m ay be applied or left in place prior
to testing.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 48/73
DOC.
NO.
KOC MV 007 Paae 48
of 73
REV. 1
11 7 Shel l est
Restraining effects of internals.
Test f luid and details of any chemical addit ions.
The min imum temperature for tes t water .
Fil ling rate (s) and holding t ime(s1.
Vent ing arrangements
+
means of ensur ing these are not
comprom ised dur ing f i l l ing or emptying)
Arrangements fo r emergency emptying.
Sett lement m easurement methods, locat ions and intervals.
Limiting sett lement criteria.
Leak detection methods.
Not i f icat ion to KOC of any leaks or deformations ident i f ied
during fil l ing.
Wa ter for hydrostat ic test ing shal l be at a temperature not lower than
1O°C. In exceptional circum stance s wh en test water temperature fal ls
be low this value, then f i ll ing shal l n ot proceed wit ho ut approval of
KOC. A ny such approval wi l l be based on an assessment of the risk of
br i t t le f racture.
The shel l o f f ixed roof tanks shall be tested after complet ion of the
roof and those of open top tanks af ter complet ion of the wind gi rder
and to p angle.
For the shel l test ing of a f loat ing roof tank, the weatherseal shall not
be installed. The test level shall be to a height such tha t the secondary
seal is just retained w ith in the shell. The design shall ensure tha t the
roof wi l l no t interfere w ith the gauger 's plat form or any other f i t t ing
wh en at th is tes t he ight .
To successful ly complete the test, th e tank shall stand for a per iod of
48
hours w ith no leaks.
In addi t ion
t o
a
foundation level survey prior to erection, level surveys
shal l be performed of the tank per iphery and bo tto m apex for
sett lem ent pr ior to f i ll ing for the hydrostat ic test and for the per iphery
at each of the ho ld po in ts l is ted in Table 11.7.5 be low. A t the ho ld
points , f i ll ing or em ptying should stop and the tank lef t standing for
the t ime indicated.
Measurements shal l be taken at th e beginning and
the end of the standing per iods.
Al l levels and sett lem ents shall be
measured w it h opt ical survey apparatus and the f inal record submit ted
fo r KOC rev iew approval. All measu rements shall be recorded and
plo tte d as i l lustrated in Fig.8-3 of API
653
Limiting sett lement criteria
shal l no t exceed the fol lowing (using th e def ini tions of 8.2.2 of API
653 :-
Uni form Set t lement
15 mm . (how ever f il ling shal l be stopped and KOC not i f ied i f uni form
sett lem ent reaches
5 0
mm.)
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 49/73
DOC. NO. KOC MV 007 I
Page 49
of 73
REV.
1
Planar Tilt
Max of 1:400 for Oil Tanks or 1:250 for Water Tanks. Filling shall be
stopped and
KO
notified if t becomes evident that the limit would be
exceeded by proceeding further.
Out-of-Plane (Differential) Settlement
One half of the limit calculated by the formula in 8.3.2 of API 653.
Filling shall be stopped and KOC notified if t becomes evident that the
limit would be exceeded by proceeding further.
When any of the above criteria are exceeded, any remedial or
concessionary proposal shall be subject to KOC approval.
Table 11.7.5 : Hydrotest 'Hold Points
Operation evel Holdincr Time
Filling: Empty
25% full 24 hours
50% full
24 hours
75% full
24 hours
100% full
48 hours
Emptying: 50% 24 hours
11.8 Floatina Roof Test
11.8.1
The hydrostatic test of floating roof tanks shall include examinations
for water leaks inside pontoon and double deck compartments and
through the single deck. The examination for roof leaks may be
conducted at any convenient flotation level but not when it is wet or
raining. Roof drains shall have been pre-tested to 50 psig prior to filling
the tank and a further check shall be made for leaks from external
pressure when the roof is floating at its highest level. (C.4.3, C.4.5)
11 8.2 During filling and emptying of the tank, the roof shall be monitored for
even flotation. At half-full and full, the shell shall be checked for
circularity and measurements recorded.
11 9 Fixed Roof Test
11.9.1 All fixed roof tanks which are not open vented shall be deemed to
require gas-tightness and shall be subject to leak testing. (5.3.7.1,
F.7.6)
11.9.2 Pressurizing of the space under the fixed roof may not proceed until
the shell hydrostatic test has stood for the specified time with no
evidence of leakage.
11.9.3 manometer shall be set up for a roof pressure test such that any
significant overpressure will blow out the water. The bore of the
manometer shall be sufficient to release air from the tank at a rate
which will avoid a build up from the pressurizing source.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 50/73
pressure. The pressurizing source shall be disco nne cted imm ediately
on completion of the test and the pressure shal l be released and the
space suitably vented without delay.
11 10 Coils
Heating coils or other heating devices containing fluid pressure shall be tested
hydrostatical ly whi le the tank is empty to a pressure o f
1.5 x
working pressure,
bu t no t less than 7 barg.
1 1
Internal Exam ination
Prior to internal l ining, the bottom apex and, if applicable the bottom outlet
connection, shall be checked for settlement relative to the shell and the
mea sureme nts recorded. Displacement of the bo tto m apex shall not increase or
decrease the bo tto m slope by more than 50 .
A
detailed survey of settlement of the bottom plates is not required, but any
area of pronounced depression or bulging shall be mapped and assessed against
the criterion in clause 8.3.3 of API 653 . The maxim um allowable depression or
bulge shall be two-th irds of t hat der ived from th e formula.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 51/73
12.1 General
12.1.1 Com prehensive NDE procedures shall be sub mitte d for approval by all
NDE
contractors together with detailed technique sheets.
12.1.2 Interp retation of non-destructive examinations shall be made by or on
behalf of the constructor by ASNT SNT-TC-1A Level
II
or Ill personnel
or agreed equivalent.
1
2.2
Vo lum etric Exa mination General Requirements
12.2.1 Vo lum etric examination shall be by radiography except for lamination
checks or as otherwise agreed by KOC.
12.2.2
X
radiography shall be used unless prior approval has been obtained for
the use of the isotope Iridium 192. 6.1.3.1)
12.2 .3 Radiographic examination shall be made as the w ork progresses.
Wh ere shell seams require 10 0 exam ination this shall be delayed at
least 2 4 hours. Otherwise, radiography shall be performed as soon as
practicable to give an early indication of problems with equipment or
consumables. Mark up of the radiographic location record shall also be
done progressively. 6.1.8.1)
12.2 .4 Locations for th e spot radiography of vertical seams and intersections
may be selected
y
the constructor if KOC's inspection representative
is satisfied that welders are not aware of selected locations in
advance. 6.1.2.2)
12.2 .5 Locations for spot radiography of horizontal seams and for random
radiography of vertical seams shall be selected by KOC's inspection
representative. 6.7.2.3)
12.2 .6 Iden tification markers shall appear on the films as radiographic images.
12.2.7 W hen additional radiography adjacent to a defe ctive area of a spot or
randomly radiographed vertical seam reveals further unacceptable
defects, then tha t vertical seam shall be subject t o 1 00 radiographic
examination. 6.1.6)
12.2.8 KOC shall be afforded the right to have further additional ex m ina tio ns
performed. When the addit ional examinations required by K O ' w e a l
no defects which require repair ing then the cost of these e x a v i ~ :
- - s
ma y be charged to KOC.
12.3 lmaqe Q ualitv Indicators
Radiographic sensitivity shall be controlled by utilizing test method ASTM
E-
747 and image quality indicators or penetrameters conforming to that standard
or to BS 3971
or EN 46 2-1 . However the required visible wire shall be as per
Table 12.3 for th listed nominal material thicknesses . No additional thickness
shall be allowed for we ld reinforcement or for b acking strips.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 52/73
DOC. NO.
KOC-MV-007
Page 52 of 73
REV.
1
Table 12.3 Radiographic Sensitivity
Nominal Thickness Wire
NO
Wire
No.
Wire Diameter
BS
3971 EN
462-1
ASTM-E747
under
7
mm 8
14 0.006 (0.16 m m )
up to
8
mm
9
13 0.008 (0.20
m m )
up to 14 mrn
10 12 0.010 (0.25
m m )
ua
to 19
11 11
0.012 (0.32 m m )
Film Densitv:
The density through the weld metal shal l not be less than
2.0
and not more
than
3.2.
The density in parent metal adjacent to the weld shal l not exceed
4.0.
Film den sity shall be assessed using a su itably ca librated densitorneter.
Film
T V D ~
The ty pe of f i lm shall be at least medium speed (e.g. Kodak AX, Gevae rt
D 7
or
equ ivalen t). Intens ifying salt screens shall no t be used.
KO Acceptance
12.6.1
Exposure conditions shall be attested
in
the report by the organisat ion
responsible for shooting the radiographs. Af ter interpre tation and
checking
by
an ASNT level I or
Ill
qualified operator, all radiographs
complete with reports shal l be subject to KOC's review and
acceptance. Suitable viewing facil i t ies shall be provided and a
calibrated densitometer shall be made available.
12.6.2 When two or more types of weld defects are present in the same
radiograph whose extent equals the maximum acceptable l imit for
both , th e we ld shall be judged unacceptable.
Retention
o f
Radiociraohs
After completion and acceptance of a tank, the radiographic fi lms including
those showing defects to be repaired, shall be handed over to KOC suitably
sorted, box ed and indexed, and become the sole prope rty of KOC.
6.1.8.2)
Surface Examination
Surface examination shal l be by the wet magnetic part icle technique using
electromagnets except where other methods are agreed by KOC to be more
suitable fo r particular applications.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 53/73
13.0
WELDING PROCEDURES QU LIFIC TIONS
13.1 eneral
13.1.1 W elding procedures and qualifications shall be in accordance w ith
Se ction IX of the ASM E Boiler and Pressure Vessel Code and any
Project S pecification for G eneral We lding Requ irements. 7.2.1.2)
13.1.2 W eld procedures shall be subm itted for approval together w ith
sup pon ing procedure qualification records and we ld key plans wh ich
shall indicate the procedures t o be applied for all welds or groups of
we lds i n the tank, including tempo rary we lds and repairs.
13.2 Weld Procedures
13.2.1
Lo w hydrogen electrodes shall be used for welding the shell to bo ttom
joint, for all steels w ith a specified minimu m tensile strength in excess
of 60,000 psi and for th e repair of surface defects. 2.2.6.2, 2.8.1)
13 .2.2 Al l shell ve rtical joints shall be welded by shielded metal arc welding
(S.M .A.W .) w ith uphill progression or, wh en specifically approved by
KOC, by automatic electro-gas welding (EGW). 5.2.1 . l )
13.2.3
Ho rizonta l shell joints shall be welded u tilizing either shielded me tal arc
welding (SM AW ) or automatic submerged arc welding (SA W ).
5.2.1.1)
13.2.4 When
t
is proposed to use a weldab le prote ctive coating on edges
prepared for welding, technical data on the coating shall be appended
to th e applicable weld procedures subm itted for approval. 5.2.1.9,
7.2.1.4)
13.2 .5 Primers applied principally to prote ct plate surfaces shall not be
considered weldab le and shall be locally rem oved by grinding or
brushing prior to th e w elding of attachments etc.
13.3
Qualification
Testina of Weld Procedures
13.3.1 The procedure q ualification tes t for submerged arc welding (SA W ) of
shell horizontal seams shall be executed in a tes t frame on plates w ith
a minim um length of 3 m etres under restrained conditions.
Procedure qualification for shell vertical seams shall be performed
vertically (3G) and shall be subject to impact testing of the weld m etal
of SM AW welds and weld me tal and heat affected zone of EGW
welds. Qua lifications for EGW shall be run on specimens of the full tier
height for
both the maximum and minimum shell thicknesses. Impact
testing of other procedures for thicknesses 38 m m and under
shall no t be required irrespective of any requirement for im pac t testing
of the plate
7.2.2.1)
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 54/73
DOC. NO. KOC MV 007
Pane 54
of 73
REV.
1
13.3.3 Procedure qualif ication for shell t o bo tto m joints shall be performed on
th e actua l joint configuration material grades and thicknesses to be
used. This procedure qualif ication tes t shall demonstrate that the
hardness of the heat affecte d zone at the shell t o bo tto m plate does
no t exceed
280
H
13 3 4
Hardness testing of procedure qualif ications shall be mandqtory for
Gro up IV and higher materials as outlined in para. 3.3.4a of API-650.
Hardness testing of EGW procedures shall also be mandatary
irrespective of the shell material group. Welds and heat affecte d zones
shall be surveyed. The maxim um allowable hardness shall be 280 Hi .
13 4
Welder Qualification
Welders shall be qualif ied in accordance w it h ASME Section IX and Appendix B
of this Standard.
7.3.2)
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 55/73
14.1 Cert i fy ina Let ter
14.1.1
A separate cer t i fy ing let ter shall be provided by the constructor to
cer t i fy tha t each tank has been constructed in accordance wi th the
requi rements of API 650, this standard and the data sheet. 8.3)
14.1 .2 When
t
is agreed tha t al l pert inent requirements have been met, KOC
shal l issue a let ter of acceptance whic h ma y be subject t o subsequent
sat isfactory compilat ion of the cert i f icat ion dossier or t o any other
condit ion . In the case of f loat ing roof tanks, acceptance wi l l be
condi t ional o n sat is factory leak- free f lotat ion on crude oi l when the
roof is less buoyant than o n test water .
14.2 M ark ing
14.2.1
Th e tan k shal l be identi f ied b y an austenit ic stainless steel nameplate
welded t o a bracket above one of the manw ays. The nameplate may
not be aff ixed unt i l KOC's acceptance letter has been received.
8.1.2)
14.2.2 Th e tan k identi f icat ion number shall also be painted onto each tan k
w it h a re-coatable urethane finish. Characters shall be painted in black
and be a minimum of 6 0 0 m m high. Identi f icat ions shall be painted at
t w o diametr ical ly opposite posit ions.
14.3
Safety Precautions
The constru ctor shall no t under any c i rcumstances remove spades f rom product
or process connections, or introduce product into the tank b y any other means
wi t ho ut pr ior the wr i t te n authorization of KOC whic h w i l l no t be issued before
the nameplate has been af fixed.
14.4
Cert i f icat ion Dossiers
Individual dossiers should be compiled for each tank. Dup l icat ion of docum ents
wi th in a dossier should be avoided.
Th e con ten t of a dossier shall be as follows:-
Mas ter and volume index.
Cert i f icate of Conform ity to the appl icable constru ct ion code together
w i t h as-buil t data sheet .
Concessions.
Cross reference t o vendor cert i f icat ion dossiers containing i tem
cert i f icat ion fo r appurtenances etc.
Material cert i f icates cross referenced to locat ion records.
Material repair records.
We ld key plan(s)
WPS's PQR's.
Summ ary sheet of qual i f ications of ut i l ized welders.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 56/73
Produ ction we ld records t o include WPS and welder traceabi li ty and
cross references t o NDE reports and heat treatm ent records i f
applicable.
NDE reports records.
Heat treatment chartslrecords.
Dimensional records
Hyd rosta t ic and leak test reports.
Pre-erection foundation level survey record.
Sett lemen t records.
Surface preparat ion and coating appl ication records and examination
reports.
Al l design calculat ions.
Cert i f ied ta nk cal ibrat ion record.
Arrangement drawing.
Nam eplate facsimi le.
14 5
Technical , O ~e ra t in c l nd Maintenance Manuals
14 .5.1 Tech nical and Maintenance data may be consol idated for each tank or
each group of tanks.
The con tent shal l be as fol lows:-
a) Dra wing l ists.
b) Dra win gs including, tank construc tion, civi l, piping, electrical,
hazardous area dass ification , cathod ic protection, process
instrumen t, f iref ight ing and safety equipment, tank f i t t ings, etc.)
c)
Safe workin g loads for roofs, platforms, etc.
d l Maintenance intervals and procedures.
e l Tes t and calibration recom men dations for electrical installation,
cathod ic protect ion, instruments, controls and safety devices.
f) Spares l istslrecom men dations.
g) Lubricat ion schedulelrequirements.
h) Mix er performance data.
14.5.2
The Operat ing Manual may be integrated w ith data for the operating
centre as a whole or for the tankage area, as appropriate.
The c onte nt shal l be as fol lows:-
a) Start-up checks, precautions, sequence and parameters.
b) Sh ut-do wn checks, precautions and sequence.
(c) Lim its o f opera ting parameters pressures, temperatures, f lo w
rates, f luid compositions).
d) Mix ing recommendations.
15 0 SP RE P RTS ND M INTEN NCE
For all relevant requirements refer to
KOC G 009.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 57/73
APPENDIX A FIELD INSPECTION CO -ORDINATION
For the purposes of this document, f ield shall refer to any locat ion wi thi n the borders
of Ku wa it at w hi ch tank pre-fabrication, construction, erect ion or test ing are
performed.
A.2 Forms
The Field lns pe ctio n Co-ordination Procedure as required by paragraph
1
1 1 3 of this
Standard shall ide nt i fy al l the forms whic h wi l l be ut i lized to con trol and record
inspect ion act ivi t ies and tests. Sample forms shall be appended. Outl ine indexes of
the content of inspection records and dossiers shall also be appended.
A.3 Desiqn Docume nts
The Field lnspe ct ion Co-ordination Procedure shall describe h o w the constructor wi l l
ensure tha t checks and inspections are performed against the correct issue of
drawings etc. The mean s by wh ich such docum ents wi l l be cert i f ied as-bui lt shall
also be described.
A.4 Punchlisting
Co-ordination asp ects o f pun chlisting shall be described. The Field lnspection Co-
ordination Procedure shall also provide for a
periodic report to be issued giving the
subject ma tter and close-out status of each punchl ist.
A.5 Communicat ions
The Field lnsp ect ion Co-ordinat ion Procedure shall address h o w form al comm unicat ions
from KOC's f ield inspect ion representat ive wi l l be dealt with. W hen the constructor is
unable to tak e immed iate a ct ion or to provide an immed iate response, the
comm unicat ion should nevertheless be formal ly and promp tly acknow ledged and an
indicat ion given of h o w th e issue is being handled and the ant icipated t imescale.
A.6
lnspect ion and Test E q u i~ m e n t nd Personnel
A.6.1
The constructor or his sub-contractors shall be responsible for making available
all th e e quipme nt and means of cal ibrat ion in suff ic ient qu anti t ies for the
performanc e of the tests and inspect ions required by the applicable codes and
speci f icat ions. When
t has been agreed to
make specific KOC facil i t ies
available, th is shall be indicated in the procedure.
A.6 2
NDE operator and interpreter qualif ications shall be mad e available t o KOC on
demand.
A.7 Ac t iv i tv Not i f icat ion
KOC's inspect ion representative shall be advised on a daily basis the intended
comm encem ent of qua l i ty related act ivit ies and their locat ion. This is bo th to faci l i tate
implemen tat ion o f inspe ct ion surveil lance, and to a l low for inspect ions to b e performed
on a f i rst- off basis to ,establish contacts, veri fy competence, veri fy adequacy of
tools and equipme nt and to ensure that requirements are properly understood.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 58/73
DOC. NO KOC MV 007
Examp les of su ch first-o ff inspe ctions are cutting , roll ing,: bending, pre-heating,
welding, joint lapping, PWHT, tes t equipme nt calibration, blasting, and coa ting
appl icat ion and test ing .
A 8
Inspection Not i f icat ion
KOC's inspect ion representative shal l be provided w ~ t hormal individual not if icat ions
for inspect ions as below:-
Ide nti fy and inspect materials of construct ion.
Structu ral checks on foundations.
Check of foundation levels, orientations and slopes.
Sub-assemblies prior to any PWHT.
Fit-up o f annular ring joints.
Fit-up o f shell vertica l and ho rizontal joints.
Fi t -up of shel l to bo t tom jo int
/
Shel l roundness and circumferenc e at
1
ft. elevation.
Fi t -up of f loat ing roo f centre deck to pontoons.
Selection of locations for spot radiography (horiz. seams) and random
radiography (ve rt. seams).
Leak test ing of bo t tom jo ints.
Ma rke d nozzle locat ions prior to cutt ing.
Fit-up o f nozzles to shell .
Fi t-up and elevat ion of win d girders.
Air te st ing o f reinforcing plates.
Peaking and banding checks of each shell course.
Magnetic Particle and Ultrasonic Examinations.
Leak t ightness o f roo f su pport column s ( i f required.)
Checks of shell and st i l lwel l plumbness and datum p late level.
Leak test ing and overal l dimensions of f loat ing roof.
Level check of to p angle pr ior to erect ion of roof or framing.
Flatness and con dit ion of f lange faces of large openings prior to closure
for tes t .
Tes t ing o f f loat ing roof drains.
Hyd rostat ic test, sett lement measurement and volumetr ic cal ibration.
Leak testin g of roof joints (if required.)
Internal pre-commissioning examination.
Pre-commissioning tests of pressure and vacuum relieving devices.
Checks on pressure and vacuum rel ieving devices and other f i t t ings after
mount ing.
Instrument and electrical checks and calibrations.
A 9 l n s ~ e c t i o n T e s t R ec ord s
NDE reports shal l be cop ied to KOC's f ield inspec t ion representative after endc:<=.- .
b y al l relevant part ies.
A 10 R e ~ a i r s ,Non-Con formities, De viations etc.
A . 10.1 All non-conform ance reports shall be copied to KOC's f ield inspection
representative,
whether these are ini t iated by the con structo r or by a sub-
contractor .
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 59/73
A 1 0 2 KOC s field inspection representative shall b e no tified of any proposals to
dev iate fr om established specifications and procedures wh en
t
becomes clear
th at a requirement is impractical or cannot be met w itho ut an adverse effect.
A 10 3 Prior wr i t t en noti f ication shall be given to KOC s f ield inspection
representative of any intention t o repair defects in mater ials together w it h
applicable procedures.
A 1 0 4
Prior wr i t t en noti f ication shall be given to KO C s f ield inspection
representative of any intention to f i l l a tank for te sting or calibration purposes.
This shall be supported b y documentary evidence of the sta tus of fabrication,
inspection and
NDE.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 60/73
DOC. NO. KOC M V 007 Page 6 0 of 7 3 REV.
APPENDIX : ESTABLISHMENT AND MAINTENANCE
OF
WELDER QUALIFICATIONS
B.
Qualification Testing
Weld ers shal l be subject t o test ing under surveil lance of KOC s inspect ion or
wel ding representat ive i r respect ive of any p revious qual i f icat ion perform ed
outs ide Kuwai t .
Employers s hould o perate a programme of regular med ical examinat ion of
welders.
Weld ers shal l be assigned an ident if icat ion code pr ior to u ndertak ing any tests.
A unique tes t number shall be a llocated t o each tes t and s tamped on the
spec imen. A l l te s t documentat ion shal l re ference th is tes t number .
Th e ident i ty, grade and thickness of parent test mater ial shal l be posi t ively
establ ished an d recorded.
Welder per formance tes t ing shall be carr ied out s t r ic t ly in accordance wi th a
sui tably qua l i f ied w eld procedure speci f icat ion
(WPS).
The tes t ma y be te rm ina ted a t the we lder s op t ion if he becomes aware tha t
he h as introdu ced a defect, and m ay b e restarted after re-preparation or
rep lacement o f the tes t specimen. Only one such welder s opt ional res tar t
ma y be a l lowed except for in tended restar ts for ne w e lect rodes or re-
posi t ioning. O n comp let ion of the test weld, no repairs shal l be al lowed i f for
exam ple a def ect is revealed by cosm etic gr inding or fi ling.
The tes t m ay be te rm ina ted by the emp loyer o r by KOC whenever
t
becomes
apparent tha t the welder lacks the requi red sk i ll to produce sat is fac tory resu lts
or i f he fa ils t o observe the requirements o f th e
WPS
In the event o f a tes t fa ilure , KOC reserves the r ight to d isa l low an immediate
re-test and t o insist on a per iod of further t raining before any re-test.
Qual i f ica t ion tes ts us ing
SAW
or
EGW
processes shal l in addi t ion to
radiographic exam inat ion be subject t o ei ther ul trasonic examinat ion or bend
test ing.
B.2 Qual i f icat ion on roduction Welds
In cer ta in c ircumstances, welders ma y be quali f ied by product ion weld ing. Th is fac i l i ty
wi l l be l imi ted t o automat ic and semi-automatic processes and wi l l on ly be a l lowed
w h e r e b o t h s id es o f t h e w e l d will be accessible t o c lose visual examinat ion. In the
event of a fai lure,
repair by a qual i f ied welder t o a sui tably qual i f ied and approved
repair
WPS
m ay b e al lowed a t KOC s discret ion.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 61/73
8.3
Quali f icat ion Te st Records
The employer ma y use his o w n form to record the qual if icat ion test of a welder so
long as all essential tes t variables are recorded and the e xte nt of qu alif ication is clearly
indicated.
8 4 ldent i tv Cards
On sat isfac tory com plet ion and recording of welders tests, a card shall be issued to
each welder con taining the fol low ing information as a minimum:-
(a)
Photograph o f the welder (no t facsimi le)
(b) Welder s name.
( c )
Welder s ident i ty code
(d l
Brief details of qualif ied processes, positions, thicknesses, diameters and
consum able codes.
(e) KOC approval stamp, signature and date.
Cards w it h at least the welder s photograph, name and identi f icat ion number shall be
presented at the t im e of tes t ing as a means of posit ive identi ficat ion.
The welder shal l carry his card at all t imes w he n welding w ork is being performed.
B 5 Records
KOC shal l be prov ided w it h copies of qual i f icat ion test records, identi ty cards and
summ ary sheets of welders emp loyed on a project. Summary sheets shal l indicate the
star t and f in ish dates of each welder . No welder wh o actually work ed on the tank
con struct ion shal l be deleted from the sheet on his departure since this sheet wi l l be
required to be included in f inal records.
B 6 Maintenance of Qual i f icat ions throuqh Production Welding
0.6.1
The con structo r shall maintain product ion performance records for welders,
upd ated on a mo nth ly basis. Product ion and repair rates shal l be recorded on a
past mo nth and project overal l basis. Welders removed fro m the project for
any rea son shall be so indicated.
B.6.2 Th e reasons for significantly high repair or rejection rates shall be inves tigated
and appropriate correct ive act ion taken. These act ions ma y include any of the
fol lowing:-
(a) Dismissal of the welder.
(b) Downg rading to non-cr it ica l work.
c)
Wit hd raw al of qual i f icat ion for a part icular weldin g process or
posit ion.
(dl Retraining.
4
Recti f icat ion o f defect ive w elding equipment.
( f Au dit o f Consumable Controls.
8 6 3
Whe re signif icant ly high reject ion rates are attr ibutable t o supervisor
deficiency, correct ive act ion should be implemented in respect of the
supervision.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 62/73
8 6 4
Failure t o observe the requirements of a WPS
n
production m ay be cause for
dismissal irrespective of the quality of welding as determined by visual or
other non destructive examination
B 6 5
A record of corrective actions shall be maintained
8 6 6
KOC reserves the r ight t o insist on the implementation of corrective actions in
t he event th at th e employer fails to take the steps
t
judges to be necessary
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 63/73
DOC. NO. KOC-MV-007 Page
6 of
73
REV. 1
KU WA R OIL COMPANY
STANDAR D FOR FIELD ERECTED STORAGE TANKS KOC-MV-007 APPENDIX C 1
FIXED ROOF OR UNROOFED TANK
DAT A SHEET API STANDA RD 650
TAG NO
SHEET
1
OF 4
Contncto r
V
Contractor
if
not cornoleted bv Purchaser
_
At .
A3.
A4.
AS.
A6.
A t .
A8.
A9.
AIO.
A l l .
A1 2.
A13.
A14.
AIS.
A16.
A l l .
A18.
PART A
:
GENERA L INFORMATION
C i a COUNTRY POST CODE FAX
RECTION SITE:
NOMINAL (RATED )CAPACITY
API BARR ELS (42 Gallon)
APACITY CALIBRATION REQUIRED
C]
YES
C]
NO refer to clause 10.14 o f KOC-MV-007)
V
PUMPING RATES: IN API BARRELSMOUR OUT APl BARRELSMOUR
DESIGN VAPOUR EVOLUTION RATE :NORMAL WM R
V MAXIMUM OPERATING TEMPER ANR E
RODU CT STORED PRODU CT SPECIFIC GRAVITY AT 'C
USCEPTIBLE TO PYROPH ORIC SCALING YES
C]
NO
if yes then l n m J n welding I nqulnd . Including roof plating)
DESIGN MINIMUM METAL TEMPERATURE (SHELL)
+ l o
V
DESIGN MAXIMUM TEMPERATURE SHELL INTERNAL 930C ROOF EXTERNAL
ORROSION ALLOWAN CE: SHELL MM ROOF 1.6 MM
ANNULA R RING 3 MM ROOF SUPPORT STRUCTURE MM
INTERNALS
V OPERATING PRESSURE RANGE
INCHES WG
DESIGN PRESSURE: INCHES WG DESIGN VACUUM 1 INCH
OTHER
ROOF DESIGN: FIXED CONICAL
ONE (UNROOFED)
V
FRANGIBLE ROOF JOINT:
1YES NO WA
UNIFORM LIVE LOAD
25 POUNDS PER SQUARE FOOT
C]
N/A
SPECIAL LOADS (PROVIDE SKETCH
GASES IN THE VAPOUR SPAC E
EARTHQUAKE DESIGN YES O N 0 ZONE IMPORTANCE FACTOR I
v s m
COEFFICIEHT
WIND LOADING: VELOCITY 100 MILES PER HOUR
SNOW ACCUMULATION NONE
SU E RESTRICTIONS: MAX. DIAMETER Metres)
MAX.
HEIGHT Metres)
OUNDATION TYPE
(Refer ta KOC-C-026)
MAXIMUM ALLOWABLE PERIPHERAL SEITLEMENT
:
UNIFORM
Dudng
Car.tructlon T n t )
TILT
OUT-OFPLANE
ROOF MAIN ACCESS: SPIRAL STAIRWAY
C]
RADIAL STAIRWAY
REMARKS:
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 64/73
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 65/73
DOC. NO. KOC -MV-00 7
.
REV. 1
KUWAIT OIL COMPANY
STA NDA RD FOR FIELD ERECTED STORAGE TANKS
:
KOC-MV-007 APPENDIX C1
FIXED ROOF OR UNROOFED TANK
DAT A SHEET API STANDA RD
650
TAG NO
SHEET 3 OF
lnfomution
to
comp tod by
Contnctor
V
Contactor if not completed by Purchaser
PART B CONSTRUCTION DETAILS corrtd
BIB.
817.
518.
B19.
BZO.
021.
822.
BZ3.
824.
BZ5.
VSUPPLEMENTARYNDE
V
LEAK TESTING: BOTTOM: VACUUM BOX
ROOF: AIR @ INCH WG
COLUMNS:
CALCULATED VENTING CA PA Cll Y REQUIREMENTS (STATE UNITS)
NORMAL INBREATHING
NORMAL OUTBREATHING (incl. Control V N Fai lun)
EMERGENCY PRESSURE RELIEF ( F i n E x p o r u n of Tank)
(Fim Exposure of Degassing Boot)
TOTAL EMERGENCY
PRESSURE ACUUM V A L M SET POINTS INCH WG PRESSURE INCH WG VACUUM
CAPACrrY OF VENllN G D M C E S AT DESIGN CONDITION (PER
UNIT :
PRESSURE VACUUM
rwn
M.nut.cbmfs
d t
and
Including
ma
M t
1
f l a m
uruton
or
other
flow
ruMctions
NUMBER
SIZ
OF INSTALLED VENTING D M C E S
P N V A L M S
VENTS
OVERFLOW CAPACITY (Volumetric)
V NUMBER, SIZE MODEL OF FOAM POURERS
DRAW ING NO:
M
TANK SUE: DIAMETER MM SHELL HEIGHT MM
MAXIMUM SAFE OPERATING LEVEL MM
V
DATE OF API STANDARD 650 EDITION EVlSlON
REMARKS
1.
All entries made after the first issue shall have triangular revision marks to identify the organisation responsible for the
entiy and the date.
2.
The Contractor shall submit this data sheet, completed as far as practicable, for approval in principle before proceeding
with preparation of detail drawings.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 66/73
DOC. NO. KOC -MV-007
KUWAIT OIL COMPANY
STANDARD FOR FIELD ERECTED STORAGE TANKS
:
KOC-MV-007
:
APPENDIX C1
FIXED ROOF OR UNROOFED TANK (API STANDARD 650)
CONNECTIONS DATA
TAG NO
SH T OF
(DATA NOT
WTERED BY KUWAIT OIL
COMPANY S W
E
COMPLETED
BY THE
CONTRACTOR
Shell
.
Bottom
Cleanout Door
36 x 48
Bottom Flush
Shell Manway
24
.,
Shell Manwav as Mixer Mounttna
Maln lnlet
Man Liquid Outlet
Sklmmed
011
utlet
nn n
I
instruments
I
I
1
Nitrogen Purge
Corrosion Probe
Foam Pourer
Overtlow
I I
Fixed
Roof
@
Radius
I
2
D om pi pe
external to
the tank
Gas Dome
Vapour Outlet
Roof Manway
I
1 24
Open Vent I
Vapour Balance I 1 I
I
Gauge Hatch
Blanked Vent
I
I
I
PressureNacuum Vent
I
Blanket Gas lnlet
Blanket Gas Outlet
Anode Suspension
Referena Electrode Suspension
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 67/73
KUWAIT OIL COMPANY
STANDARD FOR FIELD ERECTED STORAGE TANKS KOC-MV-007 APPENDIX
C2
EXTERNAL FLOATING ROOF STORAGE TANK
DATA SHEET API STANDARD 650)
TAG NO.
SHEET 1 OF 4
Infamation
to
b
ompbted
by
urchaser
a
Contactor
PART A GENERAL INFORMATION
A l .
A2.
A3.
~i
AS.
A6.
A?.
A8.
A9.
AlO.
A l l .
A12.
A13
A14.
A15.
A16.
A l l .
ENGINEERING. CONTRACTOR
ADDRESS
CITY COUNTRY POST CODE FAX
EREC TION SITE:
NOMINAL (RATED) CAPACITY
API BARRELS (42 Gallon)
SAFE OPERATING CAPACITY APl BARRELS
TOP GAUGE OPERATING MAR^ Mlnutes g
Max.
Fllllng Rate
LOW GAUGE OPERATING MARGIN Minutes
@
Max
Pumpout Rate
NET WORKING CAPACITY API BARRELS
MAX. PUMPING RATES: IN APl BARRELS HOUR OUT APl BARRELS
START UP APl BARRELS HOUR
MAXIMUM OPERATING TEMPERATURE
PRODUCT STORED PRODUCT SPECIFIC GR AV IM AT
'C
VAPOUR PRESSURE psla
DESIGN MINIMUM METAL TEMPERATURE (SHELL) + W C
DESIGN MAXIMUM TEMPERATURE SHELL INTERNAL 93 ROOF EXTERNAL
CORROSION ALLOWANCE: SHELL 1.6 MM ANNU LARRIN G 3 MM
V
ROOF DESIGN:
UNIFORM LIVE LOAD
PONTOONTYPE DOUBLE DECK TYPE
25 POUNDS PER SQUARE FOOT
EARTHQUAKE DESIGN CIYE S O N 0 ZONE IMPORTANCE FACTOR I= 1.0
V
SITE COEFFICIENT
WIND LOADING: VELOCITY 100 MILES PER HOUR
SNOW ACCUMULATION NONE
RAINFALL (FROM KOC G00 7)
V ROOF DRAIN NUMBER, M P E 6 S E
SlLE RESTRICTIONS:MAX DIAMETER etres MAX HEIGHT M.ttar
FOUNDATION ?YPE
MAXIMUM ALLOWABLE PERIPHERAL SETTLEMENT UNIFORM
During orWmcUonL 1-1 TILT
OUTOFPLANE
V
MAXIMUM ALLOWABLE S E T N M E N T OF TANK BOTTOM AT OIL O W
ROOF MAIN ACCESS: RADIAL STAIRWAY
REMARKS:
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 68/73
KUWA IT OIL COMPANY
STANDA RD FOR FIELD ERECTED STORAGE TAN KS KOC -MV-00 7 APPENDIX C 2
EXTERNAL FLOATING ROOF STORAGE TANK
DAT A SHEET API STANDA RD 650
TAG NO.
SH T 2 OF
4
InfaMtion to compl.ted
by Contractor Contractor if not completed
by
Purchaser
PART B
:
CONSTRUCTlON DETAILS
l .
02.
03.
4
09.
10.
l l .
12.
Bl3.
814.
DESIGNER:
ADDRESS:
ClTY COUNTRY POST CODE FAT
CONSTRUCTOR ABRICATOR
ADDRESS
C rP l COUNTRY POST CODE FAX SERIAL NO.
MATERIAL SPE CIFICATIONSI TEELMAKING CHEMICAL ANALYSIS UMITATlONS MATERIAL GROUP (TABLE
2-
3)
V
SHELL ANNULAR RING:
ROOF:
3
BOTTOM:
STRUCTURALS:
V
SUPPLEMENTARY M ATERlAL TESTS AND/OR HEAT TREATMENT
NO. OF SHELL COU RSES
SHELL P LATE W IDTHS AND TH ICKNES S (INCLUDING CORROSION ALLOWANCE), IN MM:
1 3
5 7
2
4
6 8
TANK BOTTOM
:
THICKNESS MM SLOPE
MINIMUM WIDTH AND THICKNESS OF BOTTOM ANNULAR PLATES MM
INTERMEDIATE WIND GIRDER7 ES NO
TOP WIND GIRDER AS WA LKWAY?
YES
ROOF PLATE THICKNESS UPPER M Y LOWER ENTREDECK MM
OUTER RIM a 6M M OTHER MM
RIMSEALS
V
COATlNG TYPUCOL0URR)RY FILM THICKNESS SURFACE PREPARATlON
EXTERIOR:
SHELL INTERNAL: LINING ONLY
ROOF TOPSIDE:
ROOF OUTER RIM
ROOF UNDERSIDE: NONE
ROOF COMPARTMENTS INTERNAL NONE
STRUC TURAL INTERIOR:
V
BOT TOM LINING: YES HElGHT OF S HE U LINING
FIBREGLASS OTHER THICKNE SS
BOTTOM SURFACE PREPARATION
BOTTOM UNDERSIDE COATlNG
35
MICRONS COAL TAR EPOXY
V CATHODIC PROTECTION
:
BOTTOM UNDERSIDE
Typr
SUPPLEMENTARY NDE:
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 69/73
DOC.
NO.
KOC-MV-007 REV.
STANDARD FOR FIELD ERECTED STORAGE TANKS
:
KOC-MV-007 APPENDIX C2
EXTERNAL FLOATING ROOF STORAG E
TANK DATA SHEET API STANDA RD 650) TAG NO.
SHEET 3
OF
4
PART B CONSTRUCnON DETAILS contd.
W K ESTING: BOTTOM: VACUU M BOX FLOTAT ION COMPARTMENTS: AIR
@
INCH WG
PRESSURE REU EF SET POINT INCH WG
DETAILS OF INSTALLED VENTING D M C E S
apacttv
her Un lt l Number Nominal Ske odel
PRESSURE RELIEF:
8
INCH WG
RIMMHT:
INCH WG
AUTOM ATlC BLEED INCH WG
AUTOMATIC BLEED IN WG VAC
NUMBER S U E CAPACITY (State
U n b )
V
INSTALLED HEAT DETECTORS (NUMBER TYPEh LOCATION)
NUMBER SIZE h MOOEL OF FOA M POURERS
DRAW lNG NO:
TANKSIZE : DIAMETER MM SHELL HEIGHT MM
NUMBER OF ROOF SUPPORT LEGS
M - R O T A T l O N D M C E S
MAINTENA NCE HEIGHT OF ROO F SUPPORT LEGS
OPERAT lNG HEIGHT OF ROOF SUPPORT LEGS
ACTUATION LEMLOF AUTOMATIC BLEEDE R VENTS
MINIMUM SAFE OPERATING LIQU ID LEVEL
LOW GAUG E NORMAL OPERATING LEVEL
TOP GAUGE NO RMAL OPERATING LEVEL
DESIGN EST LIQUID LEVEL
DATE OF API STANDARD 650 EDITION R M SI O N
REMARKS
1.
All entries made after the first issue shall have triangular revision marks to identity the organisation responsible for the
entry and
the
date.
2. The Contractor shall submit this data sheet completed as far as practicable for approval in principle before proceeding
w th preparation of detail drawings.
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 70/73
KUWAIT OIL COMPANY
STANDARD FOR FIELD ERECTED STORAGE TANKS KOC-MV-007 APPENDIX C2
EXTERN L
FLOATING ROOF STORAGE
TANK DATA
SHEET
API STANDARD 650)
CONNECTlONS DATA TAG NO.
SHEET
4
OF
4
(DATA
NOT
ENE RED BY KUWAIT
OIL COMPANY
S H U BE
COMPLETED
BY THE
CONTRACTOR)
Quantity Size I Elevation Notes
Shell Bottom I
I
Cleanout Door I 36 x 48 Bottom Flush
Shell Manway
24
Shell ManwayN~xerMounting
Mam Prcdud Inlet
Mam Prcdud Bottom Outlet
Weir Height
500
mm with Vortex
Breaker
Water Draw-Off Sumps
Water Draw-Off Pipes
Nnrogen Purge
Corrosion Probe
1 I
Instruments
I
Other
Foam Pourer
Floating Roof I I I I
Rim Vent
r l r n U
I I
I
I
...elll,w,,,,,d Drain
(Plug) I 3
n. i
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 71/73
DOC.
NO.
KOC MV 007
I
Page 7 of 7 3 REV. 1
APPENDIX D SU MM AR Y OF DOCU MENT S ACTIONS FOR KOC APPROVAL
Routine Submission of Docume nts for Review pproval
lnspec tion Test Plans
Selection of Sub-contractors
Manufacturers of Shell Bottom Plates
Sub -orders for Procurement of Shell and Bo ttom Plates and Welded Pipe
Technical Purchase Specifications for Tank Fittings, Mountings, Seals, etc.
Material Certif ication Prior to Shipment in Certain Cases
Site Coefficient for Seismic Design
Crude Oil Storage Tanks requiring Anchorage
Calculations
Drawings
Overall Configuration of Floating Roof Tanks
Stre ng th Stab ility Criteria for Floating Roofs
Floating Roof Seal Type
Emergency Venting Calculations
Fab rication Erection Procedure
Heat Treatment Procedures
Procedures for Coa ting Lining
Tank C alibration Au thority
Tank Calibration Data / Tables
Field lnspection Coordination Procedure
Material Test Reports
Hydrostatic and Leak Test Procedures
NDE Procedures Technique Sheets
WPS's, PQR's W eld Key Plans
Comp leted Data Sheets prior to proceeding w ith detail design
Routine Submission of Documents for Information
9.5.4 Pressure/Vacuum Valve Capacity Data
9.10
Study of Evaporative Losses from Floating Roof Tanks
Alterna tive Proposals for Approval
4.7 Deviations from KOC -MV-007
7.1.1 Mate rial Sub stitutions
7.1.2
Equivalent Materials (no t l isted b y AP I-650)
7.1.3
Steels with Minimum Strength 70 000 psi
8.1 1
Alternative Arrangement of Bottom Connections
8.1 2.2
Use of shell banding
8.21.5 lnternal Fillets No t -Seal welded
8A.5 .1 Removal of Interna l Piping thro ugh Cleanout Doors
8A. 1 1.1 Attachment Detail of Top Angle-to-Shell
88.10 .2 Alternative Location of Oil Outlet.
9.2.3 Frangible Roof-to-Shell Join t
10 .4 Meth od of Cutt ing Plates
10.1 1.4
Removal of Temporary Attac hme nts b y Arc-Air Gouging
10.14.1
Alternative Calibration Method for Tanks for Hydrocarbon Storage
1 1.4.2
Deviation from Mixer Ma nufacturer's Installation Recommendations
1 1.7.1
Temperature o f Test Water
<
1O°C
1 1.7.5
Remedial Action for Excessive Settlement.
13.2.2
Use of Electrogas Welding for Vertical Shell Seams
R ou tin e Proposals fo r A D D ~ O V ~ ~
7.8.1
Proposal to Perform Repairs to Materials of C onstruction
12.8
Alternatives to W et Magne tic Partic le Examination
13.2.4 'Weldable Coatings
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 72/73
APPENDIX
E TANK CAPACITY LEVEL DEFINITIONS
D E S I G N L I Q U I D L E V E L
TO
THE
TOP O F T H E SHELL I N C L U D I N G
SHE
T O P A N G L E (IF ANY) AND
I H R E S P E C T N E O F T H E H E I G H T
OF NY O V E R F L O W P R O V I S I O N
MA X I MU M S A F E O P E R A T I N G
Y E L L IM I TE D BY THE
ECEV TlON OF
FOAM P O U R E R S ,
W E H P L O W , S K I M M I N G D E V IC E S ETC
MI N I MU M O P E R A T I O N L E V E L
I MI T E D
BY
P U M P S U C T I O N
H E A D R E Q U I R E M E N T S A N D
LIQUI O U T L E T E L E V A T I O N S .
FIXED ROO F OR EXTERNAL PLOA l ING
U N R O O F E D TYPE
./
R O O F
TYPE
- D E SI G N L I QU I D U V E L P E R C 4 3
AND
C . 4. 4 O F A P I R P
2350 1st Ed.)
-MIXER UT O U T L E V E L A T MI N I MU M
OPENA I IONAI, CLEAR ANCE FOR M W N C
t ~ ~
A U G E N O R MA L O P E R A T I N G L E V E L
LEGS A T T H E
- MIN I MU M S A F E O P E R A T I O N L E V E L W I TH
MINIMUM CLEARANCE BOTH
a
AND
b= 52 nm
AND
N O O T H E R I N T E R F E R E N C E
O F R O O F ,
S W .
D R A I N S LTC
NOTE.
MA R G I N S B E T W E E N S A F E O P E R A T I N G LEVELS A N D N O R MA L O P E R A T I N G
LIMITS AND
ALL
L E V E L I N S T R U ME N T S S H A L L B E D E F I N R D 1 N
THE
TANK
D A T A S H E E T I N T E R M S O F M I N U T E S
OF
F I L L I N G O R P U MP O U T
AT
MAXIMUM
S P E C I F I E D R A T E S .
7/21/2019 Koc_mv_007field Erected Storage Tanks
http://slidepdf.com/reader/full/kocmv007field-erected-storage-tanks 73/73
Gen. Supd t. Consv. Insp.
Gen. Supdt. Fire Safe ty
DOC. NO KOC-MV-007
Gen. Supdt. Ahmadi Services
PRODUCTION EXPORT OPERATIONS GROUP
Page 73
of
73
Gen. Supd t. Ma rine Expo rt Operations
Gen. Supdt. Prod. Svcs.
Gen. Supdt. Prod. Opns. (N&W)
Gen. Supdt. Prod. Opns. (S)
R N
This KOC Standard 'Field Erected Storage Tanks has been generated by the Task Force
(TF-Mech102) com prising the fol low ing members:-
ACKNOWLEDGEMENT
This Standard has been approved
by
th e Standards Technical comm ittee (STC) consisting o f
the fo l l ow ing :
Mr. Al i
H.
Baba
Mr. Mohd. Emam
Mr. S. Kumar
Dr. Moharnmad l lyas
Mr. Khalid S. AI-AIi
Mr. He nry S. Hi ll
Mr. Jassem Al-Quraini
Mr. S. Manickavachagam
(
Standard Div.
)
(
Insp. Con . Div.
)
(
Standards Div.
)
(
Standards Div.
)
(
Maint. Proj. Div.
)
Maint.'Plng. Div.
)
(
PMD North
)
(
Engg. Design Div.
Chairman
Depu ty Chairman
Member Secretary
Member
Member
Member
Member
Member
The draft of this Standard has been ci~cu late do the KOC User Departments for their revi ew
and comm ents were received from the fol lowing:
ENGINEERING GROUP MAINTENAN CE GROUP
Gen. Supdt. Engg. Services
Gen. Supdt. Maint. Services
Head of Tea m Engg. Projects
(N)
Gen. Supdt. Maint. (N W)
LOSS PREVENTION GROUP
INDUS TRIAL SERVICES GROUP